CN108228962A - 一种基于bim的基坑周边墙体测斜热力图生成方法 - Google Patents
一种基于bim的基坑周边墙体测斜热力图生成方法 Download PDFInfo
- Publication number
- CN108228962A CN108228962A CN201711205775.2A CN201711205775A CN108228962A CN 108228962 A CN108228962 A CN 108228962A CN 201711205775 A CN201711205775 A CN 201711205775A CN 108228962 A CN108228962 A CN 108228962A
- Authority
- CN
- China
- Prior art keywords
- heating power
- measuring point
- bim
- model
- generated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 20
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000005259 measurement Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 4
- 239000003086 colorant Substances 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 description 5
- 238000007405 data analysis Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Abstract
本发明公开了一种基于BIM的基坑周边墙体测斜热力图生成方法,包括以下步骤:一)建立测斜管和围墙三维模型;二)对测斜管模型进行依次编号;三)设置测点;四)生成初始三维网格;五)设置预警值;六)导入实测的测点数据;七)生成曲面网格;八)生成热力影像;九)将热力影像映射至围墙三维模型上。本发明通过在BIM模型上生成热力影像,实时显示热力图,既形象生动,又便于大数据的综合性分析,便于用户及时发现基坑变形重点区域。并且能够减少模型和数据关联的调试工作,简化了数据上传和处理流程。
Description
技术领域
本发明涉及BIM技术,具体地,涉及基于BIM的生成基坑内部热力影像的方法。
背景技术
BIM(Building Information Modeling),又称为建筑信息模型,是一种新型的工程建设行业的计算机应用技术,通过设计、使用建筑工程项目的各项相关信息数据作为模型的基础。大部分建筑工程都存在基坑作业部分,由于基坑作业普遍风险性较大,需在建设过程中,实时对基坑进行监测。以前基坑监测由于工具限制,主要针对某一点进行分析,而针对于同类型测点的大数据分析则没有,但事实上综合数据的分析才是与事实更贴近的分析方式。热力图属于大数据分析中一种常用的分析图表,该图表针对区域内数值分布的呈现结果清晰明了,符合基坑内部变形分析要求。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种基于BIM的基坑周边墙体测斜热力图生成方法。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:一种基于BIM的基坑周边墙体测斜热力图生成方法,包括以下步骤:一)建立BIM模型:按照施工图建立测斜管和围墙三维模型;二)测斜管编号:对测斜管模型进行依次编号,并把编号一一对应地输入至测斜管三维模型的属性信息中;三)设置测点:在每个测斜管模型上从上至下设置多个均布的测点;四)生成初始三维网格:将所有测斜管模型上排序相同的测点按照测斜管的排序依次连接,将同一测斜管模型上的测点依次连接,设每个测点的初始值为零,形成初始网格;五)设置预警值:后台设定多级预警值;六)导入数据:将现场实测的测点数据导入初始网格;七)生成曲面网格:根据导入数据,赋予测点垂直于墙面的位移,测点之间的连线采用平滑过渡,生成平滑的曲面网格;八)生成热力影像:采用与初始网格平行的剖切面,采用预警值作为剖切面的剖切高度,将剖切面切入曲面网格,剖切面将曲面网格分割成按照垂直初始网格方向上下布置的多个区域,不同区域采用不同的颜色进行渲染,渲染色由下至上逐步变深;九)将热力影像映射至围墙三维模型上。
本发明具有的优点和积极效果是:通过在BIM模型上生成热力影像,实时显示热力图,既形象生动,又便于大数据的综合性分析,便于用户及时发现基坑变形重点区域。并且能够减少模型和数据关联的调试工作,简化了数据上传和处理流程。
附图说明
图1为本发明的流程图;
图2为采用本发明生成的热力影像图。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1和图2,一种基于BIM的基坑周边墙体测斜热力图生成方法,采用以下步骤:
一)建立BIM模型:按照施工图建立测斜管和围墙三维模型;
二)测斜管编号:对测斜管模型进行依次编号,并把编号一一对应地输入至测斜管三维模型的属性信息中;
三)设置测点:在每个测斜管模型上从上至下设置多个均布的测点;
四)生成初始三维网格:将所有测斜管模型上排序相同的测点按照测斜管的排序依次连接,将同一测斜管模型上的测点依次连接,设每个测点的初始值为零,形成初始网格;
