- CN108222334A CN108222334A CN201810045974.XA CN201810045974A CN108222334A CN 108222334 A CN108222334 A CN 108222334A CN 201810045974 A CN201810045974 A CN 201810045974A CN 108222334 A CN108222334 A CN 108222334A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- column
- slot
- briquetting
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Curtains And Furnishings For Windows Or Doors (AREA)
Abstract
The present invention relates to a kind of frame curtain wall and its Assembling construction methods, are related to building curtain wall technical field, it is intended to which solving the problem of easily mutually to come off between connector, pintle hook lock code part and crossbeam in the prior art makes curtain wall construction by destruction.Its drip irrigation device is, including column and crossbeam, column is equipped with the first card slot close to the side of crossbeam, crossbeam is equipped with the second card slot coordinated with the first card slot close to the side of column, column is rotatablely equipped with a briquetting for being limited to crossbeam on the side of crossbeam, and briquetting rotates in perpendicular.After first card slot and the engaging of the second card slot, when column or crossbeam radially by power when, column or crossbeam will not move;Briquetting is rotated further by, briquetting is made to compress crossbeam, makes crossbeam that can not be detached from column;It is difficult to rotate briquetting when crossbeam is by external force, so as to fulfill being stably connected between column and crossbeam otherwise unless briquetting could be rotated under manual operation.
Description
Technical field
The present invention relates to building curtain wall technical field more particularly to a kind of frame curtain walls and its Assembling construction party
Method.
Background technology
With the development of society, curtain wall is widely used in various buildings.Traditional closed chamber frame curtain wall system exists
The crossbeam between two columns can only first be installed before another root post is installed after an installation is complete root post during construction,
Adjacent another root post can be just installed, otherwise will cause the crossbeam between column that can not install, i.e., curtain wall must orderly pacify
Dress, the extremely disadvantageous construction in scene.
Therefore, Authorization Notice No. be CN104131637B Chinese patent disclose it is a kind of can unordered installation frame-type curtain
Wall closed chamber grid system and its installation method, including column and crossbeam, two ends of crossbeam are equipped with openend, the outside of column
Connector is fixed on wall, stretches into the openend and connects with the inner wall of cross rail top at the top of connector, and its both sides and horizontal stroke
The both sides of beam inner wall connect, and connect at the top of the bottom of connector and pintle hook lock code part, lower surface and the crossbeam bottom of pintle hook lock code part
Inner wall connect, the one side wall of crossbeam keeps away position opening equipped with first, and the inner wall of the opposite side of crossbeam is equipped with the positioning of pintle hook lock code
Slot, the bottom of pintle hook lock code part are accessed in the pintle hook lock code locating slot.
But said program central post and crossbeam are real by the various clampings between connector, pintle hook lock code part and openend
It now fixes, when curtain wall is by with power on pintle hook lock code part and crossbeam installation direction, holds between connector, pintle hook lock code part and crossbeam
It easily mutually comes off, is destroyed curtain wall construction.
Invention content
The first object of the present invention is to provide a kind of frame curtain wall, can effectively ensure that the company between column and crossbeam
Relationship is connect, facilitates the installation of crossbeam.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of frame curtain wall, including the column being vertically arranged and horizontally disposed crossbeam, the column and crossbeam are combined into frame
Body is equipped with panel in the framework, and the column is equipped with the first card slot close to the side of crossbeam, and the crossbeam is close to column
Side be equipped with the second card slot for coordinating with the first card slot, the column is rotatablely equipped with one on the side of crossbeam and is used for
To the briquetting that crossbeam is limited, the briquetting rotates in perpendicular.
By using above-mentioned technical proposal, after the first card slot and the engaging of the second card slot, in the first card slot and the second card slot
Mating reaction under, column and crossbeam will not all move in the radial direction thereof.Briquetting is in installation crossbeam anteposition in column end face
On, do not interfere with the installation of crossbeam;After installing crossbeam, briquetting is rotated, briquetting is made to limit crossbeam, avoid crossbeam to remote
It is moved from column direction and is detached from column;Unless can be rotated in manual operation lower lock block, otherwise, it is difficult when crossbeam is by external force
Briquetting is rotated, releases the position-limiting action to crossbeam, therefore, it is possible to which the stability connected between crossbeam and column is effectively ensured,
And it facilitates the installation of crossbeam.
Further, the briquetting is horizontally disposed with by one and rotates peace perpendicular to shaft of the column close to the side of crossbeam
On column, the shaft is retractable structure;The column is equipped with what is connected with the first card slot close to the side of crossbeam
First locating slot, side of the crossbeam far from column are equipped with the second locating slot, and the briquetting is rotated to close to crossbeam direction
It is located in the first locating slot and the second locating slot after 90 °.
By using above-mentioned technical proposal, before installing crossbeam, shaft is elongation state, at this point, briquetting is detached from the first positioning
Slot and positioned at column end face on, do not influence the installation of crossbeam;After installing crossbeam, briquetting is rotated, when briquetting turns to first
After locating slot and the second positioning groove location, shaft is compressed, briquetting card is set in the first locating slot and the second locating slot, first is fixed
The rotation of position slot and the second locating slot limitation briquetting, is further ensured that position-limiting action of the briquetting to crossbeam.
Further, the shaft includes the rotating bar that is rotatablely connected with stud location and is fixedly connected with briquetting
Sliding bar, the sliding bar is circumferentially positioned, slides axially in rotating bar, and it is located at one end and the rotation in rotating bar
The back-moving spring axially set along it is fixedly connected between bar.
By using above-mentioned technical proposal, back-moving spring applies pulling force to sliding bar, when briquetting turns to the first locating slot
After the second positioning groove location, under the pulling force effect of back-moving spring, briquetting automatic clamping is set to the first locating slot and the second positioning
In slot;Meanwhile back-moving spring can buffer portion crossbeam is made to exist to the power moved far from column direction, be further ensured that column
Being stably connected between crossbeam.
Further, lock pin is equipped between the upper and lower column, the both ends of the lock pin are described vertical in fusiformis structure
Column both ends are respectively equipped with the slot coordinated with lock pin.
By using above-mentioned technical proposal, the both ends of lock pin are plugged to the slot of corresponding position on lower upright respectively
In, realize the connection between lower upright;The lock pin of fusiformis structure can ensure between lower upright there are certain gap, with
Cope with the sedimentation or deformation of framework.Under the connection function of lock pin, the column that different number can be used by realizing assembles different rule
The framework of lattice.
Further, the column and crossbeam are equipped with perpendicular hook, the hook on the side of panel
Several are equipped with along the length direction of column and crossbeam, the panel corresponds to hook position close to the side of column and crossbeam and sets
There is the link coordinated with it.
By using above-mentioned technical proposal, the link on panel is articulated on the hook of corresponding position, you can realizing will
Panel is installed in framework, is not needed to connect using small parts such as screws, is ensured the simplicity of installation, improves installation effectiveness,
Cost is reduced, and easy to disassemble.
Further, slippage slot is offered respectively on the column and crossbeam, pull rod is slidably fitted in the slippage slot,
And the pull rod is slided along perpendicular to column and crossbeam direction;The hook is fixed on pull rod close to one end of panel, the drawing
Bar is equipped with tension spring, when the tension spring is located at longest tensional state, the pull rod between one end and sliding trench bottom far from panel
Part is located in slippage slot.
By using above-mentioned technical proposal, under the pulling force effect of tension spring, ensure that the side of hook and column or crossbeam is supported
It connects, the link in the case where no external force acts on is avoided to be detached from hook, ensures the fixed stability of panel.Wherein, using pull rod fixed hook,
It can be the stability for ensureing hook.
Further, the pull rod is equipped with the limited block of L-shaped, the side wall difference that the limited block and pull rod are located remotely from each other
It is abutted with the inner wall of slippage slot, the limit coordinated with limited block is additionally provided at the notch of slippage slot on the crossbeam and column
Position slot.
By using above-mentioned technical proposal, before panel is installed, pull rod is first pulled, limited block is pulled out into sliding groove, then move
Limited block card is set in limiting slot by pull rod, so as to ensure between hook and column or the side of crossbeam there are certain gap,
Facilitate and the link on panel is articulated on hook, without mounting a link, pull a hook, facilitate installation, and
Working efficiency can be improved.After link on panel is all articulated on the hook of corresponding position, panel is pulled, by limited block
Limiting slot, then movable panel are moved out, limited block is made to be moved to close to slippage slot direction, when limited block is moved to sliding groove location
When, under the pulling force effect of tension spring, limited block and pull rod are slided into slippage slot, and hook is closely supported with the side of column or crossbeam
It connects, realizes the installation of panel.
The second object of the present invention is to provide a kind of Assembling construction method of above-mentioned frame curtain wall, and installation is fast
Speed, it is cost-effective.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of Assembling construction method of frame curtain wall, including:
S1:The second hanger is bolted close to the side of agent structure in column, by the second hanger and is embedded in main body knot
The first hanger mounting in structure, realizes the installation of column;The installation of all columns is completed according to abovementioned steps;
S2:The second card slot on crossbeam is engaged with the first card slot on column corresponding position;
S3:Briquetting is rotated on the side flushed in fitting column and crossbeam, when briquetting turns to the first locating slot and the second positioning
During groove location, under the action of back-moving spring, briquetting card is set in the first locating slot and the second locating slot;
S4:Pull rod is pulled, limited block is caught in corresponding limiting slot, the link on panel is hung on corresponding hook;
Panel, then movable panel are pulled to far from framework direction, limited block is made to be moved to close to slippage slot direction, by limited block and pull rod
It slides into slippage slot, under the pulling force effect of tension spring, hook is closely abutted with the end face of column or crossbeam;
S5:Gap location between panel and column and crossbeam inserts foam rods, injects fluid sealant.
By using above-mentioned technical proposal, can more people column is installed simultaneously, first column is all installed, then horizontal stroke is installed
Beam compared to column and crossbeam is installed successively, greatly improves working efficiency, saves the time, reduce cost.
Further, there is a S10 between S1 and S2;
S10:Docked between upper and lower column using lock pin, lock pin plugged in corresponding slot, and ensure upper and lower column it
Between there are 15mm-20mm gap.
By using above-mentioned technical proposal, according to the actual needs of operating mode, the quantity of column is selected, is made in the connection of lock pin
Under, the framework of different size is assembled, the frame curtain wall of different size can be formed, meets the difference of actual conditions
Demand.Between lower upright there are gap, cope with the sedimentation or deformation of framework.
Further, there is a S40 between S4 and S5;
S40:After panel installs, whether measurement inspection panel installation is smooth vertical and horizontal, if undesirable, according to inclining for panel
Tilted direction is checked position of the link on hook, and is adjusted, until adjusting panel to smooth vertical and horizontal state, carries out S5.
By using above-mentioned technical proposal, over there before the sealing of plate gluing, panel is checked, and make corresponding tune
It is whole, panel is made to be in smooth vertical and horizontal state, with this ensure panel install after smooth beauty, and ensure that panel makes in the future
With stabilization in the process.
In conclusion the invention has the advantages that:
1st, it by setting the first card slot and the second card slot of mutual cooperation respectively on column and crossbeam, is rotatablely installed on column
It can be to the briquetting that crossbeam is limited, after the first card slot and the engaging of the second card slot, when column or crossbeam are radially by power
When, column or crossbeam will not move;Briquetting is rotated further by, briquetting is made to compress crossbeam, makes crossbeam that can not be detached from column;Unless
Briquetting could be rotated under manual operation, is difficult to rotate briquetting when crossbeam is by external force otherwise, so as to fulfill column and crossbeam it
Between be stably connected with;
2nd, by the hook that is slidably installed on crossbeam and column, the link of setting and hook cooperation on panel will be on panel
Link is articulated on the hook of corresponding position, you can realizes and panel is installed in framework, do not need to be small by zero using screw etc.
Part connects, and ensures the simplicity of installation, improves installation effectiveness, reduces cost, and easy to disassemble;
3rd, lower upright is connected by using lock pin, realizes the framework for the column assembling different size that can use different number,
Meet the different demands in practical application.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of frame curtain wall;
Fig. 2 is a kind of part-structure exploded perspective view of frame curtain wall;
Fig. 3 is the enlarged structure schematic diagram of part A in Fig. 2;
Fig. 4 is a kind of sectional view of frame curtain wall, for embodying pivot structure;
Fig. 5 is a kind of sectional view of frame curtain wall, for embodying the state that panel installs aft hook;
Fig. 6 is a kind of sectional view of frame curtain wall, for embodying the state of installation panel time limit position block.
In figure, 1, agent structure;11st, the first hanger;2nd, framework;21st, column;211st, the second hanger;212nd, bolt;213、
First card slot;214th, the first locating slot;215th, lock pin;216th, slot;22nd, crossbeam;221st, the second card slot;222nd, the second positioning
Slot;3rd, shaft;31st, rotating bar;311st, sliding slot;32nd, sliding bar;321st, sliding block;33rd, back-moving spring;4th, briquetting;5th, slippage slot;
51st, pull rod;52nd, tension spring;53rd, limited block;54th, limiting slot;6th, it links up with;7th, panel;71st, link.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing.
A kind of frame curtain wall with reference to Fig. 1, including several columns 21 being vertically arranged and horizontally disposed crossbeam 22, is stood
Column 21 and crossbeam 22 are combined into framework 2, and panel 7 is equipped in framework 2.Wherein, connected between lower upright 21 by lock pin 215
It connects, in fusiformis structure, 21 both ends of column are respectively equipped with the slot 216 coordinated with lock pin 215 at the both ends of lock pin 215(Label exists
In Fig. 4), after lock pin 215 is plugged in 21 corresponding slot 216 of lower upright, there are 15mm-25mm's between lower upright 21
Gap, to cope with the sedimentation of framework 2 or deformation.In the present embodiment, there are the gaps of 20mm between lower upright 21.
With reference to Fig. 2, each column 21 is on the side of crossbeam 22, positioned at its both ends at top, is respectively equipped with the
One card slot 213, crossbeam 22 is on the side of column 21, the equipped with several cooperations with the first card slot 213 along its length
After two draw-in groove 221, column 21 and crossbeam 22 are by the first card slot 213 and the engaging of the second card slot 221, column 21 is close to crossbeam 22
Side flushed with side of the crossbeam 22 far from column 21, side of the column 21 far from crossbeam 22 and crossbeam 22 are close to column 21
Side flushes, i.e., column 21 and crossbeam 22 are generally aligned in the same plane interior.In the mating reaction of the first card slot 213 and the second card slot 221
Under, column 21 and crossbeam 22 will not all move in the radial direction thereof.
With reference to Fig. 2 and Fig. 3, column 21 is rotatablely equipped with a pressure rotated in perpendicular on the side of crossbeam 22
Block 4, briquetting 4 are horizontally disposed with by one and are rotatably installed in column 21 perpendicular to shaft 3 of the column 21 close to the side of crossbeam 22
On, and shaft 3 is located at briquetting 4 close to one end of crossbeam 22.Column 21 is equipped with and the first card slot 213 close to the side of crossbeam 22
First locating slot 214 of connection, side of the crossbeam 22 far from column 21 are equipped with the second locating slot 222, when column 21 is close to horizontal
When the side of beam 22 is flushed with side of the crossbeam 22 far from column 21, the first locating slot 214 is connected with the second locating slot 222.
Wherein, shaft 3 is located in the first locating slot 214, and it is retractable structure.
With reference to Fig. 2 and Fig. 3, before installing crossbeam 22, shaft 3 is elongation state, at this point, briquetting 4 is detached from the first locating slot 214
And on the end face of column 21, the installation of crossbeam 22 is not influenced;After installing crossbeam 22, briquetting 4 is rotated, when briquetting 4 rotates
To 222 position of the first locating slot 214 and the second locating slot, shaft 3 is compressed, the card of briquetting 4 is set to the first locating slot 214 and the
In two locating slots 222, under the position-limiting action of briquetting 4, crossbeam 22 is without departing from column 21;Unless in manual operation lower lock block 4
It can rotate, be difficult otherwise, when crossbeam 22 is by external force to rotate briquetting 4, release the position-limiting action to crossbeam 22, therefore,
It can effectively ensure that the stability connected between crossbeam 22 and column 21, and it facilitates the installation of crossbeam 22.Wherein, when briquetting 4
When in the first locating slot 214 and the second locating slot 222,4 end face of briquetting is flushed with column 21 close to the side of crossbeam 22, the
214 and second locating slot 222 of a positioning groove limits the rotation of briquetting 4, is further ensured that position-limiting action of the briquetting 4 to crossbeam 22,
Meanwhile ensure the planarization on 22 surface of column 21 and crossbeam.
With reference to Fig. 2 and Fig. 3, in the present embodiment, shaft 3 includes the rotating bar 31 being connect with 21 locating rotation of column, with
And the sliding bar 32 being fixedly connected with briquetting 4,31 inner wall of rotating bar are equipped with a sliding slot 311 along its length, sliding bar 32
Side wall is equipped with a sliding block 321 being slidably mounted in sliding slot 311, determines so as to fulfill the circumferential direction between sliding bar 32 and rotating bar 31
Position is in axial sliding connection.Sliding bar 32, which is located between one end in rotating bar 31 and rotating bar 31, to be fixedly connected with along its axial direction
The back-moving spring 33 of setting.After briquetting 4 turns to the first locating slot 214 and the second 222 position of locating slot, in back-moving spring 33
Pulling force effect under, 4 automatic clamping of briquetting is set in the first locating slot 214 and the second locating slot 222;Meanwhile 33 energy of back-moving spring
Enough buffer portions make crossbeam 22 exist to the power moved far from 21 direction of column, are further ensured that between column 21 and crossbeam 22
It is stably connected with.
With reference to Fig. 2 and Fig. 5, for convenience of panel 7 is installed in framework 2, column 21 and crossbeam 22 are close to the side of panel 7
The upper slippage slot 5 offered respectively perpendicular to panel 7, slippage slot 5 are equipped with several along the length direction of column 21 and crossbeam 22,
Pull rod 51 is slidably fitted in slippage slot 5, and pull rod 51 is along perpendicular to column 21 and the slip of 22 direction of crossbeam;Pull rod 51 is far from face
Tension spring 52 is equipped between 5 bottom of one end and slippage slot of plate 7, when tension spring 52 is located at longest tensional state, 51 part of pull rod is located at
In slippage slot 5.One end that pull rod 51 stretches out slippage slot 5 is equipped with hook 6, and panel 7 is corresponded to close to the side of column 21 and crossbeam 22
It links up with 6 positions and is equipped with the link 71 coordinated with it.Pull rod 51 is equipped with the limited block 53 of L-shaped, and limited block 53 and pull rod 51 are mutual
Inner wall of the separate side wall respectively with slippage slot 5 abuts, and is additionally provided at the notch of slippage slot 5 on crossbeam 22 and column 21
The limiting slot 54 coordinated with limited block 53.In the present embodiment, hook 6 is located at 51 upper end of pull rod, and limited block 53 is located at pull rod 51
Lower end, limiting slot 54 are located at 5 lower section of slippage slot.
With reference to Fig. 5 and Fig. 6, before panel 7 is installed, pull rod 51 is first pulled out, limited block 53 is pulled out into sliding groove, still further below
The card of limited block 53 is set in limiting slot 54 by mobile pull rod 51, so as to ensure between hook 6 and the side of column 21 or crossbeam 22
There are certain gaps, facilitate and the link 71 on panel 7 is articulated on hook 6, improve working efficiency.By the extension on panel 7
After ring 71 is all articulated on the hook 6 of corresponding position, panel 7 is pulled out, limited block 53 is moved out into limiting slot 54, then to
Upper movable panel 7 makes limited block 53 be moved to close to 5 direction of slippage slot, when limited block 53 is moved to 5 position of slippage slot,
Under the pulling force effect of tension spring 52, limited block 53 and pull rod 51 are slided into slippage slot 5, the side of hook 6 and column 21 or crossbeam 22
Face closely abuts, and link 71 is prevented to be detached from hook 6, realizes the installation of panel 7.
A kind of Assembling construction method of frame curtain wall, including:
S1:With reference to Fig. 1 and Fig. 4, second hanger 211 is fixed by bolt 212 close to the side of agent structure 1 in column 21, it will
Second hanger 211 is mounted with the first hanger 11 being embedded in agent structure 1, realizes the installation of column 21.
S10:With reference to Fig. 1 and Fig. 4, docked, lock pin 215 is plugged corresponding using lock pin 215 between upper and lower column 21
In slot 216, and ensure between upper and lower column 21 there are 20mm gaps, to cope with the sedimentation of framework 2 or deformation;According to aforementioned
Step completes the installation of all columns 21.
S2:With reference to Fig. 2, the second card slot 221 on crossbeam 22 and the first card slot 213 on 21 corresponding position of column are blocked
It closes, ensures that side of the crossbeam 22 far from column 21 is flushed with column 21 close to the side of crossbeam 22.
S3:With reference to Fig. 2, briquetting 4 is rotated on the side that is flushed in fitting column 21 and crossbeam 22, when briquetting 4 turns to the
During 214 and second 222 position of locating slot of a positioning groove, under the action of back-moving spring 33, the card of briquetting 4 is set to the first locating slot
214 and second in locating slot 222, so as to fulfill being fixed to crossbeam 22.
S4:With reference to Fig. 5 and Fig. 6, pull rod 51 is pulled out, limited block 53 is pulled out into sliding groove, moves pull rod 51 still further below,
Limited block 53 is caught in corresponding limiting slot 54, the link 71 on panel 7 is hung on corresponding hook 6;To far from frame
2 direction of body pulls panel 7, then moves up panel 7, limited block 53 is made to be moved to close to 5 direction of slippage slot, when limited block 53 moves
When moving 5 position of slippage slot, under the pulling force effect of tension spring 52, limited block 53 and pull rod 51 are slided into slippage slot 5, hook 6
It is closely abutted with the side of column 21 or crossbeam 22, link 71 is prevented to be detached from hook 6, realize the installation of panel 7.
S40:After panel 7 installs, measure inspection panel 7 install it is whether smooth vertical and horizontal, if undesirable, according to face
The inclined direction of plate 7 checks position of the link 71 on hook 6, beats panel 7, until adjusting panel 7 to smooth vertical and horizontal shape
State.
S5:Gap location between panel 7 and column 21 and crossbeam 22 inserts foam rods(It is not represented in figure), inject close
Sealing(It is not represented in figure), it is sealed fixation.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art
Member can as needed make the present embodiment the modification of no creative contribution after this specification is read, but as long as at this
It is all protected in the right of invention by Patent Law.
Claims (10)
1. a kind of frame curtain wall, including the column being vertically arranged(21)With horizontally disposed crossbeam(22), the column(21)
And crossbeam(22)It is combined into framework(2), the framework(2)Panel is inside installed(7), it is characterised in that:The column(21)It leans on
Nearly crossbeam(22)Side be equipped with the first card slot(213), the crossbeam(22)Close to column(21)Side be equipped with and the
One card slot(213)Second card slot of cooperation(221), the column(21)Close to crossbeam(22)Side on be rotatablely equipped with a use
In to crossbeam(22)The briquetting limited(4), the briquetting(4)It is rotated in perpendicular.
2. a kind of frame curtain wall according to claim 1, it is characterised in that:The briquetting(4)It is horizontally disposed by one
And perpendicular to column(21)Close to crossbeam(22)Side shaft(3)It is rotatably installed in column(21)On, the shaft(3)For
Retractable structure;The column(21)Close to crossbeam(22)Side be equipped with and the first card slot(213)First positioning of connection
Slot(214), the crossbeam(22)Far from column(21)Side be equipped with the second locating slot(222), the briquetting(4)To close
Crossbeam(22)Direction is located at the first locating slot after rotating 90 °(214)With the second locating slot(222)It is interior.
3. a kind of frame curtain wall according to claim 2, it is characterised in that:The shaft(3)Including with column(21)
The rotating bar of locating rotation connection(31)And and briquetting(4)The sliding bar being fixedly connected(32), the sliding bar(32)It is circumferential
It positions, slide axially mounted on rotating bar(31)It is interior, and it is located at rotating bar(31)Interior one end and rotating bar(31)Between it is solid
Surely it is connected with the back-moving spring axially set along it(33).
4. a kind of frame curtain wall according to claim 1, it is characterised in that:The upper and lower column(21)Between be equipped with
Lock pin(215), the lock pin(215)Both ends in fusiformis structure, the column(21)Both ends are respectively equipped with and lock pin(215)
The slot of cooperation(216).
5. a kind of frame curtain wall according to claim 1, it is characterised in that:The column(21)And crossbeam(22)It is close
Panel(7)Side on perpendicular hook is installed(6), the hook(6)Along column(21)And crossbeam(22)Length
It spends direction and is equipped with several, the panel(7)Close to column(21)And crossbeam(22)Side correspond to hook(6)Position be equipped with
Its link coordinated(71).
6. a kind of frame curtain wall according to claim 5, it is characterised in that:The column(21)And crossbeam(22)Upper point
Slippage slot is not offered(5), the slippage slot(5)Inside it is slidably fitted with pull rod(51), and the pull rod(51)Along perpendicular to vertical
Column(21)And crossbeam(22)It slides in direction;The hook(6)It is fixed on pull rod(51)Close to panel(7)One end, the pull rod
(51)Far from panel(7)One end and slippage slot(5)Tension spring is equipped between bottom(52), the tension spring(52)It is stretched positioned at longest
During state, the pull rod(51)Part is located at slippage slot(5)It is interior.
7. a kind of frame curtain wall according to claim 6, it is characterised in that:The pull rod(51)It is equipped with the limit of L-shaped
Position block(53), the limited block(53)And pull rod(51)The side wall being located remotely from each other respectively with slippage slot(5)Inner wall abut, it is described
Crossbeam(22)And column(21)It is upper to be located at slippage slot(5)Notch at be additionally provided with and limited block(53)The limiting slot of cooperation
(54).
8. a kind of Assembling construction method of frame curtain wall, it is characterised in that:Including:
S1:In column(21)Close to agent structure(1)Side pass through bolt(212)Fix the second hanger(211), second is hung
Frame(211)With being embedded in agent structure(1)In the first hanger(11)Column is realized in mounting(21)Installation;According to aforementioned step
Suddenly all columns are completed(21)Installation;
S2:By crossbeam(22)On the second card slot(221)With column(21)The first card slot on corresponding position(213)Engaging;
S3:In fitting column(21)And crossbeam(22)Briquetting is rotated on the side flushed(4), work as briquetting(4)It is fixed to turn to first
Position slot(214)With the second locating slot(222)During position, in back-moving spring(33)Under the action of, briquetting(4)Card is set to the first positioning
Slot(214)With the second locating slot(222)It is interior;
S4:Pull pull rod(51), by limited block(53)It is caught in corresponding limiting slot(54)It is interior, by panel(7)On link(71)
Hang corresponding hook(6)On;To far from framework(2)Direction pulls panel(7), then movable panel(7), make limited block(53)
To close to slippage slot(5)Direction moves, by limited block(53)And pull rod(51)Slide into slippage slot(5)It is interior, in tension spring(52)'s
Under pulling force effect, hook(6)With column(21)Or crossbeam(22)End face closely abut;
S5:In panel(7)And column(21)And crossbeam(22)Between gap location insert foam rods, inject fluid sealant.
9. a kind of Assembling construction method of frame curtain wall according to claim 8, it is characterised in that:In S1 and S2
Between also have a S10;
S10:Upper and lower column(21)Between use lock pin(215)Docking, by lock pin(215)Plug corresponding slot(216)
It is interior, and ensure upper and lower column(21)Between there are 15mm-25mm gap.
10. a kind of Assembling construction method of frame curtain wall according to claim 8, it is characterised in that:In S4 and
There is a S40 between S5;
S40:Panel(7)After installing, inspection panel is measured(7)Whether installation is smooth vertical and horizontal, if undesirable, according to face
Plate(7)Inclined direction, check link(71)It is linking up with(6)On position, and be adjusted, until by panel(7)Adjust to
Smooth vertical and horizontal state carries out S5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810045974.XA CN108222334B (en) | 2018-01-17 | 2018-01-17 | A kind of frame curtain wall and its on-site assembly construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810045974.XA CN108222334B (en) | 2018-01-17 | 2018-01-17 | A kind of frame curtain wall and its on-site assembly construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108222334A true CN108222334A (en) | 2018-06-29 |
CN108222334B CN108222334B (en) | 2019-09-17 |
Family
ID=62667244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810045974.XA Active CN108222334B (en) | 2018-01-17 | 2018-01-17 | A kind of frame curtain wall and its on-site assembly construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108222334B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700454A (en) * | 2019-09-29 | 2020-01-17 | 中国一冶集团有限公司 | GRC curtain wall mounting process |
CN111677166A (en) * | 2020-06-29 | 2020-09-18 | 安徽福瑞尔铝业科技有限公司 | Assembled aluminum curtain wall plate and assembling method thereof |
CN112160472A (en) * | 2020-10-12 | 2021-01-01 | 深圳市中装建设集团股份有限公司 | Photovoltaic curtain wall framework and connecting method |
CN113027010A (en) * | 2021-03-03 | 2021-06-25 | 蔡小雨 | Building curtain wall assembly and broken building curtain wall |
CN114045965A (en) * | 2021-11-26 | 2022-02-15 | 广东振邦新材料科技有限公司 | Framework structure for mounting aluminum plate curtain wall |
CN115142598A (en) * | 2022-09-05 | 2022-10-04 | 中铁建工集团有限公司烟台分公司 | Anti-drop reinforced structure of building curtain |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29611109U1 (en) * | 1996-06-25 | 1996-12-12 | Kunad, Günther, Prof. Dr., 39110 Magdeburg | Steel and glass facade |
CN102720291A (en) * | 2012-06-20 | 2012-10-10 | 苏州环亚新型建材有限公司 | Welding-free assembled type framework and bolt latch |
CN202672420U (en) * | 2012-05-29 | 2013-01-16 | 江苏沃能光伏科技有限公司 | Curtain wall structure |
CN103774776A (en) * | 2014-02-17 | 2014-05-07 | 山东富达装饰工程有限公司 | Frame-type beamless glass curtain wall |
CN104131637A (en) * | 2014-07-18 | 2014-11-05 | 深圳市瑞华建设股份有限公司 | Framework type curtain wall closed cavity keel system capable of realizing disordered installation and installing method of framework type curtain wall closed cavity keel system |
CN203961079U (en) * | 2014-07-15 | 2014-11-26 | 深圳市方大建科集团有限公司 | Connecting structure of horizontal beam vertical post |
CN204475597U (en) * | 2015-01-08 | 2015-07-15 | 浙江中南建设集团有限公司 | Hollow glass board fixer in a kind of complete hidden glass curtain wall system |
CN205934794U (en) * | 2016-08-04 | 2017-02-08 | 浙江绣山园林建设有限公司 | Install guardrail fast |
CN206143976U (en) * | 2016-11-08 | 2017-05-03 | 杨育梁 | Novel stone material curtain wall construction |
-
2018
- 2018-01-17 CN CN201810045974.XA patent/CN108222334B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29611109U1 (en) * | 1996-06-25 | 1996-12-12 | Kunad, Günther, Prof. Dr., 39110 Magdeburg | Steel and glass facade |
CN202672420U (en) * | 2012-05-29 | 2013-01-16 | 江苏沃能光伏科技有限公司 | Curtain wall structure |
CN102720291A (en) * | 2012-06-20 | 2012-10-10 | 苏州环亚新型建材有限公司 | Welding-free assembled type framework and bolt latch |
CN103774776A (en) * | 2014-02-17 | 2014-05-07 | 山东富达装饰工程有限公司 | Frame-type beamless glass curtain wall |
CN203961079U (en) * | 2014-07-15 | 2014-11-26 | 深圳市方大建科集团有限公司 | Connecting structure of horizontal beam vertical post |
CN104131637A (en) * | 2014-07-18 | 2014-11-05 | 深圳市瑞华建设股份有限公司 | Framework type curtain wall closed cavity keel system capable of realizing disordered installation and installing method of framework type curtain wall closed cavity keel system |
CN204475597U (en) * | 2015-01-08 | 2015-07-15 | 浙江中南建设集团有限公司 | Hollow glass board fixer in a kind of complete hidden glass curtain wall system |
CN205934794U (en) * | 2016-08-04 | 2017-02-08 | 浙江绣山园林建设有限公司 | Install guardrail fast |
CN206143976U (en) * | 2016-11-08 | 2017-05-03 | 杨育梁 | Novel stone material curtain wall construction |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700454A (en) * | 2019-09-29 | 2020-01-17 | 中国一冶集团有限公司 | GRC curtain wall mounting process |
CN111677166A (en) * | 2020-06-29 | 2020-09-18 | 安徽福瑞尔铝业科技有限公司 | Assembled aluminum curtain wall plate and assembling method thereof |
CN112160472A (en) * | 2020-10-12 | 2021-01-01 | 深圳市中装建设集团股份有限公司 | Photovoltaic curtain wall framework and connecting method |
CN112160472B (en) * | 2020-10-12 | 2021-12-14 | 深圳市中装建设集团股份有限公司 | Photovoltaic curtain wall framework and connecting method |
CN113027010A (en) * | 2021-03-03 | 2021-06-25 | 蔡小雨 | Building curtain wall assembly and broken building curtain wall |
CN114045965A (en) * | 2021-11-26 | 2022-02-15 | 广东振邦新材料科技有限公司 | Framework structure for mounting aluminum plate curtain wall |
CN114045965B (en) * | 2021-11-26 | 2022-12-13 | 广东振邦新材料科技有限公司 | Framework structure for mounting aluminum plate curtain wall |
CN115142598A (en) * | 2022-09-05 | 2022-10-04 | 中铁建工集团有限公司烟台分公司 | Anti-drop reinforced structure of building curtain |
Also Published As
Publication number | Publication date |
---|---|
CN108222334B (en) | 2019-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108222334A (en) | A kind of frame curtain wall and its Assembling construction method | |
US10018595B2 (en) | Fixing device for acoustic emission test sensors for rock damage testing | |
CN108951978A (en) | A kind of full concealed frame glass curtain wall and extracting tool and method for dismounting | |
CN113161943A (en) | Furnace program control upstairs cable bridge convenient to splice and use method thereof | |
CN110778234B (en) | Multifunctional hiding device Split hinge | |
CN106894620A (en) | A kind of scaffold with fixed diagonal brace | |
CN109356473A (en) | A kind of fixed device | |
CN209704179U (en) | A kind of civil engineering protective fence being easily assembled to | |
CN210977225U (en) | Detachable external screen window | |
AU2021297407A1 (en) | Tube stay installation assembly | |
CN207273039U (en) | A kind of polish brush and polishing machine | |
CN110424659A (en) | A kind of high ductility cement exterior wall cladding | |
CN221422388U (en) | Curtain wall externally hung curved-surface reticulated shell steel structure | |
CN219675136U (en) | Portable building engineering technique measuring device | |
CN221322461U (en) | Automatic closing booster unit of air door | |
CN110434803A (en) | A kind of immersible pump axle sleeve handling tooling | |
CN221631906U (en) | Computer machine case is used in computer teaching | |
CN220653698U (en) | Interactive screen installation device | |
CN204972923U (en) | Folding football door | |
CN207118175U (en) | Board auxiliary fixing device | |
CN220623364U (en) | Movable connection structure for building energy-saving evaluation testing device and testing device | |
CN106703573A (en) | Rotating shaft structure of rotating door/window quickly mounted in T-shaped groove | |
CN219889272U (en) | Monitoring mount pad convenient to installation | |
CN221373582U (en) | Shield constructs quick-witted cutter convenient to change | |
CN212803579U (en) | Screw compressor box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |