CN108224772A CN201810116996.0A CN201810116996A CN108224772A CN 108224772 A CN108224772 A CN 108224772A CN 201810116996 A CN201810116996 A CN 201810116996A CN 108224772 A CN108224772 A CN 108224772A
Authority
CN
China
Prior art keywords
coal
furnace
blast
gas
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810116996.0A
Other languages
Chinese (zh)
Inventor
陈智华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Three Gen Fu Tai Environmental Protection Materials Ltd By Share Ltd
Original Assignee
Hunan Three Gen Fu Tai Environmental Protection Materials Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Three Gen Fu Tai Environmental Protection Materials Ltd By Share Ltd filed Critical Hunan Three Gen Fu Tai Environmental Protection Materials Ltd By Share Ltd
Priority to CN201810116996.0A priority Critical patent/CN108224772A/en
Publication of CN108224772A publication Critical patent/CN108224772A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H3/00Air heaters
    • F24H3/02Air heaters with forced circulation
    • F24H3/04Air heaters with forced circulation the air being in direct contact with the heating medium, e.g. electric heating element
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J1/00Removing ash, clinker, or slag from combustion chambers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Regulation And Control Of Combustion (AREA)

Abstract

The invention discloses a kind of novel dual-purpose boiling type hot-blast stove of bottle coal, including fluidized bed furnace;Fluidized bed furnace is divided into main furnace chamber and secondary-furnace, and main furnace chamber is set there are two siege, and siege centre is equipped with dividing wall;Firebreak is equipped among main furnace chamber and secondary-furnace, air blast blast cap is equipped in the bottom of main furnace chamber and secondary-furnace, air blast blast cap is mounted on air blast aerofoil, air blast aerofoil has main furnace chamber bellows and secondary-furnace bellows, main furnace chamber bellows are connected with blower outlet, secondary-furnace bellows are connected by air hose with main furnace chamber bellows, are equipped with main burning mouth and flame detector in fluidized bed furnace main furnace chamber side furnace wall middle and lower part, the steady burner of coal gas and liquefied gas igniter are equipped on its adjacent face furnace wall.The object of the present invention is to provide a kind of dual-purpose boiling type hot-blast stove of novel bottle coal and control methods, single coal-fired boiling type hot-blast stove is adapted to the dual-purpose boiling type hot-blast stove of bottle coal, by single or be used in mixed way, blast furnace gas more than needed is made full use of, reduces coal-fired cost.

Description

A kind of dual-purpose boiling type hot-blast stove of novel bottle coal and control method
Technical field
The present invention relates to a kind of novel dual-purpose boiling type hot-blast stove control method of bottle coal, especially suitable coal, blast furnace gas lists With, mixed hot-blast stove and control method.
Background technology
Fluidized bed furnace is a kind of coal furnace developed in recent years, it, which can not only burn, burns fat coal, can also burn general stove All kinds of colms that grate furnace and room burner cannot be burnt, and combustion efficiency is good, the thermal efficiency is high.
But environmental requirement now, burned coal price increasingly improve, and many enterprises start to try every possible means to fire using other energy substitutions Coal.Blast furnace gas combustible component is low, combustion instability, ignition temperature is low, exhaust gas volumn is big, is not paid attention in the past by everybody, now because of drop Cost needs are gradually used, wherein more is that pervious fluidized bed furnace is changed to the dual-purpose fluidized bed furnace of gas, coal, can burn gas It is cost-effective also to burn coal to solve the problems, such as that unstable, the newly-built gas burner of blast furnace gas is of high cost, security risk is big.
Because blast furnace gas be a kind of low heat value, impurity content it is high, for feed is unstable, toxicity is big its burning of fuel when Need the air before paying close attention to fire box temperature and burning and coal gas mixed proportion.Conversion between gas, coal needs strictly handle The amount held opportunity and substituted mutually, once holding inaccuracy easily causes convert failed even coking.It is guided using coal gas Stove is difficult the coal amount for holding coal opportunity and each time when burning coal.When bottle coal is used with, air blast is wanted because burning coal and burning gas It asks and differs greatly, artificial control is difficult the control equalization point, often causes coal coking or burning insufficient, on the other hand in people Substantially it can only ensure that the normal of burner hearth is difficult to take into account cost control problem, traditional coal, gas dual-purpose fluidized bed furnace when industry control The labor intensity of stoker personnel has been aggravated significantly.Simultaneously because coal-fired burning point is high, furnace igniting difficulty is opened, a large amount of combustibles need to be consumed Igniting;The defects of existing fluidized bed furnace is due in structure, making it, heat flow is slow in use, and boil the easy close-burning of dross coal, Blowing out scarfing cinder is needed once stopping burning after coking is serious, directly affects the continuous operation of production.Existing single coal-fired fluidized bed furnace pair stove Thorax tubular type air blast, easily causing air hose air port and blocking makes secondary-furnace disabler.
Invention content
The purpose of the present invention is in view of the above problems, providing a kind of dual-purpose boiling type hot-blast stove of novel bottle coal and controlling party Single coal-fired boiling type hot-blast stove is adapted to the dual-purpose boiling of bottle coal by method, the advantages of giving full play to coal-fired boiling type hot-blast stove Formula hot-blast stove by single or be used in mixed way, make full use of blast furnace gas more than needed, reduces coal-fired cost;Overcome single coal-fired boiling It rises stove and opens furnace igniting difficult, easy close-burning, Single gas hot-blast stove gas supply unstable the problems such as causing hot wind unstable.
In order to achieve the above object, the technical solution adopted by the present invention is:
A kind of dual-purpose boiling type hot-blast stove of novel bottle coal, including fluidized bed furnace;The fluidized bed furnace is divided into main furnace chamber and secondary-furnace, described Main furnace chamber is set there are two siege, and two sieges centres are equipped with dividing wall;Firebreak, the pair are equipped among main furnace chamber and secondary-furnace Burner hearth furnace wall is equipped with hot-blast outlet, connects heat supply pipeline;Air blast blast cap, the drum are equipped in the bottom of main furnace chamber and secondary-furnace Wind blast cap is mounted on air blast aerofoil, and air blast aerofoil has main furnace chamber bellows and secondary-furnace bellows, main furnace chamber bellows and air blast Machine air outlet is connected, and secondary-furnace bellows are connected by air hose with main furnace chamber bellows, and volume damper is equipped among air hose;It is boiling Stove main furnace chamber side furnace wall middle and lower part is risen equipped with main burning mouth and flame detector, is surely fired equipped with coal gas on its adjacent face furnace wall Burner and liquefied gas igniter.
Further, a coal injection pipe is equipped on each hearth furnace front side wall, coal injection pipe quantifies feeder phase with disk Even, coal injection pipe is equipped with blast pipe, and blast pipe is equipped with air blast adjustable valve, and the blast pipe is connected with main furnace chamber bellows.
Further, two rows are respectively provided on the air blast aerofoil on the two air blast aerofoils and secondary-furnace on main furnace chamber Slag pipe, the outlet of scum pipe deslagging are connected with screw conveyor.
Further, a fire door and two secondary aid distributing pipes are respectively provided on side wall in two siege furnace walls, secondary-furnace is set There are two fire door and two secondary aid distributing pipes, the secondary aid distributing pipe is connected with main furnace chamber bellows, and secondary aid distributing pipe is equipped with more A volume damper.
Further, gas inlet and combustion-supporting wind inlet are provided on the main burning mouth, the combustion-supporting wind inlet passes through Air hose connects special air blower, and spiral plate is provided in the pipeline of the main burning mouth, and pipeline is formed a combustion air spiral leads to Road.
The present invention discloses the control methods for using the dual-purpose boiling type hot-blast stove of above-mentioned bottle coal:
A kind of dual-purpose boiling type hot-blast stove control method of novel bottle coal, it include Analog input mModule, analog output module, Digital quantity input module, digital output module, CP and CPU;Analog input mModule and digital quantity input module are to fluidized bed furnace Field data and each equipment state in stove carry out data acquisition, and the signal transmission of acquisition is carried out to PLC and collection control computer Analyzing and processing data is simultaneously compared PLC Program databases, passes through analog output module and digital quantity output module Equipment is provided and is burnt using gas or instruction that coal combustion or coal gas are mixed and burned.
Further, included the following steps using gas burning:
1), system will determine gas using quantity according to external demand temperature;
2) air blower valve, is adjusted further according to data in PLC, left and right fine tuning is carried out after stablizing and is corrected, so as to further excellent Change to reach optimum value;
3) when external demand temperature or coal gas supply pressure change, system will select optimal parameter again.
Further, included the following steps using coal combustion:
1) system will determine coal dosage according to external demand temperature;
2) feeder is quantified adjusting disk further according to data in PLC give coal amount;
3) and then according to blast pressure and furnace pressure air blower valve opening is determined.
Further, included the following steps using coal gas mixed firinor fuel burning:
1) system first according to external temperature it needs to be determined that needing to provide heat;
2) maximum that can be provided is determined further according to gas pressure, lacks part and is filled up again with coal;
3) system determines coal gas with air quantity according to database in PLC after gas using quantity is determined, finally further according to furnace pressure, drum Wind pressure, fire box temperature carry out integrated judgment air blower valve opening.
Further, when burning gas switchs to burn coal, system is first shut off air blower valve, then opens air blower, then gives Fixed disk quantify feeder with it is slower to coal speed to coal, air blower valve is slowly opened, when air blower pressure, burner hearth temperature Feeder gradually increases coal-supplying amount, while air blower valve slowly adjusts, and is recycled with this until reaching again when degree, furnace pressure are stablized To desired value;When burning coal turn burning gas, then burning gas is inverted, while slowly reduce coal-supplying amount until the supply of stopping coal amount.
Beneficial effects of the present invention:
1. boiling type hot-blast stove main furnace chamber single structure is designed to multiple hearth structure, effectively increases boiling slag and coal-fired boiling is steady Qualitative and uniformity overcomes the problems, such as the full oven coke knot blowing out caused by close-burning local in burner hearth and to open furnace igniting difficult;
2. boiling type hearth of hot-blast stove is arranged to major-minor chamber structure, and secondary-furnace air blast mode is arranged to and main furnace chamber wind The bellows type air blast form that case is connected makes the remaining coal dust after main furnace chamber burns and coal gas further burn in secondary-furnace and more fill Point, multiple scum pipes are set on the aerofoil of secondary-furnace bellows, and through screw machine automatic discharge, air port will not be blocked by pulverized coal dregs;
3. installed additional on boiling type hot-blast furnace body suitable position main burning mouth and the steady burner of coal gas and liquefied gas igniter with Matching component makes boiling type hot-blast stove form the fuel gas hot-blast stove that blast furnace gas is fuel;
4. spiral-flow type combustion air helical duct is used, it is more preferable to low combustion value furnace gas air blast combustion-supporting effect, be conducive to blast furnace coal The abundant burning of gas;The steady burner installed additional realizes the easily igniting of main burning mouth and stablizes burning;The gas igniter of installation makes coal Gas ignition operation safety and reliability;
5. when burning gas can by fire box temperature, gas pressure, demand temperature analysis accurate control coal gas specified rate automatically And coal gas and air mixture ratio;
It precisely realizes that coal turns the gentle operation for turning coal of gas 6. can seize the opportunity automatically when needing coal, gas shift, ensures that coal, gas turn The success changed.
Description of the drawings
Fig. 1 is the main structure diagram of hot-blast stove of the present invention.
Fig. 2 is the left view structural representation of Fig. 1.
Fig. 3 is the partial enlargement structural representation at A in Fig. 2.
Fig. 4 is the structure diagram for the coal injection pipe connection blast pipe that disk quantifies feeder.
Fig. 5 is the local overlooking structure diagram of hot-blast stove of the present invention.
Fig. 6 is the structure diagram of main burner.
Fig. 7 is the sectional view of B-B in Fig. 6.
Fig. 8 is the sectional view of C-C in Fig. 6.
Fig. 9 is the frame diagram of hot-blast stove control method.
Figure 10 is the flow chart of hot-blast stove control method.
Label character described in figure is expressed as:1st, main furnace chamber;2nd, secondary-furnace;3rd, firebreak;4th, air blast blast cap;5th, air blast wind Plate;6th, main furnace chamber bellows;7th, secondary-furnace bellows;8th, air blower;9th, air hose;10th, flame detector;11st, main burning mouth;12nd, coal The steady burner of gas;13rd, liquefied gas igniter;14th, disk quantifies feeder;15th, screw conveyor;16th, special air blower;101、 Siege;102nd, dividing wall;103rd, coal injection pipe;104th, blast pipe;105th, scum pipe;106th, secondary aid distributing pipe;110th, gas inlet; 111st, combustion-supporting wind inlet;112nd, spiral plate;113rd, combustion air helical duct;1010th, fire door.
Specific embodiment
In order to which those skilled in the art is made to more fully understand technical scheme of the present invention, below in conjunction with the accompanying drawings to the present invention into Row detailed description, the description of this part is only exemplary and explanatory, should not there is any limitation to protection scope of the present invention Effect.
As Figure 1-Figure 8, a kind of technical solution of the present invention:A kind of dual-purpose boiling type hot-blast stove of novel bottle coal, including boiling Rise stove;The fluidized bed furnace is divided into main furnace chamber 1 and secondary-furnace 2, and the main furnace chamber 1 is set there are two siege 101, in two sieges 101 Between be equipped with dividing wall 102;Firebreak 3, major-minor burner hearth volumetric ratio 5~8: 1, the pair stove are equipped among main furnace chamber 1 and secondary-furnace 2 2 furnace wall of thorax is equipped with hot-blast outlet, connects heat supply pipeline;Air blast blast cap 4 is equipped in the bottom of main furnace chamber 1 and secondary-furnace 2, to carry The uniformity of each region boiling of height boiling siege, the air blast blast cap 4 are mounted on air blast aerofoil 5, and air blast aerofoil 5 has master Burner hearth bellows 6 and secondary-furnace bellows 7, main furnace chamber bellows 6 are connected with 8 air outlet of air blower, secondary-furnace bellows 7 by air hose 9 with Main furnace chamber bellows 6 are connected, and volume damper is equipped among air hose 9;Master is equipped in 1 side furnace wall middle and lower part of fluidized bed furnace main furnace chamber Burner 11 and flame detector 10 are equipped with the steady burner 12 of coal gas and liquefied gas igniter 13, liquid on its adjacent face furnace wall After changing gas igniter fire, to coal gas, steady burner gives gas igniting, after the burning normally of steady burner, to main burning mouth coal supply Gas ignition, ensure entire gas burner in this way stablizes burning, and entire gas-fired situation is by video flame detector Monitoring.
Preferably, it is respectively provided with anti-riot electric flow tune on main burning mouth 11 and the steady 12 respective coal supply tracheae of burner of coal gas Section, pneumatic rapid cut-off valve and anti-riot motor switch sealed butterfly valve, main gas pipe are equipped with anti-riot water seal and sealed butterfly valve;Coal gas Pipe network is equipped with gas pressure and temperature and flow instrumentation and sensor, and the monitoring of real-time central control room and regulation and control coal gas supply Should and behaviour in service, it is ensured that the safe handling of coal gas.
Preferably, a coal injection pipe 103 is equipped on each 101 stokehold side wall of siege, coal injection pipe 103 is quantitatively given with disk Coal machine 14 is connected, and coal injection pipe 103 is equipped with blast pipe 104, and blast pipe 104 is equipped with air blast adjustable valve, the blast pipe 104 It is connected with main furnace chamber bellows 6.
Preferably, two are respectively provided on the air blast aerofoil 5 on the two air blast aerofoils 5 and secondary-furnace 2 on main furnace chamber 1 Scum pipe 105, the outlet of 105 deslagging of scum pipe are connected with screw conveyor 15, and connecting tube is equipped with residual cake valve and window, the row of opening Slag valve starts screw conveyor realization automatic discharge.
Preferably, a fire door 1010 and two secondary aid distributing pipes 106 are respectively provided on side wall in two 101 furnace walls of siege, Secondary-furnace 2 is set there are two fire door 1010 and two secondary aid distributing pipes 106, and the secondary aid distributing pipe 106 connects with main furnace chamber bellows 6 Logical, secondary aid distributing pipe 106 is equipped with multiple volume dampers, complementary to adjust major-minor burner hearth wind pressure and cool down work to furnace wall With.
Preferably, be provided with gas inlet 110 and combustion-supporting wind inlet 111 on the main burning mouth 11, the combustion air into Mouth 111 connects special air blower 16 by air hose 9, spiral plate 112 is provided in the pipeline of the main burning mouth 11, by pipeline shape Into a combustion air helical duct 113.
The control principle of control method of the present invention:
This system passes through Analog input mModule and digital quantity input module collection site data and each status of equipment, Ran Houtong Scene is controlled to set by digital output module and analog output module again after crossing PLC and collection control computer for analysis processing data It is standby to ensure orderly, the safe operation of the dual-purpose fluidized bed furnace of coal gas.Increase touch screen in operating room at the scene to provide for operator on duty In real time, intuitive data analysis situation;All firemans, the experience of technical staff and method of adjustment, step are formed into program PLC is stored in as its parameter adjustment basis and periodically the abnormal data of preservation is analyzed to optimize program parameter, is ensured Its reasonability and advance;One co-exists in three kinds of combustion states in coal, the dual-purpose fluidized bed furnace of gas:1st, it is burnt using gas merely;2、 Coal combustion is used merely;3rd, coal gas is used in mixed way burning.
The system automatic control time and coal-supplying amount when coal gas guides and burns coal furnace lifting, it is ensured that the success of furnace lifting;It is meeting To gas leak, the flame-out emergency alarm when safety problems to operator on duty, will have immediately when operator on duty fails timely processing The blowing out of sequence notifies collection control personnel to ensure personnel, equipment safety simultaneously.This system has abnormal data to preserve function, facilitates technology people Member consults optimization automatic control system.
When specifically used:
(One)Be switched to after fluidized bed furnace normal operation automatic control system will oneself detect gas pressure, demand temperature again with PLC Which kind of fuel mode Program database judges this using more again.If artificially given specific fuel controlling party Formula system will be according to artificial settings automatic running, and most energy-efficient parameter operation is selected under the frame of artificial settings;Fluidized bed furnace According to the following three kinds of methods of operation of the difference of fuel:
1st, it is burnt using gas merely:It is simplest operational mode only to burn gas, and system will be according to external demand temperature come really first Determine gas using quantity, then adjust air blower valve further according to data in PLC, after stablizing again carry out left and right fine tuning correct so as to It advanced optimizes to reach optimum value.When external demand temperature or coal gas supply pressure change, system will again select most Good parameter.
2nd, coal combustion is used merely:System will determine coal dosage according to external demand temperature first, then further according to PLC Middle data adjust disk feeder coal-supplying amount, then determine air blower valve opening according to blast pressure and furnace pressure. Burning coal and removing slag needs suitable experience to come control deslagging opportunity and bed drain purge, and what slag was arranged can cause to heave difficulty in burner hearth less, slag row Can excessively cause local temperature excessively high and coking occur, which can be according to current blast pressure and furnace pressure The accurate deslagging of value of feedback, by clinker discharge ensure burner hearth in boiling degree and burning adequacy.The main stove in fluidized bed furnace Thorax and secondary-furnace are separated, and system is also by according to respective pressure, deslagging ensures the normal operation of burner hearth respectively.
3rd, coal gas is mixed and burned:Coal gas be mixed and burned when, system first according to external temperature it needs to be determined that need to Go out heat, lack part in the maximum for determining to provide according to gas pressure is filled up again with coal, may insure coal gas in this way Preferential quota use reduce cost.System determines that coal gas matches air quantity according to database in PLC after gas using quantity is determined, finally According to furnace pressure, blast pressure, fire box temperature come integrated judgment air blower valve opening.Once some or a few numbers It corrects to ensure the normal operation of burner hearth according to will all make existing parameter according to parameter in PLC when changing.
Conversion between coal and gas, conversion are divided into following two:1st, gas is burnt to switch to burn coal:Burning gas need to only prepare before burner Air be do not need to open air blower, so burn gas switch to burn coal when air blower valve open degree and coal-supplying amount number Cooperation seem important by its, once a side it is unbalance can all cause conversion failure even coking.System is when judging to need conversion Or during artificial order conversion, automatic control system be first shut off air blower valve open air blower then to fixed disk feeder with Slower gives coal speed to coal, and air blower valve is slowly opened when air blower pressure, fire box temperature, furnace pressure stabilization to coal Machine gradually increases coal-supplying amount again, while air blower valve slowly adjusts, and is recycled with this until reaching desired value.2nd, coal is burnt to switch to burn Gas then inverts burning gas, while slowly reduces coal-supplying amount until stopping the supply of coal amount.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row His property includes, so that process, method, article or equipment including a series of elements not only include those elements, and And it further includes other elements that are not explicitly listed or further includes intrinsic for this process, method, article or equipment institute Element.
Specific case used herein is expounded the principle of the present invention and embodiment, the explanation of above example It is merely used to help understand the method and its core concept of the present invention.The above is only the preferred embodiment of the present invention, should When pointing out, due to the finiteness of literal expression, and objectively there are unlimited concrete structure, for the common skill of the art For art personnel, without departing from the principle of the present invention, several improvement, retouching or variation can also be made, can also incited somebody to action Above-mentioned technical characteristic is combined in the right way;These improve retouching, variation or combination or the not improved structure by invention Think and technical solution directly applies to other occasions, be regarded as protection scope of the present invention.

Claims (10)

1. a kind of dual-purpose boiling type hot-blast stove of novel bottle coal, it includes fluidized bed furnace;It is characterized in that, the fluidized bed furnace is divided into main stove Thorax(1)And secondary-furnace(2), the main furnace chamber(1)If there are two sieges(101), two sieges(101)Centre is equipped with dividing wall (102);Main furnace chamber(1)And secondary-furnace(2)Centre is equipped with firebreak(3), the secondary-furnace(2)Furnace wall is equipped with hot-blast outlet, Connect heat supply pipeline;In main furnace chamber(1)And secondary-furnace(2)Bottom be equipped with air blast blast cap(4), the air blast blast cap(4)Installation In air blast aerofoil(5)On, air blast aerofoil(5)Have main furnace chamber bellows(6)With secondary-furnace bellows(7), main furnace chamber bellows(6)With Air blower(8)Air outlet is connected, secondary-furnace bellows(7)Pass through air hose(9)With main furnace chamber bellows(6)It is connected, air hose(9)It is intermediate Equipped with volume damper;In fluidized bed furnace main furnace chamber(1)Side furnace wall middle and lower part is equipped with main burning mouth(11)And flame detector (10), the steady burner of coal gas is equipped on its adjacent face furnace wall(12)And liquefied gas igniter(13).
2. a kind of novel dual-purpose boiling type hot-blast stove of bottle coal according to claim 1, which is characterized in that in each siege (101)Stokehold side wall is equipped with a coal injection pipe(103), coal injection pipe(103)Feeder is quantified with disk(14)It is connected, coal injection pipe (103)It is equipped with blast pipe(104), blast pipe(104)It is equipped with air blast adjustable valve, the blast pipe(104)With main furnace chamber Bellows(6)It is connected.
3. a kind of novel dual-purpose boiling type hot-blast stove of bottle coal according to claim 2, which is characterized in that positioned at main furnace chamber (1)On two air blast aerofoils(5)And secondary-furnace(2)On air blast aerofoil(5)On be respectively provided with two scum pipes(105), deslagging Pipe(105)Deslagging exports and screw conveyor(15)It is connected.
A kind of 4. novel dual-purpose boiling type hot-blast stove of bottle coal according to claim 1, which is characterized in that two sieges (101)A fire door is respectively provided in furnace wall on side wall(1010)With two secondary aid distributing pipes(106), secondary-furnace(2)There are two if Fire door(1010)With two secondary aid distributing pipes(106), the secondary aid distributing pipe(106)With main furnace chamber bellows(6)Connection, it is secondary to match Air hose(106)It is equipped with multiple volume dampers.
A kind of 5. novel dual-purpose boiling type hot-blast stove of bottle coal according to claim 1, which is characterized in that the main burning mouth (11)On be provided with gas inlet(110)With combustion-supporting wind inlet(111), the combustion-supporting wind inlet(111)Pass through air hose(9)Connection Special air blower(16), the main burning mouth(11)Pipeline in be provided with spiral plate(112), pipeline is formed into a combustion-supporting conch Revolve channel(113).
6. a kind of dual-purpose boiling type hot-blast stove control method of novel bottle coal, which is characterized in that it includes Analog input mModule, mould Analog quantity output module, digital quantity input module, digital output module, CP and CPU;Analog input mModule and digital quantity input Module carries out data acquisition to the field data in fluidized bed furnace stove and each equipment state, by the signal transmission of acquisition to PLC and Collection control computer carries out analyzing and processing data and PLC Program databases is compared, and passes through analog output module sum number Word amount output module provides equipment to be burnt or instruction that coal combustion or coal gas are mixed and burned using gas.
7. a kind of novel dual-purpose boiling type hot-blast stove control method of bottle coal according to claim 6, which is characterized in that use Gas burning includes the following steps:
1), system will determine gas using quantity according to external demand temperature;
2) air blower valve, is adjusted further according to data in PLC, left and right fine tuning is carried out after stablizing and is corrected, so as to further excellent Change to reach optimum value;
3), when external demand temperature or coal gas supply pressure change, system will select optimal parameter again.
8. a kind of novel dual-purpose boiling type hot-blast stove control method of bottle coal according to claim 6, which is characterized in that use Coal combustion includes the following steps:
1), system will coal dosage be determined according to external demand temperature;
2), quantify feeder adjusting disk further according to data in PLC and give coal amount;
3)And then air blower valve opening is determined according to blast pressure and furnace pressure.
9. a kind of novel dual-purpose boiling type hot-blast stove control method of bottle coal according to claim 6, which is characterized in that use Coal gas mixed firinor fuel burning includes the following steps:
1), system first according to external temperature it needs to be determined that needing to provide heat;
2), the maximum that further according to gas pressure determines to provide, lack part and filled up again with coal;
3), system determines coal gas with air quantity according to database in PLC after gas using quantity is determined, finally further according to furnace pressure, Blast pressure, fire box temperature carry out integrated judgment air blower valve opening.
10. a kind of novel dual-purpose boiling type hot-blast stove control method of bottle coal according to claim 9, which is characterized in that when Burn gas switch to burn coal when, system is first shut off air blower valve, then opens air blower, then to fixed disk quantify feeder with compared with Slow coal speed of giving to coal, slowly open by air blower valve, when air blower pressure, fire box temperature, furnace pressure stabilization to coal Machine gradually increases coal-supplying amount again, while air blower valve slowly adjusts, and is recycled with this until reaching desired value;Turn to burn gas when burning coal When, then burning gas is inverted, while slowly reduce coal-supplying amount until stopping the supply of coal amount.
CN201810116996.0A 2018-02-06 2018-02-06 A kind of dual-purpose boiling type hot-blast stove of novel bottle coal and control method Pending CN108224772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810116996.0A CN108224772A (en) 2018-02-06 2018-02-06 A kind of dual-purpose boiling type hot-blast stove of novel bottle coal and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810116996.0A CN108224772A (en) 2018-02-06 2018-02-06 A kind of dual-purpose boiling type hot-blast stove of novel bottle coal and control method

Publications (1)

Publication Number Publication Date
CN108224772A true CN108224772A (en) 2018-06-29

Family

ID=62669775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810116996.0A Pending CN108224772A (en) 2018-02-06 2018-02-06 A kind of dual-purpose boiling type hot-blast stove of novel bottle coal and control method

Country Status (1)

Country Link
CN (1) CN108224772A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109058974A (en) * 2018-07-03 2018-12-21 安徽辰宇机械科技有限公司 A kind of stalk chaff environmental protection suspension hot-blast stove
CN112113332A (en) * 2020-09-11 2020-12-22 安徽铱玛热能设备制造股份有限公司 Electromagnetic induction hot-blast stove

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2073541U (en) * 1989-07-25 1991-03-20 黄世汉 Ebullition combusting boilers with the feature of double speed, double bed and re-cycling
JPH08338602A (en) * 1995-06-14 1996-12-24 Babcock Hitachi Kk Boiler controller
CN1557972A (en) * 2004-01-16 2004-12-29 冶金自动化研究设计院 Optimizing control method for hybrid type blast furnace hot blast stove
CN2896027Y (en) * 2006-04-05 2007-05-02 袁朝阳 Strong hot-air double-hearth high-temperature boilling furnace
CN201251178Y (en) * 2008-08-20 2009-06-03 王全祥 Coal-fired floating furnace
CN101551191A (en) * 2009-05-09 2009-10-07 江苏科行环境工程技术有限公司 Novel air heating furnace
CN103148478A (en) * 2013-03-07 2013-06-12 黄石市建材节能设备总厂 Multi-hearth fluidized bed furnace
CN103486607A (en) * 2013-09-30 2014-01-01 攀钢集团攀枝花钢钒有限公司 Automatic fuel adjustment system and method of multi-fuel fired boiler
CN203533626U (en) * 2013-09-27 2014-04-09 陕西钢铁集团有限公司 Ignition device of coal gas fired kiln
CN104776434A (en) * 2015-04-27 2015-07-15 淄博万方窑炉工程有限责任公司 Nozzle for blast furnace gas oven
CN207865695U (en) * 2018-02-06 2018-09-14 湖南三创富泰环保材料股份有限公司 A kind of dual-purpose boiling type hot-blast stove of novel bottle coal

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2073541U (en) * 1989-07-25 1991-03-20 黄世汉 Ebullition combusting boilers with the feature of double speed, double bed and re-cycling
JPH08338602A (en) * 1995-06-14 1996-12-24 Babcock Hitachi Kk Boiler controller
CN1557972A (en) * 2004-01-16 2004-12-29 冶金自动化研究设计院 Optimizing control method for hybrid type blast furnace hot blast stove
CN2896027Y (en) * 2006-04-05 2007-05-02 袁朝阳 Strong hot-air double-hearth high-temperature boilling furnace
CN201251178Y (en) * 2008-08-20 2009-06-03 王全祥 Coal-fired floating furnace
CN101551191A (en) * 2009-05-09 2009-10-07 江苏科行环境工程技术有限公司 Novel air heating furnace
CN103148478A (en) * 2013-03-07 2013-06-12 黄石市建材节能设备总厂 Multi-hearth fluidized bed furnace
CN203533626U (en) * 2013-09-27 2014-04-09 陕西钢铁集团有限公司 Ignition device of coal gas fired kiln
CN103486607A (en) * 2013-09-30 2014-01-01 攀钢集团攀枝花钢钒有限公司 Automatic fuel adjustment system and method of multi-fuel fired boiler
CN104776434A (en) * 2015-04-27 2015-07-15 淄博万方窑炉工程有限责任公司 Nozzle for blast furnace gas oven
CN207865695U (en) * 2018-02-06 2018-09-14 湖南三创富泰环保材料股份有限公司 A kind of dual-purpose boiling type hot-blast stove of novel bottle coal

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张子慧: "《热工测量和自动控制》", 30 November 1996, 中国建筑工业出版社, pages: 256 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109058974A (en) * 2018-07-03 2018-12-21 安徽辰宇机械科技有限公司 A kind of stalk chaff environmental protection suspension hot-blast stove
CN112113332A (en) * 2020-09-11 2020-12-22 安徽铱玛热能设备制造股份有限公司 Electromagnetic induction hot-blast stove

Similar Documents

Publication Publication Date Title
CN105387458A (en) System and method for reducing emission of oxynitride of combustion equipment
CN101576314B (en) Ignition control system of tube furnace
CN205191552U (en) System for it discharges to reduce combustion apparatus nitrogen oxide
CN104456557B (en) Domestic waste incineration gas burner system
CN103982911B (en) Segmented ceramic kiln fuel gas and air linkage control system
CN207865695U (en) A kind of dual-purpose boiling type hot-blast stove of novel bottle coal
CN106918227A (en) Using the end heat stove of heat-accumulating burner
CN108224772A (en) A kind of dual-purpose boiling type hot-blast stove of novel bottle coal and control method
CN204717692U (en) A kind of palm waste boiler smoke circulating combustion system
CN2908508Y (en) Energy-saving high-efficient coal fired gasification furnace
CN201606876U (en) Low-NOx coal burner
CN104748118A (en) Rotational-flow-adjustable gas burner
CN110220211B (en) Device and method for cooperatively controlling load of coal-fired boiler by utilizing coupling of coal and gas
CN202082935U (en) Ignitable industrial waste gas boiler
CN112303616A (en) Industrial flue gas heating furnace system and control method thereof
CN105858649A (en) Graphite high-temperature expanding furnace
CN208154485U (en) A kind of Secondary Air optimization system of waste incinerator
CN207334775U (en) Biological mass gas burnnig boiler flue gas emission oxygen content monitors Analysis Control Unit
CN207247265U (en) A kind of wind powder mixing temperature and flow velocity secondary regulation system
CN206320786U (en) A kind of combustion control system of pulverized-coal fired boiler
CN204648233U (en) A kind of fuel burner nozzle of adjustable swirl
CN204268475U (en) Domestic waste incineration gas burner system
CN210796357U (en) Light-heavy phase oil heating and tail gas burning integrated furnace for producing needle coke
CN103588401B (en) Coal gas of converter dries calcining furnace and the furnace drying method of desulfurated plaster
CN110643383B (en) Light-heavy phase oil heating and tail gas burning integrated furnace for producing needle coke and control method

Legal Events