CN108242028A - Substation Bus Arrangement figure and intelligent alarm test case visualization automatic correlation method - Google Patents

Substation Bus Arrangement figure and intelligent alarm test case visualization automatic correlation method Download PDF

Info

Publication number
CN108242028A
CN108242028A CN201711488312.1A CN201711488312A CN108242028A CN 108242028 A CN108242028 A CN 108242028A CN 201711488312 A CN201711488312 A CN 201711488312A CN 108242028 A CN108242028 A CN 108242028A
Authority
CN
China
Prior art keywords
test case
substation
file
intelligent alarm
interval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711488312.1A
Other languages
Chinese (zh)
Other versions
CN108242028B (en
Inventor
张磐
王强
蒋菱
陈建
康宁
郭凌旭
马敏杰
顾俊捷
王旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Original Assignee
NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd, Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd filed Critical NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201711488312.1A priority Critical patent/CN108242028B/en
Publication of CN108242028A publication Critical patent/CN108242028A/en
Application granted granted Critical
Publication of CN108242028B publication Critical patent/CN108242028B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to a kind of Substation Bus Arrangement figure and the visualization automatic correlation method of intelligent alarm test case, technical characterstic is to include the following steps:Step 1 instantiates substation's SCD file and substation fault template according to substation's actual interval information;Step 2, the information according to the voltage class at the interval of main wiring diagram, primary equipment description, IEDName and IEDDesc, each interval that will instantiate test case file and main wiring diagram carries out auto-associating;Step 3 selectes some interval on main wiring diagram, and use-case to be tested is chosen after having access to the relevant all intelligent alarm test cases in the interval, and normative test is carried out to the intelligent alarm function of integrated monitoring system.The present invention can effectively improve the testing efficiency of intelligent alarm.

Description

Substation Bus Arrangement figure and intelligent alarm test case visualization automatic correlation method
Technical field
The invention belongs to power system automation technology fields, are related to the intelligent alarm of intelligent substation, especially a kind of The visualization automatic correlation method of Substation Bus Arrangement figure and intelligent alarm test case.
Background technology
New Generation of Intelligent station monitoring system, which has been substantially met, realizes intelligent substation regulation and control integration and big production management New demand, its advanced application, system configuration and functions of modules have all reached unprecedented height.With power automation skill The development of art, intelligent substation all-round construction, automated system have accessed more and more secondary device information, and operation maintenance personnel exists To in the monitoring of substation, a large amount of warning information often generated in face of electric substation automation system are felt confused, and to alarm The analyzing and processing of information takes a significant amount of time.At present, secondary device producer in part develops relevant alarm for this problem and answers With realizing and associated warning information refined and integrated from mass alarm information, it is former to infer alarm by intelligent alarm module Cause and cause of accident reduce the manual analysis time and simultaneously improve accident treatment efficiency.But each secondary device producer is developed at present The unified specification and standard of intelligent alarm application neither one, especially alert analysis logic is mostly according to previous experiences and area Property requirement exploitation.But the New Generation of Intelligent station that is directed to for so far, meeting " four unifications, four specifications " requirement that state recalls platform monitors The bus system arrangement figure of system and the visualization automatic correlation method of intelligent alarm test case do not occur yet.
At present, it is surveyed about Substation Bus Arrangement figure and the visualization auto-associating of intelligent alarm test case in intelligent alarm Application study in examination, it is all more rare in correlative study at home and abroad.Under normal circumstances, common integrated monitoring system It is that main wiring diagram and secondary device information are made into association process, and it is all to establish that other, which is carried with the test system of case script, Test case library screens use-case to be tested according to interval inside use-case library manually, does not establish direct links with main wiring diagram, This mode is not intuitive friendly, and easily the wrong test case of choosing, testing efficiency are lower.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of reasonable design, operability are strong and intuitive Convenient Substation Bus Arrangement figure and the visualization automatic correlation method of intelligent alarm test case.
The present invention solves its technical problem and following technical scheme is taken to realize:
A kind of Substation Bus Arrangement figure and the visualization automatic correlation method of intelligent alarm test case, including following step Suddenly:
Step 1 carries out substation's SCD file and substation fault template file in fact according to substation's actual interval information Exampleization obtains instantiation test case file;
Step 2, the letter according to the voltage class at the interval of main wiring diagram, primary equipment description, IEDName and IEDDesc Breath, the instantiation test case file that step 1 is obtained and each interval of main wiring diagram carry out auto-associating, form interval and use Example association;
Step 3 selectes some interval on main wiring diagram, after having access to the relevant all intelligent alarm test cases in the interval Use-case to be tested is chosen, normative test is carried out to the intelligent alarm function of integrated monitoring system.
Moreover, the substation fault template file foundation《Intelligent substation comprehensive analysis of fault criterion specification》Editor is not With the signal and signal sequence of fault category.
Moreover, the specific steps of the step 1 include:
(1) data information in SCD file and standrded fault pattern file is looked by searching the method for label in XML It looks for and mapping association is carried out to tag attributes;
(2) the IED information in project data SCD file and standrded fault pattern file is subjected to mapping association;
(3) the DataSet information in project data SCD file and standrded fault pattern file is subjected to mapping association;
It (4) will be in InClass, desc, doName information in project data SCD file and standrded fault pattern file Mstchrule, desc, name information carry out mapping association;
(5) test case file of instantiation is obtained according to map information.
Moreover, the specific steps of the step 2 include:
(1) test case for the instantiation for obtaining step 1 is classified automatically according to IEDName, IEDDesc into between-line spacing;
(2) main wiring diagram is described automatically to classify into between-line spacing according to voltage class and primary equipment;
(3) the instantiation test case of all classification and main wiring diagram information are subjected to mapping association, form interval use-case Association.
The advantages and positive effects of the present invention are:
1st, the detection of primary study of the present invention substation integrated monitoring intelligent Application function test and postitallation evaluation skill Art has developed a kind of Substation Bus Arrangement figure and the visualization automatic correlation method of intelligent alarm test case, can be to aforementioned Specific aim test is carried out about current intelligent warning system logic disunity and nonstandard problem, by being selected on main wiring diagram Determine the different type intelligent alarm test case of corresponding interval, it can be before substation puts into operation to the intelligence of integrated monitoring system Alarm carries out normative test using logic, ensures that the intelligent alarm function of integrated monitoring system is stablized in Life cycle And standardized operation.
2nd, the present invention provides main wiring diagrams and the associated mode of test script, overcome current main wiring diagram and power transformation Secondary device data of standing are associated the defects of caused operability, poor intuition, so, how man-machine interface is by substation Main wiring diagram and intelligent alarm test case visualization auto-associating improve the operability of intelligent alarm test case and intuitive Property and the present invention one of innovative point.
3rd, a kind of Substation Bus Arrangement figure of the invention and the visualization automatic correlation method of intelligent alarm test case, it is main To include two parts:(1) Substation Bus Arrangement figure is associated with the automatic batch of intelligent alarm test case;(2) power transformation station owner connects The method that intelligent alarm test case is called in line chart visualization;The present invention can be by directly choosing on Substation Bus Arrangement figure Test case carries out intelligent alarm test, can effectively improve the testing efficiency of intelligent alarm.
Description of the drawings
Fig. 1 is the process chart of the present invention;
Fig. 2 is the test case template mapping of the present invention and instantiation schematic diagram;
Fig. 3 is the main wiring diagram of the present invention and the auto-associating process chart of test case;
Fig. 4 is the 220kV line segregation figures of the present invention;
Fig. 5 is the 220kV line segregation test case group schematic diagrames of the present invention.
Specific embodiment
The embodiment of the present invention is described in further detail below in conjunction with attached drawing:
A kind of Substation Bus Arrangement figure and the visualization automatic correlation method of intelligent alarm test case, as shown in Figure 1, packet Include following steps:
Step 1 carries out substation's SCD file and substation fault template file in fact according to substation's actual interval information Exampleization obtains instantiation test case file, as shown in Figure 2:
The specific steps of the step 1 include:
(1) data information in SCD file and standrded fault pattern file is looked by searching the method for label in XML It looks for and mapping association is carried out to tag attributes;
(2) the IED information in project data SCD file and standrded fault pattern file is subjected to mapping association;
(3) the DataSet information in project data SCD file and standrded fault pattern file is subjected to mapping association;
It (4) will be in InClass, desc, doName information in project data SCD file and standrded fault pattern file Mstchrule, desc, name information carry out mapping association;
(5) test case file of instantiation is obtained according to map information.
In the present embodiment, the substation fault template file foundation《Intelligent substation comprehensive analysis of fault criterion is advised Model》Edit the signal and signal sequence of different faults classification.
Step 2, the letter according to the voltage class at the interval of main wiring diagram, primary equipment description, IEDName and IEDDesc Breath, the instantiation test case file that step 1 is obtained and each interval of main wiring diagram carry out auto-associating, form interval and use Example association, as shown in Figure 3:
The specific steps of the step 2 include:
(1) test case for the instantiation for obtaining step 1 is classified automatically according to IEDName, IEDDesc into between-line spacing;
Such as:PL2201xx route protections, mother's PM2201x bus protection, PT2201x main transformer protections etc.;
(2) main wiring diagram is described automatically to classify into between-line spacing according to voltage class and primary equipment;
Such as:220kVxx line segregations, 220kV busbares interval, No. 1 main transformer interval etc.;
(3) the instantiation test case of all classification and main wiring diagram information are subjected to mapping association, form interval use-case Association.
Such as:IedName=" PL2201A ", iedDesc=" protection of one line first set of western suburb ",
" PL " represents route protection, and " 22 " represent 220kV voltage class, and thus this test case is associated with master and connect by software The one line interval of 220kV western suburbs of line chart, as shown in Figure 4.
Step 3 selectes some interval on main wiring diagram, after having access to the relevant all intelligent alarm test cases in the interval Use-case to be tested is chosen, normative test is carried out to the intelligent alarm function of integrated monitoring system, shown in Fig. 5:
In the present embodiment, the preparation stage before on-test, visualization main wiring diagram interface are selected under appointed interval Concrete use case, as shown in figure 5, the test case group under one line line segregation of 220kV western suburbs, contains 10 multinomial specific tests Required test case is selected at mode, the one line interval of western suburb on main wiring diagram, finally carries out the detailed test of intelligent alarm.
By using the present invention Substation Bus Arrangement figure and intelligent alarm test case visualization auto-associating method, In the test preparation stage, software instantiates test case and automatically closes test case by interval according to the SCD of practical substation Substation Bus Arrangement figure is coupled to, reduces the artificial behavior for distinguishing substation interval, meanwhile, by way of interface visualization, directly It is connected on main wiring diagram according to the spaced pick test case to be tested used, improves intuitive and use-case selection that use-case is chosen Accuracy.By both the above mode, the effect of the test to integrated monitoring system intelligent alarm function can be effectively improved Rate.
It is emphasized that embodiment of the present invention is illustrative rather than limited, therefore present invention packet Include the embodiment being not limited to described in specific embodiment, it is every by those skilled in the art according to the technique and scheme of the present invention The other embodiment obtained, also belongs to the scope of protection of the invention.

Claims (4)

1. a kind of Substation Bus Arrangement figure and the visualization automatic correlation method of intelligent alarm test case, it is characterised in that:Packet Include following steps:
Substation's SCD file and substation fault template file are carried out example by step 1 according to substation's actual interval information Change, obtain instantiation test case file;
Step 2, the information according to the voltage class at the interval of main wiring diagram, primary equipment description, IEDName and IEDDesc, will The instantiation test case file and each interval of main wiring diagram that step 1 obtains carry out auto-associating, form interval use-case and close Connection;
Step 3 selectes some interval on main wiring diagram, is chosen after having access to the relevant all intelligent alarm test cases in the interval Use-case to be tested carries out normative test to the intelligent alarm function of integrated monitoring system.
2. a kind of Substation Bus Arrangement figure according to claim 1 and the visualization auto-associating of intelligent alarm test case Method, it is characterised in that:The substation fault template file foundation《Intelligent substation comprehensive analysis of fault criterion specification》It compiles Collect the signal and signal sequence of different faults classification.
3. a kind of Substation Bus Arrangement figure according to claim 1 or 2 and the visualization of intelligent alarm test case are automatic Correlating method, it is characterised in that:The specific steps of the step 1 include:
(1) data information in SCD file and standrded fault pattern file is searched simultaneously by searching the method for label in XML Mapping association is carried out to tag attributes;
(2) the IED information in project data SCD file and standrded fault pattern file is subjected to mapping association;
(3) the DataSet information in project data SCD file and standrded fault pattern file is subjected to mapping association;
It (4) will be in InClass, desc, doName information in project data SCD file and standrded fault pattern file Mstchrule, desc, name information carry out mapping association;
(5) test case file of instantiation is obtained according to map information.
4. a kind of Substation Bus Arrangement figure according to claim 1 or 2 and the visualization of intelligent alarm test case are automatic Correlating method, it is characterised in that:The specific steps of the step 2 include:
(1) test case for the instantiation for obtaining step 1 is classified automatically according to IEDName, IEDDesc into between-line spacing;
(2) main wiring diagram is described automatically to classify into between-line spacing according to voltage class and primary equipment;
(3) the instantiation test case of all classification and main wiring diagram information are subjected to mapping association, form interval use-case association.
CN201711488312.1A 2017-12-30 2017-12-30 Visual automatic association method for main wiring diagram and intelligent alarm test case of transformer substation Active CN108242028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711488312.1A CN108242028B (en) 2017-12-30 2017-12-30 Visual automatic association method for main wiring diagram and intelligent alarm test case of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711488312.1A CN108242028B (en) 2017-12-30 2017-12-30 Visual automatic association method for main wiring diagram and intelligent alarm test case of transformer substation

Publications (2)

Publication Number Publication Date
CN108242028A true CN108242028A (en) 2018-07-03
CN108242028B CN108242028B (en) 2022-01-18

Family

ID=62701168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711488312.1A Active CN108242028B (en) 2017-12-30 2017-12-30 Visual automatic association method for main wiring diagram and intelligent alarm test case of transformer substation

Country Status (1)

Country Link
CN (1) CN108242028B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111948489A (en) * 2020-07-27 2020-11-17 国网山东省电力公司电力科学研究院 Intelligent substation secondary equipment board card-level abnormal defect diagnosis and positioning method and system
CN112133236A (en) * 2020-09-28 2020-12-25 深圳创维-Rgb电子有限公司 Display screen testing method, oscilloscope and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944770A (en) * 2010-08-04 2011-01-12 浙江省电力公司 Communication implementation method of virtual station grade IED mode between primary station and substation in fault information system 61850
CN103200051A (en) * 2013-04-27 2013-07-10 国家电网公司 Intelligent substation message simulation testing and association message analysis system and method
CN104867058A (en) * 2015-05-22 2015-08-26 国网四川省电力公司技能培训中心 IED visualization method of intelligent transformer substation SCD file
CN105573283A (en) * 2016-02-16 2016-05-11 国网四川省电力公司电力科学研究院 Transformer station equipment function association database establishing method and event association information group filtering method
CN107394894A (en) * 2017-08-06 2017-11-24 俞秋芳 A kind of fault location based on automation equipment virtual connections and visual presentation device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944770A (en) * 2010-08-04 2011-01-12 浙江省电力公司 Communication implementation method of virtual station grade IED mode between primary station and substation in fault information system 61850
CN103200051A (en) * 2013-04-27 2013-07-10 国家电网公司 Intelligent substation message simulation testing and association message analysis system and method
CN104867058A (en) * 2015-05-22 2015-08-26 国网四川省电力公司技能培训中心 IED visualization method of intelligent transformer substation SCD file
CN105573283A (en) * 2016-02-16 2016-05-11 国网四川省电力公司电力科学研究院 Transformer station equipment function association database establishing method and event association information group filtering method
CN107394894A (en) * 2017-08-06 2017-11-24 俞秋芳 A kind of fault location based on automation equipment virtual connections and visual presentation device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
彭海平 等: "智能变电站间隔层设备智能定检作业系统的研究", 《电力系统保护与控制》 *
董磊超 等: "智能变电站间隔层设备自动测试系统研制", 《电力系统自动化》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111948489A (en) * 2020-07-27 2020-11-17 国网山东省电力公司电力科学研究院 Intelligent substation secondary equipment board card-level abnormal defect diagnosis and positioning method and system
CN111948489B (en) * 2020-07-27 2024-02-02 国网山东省电力公司电力科学研究院 Intelligent substation secondary equipment board card level abnormal defect diagnosis positioning method and system
CN112133236A (en) * 2020-09-28 2020-12-25 深圳创维-Rgb电子有限公司 Display screen testing method, oscilloscope and storage medium

Also Published As

Publication number Publication date
CN108242028B (en) 2022-01-18

Similar Documents

Publication Publication Date Title
CN108268706B (en) Closed loop test system and method for intelligent alarm application of integrated monitoring system
CN110020967B (en) Information processing method and device for intelligent alarm of power grid dispatching end transformer substation
CN106199276B (en) The intelligent diagnosis system and method for exception information in a kind of power information acquisition system
CN106383958B (en) A kind of substation's anti-misoperation locking logic and intelligent Acceptance Test System
CN105809260A (en) Method for intelligently generating monitoring information point list of dispatching automation system
CN111478324B (en) Power station alarm analysis system
CN105388370A (en) Automatic closed-loop testing method for connecting-and-locking logic of substation bay level
CN106130185A (en) A kind of monitoring system of electric substation modeling method based on status monitoring information
CN103995932A (en) Unified modeling method adopting generalized measurement transverse association mode
CN104360835A (en) Automatic sequential control operation ticket generation method based on topologic mode
CN108490282B (en) Method and system for presetting alarm test data of intelligent substation
CN103730894A (en) Diagram checking method and device of energy management system
CN116169778A (en) Processing method and system based on power distribution network anomaly analysis
CN103616616A (en) Fault detection method for large-scale grounding grid
CN109408492A (en) Railway power equipment record management system and its method based on fault location function
CN108242028A (en) Substation Bus Arrangement figure and intelligent alarm test case visualization automatic correlation method
CN116743079A (en) Photovoltaic string fault processing method and device, photovoltaic management system and medium
CN115224800A (en) Monitoring information fault studying, judging and early warning method fusing multidimensional data
CN110706365A (en) Image characteristic data modeling method for power equipment
CN107730123B (en) Method for checking consistency of dispatching automation graph model specification
CN104298421B (en) Power distribution network safety control method based on rapid simulation analysis technology
CN109633381A (en) A kind of electric network failure diagnosis intelligent analysis method
CN116208091A (en) Fault diagnosis and early warning method for distributed photovoltaic power station equipment
CN115587635A (en) Transformer area line loss analysis method and system based on neutral point deviation judgment
CN114626440A (en) Monitoring signal objectification analysis method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: No. 8, Haitai Huake 4th Road, Huayuan Industrial Zone, High tech Zone, Binhai New Area, Tianjin, 300384

Patentee after: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee after: STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Patentee after: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd.

Address before: No.8, Haitai Huake 4th Road, Xiqing District, Tianjin 300384

Patentee before: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee before: STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Patentee before: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd.

CP02 Change in the address of a patent holder