CN108229917A - Project data analysis method and system - Google Patents

Project data analysis method and system Download PDF

Info

Publication number
CN108229917A
CN108229917A CN201810006713.7A CN201810006713A CN108229917A CN 108229917 A CN108229917 A CN 108229917A CN 201810006713 A CN201810006713 A CN 201810006713A CN 108229917 A CN108229917 A CN 108229917A
Authority
CN
China
Prior art keywords
client
project
data
data list
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810006713.7A
Other languages
Chinese (zh)
Other versions
CN108229917B (en
Inventor
张森
尹山
仵军胜
周永军
叶龙剑
刘雪倩
韩林生
李海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tunnel Tang Technology Co Ltd
Original Assignee
Tunnel Tang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tunnel Tang Technology Co Ltd filed Critical Tunnel Tang Technology Co Ltd
Priority to CN201810006713.7A priority Critical patent/CN108229917B/en
Publication of CN108229917A publication Critical patent/CN108229917A/en
Application granted granted Critical
Publication of CN108229917B publication Critical patent/CN108229917B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)

Abstract

A kind of project data analysis method and system provided by the invention.Wherein, the method is applied to project data analysis system.The method receives cuit cost data by the first client end response user's operation, and first client corresponds to the project data list of destination item according to the project cost data update.The updated project data list is sent to the server again, the project data list and corresponding preset expected project data of the server according to reception generate analysis result, and the analysis result are shown.So as to by project cost data feedback to server, user to be reminded to be managed in time to cost after server analysis, avoid unnecessary loss in time.