五)设置预警值:后台设定多级预警值;
六)导入数据:将现场实测的测点数据导入初始网格;
七)生成曲面网格:根据导入数据,赋予测点垂直于墙面的位移,测点之间的连线采用平滑过渡,生成平滑的曲面网格;
八)生成热力影像:采用与初始网格平行的剖切面,采用预警值作为剖切面的剖切高度,将剖切面切入曲面网格,剖切面将曲面网格分割成按照垂直初始网格方向上下布置的多个区域,不同区域采用不同的颜色进行渲染,渲染色由下至上逐步变深;
九)将热力影像映射至围墙三维模型上。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围的情况下,还可以做出很多形式,这些均属于本发明的保护范围之内。
Claims (1)
1.一种基于BIM的基坑周边墙体测斜热力图生成方法,其特征在于,包括以下步骤:
一)建立BIM模型:按照施工图建立测斜管和围墙三维模型;
二)测斜管编号:对测斜管模型进行依次编号,并把编号一一对应地输入至测斜管三维模型的属性信息中;
三)设置测点:在每个测斜管模型上从上至下设置多个均布的测点;
四)生成初始三维网格:将所有测斜管模型上排序相同的测点按照测斜管的排序依次连接,将同一测斜管模型上的测点依次连接,设每个测点的初始值为零,形成初始网格;
五)设置预警值:后台设定多级预警值;
六)导入数据:将现场实测的测点数据导入初始网格;
七)生成曲面网格:根据导入数据,赋予测点垂直于墙面的位移,测点之间的连线采用平滑过渡,生成平滑的曲面网格;
八)生成热力影像:采用与初始网格平行的剖切面,采用预警值作为剖切面的剖切高度,将剖切面切入曲面网格,剖切面将曲面网格分割成按照垂直初始网格方向上下布置的多个区域,不同区域采用不同的颜色进行渲染,渲染色由下至上逐步变深;
九)将热力影像映射至围墙三维模型上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711205775.2A CN108228962B (zh) | 2017-11-27 | 一种基于bim的基坑周边墙体测斜热力图生成方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711205775.2A CN108228962B (zh) | 2017-11-27 | 一种基于bim的基坑周边墙体测斜热力图生成方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108228962A true CN108228962A (zh) | 2018-06-29 |
CN108228962B CN108228962B (zh) | 2024-04-26 |
Family
ID=
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109063301A (zh) * | 2018-07-24 | 2018-12-21 | 杭州师范大学 | 一种基于热力图的单幅图像室内物体姿态估计方法 |
CN109447849A (zh) * | 2018-09-13 | 2019-03-08 | 中铁上海工程局集团有限公司 | 一种bim环境下的实时远程监测方法及系统 |
CN109559379A (zh) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | 一种基于装配式建筑平台的全景看房方法及装置 |
CN111560992A (zh) * | 2020-04-02 | 2020-08-21 | 中核华纬工程设计研究有限公司 | 一种基于bim模型容器与基坑形变监测系统及其方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010003238A (ko) * | 1999-06-22 | 2001-01-15 | 정선종 | 실시간 측정오차 검증방법 및 장치 |
JP2004013672A (ja) * | 2002-06-10 | 2004-01-15 | Rikogaku Shinkokai | 3次元メッシュ生成方法 |
KR101465487B1 (ko) * | 2013-12-23 | 2014-11-26 | 한국건설기술연구원 | 건물의 외피객체를 추출하는 bim데이터 처리 시스템 |
CN104680331A (zh) * | 2015-03-18 | 2015-06-03 | 国网上海市电力公司 | 一种基于ifc的输变电工程三维数字化管理平台 |
CN105631154A (zh) * | 2016-01-11 | 2016-06-01 | 中铁隧道集团有限公司 | 一种在bim施工管理平台上查看隧道监控量测数据的方法 |
CN106682325A (zh) * | 2016-12-30 | 2017-05-17 | 武汉英思工程科技股份有限公司 | 基于bim的拱坝施工期变形场动态拟合分析方法 |
CN106702995A (zh) * | 2016-12-27 | 2017-05-24 | 福建省建筑设计研究院 | 基于bim的岩土工程监测模型构建方法 |
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010003238A (ko) * | 1999-06-22 | 2001-01-15 | 정선종 | 실시간 측정오차 검증방법 및 장치 |
JP2004013672A (ja) * | 2002-06-10 | 2004-01-15 | Rikogaku Shinkokai | 3次元メッシュ生成方法 |
KR101465487B1 (ko) * | 2013-12-23 | 2014-11-26 | 한국건설기술연구원 | 건물의 외피객체를 추출하는 bim데이터 처리 시스템 |
CN104680331A (zh) * | 2015-03-18 | 2015-06-03 | 国网上海市电力公司 | 一种基于ifc的输变电工程三维数字化管理平台 |
CN105631154A (zh) * | 2016-01-11 | 2016-06-01 | 中铁隧道集团有限公司 | 一种在bim施工管理平台上查看隧道监控量测数据的方法 |
CN106702995A (zh) * | 2016-12-27 | 2017-05-24 | 福建省建筑设计研究院 | 基于bim的岩土工程监测模型构建方法 |
CN106682325A (zh) * | 2016-12-30 | 2017-05-17 | 武汉英思工程科技股份有限公司 | 基于bim的拱坝施工期变形场动态拟合分析方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109063301A (zh) * | 2018-07-24 | 2018-12-21 | 杭州师范大学 | 一种基于热力图的单幅图像室内物体姿态估计方法 |
CN109063301B (zh) * | 2018-07-24 | 2023-06-16 | 杭州师范大学 | 一种基于热力图的单幅图像室内物体姿态估计方法 |
CN109447849A (zh) * | 2018-09-13 | 2019-03-08 | 中铁上海工程局集团有限公司 | 一种bim环境下的实时远程监测方法及系统 |
CN109559379A (zh) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | 一种基于装配式建筑平台的全景看房方法及装置 |
CN109559379B (zh) * | 2018-09-20 | 2023-06-06 | 中建科技有限公司深圳分公司 | 一种基于装配式建筑平台的全景看房方法及装置 |
CN111560992A (zh) * | 2020-04-02 | 2020-08-21 | 中核华纬工程设计研究有限公司 | 一种基于bim模型容器与基坑形变监测系统及其方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107944086B (zh) | 一种基于钻孔数据的快速建模方法 | |
CN110633518B (zh) | 基于bim的简易参数化单元式幕墙材质分类统计方法 | |
WO2014071048A1 (en) | Three-dimensional modeling and drawing extraction tool | |
JP2008040921A (ja) | 形状簡略化装置及びそれに用いられるプログラム | |
CN110158818A (zh) | 一种基于bim模型的平面幕墙的快速建造方法 | |
CN102629391A (zh) | 基于数字图形介质的三维空间结构图形切割及切片方法 | |
CN108318010A (zh) | 一种基于bim的基坑监测测点快速选取方法 | |
CN107944203A (zh) | 一种风速流线可视化的建筑设计方法 | |
CN108090313A (zh) | 一种复杂岩石裂隙模型建模识别方法 | |
CN110440950B (zh) | 基于光纤测温的大体积混凝土温度监测可视化系统及方法 | |
CN112987087A (zh) | 微震监测/声发射破裂源时空分布状态与趋势的预警方法 | |
CN115047825A (zh) | 一种数控加工铣削实时显示的方法 | |
CN106446306A (zh) | 一种基于高斯球聚类的机械零件逆向工程建模方法 | |
CN108228962A (zh) | 一种基于bim的基坑周边墙体测斜热力图生成方法 | |
CN102722621A (zh) | 一种有限元法计算结果的可视化处理方法 | |
CN112069562A (zh) | 矩形构件中三向环箍型钢筋笼结构零碰撞快速布置方法 | |
CN108228962B (zh) | 一种基于bim的基坑周边墙体测斜热力图生成方法 | |
CN113256084A (zh) | 一种基于bim的建筑经济指标智能统计与校核方法和系统 | |
CN107515979A (zh) | 一种对大批量工件模型数据的处理方法及处理系统 | |
JP2021169947A (ja) | 物体認識装置及び物体認識方法 | |
CN109359402B (zh) | 一种三维土层构建方法及其装置 | |
CN112560313B (zh) | 面向高科电子产品仿真驱动的智能设计推荐方法及系统 | |
CN111859493A (zh) | 一种基于Revit软件的桥梁施工监测可视化系统 | |
KR20110099151A (ko) | 아이에프씨기반의 건축객체 표준화방법 | |
CN104143126A (zh) | 一种基于五要素体系的信息系统运维管理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |