CN108222915A - Monitoring system, method and the jumbolter of jumbolter - Google Patents

Monitoring system, method and the jumbolter of jumbolter Download PDF

Info

Publication number
CN108222915A
CN108222915A CN201810143205.3A CN201810143205A CN108222915A CN 108222915 A CN108222915 A CN 108222915A CN 201810143205 A CN201810143205 A CN 201810143205A CN 108222915 A CN108222915 A CN 108222915A
Authority
CN
China
Prior art keywords
jumbolter
job parameter
parameter
job
under current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810143205.3A
Other languages
Chinese (zh)
Inventor
江乃东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd
Original Assignee
BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd filed Critical BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd
Priority to CN201810143205.3A priority Critical patent/CN108222915A/en
Publication of CN108222915A publication Critical patent/CN108222915A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Abstract

This disclosure relates to a kind of monitoring system of jumbolter, method and jumbolter, the system comprises:Harvester, for acquiring job parameter of the jumbolter under current working status;Monitoring unit is monitored for job parameter of the jumbolter collected to harvester under current working status, and controls the jumbolter according to the job parameter.In the above-mentioned technical solutions, to harvester, job parameter of the collected jumbolter under current working status is monitored, it is possible to prevente effectively from the deviation occurred during artificial observation, record, not only it had been convenient for carrying out data preparation and preservation to job parameter, but also the accuracy of data can be improved.Job parameter is monitored by monitoring unit simultaneously, and jumbolter is controlled with this, it can ensure the real-time and accuracy of jumbolter control, effectively reduce the risk that accident occurs, the construction efficiency and construction quality to improve jumbolter are provided and be effectively ensured.

Description

Monitoring system, method and the jumbolter of jumbolter
Technical field
This disclosure relates to engineering tunnel field, and in particular, to a kind of monitoring system of jumbolter, method and anchor pole bore Machine.
Background technology
The economy in China just develops continuously and healthily, and the laying of the rapid too busy to get away Rail Highway of economic development is being laid with It is bound in the process across many tunnels.
Jumbolter is mainly used for rock soil anchor, roadbed, slope treatment, underground deep basal pit supporting and retaining system, and Wall Rock of Tunnel is stablized, in advance The Hazard controls such as landslide-proofing, underground engineering support and Ground Treatment of High-rise Buildings etc. are also applied for deep basal pit spray shield, side slope soil nailing The non-prestressed suspension roof support of engineering, mainly for sandy soil layer, loess formation and soft damage.It is improving supporting effect, is reducing branch Shield cost is accelerated into lane speed, reduces assistant conveyance amount, reduces labor intensity, improves drift section utilization rate etc. and have Very prominent superiority.At this stage, it is the work data of manually record jumbolter mostly, does not simply fail to the number ensured According to reliability, and record data accuracy and real-time be difficult to ensure that, so as to be difficult to according to the data in real time to applying Work process is monitored.Also, when being analyzed according to work data, criterion disunity, time-consuming and laborious, working efficiency Lowly.
Invention content
The purpose of the disclosure is to provide a kind of monitoring system of jumbolter, method and jumbolter.
To achieve these goals, it is described according to the disclosure in a first aspect, provide a kind of monitoring system of jumbolter System includes:
Harvester, for acquiring job parameter of the jumbolter under current working status;
Monitoring unit, for operation of the jumbolter collected to the harvester under current working status Parameter is monitored, and controls the jumbolter according to the job parameter.
Optionally, the system also includes:
Display device, for showing the job parameter;
The monitoring unit is additionally operable to receive the operational order that user is directed to the job parameter, and in response to the operation Instruction controls the jumbolter, wherein, the operational order is used to indicate the job parameter for needing to modify.
Optionally, the system also includes:
Warning device, for the monitoring unit determine the job parameter be more than its corresponding parameter area when, into Row alarm.
Optionally, the system also includes:
Storage unit, for storing the job parameter;
The monitoring unit is additionally operable to when the jumbolter breaks down, the operation ginseng in the storage unit The determining failure cause of number.
Optionally, the harvester includes at least one of following:
Speed probe, pressure sensor, flow sensor, liquid level sensor, drilling speed sensor, position sensor, from Motion tracking formula measuring instrument, obliquity sensor, GPS, velocity sensor, camera, counter.
According to the second aspect of the disclosure, a kind of monitoring method of jumbolter is provided, the method includes:
Acquire job parameter of the jumbolter under current working status;
The job parameter is monitored, and the jumbolter is controlled according to the job parameter.
Optionally, it is described that the jumbolter is controlled according to the job parameter, including:
Determine the deviation between the collected job parameter and corresponding parameter preset;
When the deviation is more than preset deviation range corresponding with the job parameter, according to the parameter preset pair Job parameter of the jumbolter under current working status is modified.
Optionally, the method further includes:
Show the job parameter;
Receive user and be directed to the operational order of the job parameter, wherein, the operational order be used to indicate need into The job parameter of row modification;
The jumbolter is controlled in response to the operational order.
Optionally, the job parameter includes at least one of following:
The engine speed of the jumbolter, pressure, flow, the liquid level of the hydraulic system of the jumbolter;
Penetration rate, drilling depth, the bore angle of the jumbolter;
The current location of the jumbolter, the speed of travel;
Installation site, the quantity of the anchor pole of the jumbolter.
Optionally, the method further includes:
Store the job parameter of the jumbolter under current working status;
In the jumbolter failure, failure cause is determined according to the job parameter of storage.
According to the third aspect of the disclosure, a kind of jumbolter is provided, the jumbolter includes:
The monitoring system of any jumbolter of above-mentioned first aspect.
In the above-mentioned technical solutions, job parameter of the collected jumbolter under current working status to harvester It is monitored, it is possible to prevente effectively from the deviation occurred during artificial observation, record, had both been convenient for carrying out data to job parameter It arranges and preserves, and the accuracy of data can be improved.Job parameter is monitored, and is controlled with this by monitoring unit simultaneously Jumbolter processed, it is ensured that the real-time and accuracy of jumbolter control effectively reduce the risk that accident occurs, to improve Construction efficiency and the construction quality offer of jumbolter are effectively ensured.
Other feature and advantage of the disclosure will be described in detail in subsequent specific embodiment part.
Description of the drawings
Attached drawing is for providing further understanding of the disclosure, and a part for constitution instruction, with following tool Body embodiment is used to explain the disclosure, but do not form the limitation to the disclosure together.In the accompanying drawings:
Fig. 1 is the block diagram of the monitoring system of the jumbolter provided according to an embodiment of the present disclosure;
Fig. 2 is the block diagram of the monitoring system of the jumbolter provided according to the another embodiment of the disclosure;
Fig. 3 is the block diagram of the monitoring system of the jumbolter provided according to the another embodiment of the disclosure;
Fig. 4 is the flow chart of the monitoring method of the jumbolter provided according to an embodiment of the present disclosure.
Specific embodiment
The specific embodiment of the disclosure is described in detail below in conjunction with attached drawing.It should be understood that this place is retouched The specific embodiment stated is only used for describing and explaining the disclosure, is not limited to the disclosure.
Shown in Fig. 1, for the block diagram of the monitoring system of jumbolter provided according to an embodiment of the present disclosure, such as scheme Shown in 1, the system 10 includes:
Harvester 100, for acquiring job parameter of the jumbolter under current working status;
Optionally, harvester 100 includes at least one of following:
Speed probe, pressure sensor, flow sensor, liquid level sensor, drilling speed sensor, position sensor, from Motion tracking formula measuring instrument, obliquity sensor, GPS (Global Positioning System, global positioning system), speed pass Sensor, camera, counter.
Correspondingly, the job parameter can include at least one of following:
The engine speed of the jumbolter, pressure, flow, the liquid level of the hydraulic system of the jumbolter;
Penetration rate, drilling depth, the bore angle of the jumbolter;
The current location of the jumbolter, the speed of travel;
Installation site, the quantity of the anchor pole of the jumbolter.
Illustratively, the engine speed of jumbolter can be acquired by speed probe;Pass through pressure sensor, flow Sensor and liquid level sensor acquire pressure, flow and the liquid level of the hydraulic system of jumbolter respectively;Pass through drilling speed sensor Acquire the penetration rate of jumbolter;The drilling depth of jumbolter, the drilling speed of jumbolter are acquired by position sensor Degree can also be carried out calculating by collected drilling depth and drilling time and be determined;Pass through automatic tracking type measuring instrument or inclination angle Sensor acquires the bore angle of jumbolter;Pass through the current location of GPS gathers jumbolter;It is acquired by velocity sensor The speed of travel of jumbolter can also be calculated by the current location of GPS gathers jumbolter, and according to travel time The speed of travel of jumbolter;The installation site of the anchor pole of jumbolter is acquired by camera;Anchor pole is bored by counter The quantity of the anchor pole of machine installation is counted.
Wherein, it should be noted that the specific method that job parameter is obtained by mode described above belongs to this field skill Well known to art personnel, no longer it is described in detail in the disclosure.
Monitoring unit 200, for the collected jumbolter of the harvester 100 under current working status Job parameter be monitored, and the jumbolter is controlled according to the job parameter.
Optionally, the jumbolter is controlled according to the job parameter, including:
Determine the deviation between the collected job parameter and corresponding parameter preset.
When the deviation is more than preset deviation range corresponding with the job parameter, according to the parameter preset pair Job parameter of the jumbolter under current working status is modified.
Wherein, before jumbolter start-up operation, operating personnel can be configured the job parameter of jumbolter, It may thereby determine that parameter preset during jumbolter work, which can directly be set by operating personnel, can also By operating personnel set job parameter carry out operation or according to preset correspondence obtain, the disclosure to this without It limits.
In one embodiment, collected job parameter is the engine speed of jumbolter.Illustratively, monitoring unit exists When getting the transmitter rotating speed of harvester acquisition, it may be determined that the engine speed and preset engine for going out the acquisition turn Deviation between speed.If the deviation is less than preset deviation range, represent according to jumbolter under current working status Job parameter can smoothly complete its task.If the deviation is more than preset deviation range, at this point, should be to jumbolter Job parameter correspondingly corrected.For example, when the deviation between the engine speed and preset engine speed of acquisition It, can be corresponding pre- according to engine speed for A, and when deviation A is more than the preset deviation range corresponding to engine speed Setting parameter (i.e. preset engine speed) is modified engine speed of the jumbolter under current working status, e.g., Can select numerical value between engine speed and preset engine speed of the jumbolter under current working status as The parameter value, illustratively, the parameter value can be determined by golden ratio.Therefore, through the above technical solutions, can effectively keep away Exempt from the deviation being likely to occur in jumbolter work, effectively improve the work quality of jumbolter, meet the use demand of user.
In the above-mentioned technical solutions, job parameter of the collected jumbolter under current working status to harvester It is monitored, it is possible to prevente effectively from the deviation occurred during artificial observation, record, had both been convenient for carrying out data to job parameter It arranges and preserves, and the accuracy of data can be improved.Job parameter is monitored, and is controlled with this by monitoring unit simultaneously Jumbolter processed, it is ensured that the real-time and accuracy of jumbolter control effectively reduce the risk that accident occurs, to improve Construction efficiency and the construction quality offer of jumbolter are effectively ensured.
Optionally, as shown in Fig. 2, the system 10 further includes:
Display device 300, for showing the job parameter;
The monitoring unit 200 is additionally operable to receive the operational order that user is directed to the job parameter, and in response to described Operational order controls the jumbolter, wherein, the operational order is used to indicate the job parameter for needing to modify.
In this embodiment it is possible to by the display device 300 to collected jumbolter under current working status Job parameter shown, the parameter in the jumbolter course of work can be intuitively observed so as to user, be convenient for User knows the working condition of jumbolter in time.Illustratively, user can be by checking that the display device understands the anchor in real time The job parameter of bar drill machine.Therefore, when finding that a certain job parameter occurs abnormal, user can be by the display device to this There is abnormal job parameter to modify.Illustratively, user is by checking that the display device confirms the walking speed of jumbolter It spends slowly, at this point, user can modify to the speed of travel by an operational order, as the operational order is used to indicate anchor The speed of travel of bar drill machine is set as B.Therefore, monitoring unit can refer to when receiving the operational order in response to the operation It enables and the speed of travel of jumbolter is set as B, so that the job parameter of jumbolter meets the use demand of user, carry Rise user experience.
In another embodiment, when monitoring unit determines that the deviation between a certain job parameter and corresponding parameter preset surpasses It, can be preferentially according to the operational order when crossing preset deviation range corresponding with the job parameter and receiving operational order It modifies to the job parameter.Wherein, aforesaid way is only an example implementations, is not used in the limitation disclosure.
Optionally, as shown in figure 3, the system 10 further includes:
Warning device 400, for determining that the job parameter is more than its corresponding parameter area in the monitoring unit 200 When, it alarms.
In one embodiment, when monitoring unit 200 determines that the engine speed of jumbolter is corresponded to more than engine speed Parameter area when, can be alarmed by warning device 400, so as to inform the hair of the current jumbolter of user in time Motivation rotating speed has exception, in order to which user makes adjustment in time for the abnormal conditions, ensure jumbolter construction safety and Quality.
Optionally, the system 10 further includes:
Storage unit, for storing the job parameter;
The monitoring unit 200 is additionally operable to when the jumbolter breaks down, according to the work in the storage unit Industry parameter determines failure cause.
In this embodiment it is possible to the job parameter by the collected jumbolter of harvester under current working status It stores to storage unit.Therefore, it when jumbolter during construction when breaking down, can be based on depositing in the storage unit The job parameter of storage is analyzed, so that it is determined that the reason of causing the failure.It through the above technical solutions, can be to jumbolter Job parameter preserved, and can the job parameter based on the preservation failure cause of jumbolter is analyzed, I.e. convenient for preserving the job parameter in jumbolter work progress, and construction operation state can be recalled, it can also be Failure cause is effectively analyzed when jumbolter breaks down, further promotes user experience.
The disclosure also provides a kind of monitoring method of jumbolter.It is according to an embodiment of the present disclosure shown in Fig. 4 The flow chart of the monitoring method of the jumbolter of offer, as shown in figure 4, the method includes:
In S11, job parameter of the acquisition jumbolter under current working status;
In S12, job parameter is monitored, and the jumbolter is controlled according to job parameter.
Optionally, it is described that the jumbolter is controlled according to the job parameter, including:
Determine the deviation between the collected job parameter and corresponding parameter preset;
When the deviation is more than preset deviation range corresponding with the job parameter, according to the parameter preset pair Job parameter of the jumbolter under current working status is modified.
Optionally, the method further includes:
Show the job parameter;
Receive user and be directed to the operational order of the job parameter, wherein, the operational order be used to indicate need into The job parameter of row modification;
The jumbolter is controlled in response to the operational order.
Optionally, the job parameter includes at least one of following:
The engine speed of the jumbolter, pressure, flow, the liquid level of the hydraulic system of the jumbolter;
Penetration rate, drilling depth, the bore angle of the jumbolter;
The current location of the jumbolter, the speed of travel;
Installation site, the quantity of the anchor pole of the jumbolter.
Optionally, the method further includes:
Store the job parameter of the jumbolter under current working status;
In the jumbolter failure, failure cause is determined according to the job parameter of storage.
About the method in above-described embodiment, wherein each step performs the concrete mode of operation in the related system Embodiment in be described in detail, explanation will be not set forth in detail herein.
The disclosure also provides a kind of jumbolter, and the jumbolter includes:The monitoring system of any of the above-described jumbolter System.
The preferred embodiment of the disclosure is described in detail above in association with attached drawing, still, the disclosure is not limited to above-mentioned reality The detail in mode is applied, in the range of the technology design of the disclosure, a variety of letters can be carried out to the technical solution of the disclosure Monotropic type, these simple variants belong to the protection domain of the disclosure.It is further to note that in above-mentioned specific embodiment Described in each particular technique feature, in the case of no contradiction, can be combined by any suitable means.For Unnecessary repetition is avoided, the disclosure no longer separately illustrates various combinations of possible ways.
In addition, arbitrary combination can also be carried out between a variety of different embodiments of the disclosure, as long as it is without prejudice to originally Disclosed thought should equally be considered as disclosure disclosure of that.

Claims (11)

1. a kind of monitoring system of jumbolter, which is characterized in that the system comprises:
Harvester, for acquiring job parameter of the jumbolter under current working status;
Monitoring unit, for job parameter of the jumbolter collected to the harvester under current working status It is monitored, and the jumbolter is controlled according to the job parameter.
2. system according to claim 1, which is characterized in that the system also includes:
Display device, for showing the job parameter;
The monitoring unit is additionally operable to receive the operational order that user is directed to the job parameter, and in response to the operational order The jumbolter is controlled, wherein, the operational order is used to indicate the job parameter for needing to modify.
3. system according to claim 1, which is characterized in that the system also includes:
Warning device, for when the monitoring unit determines that the job parameter is more than its corresponding parameter area, being reported It is alert.
4. system according to claim 1, which is characterized in that the system also includes:
Storage unit, for storing the job parameter;
The monitoring unit is additionally operable to when the jumbolter breaks down, and the job parameter in the storage unit is true Determine failure cause.
5. system according to claim 1, which is characterized in that the harvester includes at least one of following:
Speed probe, pressure sensor, flow sensor, liquid level sensor, drilling speed sensor, position sensor, automatically with Track formula measuring instrument, obliquity sensor, GPS, velocity sensor, camera, counter.
6. a kind of monitoring method of jumbolter, which is characterized in that the method includes:
Acquire job parameter of the jumbolter under current working status;
The job parameter is monitored, and the jumbolter is controlled according to the job parameter.
7. according to the method described in claim 6, it is characterized in that, described control the anchor pole to bore according to the job parameter Machine, including:
Determine the deviation between the collected job parameter and corresponding parameter preset;
When the deviation is more than preset deviation range corresponding with the job parameter, according to the parameter preset to described Job parameter of the jumbolter under current working status is modified.
8. according to the method described in claim 6, it is characterized in that, the method further includes:
Show the job parameter;
The operational order that user is directed to the job parameter is received, wherein, the operational order, which is used to indicate, to be repaiied The job parameter changed;
The jumbolter is controlled in response to the operational order.
9. according to the method described in claim 6, it is characterized in that, the job parameter is including at least one of following:
The engine speed of the jumbolter, pressure, flow, the liquid level of the hydraulic system of the jumbolter;
Penetration rate, drilling depth, the bore angle of the jumbolter;
The current location of the jumbolter, the speed of travel;
Installation site, the quantity of the anchor pole of the jumbolter.
10. according to the method described in claim 6, it is characterized in that, the method further includes:
Store the job parameter of the jumbolter under current working status;
In the jumbolter failure, failure cause is determined according to the job parameter of storage.
11. a kind of jumbolter, which is characterized in that the jumbolter includes:
The monitoring system of jumbolter described in any one of claim 1-5.
CN201810143205.3A 2018-02-11 2018-02-11 Monitoring system, method and the jumbolter of jumbolter Pending CN108222915A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810143205.3A CN108222915A (en) 2018-02-11 2018-02-11 Monitoring system, method and the jumbolter of jumbolter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810143205.3A CN108222915A (en) 2018-02-11 2018-02-11 Monitoring system, method and the jumbolter of jumbolter

Publications (1)

Publication Number Publication Date
CN108222915A true CN108222915A (en) 2018-06-29

Family

ID=62661704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810143205.3A Pending CN108222915A (en) 2018-02-11 2018-02-11 Monitoring system, method and the jumbolter of jumbolter

Country Status (1)

Country Link
CN (1) CN108222915A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098706A (en) * 2018-08-22 2018-12-28 山东理工大学 A kind of mine drilling comprehensive parameters monitoring method and device based on sound wave
CN109634218A (en) * 2018-08-01 2019-04-16 广州市机电高级技工学校(广州市机电技师学院、广州市机电高级职业技术培训学院) A kind of multiaxis intelligence drilling machine control system with self-learning function
CN111813047A (en) * 2020-07-31 2020-10-23 西北工业大学 Real-time monitoring system and method for robot automatic drilling and riveting operation state

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040140112A1 (en) * 2001-05-15 2004-07-22 Sandvik Tamrock Oy Drilling control arrangement
WO2009002306A1 (en) * 2007-06-26 2008-12-31 Atlas Copco Rock Drills Ab Method and device for controlling a rock drill rig
CN101886519A (en) * 2010-07-19 2010-11-17 曾庆义 Anchor rod drilling machine capable of monitoring working state of drill hole, and monitoring device thereof
US20120261190A1 (en) * 2011-04-14 2012-10-18 Krueger Iv Rudolf Ernst Mechanical specific energy drilling system
CN203347686U (en) * 2013-06-20 2013-12-18 北京新能正源环境科技有限公司 Drilling machine for roadways
US20140060931A1 (en) * 2012-08-31 2014-03-06 Ensign Drilling Partnership Systems and Methods for Automatic Drilling of Wellbores
CN103958828A (en) * 2011-11-16 2014-07-30 哈利伯顿能源服务公司 Systems and methods of harvesting information from a well-site
CN105569630A (en) * 2014-10-11 2016-05-11 西安扩力机电科技有限公司 Monitoring method for coal mine drilling machine
CN106812518A (en) * 2015-09-15 2017-06-09 山特维克矿山工程机械有限公司 Equipment, rock drill and method for rock-boring
US20170306702A1 (en) * 2014-08-28 2017-10-26 Schlumberger Technology Corporation Method and system for directional drilling
CN107339094A (en) * 2017-08-31 2017-11-10 安徽三山机械制造有限公司 A kind of mine drilling machine intelligent control system
CN208650840U (en) * 2018-02-11 2019-03-26 北京新能正源智能装备有限公司 The monitoring system and jumbolter of jumbolter

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040140112A1 (en) * 2001-05-15 2004-07-22 Sandvik Tamrock Oy Drilling control arrangement
WO2009002306A1 (en) * 2007-06-26 2008-12-31 Atlas Copco Rock Drills Ab Method and device for controlling a rock drill rig
CN101886519A (en) * 2010-07-19 2010-11-17 曾庆义 Anchor rod drilling machine capable of monitoring working state of drill hole, and monitoring device thereof
US20120261190A1 (en) * 2011-04-14 2012-10-18 Krueger Iv Rudolf Ernst Mechanical specific energy drilling system
CN103958828A (en) * 2011-11-16 2014-07-30 哈利伯顿能源服务公司 Systems and methods of harvesting information from a well-site
US20140060931A1 (en) * 2012-08-31 2014-03-06 Ensign Drilling Partnership Systems and Methods for Automatic Drilling of Wellbores
CN203347686U (en) * 2013-06-20 2013-12-18 北京新能正源环境科技有限公司 Drilling machine for roadways
US20170306702A1 (en) * 2014-08-28 2017-10-26 Schlumberger Technology Corporation Method and system for directional drilling
CN105569630A (en) * 2014-10-11 2016-05-11 西安扩力机电科技有限公司 Monitoring method for coal mine drilling machine
CN106812518A (en) * 2015-09-15 2017-06-09 山特维克矿山工程机械有限公司 Equipment, rock drill and method for rock-boring
CN107339094A (en) * 2017-08-31 2017-11-10 安徽三山机械制造有限公司 A kind of mine drilling machine intelligent control system
CN208650840U (en) * 2018-02-11 2019-03-26 北京新能正源智能装备有限公司 The monitoring system and jumbolter of jumbolter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
应立军;李科军;刘辉;: "管棚钻机钻杆定位控制系统", 现代机械, no. 04 *
胡金艳, 周静, 付鑫生: "用可控偏心器实现井眼轨迹的闭环控制", 天然气工业, no. 06 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109634218A (en) * 2018-08-01 2019-04-16 广州市机电高级技工学校(广州市机电技师学院、广州市机电高级职业技术培训学院) A kind of multiaxis intelligence drilling machine control system with self-learning function
CN109634218B (en) * 2018-08-01 2022-02-01 广州市机电高级技工学校(广州市机电技师学院、广州市机电高级职业技术培训学院) Multi-spindle intelligent drilling machine control system with self-learning function
CN109098706A (en) * 2018-08-22 2018-12-28 山东理工大学 A kind of mine drilling comprehensive parameters monitoring method and device based on sound wave
CN109098706B (en) * 2018-08-22 2022-04-01 山东理工大学 Mine drilling comprehensive parameter monitoring method and device based on sound waves
CN111813047A (en) * 2020-07-31 2020-10-23 西北工业大学 Real-time monitoring system and method for robot automatic drilling and riveting operation state

Similar Documents

Publication Publication Date Title
CN108222915A (en) Monitoring system, method and the jumbolter of jumbolter
US10066367B1 (en) System for determining autonomous adjustments to an implement position and angle
US20080230270A1 (en) Arrangement for Positioning Rock Drilling Rig on Drilling Site
US6701239B2 (en) Method and apparatus for controlling the updating of a machine database
CN107269274A (en) Tunneling machine cutting control system and control method
CN109891031B (en) Method and construction device for soil working
CA2916148A1 (en) Arrangement for controlling percussive drilling process
US10208595B2 (en) Arrangement and method of utilizing rock drilling information
CN110528550A (en) The hard soil layer in caisson cutting edge position is broken and slag cleaning device and its construction method
CN106949877A (en) The monitoring method of ground settlement above a kind of various dimensions shield tunnel
CN208650840U (en) The monitoring system and jumbolter of jumbolter
CN102797461B (en) For monitoring the method and system of the operation of cable shovel
CN104806256B (en) A kind of shield is prominent to meet processing method in molten chamber hole
JP2017203739A (en) Evaluation method and system of trafficability
CN110878572B (en) Machine tool grade management system
JP5709144B1 (en) Antifreeze agent automatic spraying control device, antifreeze agent automatic spraying control program, and antifreeze agent automatic spraying control method
EP0344412B1 (en) Process and device for the continuous measuring of the relative height of a long object driven into the earth
CN115075837A (en) Construction method and system for open type TBM to penetrate through water-rich broken belt
AU2014301655A1 (en) Arrangement for controlling automated drilling operation mode
DE102021122140A1 (en) Method for determining the position of explosive ordnance, and device and drilling device for carrying out the method
KR101501904B1 (en) System and method for monitoring dig through surface displacement by laser rangefinder
CN108590668A (en) A kind of Station overlength pipe shed trombone slide method
JP6901796B2 (en) Plane position detection structure of soil cement column and soil cement column position coordinate recording system using this
JP7303720B2 (en) Strata structure analysis system and program
WO2002018749A1 (en) An apparatus for installing a support assembly for a rock structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 10, color Xiang Dong Road, South color Town, Beijing, Shunyi District, Beijing

Applicant after: Beijing new energy source intelligent equipment Co., Ltd.

Address before: 101300 No. 8 Choi Yuan Industrial Park, 10 Choi Cheung Road, Shunyi District, Beijing.

Applicant before: Beijing Xin Neng Zheng Yuan Environment Technology Co., Ltd.