Description

Project data analysis method and system
Technical field
The present invention relates to technical field of buildings, in particular to a kind of project data analysis method and system.
Background technology
During previous projects are carried out, construction project management person often only focuses on field management, and ignores Engineering cost and profit.Enterprise is also that project administrator is examined with the field managements situation such as construction speed, without into This is examined.But in fact in the project management of enterprise, cost is core.Cost data is constantly incremental number simultaneously According to, if cannot timely management and control, very big loss will be brought to construction enterprises.
Invention content
The purpose of the present invention is to provide a kind of project data analysis method and system, to improve problem above.
To achieve these goals, technical solution used in the embodiment of the present invention is as follows:
In a first aspect, an embodiment of the present invention provides a kind of project data analysis method, system is analyzed applied to project data System, the system comprises server and multiple client, communicates to connect between the server and multiple client, the multiple Client includes one first client, the method includes:The first client end response user's operation receives cuit Cost data;First client corresponds to the project data list of destination item according to the project cost data update;Institute It states the first client and the updated project data list is sent to the server;The server is according to the institute of reception Project data list and corresponding preset expected project data are stated, generates analysis result, and the analysis result is opened up Show.
Second aspect, an embodiment of the present invention provides a kind of project data analysis system, the system comprises server and Multiple client communicates to connect between the server and multiple client, and the multiple client includes one first client End;The first client end response user's operation receives cuit cost data;First client is according to the project The project data list of the corresponding destination item of cost data update;First client arranges the updated project data Table is sent to the server;The project data list and corresponding preset expected project of the server according to reception Data generate analysis result, and the analysis result are shown.
Compared with prior art, a kind of project data analysis method provided by the invention analyzes system applied to project data System.The method receives cuit cost data, first client by the first client end response user's operation The project data list of destination item is corresponded to according to the project cost data update.The updated project data is arranged again Table is sent to the server, the project data list and corresponding preset expected project of the server according to reception Data generate analysis result, and the analysis result are shown.So as in time by project cost data feedback to service Device user to be reminded to be managed in time to cost after server analysis, avoids unnecessary loss.
For the above objects, features and advantages of the present invention is enable to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate Appended attached drawing, is described in detail below.
Description of the drawings
It in order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range, for those of ordinary skill in the art, without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is a kind of structure diagram of project data analysis system provided in an embodiment of the present invention.
Fig. 2 is the structure diagram of server shown in Fig. 1.
Fig. 3 is a kind of step flow chart of project data analysis method provided in an embodiment of the present invention.
Fig. 4 is a kind of another part of the step flow chart of project data analysis method provided in an embodiment of the present invention.
Icon:100- servers;111- memories;112- processors;113- communication units;200- electronic equipments;300- Client;400- project data analysis systems.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be configured to arrange and design with a variety of different herein.Cause This, the detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit claimed invention below Range, but it is merely representative of the selected embodiment of the present invention.Based on the embodiment of the present invention, those skilled in the art are not doing Go out all other embodiments obtained under the premise of creative work, shall fall within the protection scope of the present invention.
It please refers to Fig.1, a kind of project data analysis system 400 provided in an embodiment of the present invention.The project data analysis System 400 includes server 100 and multiple electronic equipments 200.Above-mentioned server 100 is communicated to connect with electronic equipment 200.
Electronic equipment 200 be preferably mobile terminal device, such as can include smart mobile phone, tablet computer, it is on knee just Take computer, vehicle-mounted computer, wearable mobile terminal etc..One client 300 is installed in the electronic equipment 200.Client 300 It is corresponding with server 100, provide service to the user.
Above-mentioned client 300 can be respectively iOS and Android ends.IOS ends use Objective-C as development language, The iOS SDK developed using Apple Inc. build development environment;Android ends use java as development language, use Google's public affairs The Android SDK of department's exploitation build development environment;PC ends use C# as development language, are developed based on .NET.
Fig. 2 is please referred to, is the block diagram of above-mentioned server 100.The server 100 includes memory 111, processing Device 112 and communication unit 113.
The memory 111, processor 112 and 113 each element of communication unit are directly or indirectly electrical between each other Connection, to realize the transmission of data or interaction.For example, these elements can pass through one or more communication bus or letter between each other Number line, which is realized, to be electrically connected.Realize project data analysis software include it is at least one can be with software or firmware (Firmware) Form is stored in the memory 111 or is solidificated in the operating system (Operating System, OS) of the server 100 In software function module.The processor 112 is used to perform the executable module stored in the memory 111.
Wherein, the memory 111 may be, but not limited to, random access memory (Random Access Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..Wherein, memory 111 is used to store program or data.The communication unit 113 is used to pass through institute It states network and establishes communication connection between the server 100 and other communication terminals, and for receiving and dispatching number by the network According to.
It should be understood that structure shown in Fig. 2 is only the structure diagram of server 100, the server 100 may be used also Including either less components more than shown in Fig. 2 or with the configuration different from shown in Fig. 2.Each group shown in Fig. 2 Hardware may be used in part, software or combination is realized.
It please refers to Fig.3, Fig. 3 is the flow chart of a kind of project data analysis method that present pre-ferred embodiments provide.It should For project data analysis system 400 shown in FIG. 1.Above-mentioned project data analysis method includes the following steps:
Step S101, the first client end response user's operation receive cuit cost data.
In embodiments of the present invention, project cost data can be the cost data of an engineering project.Specifically, project The type of cost data can include, but are not limited to include cost of labor, material cost, construction machinery cost of use, construction point It covers all expenses use.The type of project cost data can be increased and decreased according to the demand of user.Project cost data input by user can To be at least one of mentioned kind.Multiple client 300 can communicate to connect, and client 300 with server 100 simultaneously Between also communicate to connect.Multiple client 300 includes one first client.It should be noted that user needs upload project During cost data, client 300 can be chosen to input the project cost data, choosing by using one in multiple client 300 In client 300 need to have editing authority to the corresponding engineering project of project cost data.For the convenience of description, it will connect The client 300 for receiving user's cuit cost data is used as the first client.And do not receive directly project input by user into The client 300 of notebook data is the second client.
Step S102, first client correspond to the project data of destination item according to the project cost data update List.
In embodiments of the present invention, destination item can be the engineering item corresponding to project cost data input by user Mesh.There is project data list corresponding with its engineering project with editing authority in each client 300.Above-mentioned item number Include the type of multiple project cost data and the corresponding numerical value of each type according to list.Update the project data row of destination item The mode of table can have type when the project cost data received are not belonging to above-mentioned project data list, then by project The corresponding type of cost data is increased newly in the project data list, and the corresponding value of corresponding project cost data is written Project data list;Have type when the project cost data received belong to above-mentioned project data list, then using project into The numerical value of notebook data is updated the numerical value that type is corresponded in project data list, (replaces original numerical value or in original numerical value Upper increase).For example, project data list includes cost of labor, material cost, construction machinery cost of use, user is received The project cost data of input are cost of labor added value, then add in cost of labor added value original in project data list In cost of labor, to obtain updated project data list.
It please refers to Fig.4, the method can also include step:
Step S201, after first client receives the project cost data, generates corresponding feature tag.
In embodiments of the present invention, the sequencing not between step S102 and step S201 is defined, Ke Yishi It is performed simultaneously.First client receives the Hash that the project cost data can extract the project cost data of input later Value is as feature tag.
The project cost data and feature tag are sent to the multiple second by step S202, first client Client.
In embodiments of the present invention, the first client by the project cost data and feature tag be sent to each Two clients.And judge whether the right of compilation with the destination item according to the project cost data by the second client Limit.
Step S203 has the second client of the editing authority according to the project cost data update second visitor The corresponding project data list in the end of family, and preserve the feature tag.
It should be noted that there is also the corresponding project datas of destination item for the second client with the editing authority List, such second client utilize the mode such as step S102, are also stored in being somebody's turn to do for itself using project cost data update Project data list.Corresponding preservation feature tag.
Step S204, the second client without the editing authority, preserves the feature tag.
By the above process, it is ensured that each project cost data input by user can be known by other clients, make Other clients can play supervisory role to the validity for the data for feeding back to server 100 later.
The updated project data list is sent to the server 100 by step S103, first client.
In embodiments of the present invention, can be the first client by the corresponding feature mark of project cost data input by user Label are added into the project data list.
After the project data list for receiving the transmission of the first client in the server 100,100 basis of server The first item data list for the destination item that the feature tag and adjacent last time receive, examines the item Newer project cost data in mesh data list whether effectively.Specifically, server 100 obtains the adjacent last time The project data list that first item data list and this of the destination item received receive is compared, and determines update Partial data, and the corresponding feature tag of update partial data is calculated, by the feature tag calculated and project data list The feature tag of middle carrying is compared.If identical, inspection result is effective;If it is different, then inspection result is invalid. When inspection result is effective, the server 100 receives and stores the project data list.
When the inspection result is invalid, with the editing authority described in the random selection of server 100 one Second client transmission list ask, with obtain choose described in have the editing authority the second client described in target The corresponding second item data list of project.
As a kind of embodiment, the server 100 can be by according to the feature tag and the first item Data list, examine newer project cost data in the second item data list whether effectively.Specific inspection Proved recipe formula is consistent with above-mentioned check system, and when this inspection result is effective, the server 100 is by the second item Data list as newest reception project data list and store.When this inspection result is invalid, then repeat from it is remaining its He, which has, randomly chooses a client 300 in the second client of the editing authority, and repeats to obtain second item data row Table.
As another embodiment, the random selection of server 100 one does not have the second visitor of the editing authority Family end, and the corresponding feature tag of the destination item is obtained from second client, the server 100 is according to described first Project data list and from the feature tag that the second client without the editing authority is chosen to obtain examines described the Newer project cost data in two project data lists whether effectively.When inspection result is effective, the clothes Business device 100 as newest project data list and stores the second item data list.
By the above process, the data that can prevent from transmitting between the first client and server 100 are by third party Malice is distorted.Ensure that the data that server 100 stores are authentic and valid, to obtain accurately analyzing data.
Step S104, the project data list and corresponding preset expected item of the server 100 according to reception Mesh number evidence generates analysis result, and the analysis result is shown.
