CN108222041A - Large-sized deep water basis single wall steel boxed cofferdam construction - Google Patents

Large-sized deep water basis single wall steel boxed cofferdam construction Download PDF

Info

Publication number
CN108222041A
CN108222041A CN201810183755.8A CN201810183755A CN108222041A CN 108222041 A CN108222041 A CN 108222041A CN 201810183755 A CN201810183755 A CN 201810183755A CN 108222041 A CN108222041 A CN 108222041A
Authority
CN
China
Prior art keywords
steel
cofferdam
meters
millimeters
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810183755.8A
Other languages
Chinese (zh)
Inventor
冯龙
杜廷建
王陈君
敖刚
童智道
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201810183755.8A priority Critical patent/CN108222041A/en
Publication of CN108222041A publication Critical patent/CN108222041A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Abstract

The invention discloses a kind of large-sized deep water basis single wall steel boxed cofferdam constructions, it chooses main pier steel boxed cofferdam and selects single-wall structure, main pier bearing platform is arranged in the construction of letter river dry season, with reference to analysis of hydrological data, water level of the Huanghai Sea elevation in dry season is positive 24.0 meters, cofferdam water level of setting up defences takes positive 24.20 meters, wave resistance height is by 0.30 meter of consideration, that is a height of positive 24.50 meters of cofferdam top mark, positive 13.0 meters of cushion cap bottom surface absolute altitude, 3.0 meters of bottoming concrete thickness, then cofferdam bottom absolute altitude take positive 10.0 meters, steel jacket box total height is designed as 14.50 meters.Side plate of the present invention carries out interim water proof with bottom concrete composition enclosed construction, drain the water in cofferdam, by the use of casing side plate as bearing platform construction template, realize construction bearing platform, pier shaft in precast-boxed cofferdam, the waste of manpower and materials is reduced, operation difficulty reduces, and mechanization degree is high, construction is time-consuming short, can be used for the equipment construction on large-sized deep water basis.

Description

Large-sized deep water basis single wall steel boxed cofferdam construction
Technical field
The present invention relates to cofferdam construction technical fields more particularly to a kind of large-sized deep water basis single wall steel boxed cofferdam to construct Engineering method.
Background technology
Cofferdam refers in hydraulic engineering construction, for the permanent water conservancy projects of construction, the provisional building enclosure built, Effect is to prevent water and soil from entering building and building position, and so as in cofferdam internal drainage, excavation pit builds building, one As be mainly used in waterwork, except as formal building a part in addition to, cofferdam is generally removed after being finished, cofferdam height Higher than the peak level being likely to occur in the construction time;Existing large-sized deep water basis cofferdam equipment is implemented to need a large amount of manpower object Power, operation difficulty is larger, and mechanization degree is relatively low, and time-consuming for construction, and invention is generally used for low stake according to the bottomless steel jacket box of single wall Bearing platform construction, the box structure being mainly made of side plate and inner support form interim stop water together with bottom concrete It constructs.
Invention content
Technical problems based on background technology, the present invention propose a kind of large-sized deep water basis single wall steel boxed cofferdam Construction.
A kind of large-sized deep water basis single wall steel boxed cofferdam construction proposed by the present invention, includes the following steps:
S1:According to geological and hydrological conditions and construction experience at bridge bridge site, main pier steel boxed cofferdam selects single-wall structure, main Pier cushion cap is arranged in the construction of letter river dry season, and with reference to analysis of hydrological data, water level of the Huanghai Sea elevation in dry season is positive 24.0 meters, Cofferdam water level of setting up defences takes positive 24.20 meters, and wave resistance height is by 0.30 meter of consideration, i.e. a height of positive 24.50 meters of cofferdam top mark, cushion cap bottom surface Positive 13.0 meters of absolute altitude, 3.0 meters of bottoming concrete thickness, then cofferdam bottom absolute altitude take positive 10.0 meters, steel jacket box total height is designed as 14.50 meters;
S2:Making demand of the raw material for side plate and adjusting block is purchased, 180 × 110 × 12 angle steel of ∠ is used between block and block Connecting flange is done, 2 row's spacing are set on flange as 20 centimetres, a diameter of 20 millimeters of hole, by quincuncial arrangement, diameter 18 The bolt connection plate making of millimeter needs material to have 6 millimeters of steel plates, 8 millimeters of panels, 10 channel steel cross ribs, 18 channel steels to erect rib, ∠ 180 × 110 × 12 angle steel flanges, 25a make outer waistband and 30b makees interior waistband, the diameter specifications equipped with 25a diagonal braces are 820 millimeters Steel pipe that × 8 millimeters of steel pipe, the diameter specifications equipped with 25a diagonal braces are 630 millimeters × 8 millimeters, diameter specifications are 630 millimeters × The stent that 8 millimeters of steel pipe, the steel pipe that diameter specifications are 402 millimeters × 6 millimeters, straight support are 2I45b;
S3:After making, carry out side plate and adjustable plate is directly assembled, during assembled, drilling platform is repacked into Cofferdam platform for lining, the upper bracket of steel stove cylinder welding therein are supported, after welding, need to carry out steel bushing box structure inspection It calculates;
S4:Steel cofferdam structure checking computations refer to calculate using MIDAS/Civil software computers modeling analysis, mainly to casing Intensity, whole resistant slide, whole antidumping and whole anti-uplift stability are checked, and checking computations are divided into three parts, first part For cofferdam structure intensity operating mode, second part is stability checking computations after back cover, and Part III is tested for bottom concrete stress It calculates;
S5:It after checking computations, is positioned, cofferdam positioning device puts volume field machine using ten tablecloths, and ten tablecloths put volume field machine Respectively in surrounding with one four four one distributions, stationary steel bushing case is transferred;
S6:Then suck sediment subsidence is carried out, clear base and levelling, back cover in cofferdam, draws water and blocks up slot, is ensured steady after decentralization It is qualitative;
S7:Finally carry out dismounting steel boxed cofferdam.
Preferably, the system of processing sets up platform, and steel jacket box bottom including steel jacket box, side plate, adjustable plate and steel jacket box Corbels support is welded at portion's fascia edge, steel jacket box sets up platform both sides outer wall and is fixed with ten hoist engines by screw, and ten The output terminal of platform hoist engine is fixed on by steel wire rope on the outer wall of steel jacket box both sides.
Preferably, the steel jacket box sets up table top outer wall and is fixed with ten pulley blocks, and ten pulleys by screw Group includes six groups of wheel pulley blocks, and six groups of roller group opposite side inner walls slidably connect a diameter of 22 millimeters of steel wire Rope, steel wire rope one end is fixed on the input terminal of hoist engine.
Preferably, the steel jacket box sets up table top outer wall and is fixed with air compressor machine, and the pneumatics of air compressor machine by screw Area is 12m3, the input terminal of air compressor machine is connected with switch, and switch is connected with controller, controller model DATA-7311.
Preferably, the bottom outer wall of the steel jacket box is connected with back cover, and back cover is the disposable back cover knot of rigid conduit method Structure, is plugged with conduit mouth in back cover bottom outer wall, conduit mouth bottom outer wall and steel jacket box set up between the basal plane of platform there are Gap, gap size are 13 to 16 centimetres.
Preferably, side plate both sides outer wall is provided with water level regulation hole, and water level regulation hole bottom outer wall and steel jacket box It sets up there are gap between the substrate of platform, gap size is 19 to 21 centimetres.
Having the beneficial effect that in the present invention:It is welded on the cofferdam platform for lining and steel pile casting converted based on drilling platform Corbels support, it is whole as cofferdam using more hoist engines and pulley blocks using crane barge cooperation assembly steel cofferdam on platform in water Body promotes lower sinking system, and steel bushing caisson sinking latus inframedium is inserted directly into riverbed, clear in casing by suck sediment subsidence to designed elevation Base, it is levelling after, pour bottom concrete, side plate carries out interim water proof with bottom concrete composition enclosed construction, drains in cofferdam Water, by the use of casing side plate as bearing platform construction template, realize construction bearing platform, pier shaft in precast-boxed cofferdam, reduce manpower and materials Waste, operation difficulty reduces, and mechanization degree is high, and construction takes short, can be used for the equipment construction on large-sized deep water basis.
Description of the drawings
Fig. 1 is a kind of flow chart of large-sized deep water basis single wall steel boxed cofferdam construction proposed by the present invention;
Fig. 2 is a kind of cofferdam planar structure of large-sized deep water basis single wall steel boxed cofferdam construction proposed by the present invention Figure;
Fig. 3 is a kind of cofferdam side, sectional of large-sized deep water basis single wall steel boxed cofferdam construction proposed by the present invention Figure.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.
With reference to Fig. 1-3, a kind of large-sized deep water basis single wall steel boxed cofferdam construction includes the following steps:
S1:Main pier steel boxed cofferdam selects single-wall structure, and main pier bearing platform is arranged in the construction of letter river dry season, is provided with reference to the hydrology Material analysis, Huanghai Sea elevation dry season water level for positive 24.0 meters, cofferdam water level of setting up defences takes positive 24.20 meters, and wave resistance height is pressed 0.30 meter of consideration, i.e. a height of positive 24.50 meters of cofferdam top mark, positive 13.0 meters of cushion cap bottom surface absolute altitude, 3.0 meters of bottoming concrete thickness, Then cofferdam bottom absolute altitude takes positive 10.0 meters, and steel jacket box total height is designed as 14.50 meters;
S2:Plate making need material have 6 millimeters of steel plates, 8 millimeters of panels, 10 channel steel cross ribs, 18 channel steels erect rib, ∠ 180 × 110 × 12 angle steel flanges, 25a make outer waistband and 30b makees interior waistband, the diameter specifications equipped with 25a diagonal braces are 820 millimeters × 8 millis Rice steel pipe, the diameter specifications equipped with 25a diagonal braces be 630 millimeters × 8 millimeters steel pipe, diameter specifications be 630 millimeters × 8 millimeters Steel pipe, the steel pipe that diameter specifications are 402 millimeters × 6 millimeters, straight support be 2I45b stent;
S3:During assembly, drilling platform is repacked into cofferdam platform for lining, the upper bracket of steel stove cylinder welding therein carries out Support after welding, needs to carry out steel jacket box Structure Checking Method;
S4:Checking computations are divided into three parts, and first part is cofferdam structure intensity operating mode, and second part is steady for anti-floating after back cover Qualitative checking computations, Part III are bottom concrete stress checking calculation;
S5:It after checking computations, is positioned, cofferdam positioning device puts volume field machine using ten tablecloths, and ten tablecloths put volume field machine Respectively in surrounding with one four four one distributions, stationary steel bushing case is transferred;
S6:Then suck sediment subsidence is carried out, clear base and levelling, back cover in cofferdam, draws water and blocks up slot, is ensured steady after decentralization It is qualitative;
S7:Finally carry out dismounting steel boxed cofferdam.
In the present invention, system of processing sets up platform, and steel jacket box bottom including steel jacket box, side plate, adjustable plate and steel jacket box Corbels support is welded at fascia edge, steel jacket box sets up platform both sides outer wall and is fixed with ten hoist engines by screw, ten The output terminal of hoist engine is fixed on by steel wire rope on the outer wall of steel jacket box both sides, and steel jacket box sets up table top outer wall and passes through spiral shell Nail is fixed with ten pulley blocks, and ten pulley blocks include six groups of wheel pulley blocks, and six groups of roller group opposite side inner walls slide A diameter of 22 millimeters of steel wire rope is connected with, steel wire rope one end is fixed on the input terminal of hoist engine, and steel jacket box is set up flat Platform top exterior walls are fixed with air compressor machine by screw, and the pneumatics area of air compressor machine is 12m3, the input terminal of air compressor machine is connected with Switch, switch are connected with controller, controller model DATA-7311, and the bottom outer wall of steel jacket box is connected with back cover, and back cover For the disposable back cover structure of rigid conduit method, conduit mouth, conduit mouth bottom outer wall and steel jacket box are plugged in back cover bottom outer wall It is 13 to 16 centimetres to set up between the basal plane of platform there are gap, gap size, and side plate both sides outer wall is provided with water level tune Knothole, and water level regulation hole bottom outer wall and steel jacket box are set up between the substrate of platform there are gap, gap size for 19 to 21 centimetres.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of large-sized deep water basis single wall steel boxed cofferdam construction, includes the following steps:
S1:According to geological and hydrological conditions and construction experience at bridge bridge site, main pier steel boxed cofferdam selects single-wall structure, and main pier is held Platform is arranged in the construction of letter river dry season, and with reference to analysis of hydrological data, water level of the Huanghai Sea elevation in dry season is positive 24.0 meters, cofferdam Water level of setting up defences takes positive 24.20 meters, and wave resistance height is by 0.30 meter of consideration, i.e. a height of positive 24.50 meters of cofferdam top mark, cushion cap bottom surface absolute altitude Positive 13.0 meters, 3.0 meters of bottoming concrete thickness, then cofferdam bottom absolute altitude take positive 10.0 meters, steel jacket box total height is designed as 14.50 Rice;
S2:Making demand of the raw material for side plate and adjusting block is purchased, is done and connected using 180 × 110 × 12 angle steel of ∠ between block and block Acting flange sets 2 row's spacing as 20 centimetres, a diameter of 20 millimeters of hole on flange, and by quincuncial arrangement, diameter is 18 millimeters Bolt connection plate making need material have 6 millimeters of steel plates, 8 millimeters of panels, 10 channel steel cross ribs, 18 channel steels erect rib, ∠ 180 × 110 × 12 angle steel flanges, 25a make outer waistband and 30b makees interior waistband, the diameter specifications equipped with 25a diagonal braces are 820 millimeters × 8 millis Rice steel pipe, the diameter specifications equipped with 25a diagonal braces be 630 millimeters × 8 millimeters steel pipe, diameter specifications be 630 millimeters × 8 millimeters Steel pipe, the steel pipe that diameter specifications are 402 millimeters × 6 millimeters, straight support be 2I45b stent;
S3:After making, carry out side plate and adjustable plate is directly assembled, during assembled, repack drilling platform into cofferdam Platform for lining, the upper bracket of steel stove cylinder welding therein are supported, after welding, need to carry out steel jacket box Structure Checking Method;
S4:Steel cofferdam structure checking computations refer to calculate using MIDAS/Civil software computers modeling analysis, mainly to the strong of casing Degree, whole resistant slide, whole antidumping and whole anti-uplift stability are checked, and checking computations are divided into three parts, and first part is Cofferdam structure intensity operating mode, second part are stability checking computations after back cover, and Part III is bottom concrete stress checking calculation;
S5:It after checking computations, is positioned, cofferdam positioning device puts volume field machine using ten tablecloths, and ten tablecloths put volume field machine difference In surrounding with one four four one distributions, stationary steel bushing case is transferred;
S6:Then suck sediment subsidence is carried out, clear base and levelling, back cover in cofferdam, draws water and blocks up slot, ensures the stabilization after decentralization Property;
S7:Finally carry out dismounting steel boxed cofferdam.
2. a kind of large-sized deep water basis single wall steel boxed cofferdam construction according to claim 1, passes through system of processing Implemented, which is characterized in that the system of processing sets up platform, and steel bushing including steel jacket box, side plate, adjustable plate and steel jacket box Corbels support is welded at bottom portion fascia edge, steel jacket box sets up platform both sides outer wall and is fixed with ten elevators by screw Machine, the output terminal of ten hoist engines are fixed on by steel wire rope on the outer wall of steel jacket box both sides.
3. a kind of system of processing of large-sized deep water basis single wall steel boxed cofferdam construction according to claim 2, It is characterized in that, the steel jacket box sets up table top outer wall and is fixed with ten pulley blocks by screw, and ten pulley blocks include There are six groups of wheel pulley blocks, six groups of roller group opposite side inner walls slidably connect a diameter of 22 millimeters of steel wire rope, steel wire Rope one end is fixed on the input terminal of hoist engine.
4. a kind of system of processing of large-sized deep water basis single wall steel boxed cofferdam construction according to claim 2, It is characterized in that, the steel jacket box sets up table top outer wall and is fixed with air compressor machine by screw, and the pneumatics area of air compressor machine is 12m3, the input terminal of air compressor machine is connected with switch, and switch is connected with controller, controller model DATA-7311.
5. a kind of system of processing of large-sized deep water basis single wall steel boxed cofferdam construction according to claim 2, It is characterized in that, the bottom outer wall of the steel jacket box is connected with back cover, and back cover is the disposable back cover structure of rigid conduit method, back cover It is plugged with conduit mouth in bottom outer wall, conduit mouth bottom outer wall and steel jacket box set up between the basal plane of platform that there are gap, gaps Size is 13 to 16 centimetres.
6. a kind of system of processing of large-sized deep water basis single wall steel boxed cofferdam construction according to claim 2, Be characterized in that, side plate both sides outer wall is provided with water level regulation hole, and water level regulation hole bottom outer wall and steel jacket box set up it is flat There are gap between the substrate of platform, gap size is 19 to 21 centimetres.
CN201810183755.8A 2018-03-06 2018-03-06 Large-sized deep water basis single wall steel boxed cofferdam construction Pending CN108222041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810183755.8A CN108222041A (en) 2018-03-06 2018-03-06 Large-sized deep water basis single wall steel boxed cofferdam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810183755.8A CN108222041A (en) 2018-03-06 2018-03-06 Large-sized deep water basis single wall steel boxed cofferdam construction

Publications (1)

Publication Number Publication Date
CN108222041A true CN108222041A (en) 2018-06-29

Family

ID=62666954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810183755.8A Pending CN108222041A (en) 2018-03-06 2018-03-06 Large-sized deep water basis single wall steel boxed cofferdam construction

Country Status (1)

Country Link
CN (1) CN108222041A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119213A (en) * 2019-12-18 2020-05-08 中建三局基础设施建设投资有限公司 Double-wall steel cofferdam with open edge feet and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201891123U (en) * 2010-11-16 2011-07-06 中铁二十四局集团有限公司 Single-wall steel hanging box with concrete bottom plate
CN103821157A (en) * 2014-02-27 2014-05-28 山东省路桥集团有限公司 Wallboard lattice type steel cover box and method for constructing underwater bearing platform steel cover box
CN103835300A (en) * 2014-01-22 2014-06-04 中铁大桥局集团第五工程有限公司 Inner-support-free double-wall locking mouth steel bushing box cofferdam construction method and cofferdam
CN107034908A (en) * 2017-06-20 2017-08-11 中铁二十四局集团新余工程有限公司 A kind of steel boxed cofferdam integral elevating equipment
CN107044129A (en) * 2017-01-20 2017-08-15 中国葛洲坝集团第六工程有限公司 A kind of bottomless single wall steel boxed cofferdam of piecemeal pin-connected panel and its construction method
CN206554099U (en) * 2017-01-20 2017-10-13 中国葛洲坝集团第六工程有限公司 A kind of bottomless single wall steel boxed cofferdam of piecemeal pin-connected panel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201891123U (en) * 2010-11-16 2011-07-06 中铁二十四局集团有限公司 Single-wall steel hanging box with concrete bottom plate
CN103835300A (en) * 2014-01-22 2014-06-04 中铁大桥局集团第五工程有限公司 Inner-support-free double-wall locking mouth steel bushing box cofferdam construction method and cofferdam
CN103821157A (en) * 2014-02-27 2014-05-28 山东省路桥集团有限公司 Wallboard lattice type steel cover box and method for constructing underwater bearing platform steel cover box
CN107044129A (en) * 2017-01-20 2017-08-15 中国葛洲坝集团第六工程有限公司 A kind of bottomless single wall steel boxed cofferdam of piecemeal pin-connected panel and its construction method
CN206554099U (en) * 2017-01-20 2017-10-13 中国葛洲坝集团第六工程有限公司 A kind of bottomless single wall steel boxed cofferdam of piecemeal pin-connected panel
CN107034908A (en) * 2017-06-20 2017-08-11 中铁二十四局集团新余工程有限公司 A kind of steel boxed cofferdam integral elevating equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119213A (en) * 2019-12-18 2020-05-08 中建三局基础设施建设投资有限公司 Double-wall steel cofferdam with open edge feet and construction method thereof

Similar Documents

Publication Publication Date Title
CN105133627B (en) Construction under single wall steel sheet-pile cofferdam flowing water state
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN103195158B (en) Municipal drainage pipeline slurry balance pipe-jacking construction method
CN102425160A (en) Method for constructing engineering pile by combining rotary drilling rig with manual pile base chambering
CN205152976U (en) Marine precast concrete cushion cap wind turbine foundation
CN104532813A (en) Overwater building construction platform and erecting method and use method thereof
CN107869144A (en) A kind of pre- slotting ring seal Double-Wall Steel Boxed Cofferdam deep water foundation comprehensive construction method
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
CN107059900B (en) A kind of construction method that Double-wall sin-gle-image radiography quickly sinks in sand-pebble layer
CN103806464A (en) Reverse construction method for vertical intersection between large high-speed rail station and subway
CN110820765A (en) Prefabricated enclosure structure for narrow deep foundation pit and construction method
CN101597888A (en) Construction method of municipal drainage culvert sinking trough
CN108222041A (en) Large-sized deep water basis single wall steel boxed cofferdam construction
CN113404649A (en) Pontoon suitable for multi-pile foundation and floating fan combined structure system
CN108225432A (en) Refuse landfill cut-pff wall model measurement device and preparation method thereof
CN211646415U (en) Prefabricated enclosure structure for narrow deep foundation pit
CN117113718A (en) Method, device and medium for measuring scouring power of offshore wind power single pile foundation
CN109594590A (en) Building basement waterproof treatment structure and its construction method under the conditions of a kind of rock-mass
CN206847612U (en) A kind of miniature tide register erecting device of offshore
CN102518142B (en) Pile and wall combined sealing system and construction method thereof
CN105544474B (en) A kind of floating net being used for before water inlet disappears vortex method
CN107700478A (en) Work transmission line bored concrete pile single-pile foundation one-shot forming construction method
CN203420278U (en) Suction pile type gravity foundation and installation device thereof
CN208455485U (en) Combined type single wall steel bushing case apparatus
CN105887890A (en) Plastic pile, construction method of plastic pile and foundation pit supporting watertight seal structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication