CN108223245A - A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation - Google Patents

A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation Download PDF

Info

Publication number
CN108223245A
CN108223245A CN201711478707.3A CN201711478707A CN108223245A CN 108223245 A CN108223245 A CN 108223245A CN 201711478707 A CN201711478707 A CN 201711478707A CN 108223245 A CN108223245 A CN 108223245A
Authority
CN
China
Prior art keywords
unit
energy
water
turbine
generator units
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711478707.3A
Other languages
Chinese (zh)
Inventor
曹威
王磊
顾文钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN201711478707.3A priority Critical patent/CN108223245A/en
Publication of CN108223245A publication Critical patent/CN108223245A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B15/00Controlling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Primary Health Care (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Control Of Water Turbines (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The present invention relates to a kind of overall process quantitative estimation methods of turbine-generator units water power calculation evaluation.It needs to study a kind of turbine-generator units water power calculation evaluation method at present.Step of the present invention is as follows:One:The measured data of computer supervisory control system, waterpower scheduling automation, unit ultrasonic flowmeter is read, obtains the operating status and real-time running data of turbine-generator units;Two:Operating status based on unit, the conversion process decomposition of electric energy can be arrived by carrying out the machine water excessively of unit, determine that unit is crossed the conversion of machine hydraulic energy and formed;Three:The computation model of each section energy that machine water can convert was established, carries out the real-time calculating of energy;Four:Based on real-time result of calculation, the unit that statistics calculates specific time period crosses each section energy that machine water can convert, and carries out the quantitative assessment of unit water power calculation conversion.The present invention realizes the immediate assessment and after-action review of unit performance efficiency, and the safety and economic operation in power station is instructed to work.

Description

A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation
Technical field
The present invention relates to a kind of overall process quantitative estimation methods of turbine-generator units water power calculation evaluation, belong to waterpower hair Electro-technical field.
Background technology
With the unit of the fast development of hydropower technology and equipment manufacturing technology, at present newly-built power station turbine-generator units Capacity and size are all relatively large.With the growth of run time after the operation of unit, the abrasion of unit flow passage components, diversion culvert The factors such as siltation, cause the decline of the energy conversion performance of unit.The reduction of the unit energy conversion performance of large capacity, results in Significant hydraulic energy of hydropower station utilizes loss.
At present, for the quantitative estimation method of Hydropower Plant energy utilization evaluation main effective percentage, water consumption rate, power station water Energy utilization rate etc..Efficiency is an instantaneous calculated value, is influenced by unit operation operating mode, it is difficult to the energy utilization in a period Situation is assessed, at the same efficiency just for generating equipment in itself, do not consider energy loss caused by the diversion culvert of power station. Water consumption rate has reacted power station or the energy conversion situation in the unit period, but is unable to the reason of reaction energy loses.Power station Waterpower utilization rate has reacted the water power calculation situation of power station entirety, it is impossible to react the performance efficiency of particular rack.
Therefore, it is necessary to study a kind of turbine-generator units water power calculation evaluation method, power station unit operation work is considered Condition, diversion culvert, equipment performance etc., assess the unit efficiency utilization power of different periods, and can carry out lateral, longitudinal direction comparison Analysis provides valuable information to policymaker.Existing such as publication date is on 03 23rd, 2016, Publication No. In the Chinese patent of CN105429184A, a kind of disclosed overall process quantitative estimation method of wind-powered electricity generation priority scheduling evaluation;And Publication date is on February 10th, 2016, and in the Chinese patent of Publication No. CN105320992A, a kind of disclosed electric system is standby With quantitative estimation method, it is not suitable in the evaluation of turbine-generator units water power calculation.
Invention content
It is an object of the invention to overcome above-mentioned deficiency in the prior art, and provide a kind of turbine-generator units water The overall process quantitative estimation method of energy Utilization assessment, realizes the immediate assessment and after-action review of unit performance efficiency, instructs power station Safety and economic operation work.
Technical solution is used by the present invention solves the above problems:The full mistake of turbine-generator units water power calculation evaluation The characteristics of journey quantitative estimation method, is:Include the following steps:
Step 1:Read the actual measurement of computer supervisory control system, waterpower scheduling automation, unit ultrasonic flowmeter Data obtain the operating status and real-time running data of turbine-generator units, and basic information is provided for evaluation;
Step 2:Operating status based on unit, the conversion process decomposition of electric energy can be arrived by carrying out the machine water excessively of unit, be determined Unit is crossed the conversion of machine hydraulic energy and is formed, and the qualitative assessment for water power calculation provides foundation;
Step 3:The computation model of each section energy that machine water can convert was established, carries out the real-time calculating of energy;
Step 4:Based on real-time result of calculation, the unit that statistics calculates specific time period crosses each section energy that machine water can convert Amount carries out the quantitative assessment of unit water power calculation conversion.
Preferably, in step 1 of the present invention, the operating status includes:Power generation state, idle running state, is stopped at unloaded state Machine state, phase modulation state and indefinite state, water power calculation quantitative evaluation only consider generate electricity state and shutdown state.
Preferably, in step 1 of the present invention, the real-time running data includes:Unit active power, unit tire out It counts generated energy, upstream water level, the level of tail water, cross machine flow, Weng'an biota and draft tube outlet pressure.
Preferably, in step 2 of the present invention, the energy conversion forms as follows:
When unit is in power generation state, unit, which crosses machine water, can be converted into diversion off-energy, intrinsic off-energy, performance damage Disability amount and actual power generation;
When unit, which is in, shuts down state, unit, which crosses machine water, can be converted into guide vane water loss energy.
Preferably, in step 3 of the present invention, the computation model includes the following steps:
Judge the operating status of unit;
According to the operating status of unit, calculate unit and cross machine water energy and conversion energy;
It calculates with 1 minute as calculating cycle, is calculated in the calculating cycle period using integral way.
Preferably, in step 4 of the present invention, the specific time period includes:Hour, day, the moon, year.
Preferably, in step 4 of the present invention, the content of the quantitative assessment is to count the unit water of calculation interval It can utilization rate index.
Preferably, in step 2 of the present invention, unit crosses the total water of theory that machine water can be input unit in the period Can, formula (1) is shown in calculating,
In formula:
Esn:Cross machine water energy, unit:kW·h;
ρ:Water density, unit:kg/m3
g:Acceleration of gravity, unit:m/s2
Hg:Unit generation gross head, unit:M is that power station water levels of upstream and downstream is poor;
Qgj:Unit crosses machine flow, unit:m3/ s is unit ultrasonic flow rate measurement value;
t0:The initial time of calculation interval;
t1:The termination time of calculation interval;
When unit is in power generation state, the machine water excessively of unit can be decomposed into diversion off-energy, intrinsic off-energy, performance Off-energy and actual power generation;
Formula (2) is shown in electric flux of the unit generation amount for unit output in the period, calculating,
In formula:
Esn:Unit generation amount, unit:kW·h;
Pdq:Unit active power, unit:kW;
Unit performance off-energy is that unit is since self performance declines in the period, caused by efficiency off-design efficiency Formula (3) is shown in energy loss, calculating,
In formula:
Exs:Performance loss energy, unit:kW·h;
H:Unit generation working head, unit:M, by Weng'an biota, draft tube outlet pressure and spiral case inlet section Obtained by flow relocity calculation;
ηsl-sh:Hydraulic turbine actual efficiency, unit:%;
ηsl-sj:Design of Hydraulic Turbine efficiency, unit:% is operated by the current operating head polishing of unit, load and Design of Hydraulic Turbine Characteristic curve determines;
ηfd:Generator actual efficiency, unit:%, it is bent by the current operating head polishing of unit, load and generator design efficiency Line determines;
Qfd:Unit generation flow, unit:m3/ s when unit is run mode, crosses machine flow, when unit is equal to unit During inoperative state, equal to 0;
The intrinsic off-energy of unit is damaged for the period interior energy being not achieved caused by 100% unit design efficiency itself It loses, formula (4) is shown in calculating,
In formula:
Esn:The intrinsic off-energy of unit, unit:kW·h;
Unit diversion off-energy is energy loss caused by the head loss caused by diversion culvert in the period, is calculated See formula (5),
In formula:
Eys:Unit diversion off-energy, unit:kW·h;
ΔH:Unit generation head loss, unit:M is the difference of gross head and working head;
When unit, which is in, shuts down state, the machine water of crossing of unit can be guide vane water loss energy;
Unit guide vane water loss energy is interior due to energy loss caused by guide vane leak for the period, and formula (6) is shown in calculating,
In formula:
Edl:Unit guide vane water loss energy, unit:kW·h;
Qdl:Unit guide vane leak flow, unit:m3/s;When unit is shuts down state, machine flow is crossed equal to unit, works as machine When group is non-shutdown state, equal to 0.
Preferably, the present invention realizes the operating status and operation data of turbine-generator units using computer supervisory control system Acquisition, processing, data information is sent to turbine-generator units water power calculation evaluation system;Waterpower scheduling automation realizes electricity Stand water levels of upstream and downstream hydrographic information acquisition, processing, by data information be sent to turbine-generator units water power calculation evaluation system System;Turbine-generator units water power calculation evaluation system by the information of acquisition, real-time computer group energy stream and waterpower utilization rate, And periodically result of calculation is counted as day evaluation, week evaluation, is evaluated the moon, year evaluation result;Turbine-generator units water power calculation is commented Regular evaluation result is sent to water power diagnostic system, inspection base, automatic power generation system and region class by valency system should With system, to provide foundation and reference data;Automatic electricity generation control system supports the on-line tuning of power station unit sharing of load, real Now to the closed-loop control of turbine-generator units, system is by the unit efficiency evaluation of acquisition as a result, periodically Load adjustment distributes plan Slightly.
Compared with prior art, the present invention haing the following advantages and effect:The present invention is with Supervisory Computer Control System For Hydroelectic Power Plant Based on waterpower scheduling automation, data unit operation is obtained in real time, by establishing the energy stream calculation under each state of unit Model is realized the instant and subsequent overall process quantitative evaluation analysis of unit performance efficiency, is made for power station operation plan, machine The control of group real time execution, repair and maintenance plan arrangement etc. provide foundation and reference data, instruct power station production run work, are promoted The safety of power station operation and economy.
Description of the drawings
Fig. 1 is the system of the overall process quantitative estimation method that turbine-generator units water power calculation is evaluated in the embodiment of the present invention Structure diagram.
Fig. 2 is the flow of the overall process quantitative estimation method that turbine-generator units water power calculation is evaluated in the embodiment of the present invention Schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings and pass through embodiment the present invention is described in further detail, following embodiment is to this hair Bright explanation and the invention is not limited in following embodiments.
Embodiment.
Referring to Fig. 1 to Fig. 2, the computer supervisory control system in the present embodiment realizes the operating status and fortune of turbine-generator units Acquisition, the processing of row data, turbine-generator units water power calculation evaluation system is sent to by data information.Waterpower scheduling automation It realizes acquisition, the processing of the hydrographic informations such as power station water levels of upstream and downstream, data information is sent to turbine-generator units water power calculation Evaluation system.Turbine-generator units water power calculation evaluation system passes through the information of acquisition, real-time computer group energy stream and water energy Utilization rate, and be periodically day evaluation, week evaluation, moon evaluation, year evaluation result by result of calculation statistics.Turbine-generator units water energy Regular evaluation result is sent to water power diagnostic system, inspection base, automatic power generation system and area by Utilization assessment system Domain grade application system, foundation and reference data are provided for other related systems.Automatic electricity generation control system mainly supports power station machine The on-line tuning of group sharing of load, realizes the closed-loop control to turbine-generator units, the unit efficiency evaluation that system passes through acquisition As a result, regular Load adjustment allocation strategy.
The overall process quantitative estimation method of turbine-generator units water power calculation evaluation in the present embodiment includes the following steps:
Step 1:Fetch water power station computer monitoring system, waterpower scheduling automation, unit ultrasonic flowmeter actual measurement number According to obtaining the operating status and real-time running data of turbine-generator units, basic information provided for evaluation.
Operating status includes:Generate electricity state, unloaded state, idle running state, shutdown state, phase modulation state, indefinite state, and water power calculation quantization is commented Estimate and only consider power generation state and shutdown state.
Real-time running data includes:Unit active power, upstream water level, the level of tail water, crosses machine stream at unit the accumulative total of generating electricity Amount, Weng'an biota, draft tube outlet pressure.
Step 2:Operating status based on unit, the conversion process decomposition of electric energy can be arrived by carrying out machine water, determine unit mistake The conversion of machine hydraulic energy is formed, and the qualitative assessment for water power calculation provides foundation.
Unit crosses the total water energy of theory that machine water can be input unit in the period, and formula (1) is shown in calculating,
In formula:
Esn:Cross machine water energy, unit:kW·h;
ρ:Water density, unit:kg/m3
g:Acceleration of gravity, unit:m/s2
Hg:Unit generation gross head, unit:M is that power station water levels of upstream and downstream is poor;
Qgj:Unit crosses machine flow, unit:m3/ s is unit ultrasonic flow rate measurement value;
t0:The initial time of calculation interval;
t1:The termination time of calculation interval;
When unit is in power generation state, unit, which crosses machine water, can be decomposed into diversion off-energy, intrinsic off-energy, performance loss Energy, actual power generation;
Formula (2) is shown in electric flux of the unit generation amount for unit output in the period, calculating,
In formula:
Esn:Unit generation amount, unit:kW·h;
Pdq:Unit active power, unit:kW;
Unit performance off-energy is that unit is since self performance declines in the period, caused by efficiency off-design efficiency Formula (3) is shown in energy loss, calculating,
In formula:
Exs:Performance loss energy, unit:kW·h;
H:Unit generation working head, unit:M, by Weng'an biota, draft tube outlet pressure and spiral case inlet section Flow velocity etc. calculates gained;
ηsl-sh:Hydraulic turbine actual efficiency, unit:%;
ηsl-sj:Design of Hydraulic Turbine efficiency, unit:% is operated by the current operating head polishing of unit, load and Design of Hydraulic Turbine Characteristic curve determines;
ηfd:Generator actual efficiency, unit:%, it is bent by the current operating head polishing of unit, load and generator design efficiency Line determines;
Qfd:Unit generation flow, unit:m3/ s, when unit be run mode, cross machine flow equal to unit, when unit be its His state, equal to 0;
The intrinsic off-energy of unit is damaged for the period interior energy being not achieved caused by 100% unit design efficiency itself It loses, formula (4) is shown in calculating,
In formula:
Esn:The intrinsic off-energy of unit, unit:kW·h;
Unit diversion off-energy is energy loss caused by the head loss caused by diversion culvert in the period, is calculated See formula (5),
In formula:
Eys:Unit diversion off-energy, unit:kW·h;
ΔH:Unit generation head loss, unit:M is the difference of gross head and working head;
State is shut down when unit is in, it can be guide vane water loss energy that unit, which crosses machine water,;
Unit guide vane water loss energy is interior due to energy loss caused by guide vane leak for the period, and formula (6) is shown in calculating,
In formula:
Edl:Unit guide vane water loss energy, unit:kW·h;
Qdl:Unit guide vane leak flow, unit:m3/s;When unit for shut down state, cross machine flow equal to unit, work as unit For other states, equal to 0.
Step 3:The computation model of each section energy that machine water can convert was established, carries out the real-time calculating of energy.It calculates Model includes the following steps:
Judge the operating status of unit;
According to operating states of the units, calculate unit and cross machine water energy and conversion energy;
It calculates with 1 minute as calculating cycle, is calculated in the calculating cycle period using integral way.
Step 4:Based on real-time result of calculation, the unit that statistics calculates specific time period crosses each section energy that machine water can convert Amount carries out the quantitative assessment of unit water power calculation conversion.
Specific time period includes:Hour, day, the moon, year.
Evaluation content is to count the unit waterpower utilization rate index of calculation interval.
Unit waterpower utilization rate crosses the ratio of machine water energy for unit actual power generation with unit.
Furthermore, it is necessary to illustrate, the specific embodiment described in this specification, the shape of parts and components is named Claiming etc. can be different, described in this specification above content is only to structure example explanation of the present invention.It is all according to According to equivalence changes or simple change that construction, feature and the principle described in inventional idea of the present invention are done, it is included in this hair In the protection domain of bright patent.Those skilled in the art can do described specific embodiment various The modification of various kinds or supplement substitute in a similar way, without departing from structure of the invention or surmount present claims Range defined in book, is within the scope of protection of the invention.

Claims (9)

1. a kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation, it is characterised in that:Including walking as follows Suddenly:
Step 1:Read the actual measurement number of computer supervisory control system, waterpower scheduling automation, unit ultrasonic flowmeter According to obtaining the operating status and real-time running data of turbine-generator units, basic information provided for evaluation;
Step 2:Operating status based on unit, the conversion process decomposition of electric energy can be arrived by carrying out the machine water excessively of unit, determine unit It crosses the conversion of machine hydraulic energy to form, the qualitative assessment for water power calculation provides foundation;
Step 3:The computation model of each section energy that machine water can convert was established, carries out the real-time calculating of energy;
Step 4:Based on real-time result of calculation, the unit that statistics calculates specific time period crosses each section energy that machine water can convert, into The quantitative assessment of row unit water power calculation conversion.
2. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:In the step 1, the operating status includes:Generate electricity state, unloaded state, idle running state, shut down state, phase modulation state and indefinite State.
3. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:In the step 1, the real-time running data includes:Unit active power, unit the accumulative total of generating electricity, upstream water level, The level of tail water crosses machine flow, Weng'an biota and draft tube outlet pressure.
4. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:In the step 2, the energy conversion forms as follows:
When unit is in power generation state, unit, which crosses machine water, can be converted into diversion off-energy, intrinsic off-energy, performance loss energy Amount and actual power generation;
When unit, which is in, shuts down state, unit, which crosses machine water, can be converted into guide vane water loss energy.
5. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:In the step 3, the computation model includes the following steps:
Judge the operating status of unit;
According to the operating status of unit, calculate unit and cross machine water energy and conversion energy;
It calculates with 1 minute as calculating cycle, is calculated in the calculating cycle period using integral way.
6. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:In the step 4, the specific time period includes:Hour, day, the moon, year.
7. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:In the step 4, the content of the quantitative assessment is to count the unit waterpower utilization rate index of calculation interval.
8. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:In the step 2, unit crosses the total water energy of theory that machine water can be input unit in the period, and formula (1) is shown in calculating,
In formula:
Esn:Cross machine water energy, unit:kW·h;
ρ:Water density, unit:kg/m3
g:Acceleration of gravity, unit:m/s2
Hg:Unit generation gross head, unit:M is that power station water levels of upstream and downstream is poor;
Qgj:Unit crosses machine flow, unit:m3/ s is unit ultrasonic flow rate measurement value;
t0:The initial time of calculation interval;
t1:The termination time of calculation interval;
When unit is in power generation state, the machine water excessively of unit can be decomposed into diversion off-energy, intrinsic off-energy, performance loss Energy and actual power generation;
Formula (2) is shown in electric flux of the unit generation amount for unit output in the period, calculating,
In formula:
Esn:Unit generation amount, unit:kW·h;
Pdq:Unit active power, unit:kW;
Unit performance off-energy is that unit is since self performance declines in the period, the energy caused by efficiency off-design efficiency Formula (3) is shown in loss, calculating,
In formula:
Exs:Performance loss energy, unit:kW·h;
H:Unit generation working head, unit:M, by Weng'an biota, draft tube outlet pressure and spiral case inlet cross-sectional flow Calculate gained;
ηsl-sh:Hydraulic turbine actual efficiency, unit:%;
ηsl-sj:Design of Hydraulic Turbine efficiency, unit:%, by the current operating head polishing of unit, load and Design of Hydraulic Turbine service performance Curve determines;
ηfd:Generator actual efficiency, unit:%, it is true by the current operating head polishing of unit, load and generator design efficiency curve It is fixed;
Qfd:Unit generation flow, unit:m3When unit is run mode, machine flow is crossed equal to unit by/s, when unit is non-fortune During row state, equal to 0;
The intrinsic off-energy of unit in the period since the energy loss caused by 100% is not achieved in unit design efficiency itself, Formula (4) is shown in calculating,
In formula:
Esn:The intrinsic off-energy of unit, unit:kW·h;
Unit diversion off-energy is that formula is shown in energy loss caused by the head loss caused by diversion culvert, calculating in the period (5),
In formula:
Eys:Unit diversion off-energy, unit:kW·h;
ΔH:Unit generation head loss, unit:M is the difference of gross head and working head;
When unit, which is in, shuts down state, the machine water of crossing of unit can be guide vane water loss energy;
Unit guide vane water loss energy is interior due to energy loss caused by guide vane leak for the period, and formula (6) is shown in calculating,
In formula:
Edl:Unit guide vane water loss energy, unit:kW·h;
Qdl:Unit guide vane leak flow, unit:m3/s;When unit is shuts down state, machine flow is crossed equal to unit, when unit is During non-shutdown state, equal to 0.
9. the overall process quantitative estimation method of turbine-generator units water power calculation evaluation according to claim 1, feature It is:Acquisition, the processing of the operating status and operation data of turbine-generator units are realized using computer supervisory control system, by data Information is sent to turbine-generator units water power calculation evaluation system;Waterpower scheduling automation realizes the hydrology of power station water levels of upstream and downstream Acquisition, the processing of information, turbine-generator units water power calculation evaluation system is sent to by data information;Turbine-generator units water energy Utilization assessment system is periodically united result of calculation by the information of acquisition, real-time computer group energy stream and waterpower utilization rate It is calculated as day evaluation, week evaluation, moon evaluation, year evaluation result;Turbine-generator units water power calculation evaluation system will periodically evaluate knot Fruit is sent to water power diagnostic system, inspection base, automatic power generation system and region class application system, with provide foundation and Reference data;Automatic electricity generation control system supports the on-line tuning of power station unit sharing of load, realizes to turbine-generator units Closed-loop control, system is by the unit efficiency evaluation of acquisition as a result, regular Load adjustment allocation strategy.
CN201711478707.3A 2017-12-29 2017-12-29 A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation Pending CN108223245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711478707.3A CN108223245A (en) 2017-12-29 2017-12-29 A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711478707.3A CN108223245A (en) 2017-12-29 2017-12-29 A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation

Publications (1)

Publication Number Publication Date
CN108223245A true CN108223245A (en) 2018-06-29

Family

ID=62646984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711478707.3A Pending CN108223245A (en) 2017-12-29 2017-12-29 A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation

Country Status (1)

Country Link
CN (1) CN108223245A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108960688A (en) * 2018-08-30 2018-12-07 北京光耀电力科技股份有限公司 A kind of total management system of Wind turbines
CN110188994A (en) * 2019-04-29 2019-08-30 贵州乌江水电开发有限责任公司 Running priority grade assessment method in a kind of Hydropower Unit factory
CN113833593A (en) * 2021-08-26 2021-12-24 长江勘测规划设计研究有限责任公司 Method for quantifying maintenance period of vertical coaxial two-stage mixed-flow water turbine under high-water-head and sediment-rich condition

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002007523A (en) * 2000-06-23 2002-01-11 Osaka Gas Co Ltd Evaluation system for consumer energy facility
CN101672239A (en) * 2009-09-24 2010-03-17 昆明理工大学 Dynamic monitoring method for internal energy loss of water turbine
CN102855393A (en) * 2012-08-14 2013-01-02 贵州乌江水电开发有限责任公司 Method and system for measuring and calculating hydroenergy utilization improvement rate of cascaded hydropower stations
CN102930480A (en) * 2012-11-19 2013-02-13 甘肃省电力公司电力科学研究院 System and method for comprehensive energy efficiency evaluation of hydraulic power plant

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002007523A (en) * 2000-06-23 2002-01-11 Osaka Gas Co Ltd Evaluation system for consumer energy facility
CN101672239A (en) * 2009-09-24 2010-03-17 昆明理工大学 Dynamic monitoring method for internal energy loss of water turbine
CN102855393A (en) * 2012-08-14 2013-01-02 贵州乌江水电开发有限责任公司 Method and system for measuring and calculating hydroenergy utilization improvement rate of cascaded hydropower stations
CN102930480A (en) * 2012-11-19 2013-02-13 甘肃省电力公司电力科学研究院 System and method for comprehensive energy efficiency evaluation of hydraulic power plant

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张立中 主编: "《水资源管理 第二版》", 28 February 2006, 中央广播电视大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108960688A (en) * 2018-08-30 2018-12-07 北京光耀电力科技股份有限公司 A kind of total management system of Wind turbines
CN108960688B (en) * 2018-08-30 2023-06-30 北京光耀电力科技股份有限公司 Comprehensive management system of wind turbine generator system
CN110188994A (en) * 2019-04-29 2019-08-30 贵州乌江水电开发有限责任公司 Running priority grade assessment method in a kind of Hydropower Unit factory
CN110188994B (en) * 2019-04-29 2023-07-21 贵州乌江水电开发有限责任公司 Method for evaluating running priority in hydropower unit plant
CN113833593A (en) * 2021-08-26 2021-12-24 长江勘测规划设计研究有限责任公司 Method for quantifying maintenance period of vertical coaxial two-stage mixed-flow water turbine under high-water-head and sediment-rich condition

Similar Documents

Publication Publication Date Title
Salimi et al. Simultaneous operation of wind and pumped storage hydropower plants in a linearized security-constrained unit commitment model for high wind energy penetration
CN103077430B (en) Under wind-fire coordinated dispatching mode, operation plan optimizes aided analysis method a few days ago
CN111882131B (en) Variable-speed seawater pumping and storage power station capacity optimization method based on dual-working-condition optimal efficiency tracking
CN104682381B (en) Reliability calculation method for flexible direct-current transmission system of large wind power plant
CN108223245A (en) A kind of overall process quantitative estimation method of turbine-generator units water power calculation evaluation
CN109586284B (en) Random production simulation method of transmitting-end power system considering energy curtailment and application
CN112257926B (en) Energy block power trading system and clearing method based on regional electricity price
CN104124685A (en) Sample fan method based wind power plant theoretical power computing method
CN106815771A (en) A kind of long-term evaluation method of wind power plant load
Zhang et al. Mid-long term optimal dispatching method of power system with large-scale wind-photovoltaic-hydro power generation
CN109347152A (en) Consider that polymorphic type power supply participates in the random production analog method and application of peak regulation
CN105279707A (en) Probabilistic production simulation method comprehensively considering load and wind power temporal characteristic
Kandi et al. Optimization of pump selection for running as turbine and performance analysis within the regulation schemes
CN105490309A (en) Power grid peak regulation capacity-based wind power consumption evaluation method
Souza et al. Pump-as-turbine for energy recovery in municipal water supply networks. A review
CN113446146A (en) Online water turbine efficiency test method
CN117277444B (en) New energy base power capacity optimal configuration method and device
Wang et al. Modeling and simulation of optimal wind turbine configurations in wind farms
Larson et al. California’s energy-water nexus: Water use in electricity generation
Bortoni et al. Optimal load distribution between units in a power plant
CN116054212A (en) Optimization scheduling operation method, system, equipment and medium for pumped storage power station
Shahgholian et al. A Hydroelectric Power Plant Brief: Classification and Application of Artificial Intelligence
CN110717626B (en) Optimal operation evaluation method for annual adjustment reservoir hydropower station
Feng et al. Analysis and application of hydropower real-time performance calculation
Wang et al. Real-time economic and safe operation diagnosis of hydropower units

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629

RJ01 Rejection of invention patent application after publication