In embodiments of the present invention, server 100 can be according to the newest project data list received and stored and correspondence Preset expected project data, generate analysis result.Above-mentioned expected project data is corresponded to be pre-set in each time The corresponding warning curve of all kinds of costs, the axis of abscissas of above-mentioned warning curve is the time, and axis of ordinates is corresponding Police sports Value.Specifically, the project data list that server 100 is received and preserved further includes the time tag of renewable time, above-mentioned time At the time of label can be that the first client receives user's cuit cost data.It should be noted that in server 100 Store each point of project data list corresponding with destination item of the transmission of client 300.The server 100 is according to reception To analysis time section input by user, destination item data list, institute are obtained from the stored project data list It states the corresponding time tag of destination item data list and belongs to the analysis time section.It is arranged from the destination item data Table extracts the data of each classification of destination item data list.It is fitted according to the data of each classification of extraction corresponding Curve is analyzed, above-mentioned analysis curvilinear abscissa axis is the time, and axis of ordinates is corresponding cost values.Each analysis is bent Line is compared with corresponding expecting curve in the expected project data, to obtain the analysis result.When the analysis is bent When line is more than corresponding warning curve, generates warning information and be sent to each client 300, shown.Remind carry out into This control.
The embodiment of the present invention also provide with a kind of corresponding project data analysis system 400 of the above method, in the system Detail schema be referred to the above method to realize, it is specific as follows:
First client receives cuit cost data for responding user's operation.First client is used for basis The project cost data update corresponds to the project data list of destination item.First client is used to receive the item After mesh cost data, corresponding feature tag is generated.First client is used for the project cost data and feature mark It signs and issues and gives the multiple second client.Second client is used to judge whether have according to the project cost data The editing authority of the destination item.The second client with the editing authority is used for according to the project cost data more The corresponding project data list in new second client, and preserve the feature tag.Without the editing authority The second client be used for, preserve the feature tag.First client sends out the updated project data list It send to the server 100.The server 100 is used for according to the project data list of reception and corresponding preset pre- Phase project data generates analysis result, and the analysis result is shown.Specifically, the server 100 is according to reception To analysis time section input by user, destination item data list, institute are obtained from the stored project data list It states the corresponding time tag of destination item data list and belongs to the analysis time section.It is arranged from the destination item data Table extracts the data of each classification of destination item data list.It is fitted according to the data of each classification of extraction corresponding Analyze curve.Each analysis curve is compared with corresponding expecting curve in the expected project data, to obtain The analysis result.
It is apparent to those skilled in the art that for convenience and simplicity of description, the device of foregoing description Specific work process, can refer to preceding method embodiment in corresponding process, details are not described herein.
In conclusion a kind of project data analysis method provided by the invention and system.Wherein, the method is applied to item Mesh data analysis system.The method receives cuit cost data, institute by the first client end response user's operation State the project data list that the first client corresponds to destination item according to the project cost data update.Again by updated institute It states project data list and is sent to the server, the server is according to the project data list of reception and corresponding pre- If expection project data, generate analysis result, and the analysis result be shown.So as in time by project cost data Server is fed back to, user to be reminded to be managed in time to cost after server analysis, avoids unnecessary loss.Reach According to work norm reasonable employment labour;Strengthen planning management, carry out actual effect deposit, reduce and overstock loss;Strengthen constructing Budget material and labour cost analysis, to control the use of material by norm;Improve the serviceability rate and utilization rate of construction machinery;Reasonable disposition and rent It rents, reduces the expenditure of machinery expenses;Reasonable construction organization design reduces rehandling;Enterprise is avoided to lose construction project cost Control is gone, so as to obtain the better performance of enterprises.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and block diagram in attached drawing Show the device of multiple embodiments according to the present invention, the architectural framework in the cards of method and computer program product, Function and operation.In this regard, each box in flow chart or block diagram can represent the one of a module, program segment or code Part, a part for the module, program segment or code include one or more and are used to implement holding for defined logic function Row instruction.It should also be noted that at some as in the realization method replaced, the function that is marked in box can also be to be different from The sequence marked in attached drawing occurs.For example, two continuous boxes can essentially perform substantially in parallel, they are sometimes It can perform in the opposite order, this is depended on the functions involved.It is it is also noted that every in block diagram and/or flow chart The combination of a box and the box in block diagram and/or flow chart can use function or the dedicated base of action as defined in performing It realizes or can be realized with the combination of specialized hardware and computer instruction in the system of hardware.
In addition, each function module in each embodiment of the present invention can integrate to form an independent portion Point or modules individualism, can also two or more modules be integrated to form an independent part.
If the function is realized in the form of software function module and is independent product sale or in use, can be with It is stored in a computer read/write memory medium.Based on such understanding, technical scheme of the present invention is substantially in other words The part contribute to the prior art or the part of the technical solution can be embodied in the form of software product, the meter Calculation machine software product is stored in a storage medium, is used including some instructions so that a computer equipment (can be People's computer, server or network equipment etc.) perform all or part of the steps of the method according to each embodiment of the present invention. And aforementioned storage medium includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic disc or CD.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this practical relationship or sequence.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that Also there are other identical elements in process, method, article or equipment including the element.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, that is made any repaiies Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter exists Similar terms are represented in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing It is further defined and is explained.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in change or replacement, should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention described should be subject to the protection scope in claims.

Claims (10)

1. a kind of project data analysis method, which is characterized in that applied to project data analysis system, the system comprises services Device and multiple client communicate to connect between the server and multiple client, and the multiple client includes one first Client, the method includes:
The first client end response user's operation receives cuit cost data;
First client corresponds to the project data list of destination item according to the project cost data update;
The updated project data list is sent to the server by first client;
The project data list and corresponding preset expected project data of the server according to reception, generation analysis knot Fruit, and the analysis result is shown.
2. the method as described in claim 1, which is characterized in that multiple second clients are further included in the multiple client, The method further includes:
After first client receives the project cost data, corresponding feature tag is generated;
The project cost data and feature tag are sent to the multiple second client by first client;
Second client judges whether the editing authority with the destination item according to the project cost data;
The second client with the editing authority is according to corresponding in the project cost data update second client The project data list, and preserve the feature tag;
The second client without the editing authority, preserves the feature tag.
3. method as claimed in claim 2, which is characterized in that
Before the updated project data list is sent to the server by first client, the method is also Including:The feature tag is added into the project data list by first client;
After first client sends the project data list, the method further includes:
The first item data of the destination item that the server is received according to the feature tag and adjacent last time List, examine newer project cost data in the project data list whether effectively;
When inspection result is effective, the server receives and stores the project data list.
4. method as claimed in claim 3, which is characterized in that when the inspection result is invalid, the method further includes:
The one second client transmission list with the editing authority of server random selection is asked, to obtain choosing In second client with the editing authority described in the corresponding second item data list of destination item.
5. method as claimed in claim 4, which is characterized in that the method further includes:
The server examines the second item data list according to the feature tag and the first item data list In the newer project cost data whether effectively;
When inspection result is effective, the server is using the second item data list as newest project data list And it stores.
6. method as claimed in claim 4, which is characterized in that the method further includes:
The server random selection one does not have the second client of the editing authority, and obtains institute from second client State the corresponding feature tag of destination item;
The server is according to the first item data list and from the second client without the editing authority chosen The feature tag obtained is held, whether having for the newer project cost data in the second item data list examined Effect;
When inspection result is effective, the server is using the second item data list as newest project data list And it stores.
7. the method as described in claim 1, which is characterized in that the time that the project data list includes renewable time marks Label, the server include according to the step of project data list and corresponding preset expected project data:
The server is obtained according to analysis time section input by user is received from the stored project data list Take destination item data list, the corresponding time tag of the destination item data list belongs to the analysis time area Between;
The data of each classification of destination item data list are extracted from the destination item data list;
Corresponding analysis curve is fitted according to the data of each classification of extraction;
Each analysis curve is compared with corresponding expecting curve in the expected project data, to obtain described point Analyse result.
8. a kind of project data analysis system, which is characterized in that the system comprises server and multiple client, the service It is communicated to connect between device and multiple client, the multiple client includes one first client;
The first client end response user's operation receives cuit cost data;
First client corresponds to the project data list of destination item according to the project cost data update;
The updated project data list is sent to the server by first client;
The project data list and corresponding preset expected project data of the server according to reception, generation analysis knot Fruit, and the analysis result is shown.
9. system as claimed in claim 8, which is characterized in that multiple second clients are further included in the multiple client;
After first client receives the project cost data, corresponding feature tag is generated;
The project cost data and feature tag are sent to the multiple second client by first client;
Second client judges whether the editing authority with the destination item according to the project cost data;
The second client with the editing authority is according to corresponding in the project cost data update second client The project data list, and preserve the feature tag;
The second client without the editing authority, preserves the feature tag.
10. system as claimed in claim 8, which is characterized in that the time that the project data list includes renewable time marks Label;
The server is obtained according to analysis time section input by user is received from the stored project data list Take destination item data list, the corresponding time tag of the destination item data list belongs to the analysis time area Between;
The data of each classification of destination item data list are extracted from the destination item data list;
Corresponding analysis curve is fitted according to the data of each classification of extraction;
Each analysis curve is compared with corresponding expecting curve in the expected project data, to obtain described point Analyse result.
CN201810006713.7A 2018-01-04 2018-01-04 Project data analysis method and system Active CN108229917B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810006713.7A CN108229917B (en) 2018-01-04 2018-01-04 Project data analysis method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810006713.7A CN108229917B (en) 2018-01-04 2018-01-04 Project data analysis method and system

Publications (2)

Publication Number Publication Date
CN108229917A true CN108229917A (en) 2018-06-29
CN108229917B CN108229917B (en) 2021-07-30

Family

ID=62642739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810006713.7A Active CN108229917B (en) 2018-01-04 2018-01-04 Project data analysis method and system

Country Status (1)

Country Link
CN (1) CN108229917B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930497A (en) * 2009-06-23 2010-12-29 财团法人彰化基督教医院 Independent and interactive health management system
US20110225168A1 (en) * 2010-03-12 2011-09-15 Lsi Corporation Hash processing in a network communications processor architecture
CN102262620A (en) * 2011-08-04 2011-11-30 无锡永中软件有限公司 Document cooperation method
CN102332117A (en) * 2011-10-26 2012-01-25 夏春秋 Comprehensive cost analysis method and system
US20140181421A1 (en) * 2012-12-21 2014-06-26 Advanced Micro Devices, Inc. Processing engine for complex atomic operations
CN106202021A (en) * 2010-11-02 2016-12-07 谷歌公司 By multiple users real-time synchronization documents editing to blog
CN106533799A (en) * 2016-12-16 2017-03-22 携程旅游网络技术(上海)有限公司 updating method and system of client based on multi-platform
CN107169745A (en) * 2017-06-05 2017-09-15 广州诚予国际市场信息研究有限公司 A kind of project management system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930497A (en) * 2009-06-23 2010-12-29 财团法人彰化基督教医院 Independent and interactive health management system
US20110225168A1 (en) * 2010-03-12 2011-09-15 Lsi Corporation Hash processing in a network communications processor architecture
CN106202021A (en) * 2010-11-02 2016-12-07 谷歌公司 By multiple users real-time synchronization documents editing to blog
CN102262620A (en) * 2011-08-04 2011-11-30 无锡永中软件有限公司 Document cooperation method
CN102332117A (en) * 2011-10-26 2012-01-25 夏春秋 Comprehensive cost analysis method and system
US20140181421A1 (en) * 2012-12-21 2014-06-26 Advanced Micro Devices, Inc. Processing engine for complex atomic operations
CN106533799A (en) * 2016-12-16 2017-03-22 携程旅游网络技术(上海)有限公司 updating method and system of client based on multi-platform
CN107169745A (en) * 2017-06-05 2017-09-15 广州诚予国际市场信息研究有限公司 A kind of project management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
肖长水等: ""自认证可信云存储框架与算法设计"", 《计算机工程与设计》 *

Also Published As

Publication number Publication date
CN108229917B (en) 2021-07-30

Similar Documents

Publication Publication Date Title
CN109120428B (en) Method and system for wind control analysis
CN104133765B (en) The test case sending method of network activity and test case server
US11593074B2 (en) System, method, and apparatus for data-centric networked application development services
CN108363684A (en) List creation method, device and server
CN106875303A (en) The method and apparatus for realizing electronic protocol signing
CN112118551A (en) Equipment risk identification method and related equipment
CN112217656A (en) Method and device for synchronizing configuration information of network equipment in SD-WAN (secure digital-to-Wide area network) system
CN105357204A (en) Method and apparatus for generating terminal identifying information
CN112017007A (en) User behavior data processing method and device, computer equipment and storage medium
CN112330412A (en) Product recommendation method and device, computer equipment and storage medium
CN107908442A (en) Resource loading method, device, terminal device and computer-readable recording medium based on spring
CN107147711A (en) Application service update method and device
CN106484853A (en) document analysis method and device
CN108040117A (en) Information-pushing method and device
CN111625567A (en) Data model matching method, device, computer system and readable storage medium
CN105574091B (en) Information-pushing method and device
CN107644366B (en) Order fraud identification method, system, storage medium and electronic equipment
CN113591900A (en) Identification method and device for high-demand response potential user and terminal equipment
CN112181794A (en) Page monitoring method and device, computer equipment and storage medium
CN110070383B (en) Abnormal user identification method and device based on big data analysis
CN111695077A (en) Asset information pushing method, terminal equipment and readable storage medium
CN108229917A (en) Project data analysis method and system
CN111448551A (en) Method and system for tracking application activity data from a remote device and generating corrective action data structures for the remote device
CN108763433A (en) Information-pushing method and device
CN114357289A (en) Information pushing method, information pushing system, electronic device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant