CN108243538A CN201711446815.2A CN201711446815A CN108243538A CN 108243538 A CN108243538 A CN 108243538A CN 201711446815 A CN201711446815 A CN 201711446815A CN 108243538 A CN108243538 A CN 108243538A
Authority
CN
China
Prior art keywords
power supply
phase
during
voltage
way switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711446815.2A
Other languages
Chinese (zh)
Other versions
CN108243538B (en
Inventor
三宅智裕
工藤弘行
斋藤裕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Publication of CN108243538A publication Critical patent/CN108243538A/en
Application granted granted Critical
Publication of CN108243538B publication Critical patent/CN108243538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B45/00Circuit arrangements for operating light-emitting diodes [LED]
    • H05B45/40Details of LED load circuits
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B45/00Circuit arrangements for operating light-emitting diodes [LED]

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

The present invention relates to the load control devices that can support a greater variety of loads.Load control device has two-way switch, phase-detection portion, Switching Power Supply and stop.Two-way switch with load in series is electrically connected for AC power, and the alternating voltage (Vac) that opposite direction load provides carries out phase controlling.Phase-detection portion is detected the phase of alternating voltage (Vac).Switching Power Supply is electrically connected in parallel with two-way switch, acted the transformation that voltage (Vc2) in order to control is converted using DC voltage, the i.e. driving voltage (Vc1) supplied electric power to generate from AC power by the switch motion of switch element.Stop makes Switching Power Supply and AC power electrically separated or acts the transformation of Switching Power Supply to stop during the exclusion for the detection timing for detecting phase comprising phase-detection portion in (T0).

Description

Load control device
Technical field
The present invention relates generally to load control devices, in more detail, are related to the alternating voltage that a kind of opposite load provides Carry out the load control device of phase controlling.
Background technology
In the past, it is known that a kind of light modulating device dimmed to lighting load is (for example, document 1:JP2013-149498A).
Light modulating device recorded in document 1 has:A pair of terminal;Control circuit portion;Control electricity is provided to control circuit portion The Switching Power Supply in source;And the Dimming operation portion of the dimming level of setting lighting load.
Between a pair of terminal, it is connected in parallel to control circuit portion and Switching Power Supply respectively.In addition, a pair of terminal it Between, it is connected with the series circuit of AC power and lighting load.Lighting load has multiple LED (Light Emitting Diode:Light emitting diode) element and make the power circuit that each LED element is lighted.Power circuit has diode and electrolytic capacitor The smooth circuit of device.
Control circuit portion has:The alternating voltage that opposite lighting load provides carries out the switch portion of phase controlling;To switch The switch driving part that portion is driven;And to control unit that switch driving part and Switching Power Supply are controlled.
Switching Power Supply is connected in parallel with switch portion.The alternating voltage of AC power is converted power supply in order to control by Switching Power Supply. Switching Power Supply has the electrolytic capacitor of accumulation control power supply.
From Switching Power Supply by electrolytic capacitor control power supply is provided to control unit.Control unit has microcomputer.It is micro- Type computer carries out following inverse phase control:According to the dimming level set by Dimming operation portion, in alternating voltage per half Midway, cuts off the power supply to lighting load during period.
Invention content
Problems to be solved by the invention
In addition, the load control devices such as light modulating device can be electrically connected with the miscellaneous load such as various lighting loads. Therefore, according to different from the load that load control device connects, load control device or load may carry out abnormal action.
The present invention be in view of the above-mentioned origin of an incident and complete, its purpose is to provide one kind can support a greater variety of loads Load control device.
The solution to the problem
Load control device involved by one embodiment of the present invention has two-way switch, phase-detection portion, Switching Power Supply And stop.The two-way switch with load in series is electrically connected for AC power, and the opposite load provides Alternating voltage carry out phase controlling.The phase-detection portion is detected the phase of the alternating voltage.The switch electricity Source is electrically connected in parallel with the two-way switch, will be utilized from the AC power by the switch motion of switch element The DC voltage conversion for supplying electric power and generating in order to control voltage transformation action.It is detected comprising the phase-detection portion During the exclusion of the detection timing of the phase, the stop make the Switching Power Supply and the AC power it is electrically separated, Or it acts the transformation of the Switching Power Supply and stops.
The effect of invention
The present invention has the advantages that support a greater variety of loads.
Description of the drawings
Fig. 1 is the synoptic circuit diagram of the load control device involved by embodiments of the present invention 1.
Fig. 2 is the sequence diagram for the action for representing load control device ibid.
Fig. 3 is dynamic in the case of electric energy in the load control device represented ibid, being accumulated in capacitive element is insufficient The sequence diagram of work.
Fig. 4 is the sequential for the action for representing the load control device involved by the variation 1 of embodiments of the present invention 1 Figure.
Fig. 5 is the sequence diagram for the action for representing the load control device involved by embodiments of the present invention 2.
Fig. 6 is the sequence diagram for the action for representing the load control device involved by embodiments of the present invention 3.
Fig. 7 is the sequence diagram for the action for representing the load control device involved by embodiments of the present invention 4.
Reference sign
1:Load control device;2:Two-way switch;3:Phase-detection portion;7:Load;8:AC power;51:Voltage dropping power supply; 52:Switching Power Supply;53:Test section;61:Control unit;62:Stop;63:Switching part;C1:Capacitive element;T0:During exclusion; T1:First period;T2:The second phase;T3:During third;T4:Between the fourth phase;Vac:Alternating voltage;Vc1:Driving voltage is (straight Galvanic electricity pressure);Vc2:Control voltage;Vth1:Threshold value.
Specific embodiment
Construction explained below is only the example of the present invention, the present invention is not limited to following embodiments, even if It is other than present embodiment, as long as in the range of technological thought according to the present invention is not departed from, it will be able to according to design Etc. making various changes.
(embodiment 1)
(1) summary
As shown in Figure 1, the load control device 1 involved by present embodiment has for AC power 8 with bearing Carry 7 two-way switch 2 being electrically connected in series.Load control device 1 is using two-way switch 2 to being provided from AC power 8 to load 7 Alternating voltage Vac carry out phase controlling." phase controlling " said here refers in the following manner:By changing alternating voltage The beginning of per half period of Vac or the phase angle (angle of flow) for terminating the energization to load 7 (are applied to control to provide to load 7 Add) alternating voltage Vac.That is, load control device 1 carries out phase by the alternating voltage Vac that opposite load 7 provides Control, for example to control the load such as lighting load, heater or fan 7.
In the present embodiment, as an example, it is to have multiple LED elements and make multiple LED element points to illustrate load 7 The situation of the lighting load of bright power circuit.That is, load control device 1 is formed through phase controlling come to by lighting load structure Into load 7 light output the light modulating device that is adjusted of size.AC power 8 is, for example, single-phase 100 (V), 60 (Hz) Source power supply.Load control device 1 can be applied to wall switch etc. as an example.
Here, the load control device 1 involved by present embodiment is TW two wire, so that two-way switch 2 is relative to exchange The mode being electrically connected in series for power supply 8 with load 7 is connected between AC power 8 and load 7.In other words, it is controlled in load On device 1 processed, electric wire this two electric wires for being connected with the electric wire that is connected with AC power 8 and being connected with load 7, two-way switch 2 are inserted between this two electric wires.Therefore, if two-way switch 2 is conducting state, the voltage quilt from AC power 8 Load 7 is applied to, load 7 is supplied to electric power, if two-way switch 2 is nonconducting state, the voltage quilt from AC power 8 Load control device 1 is applied to, is stopped to the power supply of load 7.Load control device 1 is by this two electric wires come from exchange Power supply 8 obtains the action electric power of load control device 1 itself, carries out the control etc. of two-way switch 2.That is, load control device 1 The action electric power of itself is generated, therefore can realize using aftermentioned power supply unit 5 when two-way switch 2 is nonconducting state The load control device 1 of TW two wire.
(2) structure
As shown in Figure 1, the load control device 1 involved by present embodiment has a pair of input terminals 11,12, two-way opened Pass 2, phase-detection portion 3, interface portion 4, power supply unit 5, control circuit 6, switch driving part 9, test section 53 and diode D1, D2.Control circuit 6 includes control unit 61, stop 62 and switching part 63." input terminal " said here can not also It is for by the component of the connections such as electric wire (terminal), such as can also be the lead of electronic unit or what circuit board included leads A part for body.
Two-way switch 2 is for example including the first switching element Q1 being electrically connected in series between input terminal 11,12 and This two elements of two switch element Q2.For example, switch element Q1, Q2 are by enhanced n-channel MOSFET (Metal- respectively Oxide-Semiconductor Field Effect Transistor:Mos field effect transistor) it forms Thyristor.
Switch element Q1, Q2 are attached between input terminal 11,12 in a manner of so-called anti-series.Namely It says, is connected to each other between the source electrode of switch element Q1, Q2.The drain electrode of switch element Q1 is connect with input terminal 11, switch element The drain electrode of Q2 is connect with input terminal 12.The source electrode of two switch elements Q1, Q2 are connect with the ground terminal of power supply unit 5.Power supply unit 5 Ground terminal for the internal circuit of load control device 1 on the basis of current potential.
Two-way switch 2 allows hand over four states by the combination opened, turned off of switch element Q1, Q2.Four states What two-way off state, two switch elements Q1, the Q2 being turned off including two switch elements Q1, Q2 were opened two-way opens shape Two kinds of unidirectional opening states that a side in state and only switch element Q1, Q2 opens.Under unidirectional opening state, from switch The parasitic diode of the switch element of a side that the switch element of a side opened in element Q1, Q2 passes through shutdown, it is a pair of defeated Enter and be uniaxially connected between terminal 11,12.For example, being opened, in the state of switch element Q2 shutdowns in switch element Q1, becoming makes The first unidirectional opening state that electric current is flowed from input terminal 11 to input terminal 12.In addition, it opens in switch element Q2, switch In the state of element Q1 shutdowns, become the second unidirectional opening state that electric current is made to be flowed from input terminal 12 to input terminal 11. Therefore, in the case of from AC power 8 to application alternating voltage Vac between input terminal 11,12, alternating voltage Vac's Positive polarity, that is input terminal 11 are in the half period that hot side, input terminal 12 are low potential side, and first unidirectionally opens Logical state is " positive opening state ", and the second unidirectional opening state is " reversed opening state ".On the other hand, in alternating voltage The negative polarity of Vac, that is input terminal 11 are in the half period that low potential side, input terminal 12 are hot side second Unidirectional opening state is " positive opening state ", and the first unidirectional opening state is " reversed opening state ".
Here, " two-way opening state " and " positive opening state " the two states of two-way switch 2 are conducting state, " two-way off state " and " reversed opening state " the two states are nonconducting state.
Phase-detection portion 3 is detected the phase of the alternating voltage Vac between being applied to input terminal 11,12.Herein Polarity (positive polarity, negative polarity) phase inspection of the described zero cross point of " phase " including alternating voltage Vac, alternating voltage Vac Survey portion 3 is configured to that detection signal is output to control circuit 6 when the zero cross point for detecting alternating voltage Vac.Phase-detection Portion 3 has diode D31, the first test section 31, diode D32 and the second test section 32.First test section 31 is via two poles Pipe D31 is electrically connected with input terminal 11.Second test section 32 is electrically connected via diode D32 with input terminal 12.First Test section 31 examines alternating voltage Vac from the zero cross point when half period of negative polarity being changed into the half period of positive polarity It surveys.Second test section 32 is to alternating voltage Vac from the zero cross point when half period of positive polarity being changed into the half period of negative polarity It is detected.
It is hot side, input terminal 12 is made to be low potential side that is, the first test section 31 ought detects input terminal 11 of sening as an envoy to Voltage when being changed into state more than specified value from the state less than specified value, be judged as zero cross point, it is defeated to control circuit 6 Go out first detection signal ZC1.Similarly, the second test section 32 ought detect input terminal 11 of sening as an envoy to and be low potential side, make input terminal When son 12 is changed into state more than specified value from the state less than specified value for the voltage of hot side, it is judged as zero crossing Point, to second detection signal of the output of control circuit 6 ZC2.Specified value is set at the values (absolute value) of 0 (V) nearby.For example, The specified value of first test section 31 is number (V) left and right, and the specified value of the second test section 32 is number (V) left and right.Thus, by the first inspection The test point of zero cross point that 31 and second test section 32 of survey portion detects is relative to the zero cross point (0 (V)) under stricti jurise For postpone a little time.
Interface portion 4 is entered the beginning to per half period of alternating voltage Vac or terminates the phase angle of the energization to load 7 Incoming level as defined in (angle of flow) progress.That is, incoming level is to the two-way switch in the half period of alternating voltage Vac 2 become the timing of conducting state or become the timing of nonconducting state being provided.In the present embodiment, load control device 1 is light modulating device, therefore interface portion 4 accepts the operation of user, accepts the input of the dimming level as incoming level.Interface portion 4 pairs of outputs of control circuit 6 represent the dim signal of dimming level.Dim signal refers to the big of the light output for given load 7 Small numerical value etc. also includes " OFF (pass) level " that load 7 is made to be OFF state sometimes.In the present embodiment, as one Example, interface portion 4 have the touch panel for the touch operation for accepting user.As long as the output of interface portion 4 represents incoming level (light modulation Level) signal structure, such as can also be variable resistance or rotary switch etc..Also, interface portion can also be by The receiving part for receiving the signal from the communication terminals such as remote controler or smart phone is formed.
In addition, in the present embodiment, interface portion 4 also has the display for showing inputted incoming level (dimming level) Portion's (indicator).Interface portion 4 for example including the display unit being made of multiple LED elements, is shown by the number of lights of LED element Incoming level.
Control circuit 6 has the function of as control unit 61, stop 62 and switching part 63.Control unit 61 is based on coming from The detection signal in phase-detection portion 3 and the dim signal from interface portion 4 control two-way switch 2.Control unit 61 is to switch Element Q1, Q2 are respectively controlled.Specifically, control unit 61 using first control signal Sb1 come control switch element Q1, profit With second control signal Sb2 come control switch element Q2.Stop 62 makes aftermentioned Switching Power Supply 52 with exchanging during exclusion Power supply 8 is electrically separated or the transformation of shutdown switch power supply 52 action.Said here is comprising phase-detection portion " during exclusion " It is to include during exclusion in the case of detecting zero cross point in phase-detection portion 3 during 3 detect the detection timing of phase During zero cross point.Switching part 63 switches over the invalidating of the function of stop 62.About stop 62 and switching Portion 63 is described in detail on the column of " action of (3.3) power supply unit ".
Control circuit 6 for example has microcomputer and is used as main structure.Microcomputer passes through in CPU (Central Processing Unit:Central processing unit) in perform in the memory of microcomputer the program that records to realize as control The function of circuit 6 processed.Program can be previously recorded in the memory of microcomputer, can also be recorded in as storage card Recording medium in provide or provided by electrical communication line.In other words, above procedure is for making computer The program that (being herein microcomputer) functions as control circuit 6.
Switch driving part 9 have switch element Q1 is driven (on/off control) the first driving portion 91 and Second driving portion 92 of (on/off control) is driven to switch element Q2.First driving portion 91 receives from control circuit 6 First control signal Sb1 applies grid voltage to switch element Q1.The first driving portion 91 opens switch element Q1 as a result, Logical/shutdown control.Similarly, the second driving portion 92 receives second control signal Sb2 from control circuit 6, is applied to switch element Q2 Add grid voltage.The second driving portion 92 carries out on/off control to switch element Q2 as a result,.First driving portion 91 is with switch Grid voltage is generated on the basis of the current potential of the source electrode of element Q1.Second driving portion 92 is also the same.
Power supply unit 5 have generation for make 9 grade actions of switch driving part driving power (electric energy) voltage dropping power supply 51 with And the Switching Power Supply 52 of generation control electric power.Driving power is the electric power for making 9 grade actions of switch driving part.Controlling electric power is For making the electric power of 6 grade actions of interface portion 4 and control circuit.Power supply unit 5 carries out following generation action:Using from alternating current Source 8 supplies electric power, and electric energy (driving power) is generated by voltage dropping power supply 51.Electric energy (the driving electricity generated by voltage dropping power supply 51 Power) it is switched on and off power supply 52 and converts electric power in order to control.
Power supply unit 5 is electrically connected via diode D1 with input terminal 11, and is come and input terminal 12 via diode D2 Electrical connection.Diode bridge by being made of diode D1, D2 and the respective parasitic diode of switch element Q1, Q2 as a result, To the alternating voltage Vac being applied between input terminal 11,12 progress full-wave rectifications, to provide power supply unit 5.Thus, double To switch 2 for the alternating voltage Vac after full-wave rectification in the case of nonconducting state, can be applied to power supply unit 5 (from diode bridge The pulsating volage of output).
Voltage dropping power supply 51 has the first circuit 511 and capacitive element (capacitor) C1.Voltage dropping power supply 51 is series voltage regulator The power circuit of mode, by being applied in the alternating voltage Vac after full-wave rectification, to carry out the decompression of applied voltage peace It is sliding, generate the driving voltage Vc1 of direct current.That is, when applying the alternating voltage Vac after full-wave rectification to the first circuit 511, capacitive Element C1 is electrically charged, and driving voltage Vc1 is generated at the both ends of capacitive element C1.Voltage dropping power supply 51 will be accumulated in capacitive element C1 Electric energy is supplied to switch driving part 9 and Switching Power Supply 52 as driving power.Driving voltage Vc1 is, for example, 15 (V).
Switching Power Supply 52 has second circuit 521 and capacitive element (capacitor) C2.Switching Power Supply 52 is buck chopper electricity The DC-DC converter of the on-off modes such as road is straight applied by being applied in driving voltage Vc1 from voltage dropping power supply 51 The decompression of galvanic electricity pressure (driving voltage Vc1) generates the control voltage Vc2 of direct current.That is, when applying driving electricity to second circuit 521 When pressing Vc1, capacitive element C2 is electrically charged, and control voltage Vc2 is generated at the both ends of capacitive element C2.Second circuit 521 includes opening Element (semiconductor switch) is closed, by the switch motion of switch element, driving voltage Vc1 is depressured to generate control voltage Vc2.In short, Switching Power Supply 52 carry out by the switch motion of switch element by using from AC power 8 supply electric power and The DC voltage conversion of generation in order to control voltage Vc2 transformation action.The control to generate is acted by the transformation of Switching Power Supply 52 Electric power processed is fed into interface portion 4 and control circuit 6 etc..It is, for example, 3.5 (V) to control voltage Vc2.
Thus, in the transformation action of Switching Power Supply 52, from the capacitive element C1 of power supply unit 5 via Switching Power Supply 52 to Control circuit 6 (control unit 61) supply of electrical energy.Control circuit 6 (control unit 61) utilizes electric energy (the control electricity from power supply unit 5 Power) it acts.
Voltage dropping power supply 51 and Switching Power Supply 52 are configured to be controlled by control unit 61.In other words, control unit 61 has The function of being controlled power supply unit 5.As a result, capacitive is accumulated in power supply unit 5 to be controlled whether to perform generation by control unit 61 The generation action of electric energy (driving power) in element C1.Also, it is wanted by control unit 61 power supply unit 5 to be controlled whether to perform generation It is accumulated in the transformation action of the electric energy (control electric power) in capacitive element C2.
In the present embodiment, control unit 61 is controlled by the semiconductor switch included to voltage dropping power supply 51, is come Switch between the state that power supply unit 5 is made to perform the state of generation action and stops the generation action of power supply unit 5.Specifically It says, control unit 61 controls the semiconductor switch of voltage dropping power supply 51 using the first power supply signal Ss1.Control unit 61 is by stopping the The input impedance acted to improve voltage dropping power supply 51 of one circuit 511 acts the generation of voltage dropping power supply 51 and stops.When according to When the generation action of one power supply signal Ss1 and voltage dropping power supply 51 stops, the generation of the electric energy (driving power) in power supply unit 5 stops Only.Also, control unit 61 is controlled by the switch element included to Switching Power Supply 52, power supply unit 5 to be made to perform change Move work state and make power supply unit 5 transformation act stop state between switch.Specifically, control unit 61 utilizes second Power supply signal Ss2 controls the switch element of Switching Power Supply 52.When the transformation of Switching Power Supply 52, which acts, to be stopped, in power supply unit 5 The generation of electric energy (control electric power) stop.
Test section 53 is detected the size of electric energy accumulated in capacitive element C1.In the present embodiment, test section 53 are configured to be detected the size of the driving voltage Vc1 of the both end voltage as capacitive element C1.Test section 53 is, for example, The divider resistance being connected between the both ends of capacitive element C1 will be exported with the comparable voltages of driving voltage Vc1 as detected value To control circuit 6.That is, test section 53 is detected by the both end voltage (driving voltage Vc1) to capacitive element C1, Directly detect the size for the electric energy accumulated in capacitive element C1.In the following, set the detected value of test section 53 and driving voltage Vc1 phases Deng.It is however not limited to the structure, test section 53 can also be, for example, with lower structure:Pass through the both ends to being used as capacitive element C2 The control voltage Vc2 of voltage is detected, to detect the size for the electric energy accumulated in capacitive element C1 indirectly.
The lighting circuit of load 7 is from the waveform display for being supported control device 1 and having carried out the alternating voltage Vac of phase controlling Dimming level changes the size of the light output of LED element.Here, lighting circuit is as an example and with electric currents such as leadage circuits The circuit ensured.It therefore, also can be to load 7 even if during the two-way switch 2 of load control device 1 is non-conduction Circulating current.
(3) it acts
(3.1) starting operation
First, illustrate the starting operation when energization of the load control device 1 of present embodiment starts.
According to the load control device 1 of above-mentioned structure, when being handed between input terminal 11,12 via load 7 to connect During galvanic electricity source 8, decompression is provided to after being rectified from AC power 8 to the alternating voltage Vac applied between input terminal 11,12 Power supply 51.The driving power generated by voltage dropping power supply 51 is fed into switch driving part 9, and is fed into Switching Power Supply 52.When When the control electric power generated by Switching Power Supply 52 is fed into control circuit 6 and interface portion 4, control circuit 6 and interface portion 4 open It is dynamic.
When control circuit 6 starts, detection signal of the control circuit 6 based on phase-detection portion 3 carries out AC power 8 The judgement of frequency.Then, control circuit 6 according to the frequency determined come with reference to prestoring numerical tabular in memory, into The setting of the parameters such as row various times.If here, were input to the dimming level of interface portion 4 as " OFF level ", control circuit Two-way switch 2 is maintained two-way off state by 6, and the impedance between a pair of input terminals 11,12 thus is maintained high impedance State.Load 7 maintains OFF state as a result,.
(3.2) control action is loaded
Then, the load control action of the load control device 1 of present embodiment is illustrated with reference to Fig. 2.In fig. 2, show Alternating voltage " Vac ", first detection signal " ZC1 ", the second detection signal " ZC2 ", first control signal " Sb1 ", second are gone out Control signal " Sb2 ", the first power supply signal " Ss1 " and driving voltage " Vc1 ".
In the present embodiment, first detection signal ZC1 is located at from " H " level (High Level:High level) variation be " L " level (Low Level:Low level) when, generate first detection signal ZC1.In addition, the second detection signal ZC2 is located at from " H " When level change is " L " level, the second detection signal ZC2 is generated.That is, the detection letters of first detection signal ZC1 and second Number ZC2 is from the signal that " H " level change is " L " level when detecting phase (zero cross point) using phase-detection portion 3.It closes In the first power supply signal Ss1 and driving voltage Vc1, illustrate in the column of " the generation action of (3.3) control electric power ".
The half period of alternating voltage Vac is divided into first by control unit 61 based on the phase detected by phase-detection portion 3 T4 between T3 and the fourth phase during period T1, second phase T2, third, to control two-way switch 2." half period " said here Be the continuous quadratic of alternating voltage Vac zero cross point between during.In first period T1 and between the fourth phase in T4, control unit 61 make two-way switch 2 be nonconducting state.In second phase T2, control unit 61 makes two-way switch 2 be conducting state.In third In period T3, control unit 61 makes two-way switch 2 be nonconducting state.
In the following, during illustrating first period T1, second phase T2, third in further detail between T3 and the fourth phase in T4 Load control device 1 action.
First, illustrate alternating voltage Vac be positive polarity half period when load control device 1 action.Load control Device 1 detects the zero cross point as the alternating voltage Vac of the benchmark of phase controlling by the use of phase-detection portion 3.In alternating current Vac is pressed from when the half period of negative polarity being changed into the half period of positive polarity, when alternating voltage Vac reaches the specified value of positive polarity When " Vzc ", the first test section 31 output first detection signal ZC1.Control unit 61 is at the time point for generating first detection signal ZC1 After t11, the detection timing of phase (zero cross point) is that is detected using phase-detection portion 3 after, during setting first Between point t1, in first time point t1, it is " ON (opening) " signal to make first control signal Sb1 and second control signal Sb2.Change speech It, in the example in figure 2, detects phase, in first time point t1 later, control unit in time point t11 phase-detection portion 3 61 make two-way switch 2 be two-way opening state.From starting point (zero cross point) t0 to first time point t1 of the half period of positive polarity During be first period T1.In first period T1, control unit 61 makes first control signal Sb1 and second control signal Sb2 For " OFF (pass) " signal.As a result, in first period T1, switch element Q1, Q2 are turned off, and two-way switch 2 is two-way shutdown shape State (nonconducting state).Therefore, in first period T1, the power supply from AC power 8 to load 7 is disconnected.
Second time point t2 is from the detection timing (time point that phase (zero cross point) is detected using phase-detection portion 3 T11 the time point for the service time that have passed through length corresponding with dim signal) is acted.In the second time point t2, control unit 61 will Second control signal Sb2 is maintained " ON " signal, and it is " OFF " signal to make first control signal Sb1.As a result, from the first time In the second phase T2 of point t1 to the second time point t2, switch element Q1, Q2 are open-minded, and two-way switch 2 is two-way opening state (conducting state).Therefore, it in second phase T2, is supplied electric power from AC power 8 via two-way switch 2 to load 7.
Third time point t3 be than the terminal of half period (zero cross point) t4 shift to an earlier date the set time (such as 300 (μ s)) when Between point.That is, will pass through from the detection timing (time point t11) that zero cross point is detected using phase-detection portion 3 In the case that time point after from the time of half period subtracting the time obtained from first period T1 is estimated as terminal t4, third Time point t3 be the set time of terminal t4 before time point.In the sequence diagram of Fig. 2, it is illustrated that be:Third time point t3 Reach the timing of the specified value " Vzc " of positive polarity with alternating voltage Vac and alternating voltage Vac reach negative polarity specified value "- The timing of Vzc " is consistent.But in fact, third time point t3 be with alternating voltage Vac with the specified value " Vzc " of positive polarity or What the timing that the specified value "-Vzc " of negative polarity intersects independently determined.
In third time point t3, control circuit 6 makes first control signal Sb1 and second control signal Sb2 believe for " OFF " Number.As a result, during the third from the second time point t2 to third time point t3 in T3, the switch in only switch element Q1, Q2 Element Q1 is turned off, and two-way switch 2 is reversed opening state (nonconducting state).Therefore, during third in T3, from AC power 8 are disconnected to the power supply of load 7.
The fourth phase of terminal (zero cross point) t4 from third time point t3 to the half period in T4, switch element Q1, Q2 is turned off, and two-way switch 2 is two-way off state (nonconducting state).
In addition, the action of the load control device 1 when alternating voltage Vac is the half period of negative polarity is half with positive polarity Period essentially identical action.
In the half period of negative polarity, when alternating voltage Vac reaches the specified value "-Vzc " of negative polarity, the second test section 32 the second detection signal of output ZC2.In the present embodiment, from the starting point t0 (t4) of the half period of negative polarity in the second detection The detection of phase (zero cross point) is detected after the generation time point of signal ZC2, that is using phase-detection portion 3 periodically It is first period T1 the first time point t1 that (time point t11) is set later during.In addition, the second time point t2 is from utilization Phase-detection portion 3 detects that the detection timing (time point t11) of phase (zero cross point) rises and is grown by corresponding with dim signal Time point after the service time of degree, third time point t3 are to shift to an earlier date the set time (such as 300 than the terminal t4 (t0) of half period (μ s)) time.
In first period T1, control unit 61 makes first control signal Sb1 and second control signal Sb2 be " OFF " signal. Two-way switch 2 is two-way off state (nonconducting state) in first period T1 as a result,.Moreover, in first time point t1, control Portion 61 processed makes first control signal Sb1 and second control signal Sb2 be " ON " signal.As a result, from first time point t1 to In the second phase T2 of two time point t2, switch element Q1, Q2 are open-minded, and two-way switch 2 is two-way opening state (conducting shape State).Therefore, it in second phase T2, is supplied electric power from AC power 8 via two-way switch 2 to load 7.
In the second time point t2, first control signal Sb1 is maintained " ON " signal, makes second control signal by control unit 61 Sb2 is " OFF " signal.In third time point t3, control unit 61 makes first control signal Sb1 and the second control signal Sb2 be " OFF " signal.As a result, during the third from the second time point t2 to third time point t3 in T3, in only switch element Q1, Q2 Switch element Q2 shutdown, two-way switch 2 be reversed opening state (nonconducting state).Therefore, during third in T3, from friendship The power supply of galvanic electricity source 8 to load 7 is disconnected.The T4 the fourth phase of the terminal t4 from third time point t3 to the half period Interior, switch element Q1, Q2 are turned off, and two-way switch 2 is two-way off state (nonconducting state).
The load control device 1 of present embodiment is alternately repeated described above by the half period of alternating voltage Vac Thus the action of the half period of positive polarity and the action of the half period of negative polarity carry out the light modulation of load 7.It is here, " two-way open-minded State " is conducting state, and " reversed opening state " is nonconducting state, therefore terminal in the second phase, that is second Time point t2, two-way switch 2 are switched to nonconducting state from conducting state.Moreover, terminal (the second time point of the second phase T2 it is) defined according to the dimming level for being input to interface portion 4.Also, if the specified value " Vzc " and negative polarity of positive polarity Specified value "-Vzc " be fixed value, then detect phase (zero crossing to using phase-detection portion 3 from the starting point t0 of half period Point) detection timing (time point t11) time be approximately fixed length time.
Therefore, as by from the starting point t0 of half period to the time of the second time point t2, that is first period T1 with And length be added with the second phase T2 that dimming level correspondingly changes obtained from the length of " variable time " of time can be with Dimming level correspondingly changes.In other words, the end of per half period of alternating voltage Vac to load 7 energization the second time The phase angle (angle of flow) of point t2 correspondingly changes with dimming level.That is, in the case where the light output for making load 7 is small, it is variable Time is prescribed short (phase angle is prescribed small), and in the case where the light output for making load 7 is big, variable time is prescribed Long (phase angle is prescribed greatly).Therefore, load control device 1 can correspondingly change with being input to the dimming level of interface portion 4 The size of the light output of varying load 7.
In addition, in the half period of alternating voltage Vac (second during the first time point t1 to the second time point t2 Period T2) other than during in (T4 between T3 and the fourth phase during first period T1, third), two-way switch 2 is non-conduction shape State (reversed opening state or two-way off state).Load control device 1 can use this that two-way switch 2 is nonconducting state Ensure the power supply from AC power 8 to power supply unit 5 during a little.About the action of power supply unit 5, " (3.3) power supply unit It is described in detail in the column of action ".
Here, " from time point A " this expression is represented comprising time point A.Such as " from first time point " is represented comprising the One time point.On the other hand, " to time point A ", this expression represents not including time point A, is to before time point A Only.Such as " to terminal of half period " represents the terminal not comprising the half period, until before the terminal of half period.
(3.3) action of power supply unit
Then, the action of power supply unit 5 is illustrated with reference to Fig. 2.
The half period of alternating voltage Vac is divided into first by control unit 61 based on the phase detected by phase-detection portion 3 T4 between T3 and the fourth phase during period T1, second phase T2, third, to control power supply unit 5.In first period T1 and the fourth phase Between in T4, control unit 61 makes voltage dropping power supply 51 carry out generation action.In second phase T2, control unit 61 makes voltage dropping power supply 51 Generation action stops.During third in T3, control unit 61 makes the generation of voltage dropping power supply 51 act stopping.That is, voltage dropping power supply 51 First period T1 and T4 between the fourth phase only in the half period of alternating voltage Vac, are utilized the supply from AC power 8 Electric power acts to generate the generation of electric energy (driving power).
Specifically, first period T1 of the control unit 61 only in the half period of alternating voltage Vac and T4 makes between the fourth phase First power supply signal Ss1 is " ON " signal (such as H level), and power supply unit 5 is thus made to carry out generation action.Control unit 61 is second T3 makes the first power supply signal Ss1 thus make the generation of power supply unit 5 for " OFF " signal (such as L level) during period T2 and third Action stops.In short, during the first power supply signal Ss1 is " ON " signal, power supply unit 5 carries out utilizing 51 next life of voltage dropping power supply Generation into electric energy (driving power) acts.At this point, the Switching Power Supply 52 of power supply unit 5 carries out transformation action.On the other hand, During one power supply signal Ss1 is " OFF " signal, power supply unit 5 stops the generation of the electric energy (driving power) in voltage dropping power supply 51, Thus stop generation action.Switching Power Supply 52 is not to stop transformation immediately when the first power supply signal Ss1 becomes " OFF " signal Action, but during the first power supply signal Ss1 is " ON " signal using capacitive element C1 in the charge accumulated continue to become Move work.As long as that is, accumulation has sufficient electric energy (driving power) in capacitive element C1, then even if in decompression electricity During the generation action of electric energy (driving power) in source 51 stops, Switching Power Supply 52 also can continue to transformation action.
But in load control device 1, timings of the first power supply signal Ss1 from " OFF " signal intensity for " ON " signal The third time point t3 for not necessarily becoming " OFF " signal with first control signal Sb1 and second control signal Sb2 is consistent.Example As or, in the timing shifted to an earlier date than third time point t3, that is between the second time point t2 and third time point t3 Some timing, the first power supply signal Ss1 becomes " ON " signal.In this case, the first power supply signal Ss1 believes from " OFF " Number variation becomes the boundary point of T4 between T3 and the fourth phase during third for the timing of " ON " signal.That is, third time point t3 it Two-way switch 2 is nonconducting state, therefore can also be after preceding, in the timing shifted to an earlier date than third time point t3, the first electricity Source signal Ss1 becomes " ON " signal, and thus T4 starts between the fourth phase.
Power supply unit 5 acts as described above, thus the first period T1 and the 4th in the half period of alternating voltage Vac In period T4, driving voltage Vc1 rises, and during second phase T2 and third in T3, driving voltage Vc1 declines.Therefore, in the presence of Eye is when continuous two half periods, from the third time point t3 of first half period to next half period the (that is the 2nd A half period) first time point t1, driving voltage Vc1 rise.
In addition, during Switching Power Supply 52 carries out transformation action, there are situations below:Because of the switch motion of switch element The impedance of power supply unit 5 is caused to change, the electric current that power supply unit 5 is flowed to from AC power 8 generates pulsation (ripple).Namely It says, compared with the power circuit of series voltage regulator mode, the DC-DC converter of switch motion mode as Switching Power Supply 52 It is more efficient, but the generating source of noise is easily made into for another side.When the electric current that power supply unit 5 is flowed to from AC power 8 produces During raw pulsation (ripple), there are situations below:It is affected by, detection of the phase-detection portion 3 to the phase of alternating voltage Vac Accuracy decline.That is, 3 logarithm of phase-detection portion (V) left and right smaller voltage monitored with detect alternating voltage Vac zero Crosspoint, therefore there are situations below:Even if electric current is only slightly swung under the influence of noise caused by Switching Power Supply 52, phase The accuracy of detection of position also declines.
Therefore, the load control device 1 involved by present embodiment as shown in Figure 2, using stop 62, comprising During the exclusion that phase-detection portion 3 detects the detection timing (time point t11) of phase in T0, make Switching Power Supply 52 and alternating current Source 8 is electrically separated.Stop 62 for example stops the action of the first circuit 511 using the first power supply signal Ss1, thus improves decompression The input impedance of power supply 51 acts the generation of voltage dropping power supply 51 and stops.When the voltage dropping power supply 51 according to the first power supply signal Ss1 Generation action stop when, Switching Power Supply 52 and AC power 8 are electrically separated.
That is, Switching Power Supply 52 is not electrically connected with AC power 8 always, divide in T0 with 8 electricity of AC power during exclusion From.As shown in Fig. 2, T0 is to be defined as the inspection comprising phase (zero cross point) is detected using phase-detection portion 3 during excluding During measure, that is during generation time point, that is, time point t11 of the detections of first detection signal ZC1 or second signal ZC2. In the present embodiment, T4 (during t3~t4) is interior between the starting point t21 of T0 is set at the fourth phase during exclusion, during exclusion The terminal t22 of T0 is set in first period T1 (during t0~t1).That is, T0 is defined as across the during excluding During four period T4 and first period T1 this 2.In more detail, the terminal t22 of T0 is set to first period during exclusion (the phase of t11~t1 during the detection timing (time point t11) later that phase is detected using phase-detection portion 3 in T1 Between).Detect the detection timing (time point t11) of phase included in during exclusion in T0 using phase-detection portion 3 as a result,.
Specifically, during exclusion of the stop 62 in the half period of alternating voltage Vac in T0, believed using the first power supply Number Ss1 stops the action of the first circuit 511, thus improves the input impedance of voltage dropping power supply 51, makes the generation of voltage dropping power supply 51 Action stops.According to the first power supply signal Ss1 and during the generation of voltage dropping power supply 51 action stops, Switching Power Supply 52 is with handing over Galvanic electricity source 8 is electrically separated.That is, from the starting point t21 being set in T4 between the fourth phase (during t3~t4) to being set in During terminal t22 in first period T1 (during t0~t1), stop 62 makes the first power supply signal Ss1 believe for " OFF " Number.As a result, during the exclusion between the fourth phase in T4 and first period T1 in T0 (during t21~t22), voltage dropping power supply 51 Generation action stops, and Switching Power Supply 52 and AC power 8 are electrically separated.
As a result, during exclusion in T0, the impedance of power supply unit 5 changes caused by the transformation action of Switching Power Supply 52 To inhibition, the electric current that power supply unit 5 is flowed to from AC power 8 is not allowed to be also easy to produce pulsation (ripple).As a result, the T0 during exclusion Comprising detection timing (time point t11), the decline of the accuracy of detection of the phase in phase-detection portion 3 is inhibited.
During exclusion the terminal t22 of T0 can also with detected using phase-detection portion 3 phase detection timing (time point T11 it is) consistent.That is, after as long as phase-detection portion 3 detects phase, the transformation action of Switching Power Supply 52 would not influence The accuracy of detection of the phase in phase-detection portion 3, therefore can also be that T0 is detecting phase using phase-detection portion 3 during exclusion The detection timing of position terminates.
The action here, Switching Power Supply 52 not stops transformation when electrically separated with AC power 8 immediately, but it is electric first Source signal Ss1 is acted during being " ON " signal using the charge accumulated in capacitive element C1 to continue transformation.That is, only To be accumulated in capacitive element C1 has sufficient electric energy (driving power), then even if during exclusion in T0, Switching Power Supply 52 Also it can continue to transformation action.
In the present embodiment, the length of T0 is regular length during exclusion.That is, Switching Power Supply 52 and 8 electricity of AC power The length of T0 was predetermined as the stipulated time during the exclusion of separation, was not changed.Such as it can be considered that is examined using phase Survey portion 3 detects the deviation of the detection timing of phase to determine the length of T0 during excluding.For example, the half cycle of alternating voltage Vac Interim detects that the detection timing of phase has deviation or according to tune according to 7 difference of load sometimes using phase-detection portion 3 Light level is different and has deviation.Therefore, the size of the deviation based on the detection timing that phase is detected using phase-detection portion 3 (dispersion) is come the length of T0 during determining exclusion so that even if detection timing has deviation, detects during being periodically also converged in exclusion In T0.
On the other hand, the position of T0 can also change during the exclusion in the half period of alternating voltage Vac.That is, Relative to the relative position energy of the starting point t21 or terminal t22 of T0 during the starting point t0 of half period of alternating voltage Vac, exclusion Enough changes.Specifically, stop 62 scan for it is in the half period of alternating voltage Vac, detected using phase-detection portion 3 The search process of the position of the detection timing (time point t11) of phase.Stop 62 determines to hand over based on the result of search process The position of T0 during exclusion in the half period of galvanic electricity pressure Vac.In short, when having distinguished alternating voltage Vac by search process Half period in detection timing position when, stop 62 consider detection timing deviation size come determine exclude during T0 Position so that detection Timing Convergence is during exclusion in T0.Such as determine exchange after the startup of control circuit 6 and just After the frequency of power supply 8 carry out stop 62 search process and exclusion during T0 position decision.
Here, in the load control device 1 involved by present embodiment, can stop be switched by switching part 63 The invalidating of 62 function.That is, make Switching Power Supply 52 and AC power 8 electrically separated in T0 during exclusion or make switch The function of stop 62 that the transformation action of power supply 52 stops is not effective always, can be set as invalid by switching part 63 yet.It cuts Portion 63 is changed for example automatically to be cut according to the surplus of electric energy (control electric power) accumulated in the state of load 7 or capacitive element C2 Change the invalidating of the function of stop 62.That is, for example exist according to 7 difference of load and do not need to T0 during setting excludes Situation, pulsation will not be generated by flowing to the electric current of power supply unit 5 from AC power 8 such as during Switching Power Supply 52 carries out transformation action (ripple) etc..In this case, it is preferable that switching part 63 makes the function of stop 62 invalid.In addition, switching part 63 Switch the effective, invalid of the function of stop 62 such as the operation for the user that can also be accepted according to interface portion 4.
In addition, different according to load 7 and there are situations below:In first period T1 and between the fourth phase in T4,5 nothing of power supply unit Method receives sufficient power supply from AC power 8, and the electric energy accumulated in capacitive element C1 is insufficient, is no longer able to maintain load control The regular event of device 1 processed.That is, different according to load 7 and there are situations below:During the half period of alternating voltage Vac The electric energy (driving power) generated by voltage dropping power supply 51 is consumed less than the half period load control device 1 in alternating voltage Vac Electric energy.In this case, the electric energy accumulated in the capacitive element C1 of voltage dropping power supply 51 can be by the half period of alternating voltage Vac And it gradually decreases.If this state continues, the electric energy accumulated in capacitive element C1 sooner or later can be insufficient, is no longer able to so as to exist Maintain the possibility of the regular event of load control device 1.The electric energy accumulated in due to capacitive element C1 is reduced and drives electricity When pressing Vc1 declines to a certain degree, for example there is situations below:Use the life of the control electric power in the Switching Power Supply 52 of driving power Become unstable into unstable or 4 grade of interface portion action is become.As a result, for example it is possible that generating the display of interface portion 4 Portion it is flashed on and off or flicker or load 7 it is flashed on and off or flicker etc. load control devices 1 or load 7 abnormal operation.
Therefore, in the present embodiment, stop 62 is configured to according to the testing result of test section 53 come will be during exclusion T0 shortens the time, thus will extend amount corresponding with shortening the time during object.It is to be stopped during object said here During stop 62 is as extended object, during at least one party including first period T1 and between the fourth phase in T4.
That is, as shown in figure 3, in load control device 1 involved by present embodiment, by stop 62 according to test section 53 Testing result T0 during exclusion is shortened, the shortening time corresponding amount with T0 during exclusion will be extended during object. In the example of Fig. 3, stop 62 eliminates T0 during exclusion, thus shortens T0 during exclusion and T0 phases during entirely excluding When length the shortening time.In the example in figure 3, by during removing between fourth phase T4 and first period T1 this two T0 during exclusion is extended, therefore T4 and first period between the fourth phase between the fourth phase during this two side of T4 and first period T1 This two side of T1 is during object.Fig. 3 is in the case of causing the electric energy accumulated in capacitive element C1 insufficient because of load 7 and Fig. 2 Same sequence diagram.
In other words, stop 62 is by the way that T0 during the exclusion included during object is shortened, will be during object in (T0 during exclusion) shortens during the generation action of voltage dropping power supply 51 stops.The generation action of script voltage dropping power supply 51 as a result, At least part of T0 is diverted as during making the object that voltage dropping power supply 51 carries out generation action during the exclusion of stopping, the object phase Between be substantially extended.
Specifically, stop 62 is incited somebody to action when the testing result of test section 53 is less than defined threshold value Vth1 (with reference to Fig. 3) T0 shortens during exclusion, and (first period T1 and this two side of T4 between the fourth phase) during object is extended the shortening with T0 during excluding Time measures accordingly.For example, as shown in figure 3, during the third of second half period in figure T3 test sections 53 detection knot In the case that fruit is less than threshold value Vth1, T3 is during detection during the third of second half period.Then, from during the detection During initial object after (T3 during the third of second half period), the fourth phase of that is second half period Between T4 rise, stop 62 will exclude during T0 shorten, will extend during object.
In this way, the electric energy accumulated in capacitive element C1 is insufficient, the reduction of electric energy is detected by test section 53, It will be for during carrying out the object of the generation of electric energy action by power supply unit 5 (first period T1 and T4 between the fourth phase) by stop 62 Extend.Thus, during object in the electric energy (driving power) that is generated by power supply unit 5 correspondingly increase with the extension during object Greatly, the result is that the deficiency for the electric energy accumulated in capacitive element C1 is inhibited.
But stop 62 is not limited by the structure that T0 shortens T0 during exclusion during removing exclusion, such as Can be that the length of T0 during exclusion is shorten to the structure of half or the length of T0 during exclusion is shortened into the set time Structure etc..
In this case, preferentially ensure to come to alternating current from AC power 8 to the power supply of power supply unit 5 The half period of pressure Vac is divided, therefore be there is not basis and be input to the dimming level of interface portion 4 come regulation second phase T2's The situation of length.For example, there are situations below:Even if user carries out interface portion 4 in a manner of making the light output of load 7 maximum Operation, but also preferentially ensure T0 during exclusion, do not set second phase T2's by the dim signal from interface portion 4 Starting point.
In addition, in the control mode of load control device 1, other than inverse phase control mode (after along mode), also There are positive phase control mode (forward position modes), that is, during from the midway to zero cross point of the half period of alternating voltage Vac It is interior, it is connected between a pair of input terminals 11,12.From zero cross point, it makes to having as light source inverse phase control mode The load 7 of LED element supplies electric power, thus can supply power to start when current waveform distortion suppression obtain it is small.It deposits as a result, In advantages below:The quantity (lamp number) for the load 7 that can be connect with load control device 1 increases or can inhibit buzzer It generates.
Although the load control device 1 of present embodiment is substantially using inverse phase control mode, than the half period The slightly slow first time point t1 of starting point (zero cross point) t0 start to supply electric power to load 7.Therefore, with starting in zero cross point The inverse phase control mode supplied electric power to load 7 is compared, and current waveform distortion may become larger.But first time point t1 The absolute value of the alternating voltage Vac at place is without so big, therefore the influence of current waveform distortion is small to the degree that can ignore.
Also, the load control device 1 of present embodiment is (during from the second time point t2 to third time point t3 Three period T3) in make two-way switch 2 for reversed opening state, therefore the error detection in phase-detection portion 3 can be reduced.That is, according to Load 7 is different and there are situations below:The absolute value of the both end voltage of load 7 is higher than the absolute value of alternating voltage Vac, knot Fruit (hereinafter referred to as " bucking voltage ") is applied to a pair of input terminals 11,12 with the opposite polarity voltages of alternating voltage Vac. Such as in the case where being provided with the both end voltages such as the load 7 of the bigger buffer condenser of capacity and not allowing the load tended to decrease 7, Easily generate this bucking voltage.When generating bucking voltage, phase-detection portion 3 can be the zero of alternating voltage Vac sometimes Outside of crosspoint flase drop measures zero cross point.Also exist different according to dimming level and generate bucking voltage or do not generate The load 7 of bucking voltage, in this load 7, zero cross point can cataclysm when dimming level changes.During third In T3, two-way switch 2 is reversed opening state, and the thus generation of this bucking voltage is suppressed, therefore can be reduced because anti- The error detection in phase-detection portion 3 caused by polar voltages.
(4) variation
(4.1) variation 1
In load control device 1 involved by variation 1 in embodiment 1, the T0 during exclusion of stop 62 does not make Switching Power Supply 52 and AC power 8 are electrically separated, but act the transformation of Switching Power Supply 52 and stop.Specifically, such as Fig. 4 institutes Show, stop 62 stops the action of second circuit 521 using second source signal Ss2, thus makes the transformation of Switching Power Supply 52 Action stops.In fig. 4 it is shown that alternating voltage " Vac ", first detection signal " ZC1 ", the second detection signal " ZC2 ", first Control signal " Sb1 ", second control signal " Sb2 ", the first power supply signal " Ss1 ", second source signal " Ss2 " and driving electricity It presses " Vc1 ".
In this case and during exclusion in T0, caused by the switch motion of the switch element of Switching Power Supply 52 The pulsation that the electric current of power supply unit 5 is flowed to from AC power 8 is suppressed.T0 is the half period phase with alternating voltage Vac during exclusion Control is maintained during short enough, therefore using the electric energy (control electric power) accumulated in the capacitive element C2 of Switching Power Supply 52 The action of 6 grade of circuit.But in this case, even if T0 shortens the time during excluding, also will not extend during object Amount corresponding with shortening the time.
Structure according to this modification also can continue to the generation action of voltage dropping power supply 51, therefore during exclusion in T0 Can electric energy (driving power) efficiently be generated by voltage dropping power supply 51.
(4.2) other variations
In the following, enumerate the variation of embodiment 1.
Above-mentioned embodiment 1 and the load control device 1 of variation 1 are not limited to be applied to LED element being used as light source Load 7, can be applied to mounting condenser it is imported it is circuit, impedance is high, the light source lighted with few electric current.As This light source, such as organic EL (Electroluminescence) element can be enumerated.In addition, load control device 1 is for example It can be applied to the load 7 of the miscellaneous light source such as discharge lamp.
Also, the load 7 controlled by load control device 1 is not limited to lighting load, such as can also be heater or wind Fan etc..In the case where load 7 is heater, load control device 1 is adjusted by adjusting to the average power of heater fed Save the calorific value of heater.In addition, in the case where load 7 is fan, load control device 1 forms the rotary speed to fan The adjuster being adjusted.
In addition, two-way switch 2 is not limited to enhanced n-channel MOSFET, such as can also be connected by anti-series two IGBT(Insulated Gate Bipolar Transistor:Igbt) etc. compositions.Also, in two-way opened In closing 2, the rectifier cell (diode) for being used to implement unidirectional opening state is not limited to the parasitic diode of switch element Q1, Q2, It can also be external diode.Diode can also be built in same encapsulation with each switch element Q1, Q2.In addition, two-way opened Close the bigrid (dual gate) of 2 semi-conducting materials of broad-band gap such as can also be to use GaN (gallium nitride) constructs half Conductor element.According to the structure, the reduction of the conduction loss of two-way switch 2 can be realized.
In addition, Switching Power Supply 52 can not also be but straight from the alternating voltage Vac after full-wave rectification by voltage dropping power supply 51 Deliver a child into control voltage Vc2.Also, control unit 61 can also be by controlling Switching Power Supply 52 whether perform life to switch Into the generation action of the electric energy (control electric power) in capacitive element C2 to be stored in.In this case, test section 53 can also be examined The size of electric energy (control electric power) accumulated in the capacitive element C2 of slowdown monitoring switch power supply 52.Test section 53 is for example detected as capacitive The size of the control voltage Vc2 of the both end voltage of element C2.
In addition, in the control of two-way switch 2, can also control " two-way to open shape to replace for " positive opening state " State ", additionally it is possible on the contrary control replaces " positive opening state " for " two-way opening state ".In addition, it can also control as " reversely Opening state " replaces " two-way off state ", additionally it is possible to control and is replaced " reversed opening state " for " two-way off state ". That is, as long as the conducting state of two-way switch 2 or the state of nonconducting state are constant.
In addition, control circuit 6 is not limited to the control mode of two-way switch 2 above-mentioned example, such as can also be following Mode:First control signal Sb1 and second control signal Sb2 is made alternately to become with the period identical with alternating voltage Vac " ON " signal.In this case, the switch element of the hot side as alternating voltage Vac in switch element Q1, Q2 is opened During logical, two-way switch 2 can be connected.That is, in the variation, realize so-called inverse phase control, that is, from friendship During the zero cross point to the midway of half period of galvanic electricity pressure Vac, be connected between a pair of input terminals 11,12.In this case, By adjusting the phase difference between first control signal and second control signal and alternating voltage Vac, two-way switch 2 can be adjusted Turn-on time.
Also, the control mode of the control unit 61 of load control device 1 can also can either support positive phase controlling party Formula can also support the general controls mode of inverse phase control mode.
In addition, whether control unit 61 is not limited to power supply unit 5 be made to carry out generation action to switch according to the first power supply signal Ss1 Structure.For example, control unit 61 can also be with lower structure:By at least one party being set in a pair of input terminals 11,12 with Shutter cut-out between power supply unit 5 (voltage dropping power supply 51), makes power supply unit 5 and AC power 8 electrically separated, thus acts generation Stop.
In addition, test section 53 be not limited to detect always the electric energy accumulated in capacitive element C1 size (driving voltage Vc1's Size) structure, can also be only detected during the part of the half period of alternating voltage Vac.For example, test section 53 The size of electric energy accumulated in capacitive element C1 can be detected only between the fourth phase by T4.
Also, the length of T0 is not limited to regular length or variable-length during excluding.In this case, for example, It can also be excluded according to the surplus of electric energy (control electric power) accumulated in the state of load 7 or capacitive element C2 to automatically adjust The length of period T0.
In addition, stop 62 by during exclusion T0 shorten function be not load control device 1 necessary to structure, also may be used Suitably to omit.In the case that T0 shortens during stop 62 will not exclude, test section 53 can also be omitted.
In addition, test section 53 can also for example be set to control circuit 6.In this case, as long as example, capacitive element C1 It is connect with the A/D transformation input terminals of control circuit 6, it will be able to be input to control circuit using driving voltage Vc1 as the analogue value 6。
In addition, switch driving part 9 is not structure necessary to load control device 1, can also suitably omit.It is opened in omission In the case of closing driving portion 9, two-way switch 2 is directly driven by control circuit 6.In the case where omitting switch driving part 9, also may be used To omit voltage dropping power supply 51.
In addition, first time point t1 is not limited to the generation time point of the detection signals of first detection signal ZC1 or second ZC2, Can also light to have passed through fixed delay time from the generation time of the detection signals of first detection signal ZC1 or second ZC2 Time point after (such as 300 (μ s)).Delay time is not limited to 300 (μ s), can be fitted in the range of 0 (μ s)~500 (μ s) Work as setting.
In addition, as long as terminal (zero cross point) t4 of third time point t3 in the half period are before, from the third time The length of point t3 to the terminal t4 of half period can be suitably set.For example, from first time point t1 to third time point t3's Time span than half period in the case of the shorter fixed stipulated time, it is specified that the time is not limited to 300 (μ s), can be in 100 (μ s) It is suitably set in the range of~500 (μ s).
Diode D1, D2 in embodiment 1 are not structures necessary to load control device 1, can also suitably be omitted Diode D1, D2.
In addition, in the embodiment 1, illustrate that load control device 1 is the situation of TW two wire, but is not limited to the knot Structure, load control device 1 can also can be connected the so-called three-way switch of three electric wires or can connect four So-called four-way switch of electric wire etc..In the case where load control device 1 forms three-way switch, by the way that two loads are controlled Device 1 is combined, can be by the top section and underclad portion of the floor to the energized state of load 7 for example between floors This is switched between two.
In addition, in comparison between two of alternating voltage Vac and specified value Vzc etc. values, " more than " including two values One side of equal situation and two values is more than this two side of the situation of the opposing party.It is however not limited to this, said here " with On " can also be identical more than " being more than " meaning of the situation of the opposing party with only including the side in two values.That is, if Including the equal situation of two values can according to the rules the setting of value Vzc etc. and arbitrarily change, therefore " more than " it is still " big In " there is no technical differences.Similarly, " being less than " can also be identical with " following " meaning.
(embodiment 2)
Load control device 1 involved by present embodiment in the control mode of control unit 61 with embodiment 1 involved by And load control device 1 it is different.In the following, pair marking common label with 1 same structure of embodiment and suitably omission is said It is bright.
In the present embodiment, as shown in figure 5, control unit 61 will be handed over based on the phase detected by phase-detection portion 3 The half period of galvanic electricity pressure Vac is divided into T3 during first period T1, second phase T2 and third.In fig. 5 it is shown that exchange Voltage " Vac ", first detection signal " ZC1 ", the second detection signal " ZC2 ", first control signal " Sb1 ", second control signal " Sb2 ", the first power supply signal " Ss1 ", second source signal " Ss2 " and driving voltage " Vc1 ".
Here, it is the during starting point (zero cross point) t0 to first time point t1 of half period from alternating voltage Vac One period T1.It is second phase T2 during the first time point t1 to the second time point t2.Second time point t2 is from utilization Phase-detection portion 3 detects that the detection timing (time point t11) of phase (zero cross point) have passed through grow corresponding with dim signal Time point after the time of degree.From the second time point t2 to being the third phase during the terminal t3 of the half period of alternating voltage Vac Between T3.
In first period T1, control unit 61 makes first control signal Sb1 and second control signal Sb2 for " OFF " signal, It is nonconducting state to make two-way switch 2.In second phase T2, control unit 61 makes first control signal Sb1 and second control letter Number Sb2 is " ON " signal, and it is conducting state to make two-way switch 2.During third in T3, control unit 61 makes first control signal Sb1 and second control signal Sb2 is " OFF " signal, and it is nonconducting state to make two-way switch 2.
In addition, in first period T1, control unit 61 makes the first power supply signal Ss1 make voltage dropping power supply 51 for " ON " signal Carry out generation action.In second phase T2, control unit 61 makes the first power supply signal Ss1 make voltage dropping power supply 51 for " OFF " signal Generation action stop.During third in T3, control unit 61 makes the first power supply signal Ss1 make voltage dropping power supply for " OFF " signal 51 generation action stops.That is, first period T1 of the voltage dropping power supply 51 only in the half period of alternating voltage Vac utilized come From the generation action supplied electric power to generate electric energy (driving power) of AC power 8.
Here, exclude during T0 using comprising as detected by phase-detection portion 3 phase (zero cross point) detection timing, That is the mode of the time point t11 of the generation time point of the detection signals of first detection signal ZC1 or second ZC2 is set at First period T1.The starting point t21 of T0 is consistent with the starting point t0 of the half period of alternating voltage Vac during exclusion.T0 during exclusion Terminal t22 be set in first period T1 using phase-detection portion 3 detect phase detection timing (time point t11) with During afterwards (during t11~t1).
In the load control device 1 involved by present embodiment, in the same manner as the variation 1 of embodiment 1, stop 62 during exclusion T0 make Switching Power Supply 52 transformation act stop.Specifically, as shown in figure 5, stop 62 utilizes second Power supply signal Ss2 stops the action of second circuit 521, thus acts the transformation of Switching Power Supply 52 and stops.
In the structure of present embodiment and during exclusion in T0, because of the switch of the switch element of Switching Power Supply 52 The pulsation of electric current for flowing to power supply unit 5 from AC power 8 caused by action is suppressed.
The structure of load control device 1 involved by embodiment 2 can be with the structure of embodiment 1 (including variation) It is appropriately combined.
(embodiment 3)
Load control device 1 involved by present embodiment in the control mode of control unit 61 with embodiment 1 involved by And load control device 1 it is different.In the following, pair marking common label with 1 same structure of embodiment and suitably omission is said It is bright.
Load control device 1 involved by present embodiment uses positive phase control mode as control mode, that is, During the midway to zero cross point of the half period of alternating voltage Vac, be connected between a pair of input terminals 11,12.
In the present embodiment, as shown in fig. 6, control unit 61 will be handed over based on the phase detected by phase-detection portion 3 The half period of galvanic electricity pressure Vac is divided into T3 during first period T1, second phase T2 and third.In fig. 6 it is shown that exchange Voltage " Vac ", first detection signal " ZC1 ", the second detection signal " ZC2 ", first control signal " Sb1 ", second control signal " Sb2 ", the first power supply signal " Ss1 ", second source signal " Ss2 " and driving voltage " Vc1 ".
Here, it is the during starting point (zero cross point) t0 to first time point t1 of half period from alternating voltage Vac One period T1.First time point t1 is from the detection timing (time point that phase (zero cross point) is detected by phase-detection portion 3 T11 the time point after the time that have passed through length corresponding with dim signal) is acted.From first time point t1 to the second time point t2 During be second phase T2.From the second time point t2 to being the third phase during the terminal t3 of the half period of alternating voltage Vac Between T3.
In first period T1, control unit 61 makes first control signal Sb1 and second control signal Sb2 for " OFF " signal, It is nonconducting state to make two-way switch 2.In second phase T2, control unit 61 makes first control signal Sb1 and second control letter Number Sb2 is " ON " signal, and it is conducting state to make two-way switch 2.During third in T3, control unit 61 makes first control signal Sb1 and second control signal Sb2 is " OFF " signal, and it is nonconducting state to make two-way switch 2.
In addition, in first period T1, control unit 61 makes the first power supply signal Ss1 make voltage dropping power supply 51 for " OFF " signal Generation action stop.In second phase T2, control unit 61 makes the first power supply signal Ss1 make voltage dropping power supply for " OFF " signal 51 generation action stops.During third in T3, control unit 61 makes the first power supply signal Ss1 for " ON " signal, makes decompression electric Source 51 carries out generation action.That is, T3 during third of the voltage dropping power supply 51 only in the half period of alternating voltage Vac, is utilized The generation action for supplying electric power to generate electric energy (driving power) from AC power 8.
Here, exclude during T0 using comprising as detected by phase-detection portion 3 phase (zero cross point) detection timing, That is the mode of the time point t11 of the generation time point of the detection signals of first detection signal ZC1 or second ZC2 is set at T3 during third.Phase is detected by phase-detection portion 3 in T3 during the starting point t21 of T0 is set at third during exclusion During before detection timing (time point t11) (during t2~t11).The terminal t22 and alternating voltage Vac of T0 during exclusion Half period terminal t3 it is consistent.
In the load control device 1 involved by present embodiment, in the same manner as the variation 1 of embodiment 1, stop 62 during exclusion T0 make Switching Power Supply 52 transformation act stop.Specifically, as shown in fig. 6, stop 62 utilizes second Power supply signal Ss2 stops the action of second circuit 521, thus acts the transformation of Switching Power Supply 52 and stops.
In the structure of present embodiment and during exclusion in T0, because of the switch of the switch element of Switching Power Supply 52 The pulsation of electric current for flowing to power supply unit 5 from AC power 8 caused by action is suppressed.
The structure of load control device 1 involved by embodiment 3 can be with the structure of embodiment 1 (including variation) It is appropriately combined.
(embodiment 4)
Load control device 1 involved by present embodiment in the control mode of control unit 61 with embodiment 1 involved by And load control device 1 it is different.In the following, pair marking common label with 1 same structure of embodiment and suitably omission is said It is bright.
Load control device 1 involved by present embodiment uses positive phase control mode as control mode, that is, During the midway to zero cross point of the half period of alternating voltage Vac, be connected between a pair of input terminals 11,12.In this reality It applies in mode, two-way switch 2 is for example made of the bidirectional thyristor (triode ac switch) of three terminals, and control circuit 6 exists Open two-way switch 2 in the midway (the second time point t2) of the half period of alternating voltage Vac.The two-way opened being made of bidirectional thyristor It closes 2 and becomes non-conduction near the zero cross point (0 (V)) of alternating voltage Vac.
In the present embodiment, as shown in fig. 7, control unit 61 will be handed over based on the phase detected by phase-detection portion 3 The half period of galvanic electricity pressure Vac is divided into T3 during first period T1, second phase T2 and third.In fig. 7 it is shown that exchange Voltage " Vac ", first detection signal " ZC1 ", the second detection signal " ZC2 ", first control signal " Sb1 ", second control signal " Sb2 ", the first power supply signal " Ss1 ", second source signal " Ss2 " and driving voltage " Vc1 ".
Here, it is the during starting point (zero cross point) t0 to first time point t1 of half period from alternating voltage Vac One period T1.It is second phase T2 during the first time point t1 to the second time point t2.Second time point t2 is from by phase Position test section 3 detects that the detection timing (time point t11) of phase (zero cross point) have passed through length corresponding with dim signal Time after time point.From the second time point t2 to during the terminal t3 of the half period of alternating voltage Vac for during third T3。
In first period T1, control unit 61 makes first control signal Sb1 and second control signal Sb2 for " OFF " signal, It is nonconducting state to make two-way switch 2.In second phase T2, control unit 61 makes first control signal Sb1 and second control letter Number Sb2 is " OFF " signal, and it is nonconducting state to make two-way switch 2.During third in T3, control unit 61 believes the first control Number Sb1 and second control signal Sb2 is " ON " signal, and it is conducting state to make two-way switch 2.
In addition, in first period T1, control unit 61 makes the first power supply signal Ss1 make voltage dropping power supply 51 for " ON " signal Carry out generation action.In second phase T2, control unit 61 makes the first power supply signal Ss1 stop voltage dropping power supply for " OFF " signal 51 generation action.During third in T3, control unit 61 makes the first power supply signal Ss1 make voltage dropping power supply 51 for " OFF " signal Generation action stop.It is come from that is, first period T1 of the voltage dropping power supply 51 only in the half period of alternating voltage Vac utilize The generation action for supplying electric power to generate electric energy (driving power) of AC power 8.
Here, exclude during T0 using comprising as detected by phase-detection portion 3 phase (zero cross point) detection timing, That is the mode of the time point t11 of the generation time point of the detection signals of first detection signal ZC1 or second ZC2 is set at First period T1.The starting point t21 of T0 is consistent with the starting point t0 of the half period of alternating voltage Vac during exclusion.T0 during exclusion Terminal t22 is set at after the detection timing (time point t11) that phase is detected by phase-detection portion 3 in first period T1 During (during t11~t1).
In the load control device 1 involved by present embodiment, in the same manner as the variation 1 of embodiment 1, stop 62 during exclusion T0 make Switching Power Supply 52 transformation act stop.Specifically, as shown in fig. 7, stop 62 utilizes second Power supply signal Ss2 stops the action of second circuit 521, thus acts the transformation of Switching Power Supply 52 and stops.
In the structure of present embodiment and during exclusion in T0, because of the switch of the switch element of Switching Power Supply 52 The pulsation of electric current for flowing to power supply unit 5 from AC power 8 caused by action is suppressed.
The structure of load control device 1 involved by embodiment 4 can be with the structure of embodiment 1 (including variation) It is appropriately combined.
(summary)
As discussed above, the load control device 1 involved by first mode has two-way switch 2, phase Test section 3, Switching Power Supply 52 and stop 62.Two-way switch 2 is electrically connected in series for AC power 8 with load 7 It connects, the alternating voltage Vac that opposite direction load 7 provides carries out phase controlling.Phase-detection portion 3 carries out the phase of alternating voltage Vac Detection.Switching Power Supply 52 is electrically connected in parallel with two-way switch 2, and carrying out will be using being selfed by the switch motion of switch element The DC voltage (driving voltage Vc1) for supplying electric power and generating in galvanic electricity source 8 converts the transformation action of voltage Vc2 in order to control.Stop Stop 62 in T0, makes Switching Power Supply 52 with exchanging during the exclusion for the detection timing that phase is detected comprising phase-detection portion 3 Power supply 8 is electrically separated or the transformation of Switching Power Supply 52 is made to act stopping.
According to the structure, during the exclusion for the detection timing that phase is detected comprising phase-detection portion 3 in T0, using stopping Stop 62, Switching Power Supply 52 is electrically isolated with AC power 8 or the transformation of Switching Power Supply 52 action stops.Thus, in phase Test section 3 detects the detection timing of phase due to the switch motion of the switch element of Switching Power Supply 52 and from AC power 8 The pulsation (ripple) generated in the electric current of power supply unit 5 is flowed to be suppressed.Therefore, because of the shadow of noise caused by Switching Power Supply 52 The decline of the accuracy of detection of phase in phase-detection portion 3 caused by sound is suppressed.If the alternating voltage in phase-detection portion 3 The accuracy of detection of the phase of Vac improves, then easily maintains the regular event of load control device 1 or load 7.Thus, according to negative Control device 1 is carried, has the advantages that support a greater variety of loads 7.
Second method is preferably, and the load control device 1 according to involved by first method is also equipped with to stop 62 Effective, the switching part 63 that switches in vain of function.According to the structure, such as load control is being able to maintain that according to load 7 In the case of device 1 processed and the regular event of load 7, the function by making stop 62 is invalid, can realize Switching Power Supply 52 Efficiency improve.But the structure is not structure necessary to load control device 1, can also suitably omit switching part 63.
Third Way is preferably, the exclusion phase of the load control device 1 according to involved by first method or second method Between the length of T0 be regular length.According to the structure, the processing for T0 during setting exclusion becomes simple.But the structure It is not structure necessary to load control device 1, the length of T0 can also be variable-length during exclusion.
Fourth way is preferably, the load control involved by any one mode in first method to Third Way The stop 62 of device 1 is configured to:It scans for handling, based on the result of search process come during determining the exclusion in the half period The position of T0.Search process is the half cycle formed during searching between the continuous secondary zero cross point by alternating voltage Vac The processing of the position of interim detection timing.According to the structure, even if for example in the detection timing according to load 7 and in the half period Position it is devious in the case of, T0 during exclusion can be also set in in the half period detection timing position it is corresponding Appropriate position.But the structure is not structure necessary to load control device 1, can also suitably omit search process.
5th mode is preferably, the load control involved by any one mode in first method to fourth way Device 1 is also equipped with voltage dropping power supply 51 and control unit 61.Voltage dropping power supply 51 has the capacitive element C1 of accumulation electric energy, with two-way switch 2 are electrically connected in parallel, are utilized the generation action for supplying electric power to generate electric energy from AC power 8.Control unit 61 is right Two-way switch 2 and voltage dropping power supply 51 are controlled.Switching Power Supply 52 is configured to:It is acted by transformation by the both ends of capacitive element C1 Voltage (driving voltage Vc1) converts voltage Vc2 in order to control.Control unit 61, will based on the phase detected by phase-detection portion 3 First period T1, second are divided by the half period formed during between the continuous secondary zero cross point of alternating voltage Vac T4 between T3 and the fourth phase during period T2, third.Control unit 61 makes two-way switch in first period T1 and between the fourth phase in T4 2 be nonconducting state, and voltage dropping power supply 51 is made to carry out generation action.Control unit 61 makes two-way switch 2 to lead in second phase T2 Logical state acts the generation of voltage dropping power supply 51 and stops.For control unit 61 during third in T3, it is non-conduction to make two-way switch 2 State acts the generation of voltage dropping power supply 51 and stops.T0 is set at first period T1 and between the fourth phase in T4 during exclusion At least one party.According to the structure, had the following advantages compared with positive phase control mode:It can will start to 7 supply electricity of load The quantity that current waveform distortion suppression during power obtains small, can be connect with load control device 1 load 7 increases or can press down The generation of buzzer processed.
6th mode is preferably, the load control involved by any one mode in first method to fourth way Device 1 is also equipped with voltage dropping power supply 51 and control unit 61.Voltage dropping power supply 51 has the capacitive element C1 of accumulation electric energy, with two-way switch 2 are electrically connected in parallel, are utilized the generation action for supplying electric power to generate electric energy from AC power 8.Control unit 61 is right Two-way switch 2 and voltage dropping power supply 51 are controlled.Switching Power Supply 52 is configured to:It is acted by transformation by the both ends of capacitive element C1 Voltage (driving voltage Vc1) converts voltage Vc2 in order to control.Control unit 61, will based on the phase detected by phase-detection portion 3 First period T1, second are divided by the half period formed during between the continuous secondary zero cross point of alternating voltage Vac T3 during period T2 and third.Control unit 61 makes two-way switch 2 make voltage dropping power supply for nonconducting state in first period T1 51 carry out generation action.Control unit 61 makes two-way switch 2 make the life of voltage dropping power supply 51 for conducting state in second phase T2 Stop into action.Control unit 61 in T3, makes two-way switch 2 make the generation of voltage dropping power supply 51 for nonconducting state during third Action stops.T0 is set at first period T1 during exclusion.According to the structure, have compared with positive phase control mode following Advantage:Can by start to load 7 supply electric power when current waveform distortion suppression obtain small, can connect with load control device 1 The quantity of the load 7 connect increases or can inhibit the generation of buzzer.
Load control device 1 involved by 7th mode is also equipped with voltage dropping power supply 51 and control unit 61.Voltage dropping power supply 51 has There is the capacitive element C1 of accumulation electric energy, be electrically connected in parallel with two-way switch 2, utilized the supply electricity from AC power 8 Power acts to generate the generation of electric energy.Control unit 61 controls two-way switch 2 and voltage dropping power supply 51.Switching Power Supply 52 is formed For:The both end voltage (driving voltage Vc1) of capacitive element C1 is converted by voltage Vc2 in order to control by transformation action.Control unit 61 Based on the phase detected by phase-detection portion 3, during between the continuous secondary zero cross point by alternating voltage Vac The half period of composition is divided into T3 during first period T1, second phase T2 and third.Control unit 61 in first period T1, Make two-way switch 2 for nonconducting state, act the generation of voltage dropping power supply 51 and stop.Control unit 61 makes in second phase T2 Two-way switch 2 is conducting state, acts the generation of voltage dropping power supply 51 and stops.Control unit 61 in T3, makes two-way during third Switch 2 is nonconducting state, and voltage dropping power supply 51 is made to carry out generation action.T0 is set at T3 during third during exclusion.According to The structure, has the following advantages:Even the load control device 1 of positive phase control mode can also be supported a greater variety of Load 7.
Load control device 1 involved by eighth mode is also equipped with voltage dropping power supply 51 and control unit 61.Voltage dropping power supply 51 has There is the capacitive element C1 of accumulation electric energy, be electrically connected in parallel with two-way switch 2, utilized the supply electricity from AC power 8 Power acts to generate the generation of electric energy.Control unit 61 controls two-way switch 2 and voltage dropping power supply 51.Switching Power Supply 52 is formed For:The both end voltage (driving voltage Vc1) of capacitive element C1 is converted by voltage Vc2 in order to control by transformation action.Control unit 61 Based on the phase detected by phase-detection portion 3, during between the continuous secondary zero cross point by alternating voltage Vac The half period of composition is divided into T3 during first period T1, second phase T2 and third.Control unit 61 is in first period T1 Two-way switch 2 is made voltage dropping power supply 51 to be made to carry out generation action for nonconducting state.Control unit 61 makes two-way in second phase T2 Switch 2 is nonconducting state, acts the generation of voltage dropping power supply 51 and stops.Control unit 61 makes two-way switch during third in T3 2 be conducting state, acts the generation of voltage dropping power supply 51 and stops.T0 is set at first period T1 during exclusion.According to the knot Structure has the following advantages:Even the load control device 1 of positive phase control mode.Also a greater variety of loads can be supported 7。

Claims (10)

1. a kind of load control device, has:
Two-way switch with load in series is electrically connected for AC power, the alternating current that the opposite load provides Pressure carries out phase controlling;
Phase-detection portion is detected the phase of the alternating voltage;
Switching Power Supply is electrically connected in parallel with the two-way switch, carry out by the switch motion of switch element will using come The DC voltage conversion generated from the supplying electric power for AC power in order to control voltage transformation action;And
Stop during the exclusion of detection timing of the phase is detected comprising the phase-detection portion, makes described open Powered-down source and the AC power are electrically separated or act the transformation of the Switching Power Supply to stop.
2. load control device according to claim 1, which is characterized in that
It is also equipped with effective, the switching part that switches in vain to the function of the stop.
3. load control device according to claim 1, which is characterized in that
Length during the exclusion is regular length.
4. load control device according to claim 1, which is characterized in that
The stop is configured to:The search process of the position of the detection timing in the half period is scanned for, based on described The result of search process determines the position during the exclusion in the half period, and the half period is by the alternating voltage It is formed during between continuous secondary zero cross point.
5. load control device according to claim 2, which is characterized in that
The stop is configured to:The search process of the position of the detection timing in the half period is scanned for, based on described The result of search process determines the position during the exclusion in the half period, and the half period is by the alternating voltage It is formed during between continuous secondary zero cross point.
6. load control device according to claim 3, which is characterized in that
The stop is configured to:The search process of the position of the detection timing in the half period is scanned for, based on described The result of search process determines the position during the exclusion in the half period, and the half period is by the alternating voltage It is formed during between continuous secondary zero cross point.
7. the load control device according to any one of claim 1~6, which is characterized in that be also equipped with:
Voltage dropping power supply has the capacitive element of accumulation electric energy, is electrically connected in parallel with the two-way switch, carries out using coming from The generation action for supplying electric power to generate the electric energy of the AC power;And
Control unit controls the two-way switch and the voltage dropping power supply,
The Switching Power Supply is configured to:It is acted by the transformation and the both end voltage of the capacitive element is transformed to the control Voltage,
The control unit is configured to:
Based on the phase detected by the phase-detection portion, by by the continuous secondary zero cross point of the alternating voltage it Between during half period for forming be divided into first period, the second phase, third during and the fourth phase between,
In between the first period and the fourth phase, the two-way switch is made to make the voltage dropping power supply for nonconducting state The generation action is carried out,
In the second phase, make the two-way switch for conducting state, act the generation of the voltage dropping power supply and stop Only,
During the third, the two-way switch is made to act the generation of the voltage dropping power supply for nonconducting state Stop,
At least one party in being set at during the exclusion between the first period and the fourth phase.
8. the load control device according to any one of claim 1~6, which is characterized in that be also equipped with:
Voltage dropping power supply has the capacitive element of accumulation electric energy, is electrically connected in parallel with the two-way switch, carries out using coming from The generation action for supplying electric power to generate the electric energy of the AC power;And
Control unit controls the two-way switch and the voltage dropping power supply,
The Switching Power Supply is configured to:It is acted by the transformation and the both end voltage of the capacitive element is transformed to the control Voltage,
The control unit is configured to:
Based on the phase detected by the phase-detection portion, by by the continuous secondary zero cross point of the alternating voltage it Between during during half period for forming is divided into first period, the second phase and third,
In the first period, make the two-way switch for nonconducting state, the voltage dropping power supply is made to carry out the generation dynamic Make,
In the second phase, make the two-way switch for conducting state, act the generation of the voltage dropping power supply and stop Only,
During the third, the two-way switch is made to act the generation of the voltage dropping power supply for nonconducting state Stop,
The first period is set at during the exclusion.
9. the load control device according to any one of claim 1~6, which is characterized in that be also equipped with:
Voltage dropping power supply has the capacitive element of accumulation electric energy, is electrically connected in parallel with the two-way switch, carries out using coming from The generation action for supplying electric power to generate the electric energy of the AC power;And
Control unit controls the two-way switch and the voltage dropping power supply,
The Switching Power Supply is configured to:It is acted by the transformation and the both end voltage of the capacitive element is transformed to the control Voltage,
The control unit is configured to:
Based on the phase detected by the phase-detection portion, by by the continuous secondary zero cross point of the alternating voltage it Between during during half period for forming is divided into first period, the second phase and third,
In the first period, the two-way switch is made to act the generation of the voltage dropping power supply for nonconducting state Stop,
In the second phase, make the two-way switch for conducting state, act the generation of the voltage dropping power supply and stop Only,
During the third, make the two-way switch for nonconducting state, the voltage dropping power supply is made to carry out the generation dynamic Make,
During the third is set at during the exclusion.
10. the load control device according to any one of claim 1~6, which is characterized in that be also equipped with:
Voltage dropping power supply has the capacitive element of accumulation electric energy, is electrically connected in parallel with the two-way switch, carries out using coming from The generation action for supplying electric power to generate the electric energy of the AC power;And
Control unit controls the two-way switch and the voltage dropping power supply,
The Switching Power Supply is configured to:It is acted by the transformation and the both end voltage of the capacitive element is transformed to the control Voltage,
The control unit is configured to:
Based on the phase detected by the phase-detection portion, by by the continuous secondary zero cross point of the alternating voltage it Between during during half period for forming is divided into first period, the second phase and third,
In the first period, make the two-way switch for nonconducting state, the voltage dropping power supply is made to carry out the generation dynamic Make,
In the second phase, the two-way switch is made to act the generation of the voltage dropping power supply for nonconducting state Stop,
During the third, make the two-way switch for conducting state, act the generation of the voltage dropping power supply and stop Only,
The first period is set at during the exclusion.
CN201711446815.2A 2016-12-27 2017-12-27 Load control device Active CN108243538B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016254534A JP6830204B2 (en) 2016-12-27 2016-12-27 Load control device
JP2016-254534 2016-12-27

Publications (2)

Publication Number Publication Date
CN108243538A true CN108243538A (en) 2018-07-03
CN108243538B CN108243538B (en) 2020-12-29

Family

ID=62701190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711446815.2A Active CN108243538B (en) 2016-12-27 2017-12-27 Load control device

Country Status (3)

Country Link
JP (1) JP6830204B2 (en)
CN (1) CN108243538B (en)
TW (1) TWI658749B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7300636B2 (en) * 2018-12-27 2023-06-30 パナソニックIpマネジメント株式会社 LOAD CONTROL CIRCUIT, LOAD CONTROL METHOD, AND PROGRAM
JP7262046B2 (en) * 2019-05-28 2023-04-21 パナソニックIpマネジメント株式会社 LOAD CONTROLLER, LOAD CONTROL METHOD AND PROGRAM
JP7033754B2 (en) * 2021-01-07 2022-03-11 パナソニックIpマネジメント株式会社 Load control device
CN113433989B (en) * 2021-06-21 2022-07-12 深圳市科信通信技术股份有限公司 Heat load system of communication equipment and control method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090273958A1 (en) * 2008-05-02 2009-11-05 Lutron Electronics Co., Inc. Cat-Ear Power Supply Having a Latch Reset Circuit
CN102292786A (en) * 2008-12-22 2011-12-21 松下电工株式会社 Load control device
JP2012004013A (en) * 2010-06-18 2012-01-05 Panasonic Electric Works Co Ltd Dimming device
CN104145531A (en) * 2012-03-05 2014-11-12 松下电器产业株式会社 Two-wire load control device
WO2016199368A1 (en) * 2015-06-08 2016-12-15 パナソニックIpマネジメント株式会社 Dimmer

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006278009A (en) * 2005-03-28 2006-10-12 Matsushita Electric Works Ltd Dimmer
US8067926B2 (en) * 2007-12-21 2011-11-29 Lutron Electronics Co., Inc. Power supply for a load control device
JP5314413B2 (en) * 2008-12-22 2013-10-16 パナソニック株式会社 Load control device
JP5361611B2 (en) * 2009-08-26 2013-12-04 パナソニック株式会社 Load control device
JP5362484B2 (en) * 2009-08-26 2013-12-11 パナソニック株式会社 Load control device
WO2011024048A1 (en) * 2009-08-26 2011-03-03 パナソニック電工株式会社 Load control device
JP5457786B2 (en) * 2009-10-19 2014-04-02 パナソニック株式会社 Load control device
JP5768979B2 (en) * 2012-01-19 2015-08-26 東芝ライテック株式会社 Light control device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090273958A1 (en) * 2008-05-02 2009-11-05 Lutron Electronics Co., Inc. Cat-Ear Power Supply Having a Latch Reset Circuit
CN102292786A (en) * 2008-12-22 2011-12-21 松下电工株式会社 Load control device
JP2012004013A (en) * 2010-06-18 2012-01-05 Panasonic Electric Works Co Ltd Dimming device
CN104145531A (en) * 2012-03-05 2014-11-12 松下电器产业株式会社 Two-wire load control device
WO2016199368A1 (en) * 2015-06-08 2016-12-15 パナソニックIpマネジメント株式会社 Dimmer

Also Published As

Publication number Publication date
TW201824950A (en) 2018-07-01
JP2018106564A (en) 2018-07-05
TWI658749B (en) 2019-05-01
JP6830204B2 (en) 2021-02-17
CN108243538B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN108243545A (en) Load control device
CN107683631A (en) Light modulating device
CN108243538A (en) Load control device
US9166496B2 (en) Load control device
JP6195200B2 (en) Light control device
US9974134B2 (en) Light-dimming device
CN107950079A (en) Light modulating device
CN102171623A (en) Load controller
CN107852800B (en) Dimming device
EP2410817A2 (en) Light emitting device driving circuit
US9288855B2 (en) Driving circuit for driving LED load
US11309796B2 (en) Control method of single live line charging circuit, control circuit of single live line charging circuit and single live line charging circuit
CN103874279B (en) Power circuit and lighting device
JP5796172B2 (en) Two-wire load control device
JP7142228B2 (en) load controller
JP7033754B2 (en) Load control device
CN108029182A (en) Light modulating device
CN108029183A (en) Light modulating device
CN104955211A (en) Lighting circuit, device and system
JP2020068072A (en) Lighting device, illumination fixture, and illumination system
US8901856B2 (en) Detection circuit, power circuit, and luminaire
TWI719593B (en) Single firewire power control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant