CN108215982A - A kind of transport vehicle of constructing tunnel with alarm function - Google Patents

A kind of transport vehicle of constructing tunnel with alarm function Download PDF

Info

Publication number
CN108215982A
CN108215982A CN201711494027.0A CN201711494027A CN108215982A CN 108215982 A CN108215982 A CN 108215982A CN 201711494027 A CN201711494027 A CN 201711494027A CN 108215982 A CN108215982 A CN 108215982A
Authority
CN
China
Prior art keywords
bull stick
placing box
transport vehicle
antetheca
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711494027.0A
Other languages
Chinese (zh)
Other versions
CN108215982B (en
Inventor
邹玉乾
谢春丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huang Haiying
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711494027.0A priority Critical patent/CN108215982B/en
Publication of CN108215982A publication Critical patent/CN108215982A/en
Application granted granted Critical
Publication of CN108215982B publication Critical patent/CN108215982B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/604Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings
    • E01F9/615Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings illuminated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/623Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by form or by structural features, e.g. for enabling displacement or deflection
    • E01F9/65Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by form or by structural features, e.g. for enabling displacement or deflection with rotatable, swingable or adjustable signs or signals
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/658Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing
    • E01F9/662Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing mounted on vehicles, e.g. service vehicles; Warning vehicles travelling along with road-maintenance, e.g. remotely controlled

Abstract

The transport vehicle with alarm function the present invention relates to a kind of constructing tunnel transport vehicle more particularly to a kind of constructing tunnel.The technical problem to be solved in the present invention is to provide one kind can carry alarm function, improve transport vehicle of the constructing tunnel with alarm function of convenience.In order to solve the above-mentioned technical problem, the present invention provides transport vehicle of such a constructing tunnel with alarm function, include transport vehicle, placing box, drawing liquid pump, inlet tube, outlet tube, first bearing seat, the first bull stick, head rod, endless glide, first sliding block etc.;Top of transport vehicle is connected with placing box, and placing box left wall is connected with drawing liquid pump, is connected with inlet tube on the upside of drawing liquid pump, feed liquor pipe end is located in placing box.Invention achieves with alarm function, the effect of convenience is improved, by being provided with transport vehicle, placing box, drawing liquid pump etc., the transport of dedusting agent had both been realized, and had also improved prompting dynamics.

Description

A kind of transport vehicle of constructing tunnel with alarm function
Technical field
The fortune with alarm function the present invention relates to a kind of constructing tunnel transport vehicle more particularly to a kind of constructing tunnel Defeated vehicle.
Background technology
In tunnel excavation and mining process, due to rock drilling, explosion, the processes such as handling ore deposit, a large amount of fine dusts that can be generated, Dust harzard health, certain dust may cause explosion, tunnel and mine safety caused seriously to endanger under certain condition Evil, in order to improve safety, will generally be made a return journey chalk dust removing using dust agent, and present dedusting agent is typically placed in defeated on transport vehicle Appointed place is sent to, but existing transport vehicle only has single transportation function, there is no the work(for warning pedestrian and drivers Can, this is easy for causing having pedestrian during dedusting agent is sprayed and driving vehicle passes by and being sprayed to can cause in this way It is greatly inconvenient.
Therefore there is an urgent need for research and development one kind can carry alarm function, improve the constructing tunnel of convenience with alarm function Transport vehicle, to overcome existing transport vehicle function single, it is inconvenient for use the shortcomings that.
Invention content
(1)Technical problems to be solved
The present invention is single in order to overcome existing transport vehicle function, it is inconvenient for use the shortcomings that, the technical problem to be solved by the present invention is to Alarm function can be carried by providing one kind, improve transport vehicle of the constructing tunnel with alarm function of convenience.
(2)Technical solution
In order to solve the above technical problem, the present invention provides transport vehicle of such a constructing tunnel with alarm function, Include transport vehicle, placing box, drawing liquid pump, inlet tube, outlet tube, first bearing seat, the first bull stick, head rod, annular Sliding rail, the first sliding block, rotor plate, strut and warning sign, top of transport vehicle are connected with placing box, and placing box left wall is connected with drawing liquid Pump, drawing liquid pump upside are connected with inlet tube, and feed liquor pipe end is located in placing box, and outlet tube is connected on the downside of drawing liquid pump, places First bearing seat is connected among case antetheca, the first bull stick is connected in first bearing seat, the first bull stick front end is connected with first Connecting rod, the placing box antetheca lower part left and right sides are respectively connected with strut, endless glide are connected on strut, is slided in endless glide Formula is connected with the first sliding block, and rotor plate is connected on the first sliding block, and groove, rotor plate antetheca and first are uniformly provided on rotor plate Connecting rod connects, and warning sign is uniformly connected on rotor plate antetheca.
Preferably, motor, the second bull stick, runner, fixture block, belt pulley and flat belt, placing box antetheca right side have been further included Motor is connected with, the second bull stick is connected on front side of motor, runner is connected on the second bull stick, fixture block, fixture block are connected on runner Coordinate with groove, be respectively connected with belt pulley on the first bull stick and the second bull stick, the belt pulley on the first bull stick is located at clutch shaft bearing Between seat and head rod, the belt pulley on the second bull stick is located at the front side of runner, is wound between the belt pulley of the left and right sides Flat belt.
Preferably, mounting rod, second bearing seat, third bull stick and stirring rod have been further included, has been connected among placing box inner top Mounting rod is connected to, second bearing seat is respectively connected at left and right sides of mounting rod, is respectively connected in the second bearing seat of the left and right sides Third bull stick is uniformly connected with stirring rod on third bull stick, and the stirring rod of the left and right sides mutually staggers.
Preferably, sector gear, the first sliding rail, the second sliding block, the second connecting rod, mounting blocks, spring, rack have been further included And first gear, sector gear is connected on the second bull stick, and sector gear is between motor and runner, on the antetheca of placing box Portion is connected with the first sliding rail, and slidingtype is connected with the second sliding block on the first sliding rail, and the second sliding block antetheca is connected with the second connecting rod, Second connecting rod upper and lower ends are respectively connected with rack, and the rack of downside is engaged with sector gear, and placing box antetheca upper left-hand connects Mounting blocks are connected to, spring is connected between the second sliding block and mounting blocks, the third bull stick top of the left and right sides is respectively connected with first Gear, the rack of upside are located on front side of first gear, and first gear is engaged with rack, and rack is located at the rear side of endless glide.
Preferably, it further included l-shaped rod, struck block and LED light, the rack left end of upside is connected with l-shaped rod, l-shaped rod bottom Rear side, which is connected with, strikes block, strikes the left side that block is located at placing box, placing box antetheca or so and is respectively connected with LED light in four sides up and down.
Operation principle:Tunnel, which can generate a large amount of dust when being constructed, to be needed to spray a certain amount of dedusting agent, when need When wanting dedusting agent, suitable dedusting agent can be placed in placing box by staff, and be transported to accordingly by transport vehicle Place, when needing to take, only need to pass through drawing liquid pumped.And after transport vehicle reaches job location stopping, people Work can attract pedestrian note that pedestrian and driver can thus be caused to notice and applying herein by rotating warning sign Work improves prompting dynamics.
Because having further included motor, the second bull stick, runner, fixture block, belt pulley and flat belt, connected on the right side of placing box antetheca Have a motor, be connected with the second bull stick on front side of motor, runner is connected on the second bull stick, be connected with fixture block on runner, fixture block with it is recessed Slot coordinates, and is respectively connected with belt pulley on the first bull stick and the second bull stick, the belt pulley on the first bull stick be located at first bearing seat with Between head rod, the belt pulley on the second bull stick is located at the front side of runner, and flat skin is wound between the belt pulley of the left and right sides Band.When carrying out prompting pedestrian and driver, staff starts motor, and motor drives runner and fixture block continuous inverse time Needle rotates, because fixture block coordinates with groove, runner and fixture block are constantly rotated counterclockwise and will be driven between rotor plate and warning sign It has a rest rotation, the warning sign rotated in this way can either improve appeal, and intermittent rotary can also make warning sign is of short duration to stop It stays so that it is convenient to which pedestrian and driver observe the word on warning sign, saving manpower.
Because having further included mounting rod, second bearing seat, third bull stick and stirring rod, it is connected among placing box inner top Mounting rod is respectively connected with second bearing seat at left and right sides of mounting rod, third is respectively connected in the second bearing seat of the left and right sides Bull stick is uniformly connected with stirring rod on third bull stick, and the stirring rod of the left and right sides mutually staggers.Meeting after dedusting agent is placed for a long time Precipitation is generated, influences dust removing effects, so when needing to be sufficiently mixed dedusting agent, staff rotates third bull stick, drives Stirring rod constantly rotates, so as to fulfill the effect of stirring dedusting agent.
Because further included sector gear, the first sliding rail, the second sliding block, the second connecting rod, mounting blocks, spring, rack and First gear is connected with sector gear on the second bull stick, and sector gear is between motor and runner, the antetheca top of placing box The first sliding rail is connected with, slidingtype is connected with the second sliding block on the first sliding rail, and the second sliding block antetheca is connected with the second connecting rod, the Two connecting rod upper and lower ends are respectively connected with rack, and the rack of downside is engaged with sector gear, the connection of placing box antetheca upper left-hand There are mounting blocks, spring is connected between the second sliding block and mounting blocks, the third bull stick top of the left and right sides is respectively connected with the first tooth Wheel, the rack of upside are located on front side of first gear, and first gear is engaged with rack, and rack is located at the rear side of endless glide.Work as electricity When dynamic second bull stick of electromechanics rotates counterclockwise, sector gear also rotates counterclockwise therewith, when the rack of sector gear and downside is nibbled During conjunction, the rack of upper and lower both sides is to left movement, and spring-compressed, first gear drives third bull stick to rotate clockwise, when shape gear When being detached with the rack of downside, under the elastic force effect of spring, the rack of upper and lower both sides moves right, and first gear drives third Bull stick rotates counterclockwise, and such sector gear constantly rotates counterclockwise, it will be able to realize that stirring rod is continuous clockwise and inverse Hour hands rotate, and so as to fulfill that need not stir dedusting agent by artificial, save manpower.
Because having further included l-shaped rod, having struck block and LED light, the rack left end of upside is connected with l-shaped rod, l-shaped rod bottom rear It is connected with and strikes block, strike the left side that block is located at placing box, placing box antetheca or so and be respectively connected with LED light in four sides up and down.When rack not During disconnected side-to-side movement, l-shaped rod and block also continuous side-to-side movement is struck, so as to fulfill the effect of placing box is beaten, can shaken Placing box so as to further prevent having sediment appearance in dedusting agent, and in the case of insufficient light, can open LED Lamp illuminates warning sign, further improves warning dynamics.
(3)Advantageous effect
Invention achieves with alarm function, the effect of convenience is improved.By being provided with transport vehicle, placing box, drawing liquid pump Deng, both realized the transport of dedusting agent, and also improved prompting dynamics, be provided with motor, the second bull stick, runner etc. so that it is convenient to Pedestrian and driver observe the word on warning sign, save manpower, are provided with dress bar, second bearing seat, third bull stick and stirring rod, So as to fulfill the effect of stirring dedusting agent, sector gear, the first sliding rail, second sliding block etc. are provided with, so as to fulfill that need not rely on It is artificial to stir dedusting agent, manpower is saved, while be provided with l-shaped rod, strike block and LED light, so as to further prevent in dedusting agent There is sediment appearance, and in the case of insufficient light, LED light can be opened, illuminate warning sign, further improve warning Dynamics.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the first part main structure diagram of the present invention.
Fig. 4 is second of part main structure diagram of the present invention.
Fig. 5 is the third part main structure diagram of the present invention.
Label in attached drawing for:1- transport vehicles, 2- placing boxes, 3- drawing liquid pumps, 4- inlet tubes, 5- outlet tubes, 6- first axles Bearing, the first bull sticks of 7-, 8- head rods, 9- endless glides, the first sliding blocks of 10-, 11- rotor plates, 12- grooves, 13- branch Bar, 14- motors, the second bull sticks of 15-, 16- runners, 17- fixture blocks, 18- belt pulleys, 19- flat belts, 20- mounting rods, 21- second Bearing block, 22- third bull sticks, 23- stirring rods, 24- sector gears, the first sliding rails of 25-, the second sliding blocks of 26-, 27- second are connected Bar, 28- mounting blocks, 29- springs, 30- racks, 31- first gears, 32-L type bars, 33- strike block, 34-LED lamps, 35- warning signs.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of transport vehicle of constructing tunnel with alarm function as shown in Figs. 1-5, includes transport vehicle 1, placing box 2, drawing liquid Pump 3, outlet tube 5, first bearing seat 6, the first bull stick 7, head rod 8, endless glide 9, the first sliding block 10, turns inlet tube 4 Movable plate 11, strut 13 and warning sign 35,1 top of transport vehicle are connected with placing box 2, and 2 left wall of placing box is connected with drawing liquid pump 3, takes out 3 upside of liquid pump is connected with inlet tube 4, and 4 end of inlet tube is located in placing box 2, and 3 downside of drawing liquid pump is connected with outlet tube 5, places First bearing seat 6 is connected among 2 antetheca of case, the first bull stick 7 is connected in first bearing seat 6,7 front end of the first bull stick is connected with Head rod 8,2 antetheca lower part of the placing box left and right sides are respectively connected with strut 13, endless glide 9, ring are connected on strut 13 Slidingtype is connected with the first sliding block 10 on shape sliding rail 9, and rotor plate 11 is connected on the first sliding block 10, is uniformly provided on rotor plate 11 Groove 12,11 antetheca of rotor plate are connect with head rod 8, and warning sign 35 is uniformly connected on 11 antetheca of rotor plate.
Embodiment 2
A kind of transport vehicle of constructing tunnel with alarm function as shown in Figs. 1-5, includes transport vehicle 1, placing box 2, drawing liquid Pump 3, outlet tube 5, first bearing seat 6, the first bull stick 7, head rod 8, endless glide 9, the first sliding block 10, turns inlet tube 4 Movable plate 11, strut 13 and warning sign 35,1 top of transport vehicle are connected with placing box 2, and 2 left wall of placing box is connected with drawing liquid pump 3, takes out 3 upside of liquid pump is connected with inlet tube 4, and 4 end of inlet tube is located in placing box 2, and 3 downside of drawing liquid pump is connected with outlet tube 5, places First bearing seat 6 is connected among 2 antetheca of case, the first bull stick 7 is connected in first bearing seat 6,7 front end of the first bull stick is connected with Head rod 8,2 antetheca lower part of the placing box left and right sides are respectively connected with strut 13, endless glide 9, ring are connected on strut 13 Slidingtype is connected with the first sliding block 10 on shape sliding rail 9, and rotor plate 11 is connected on the first sliding block 10, is uniformly provided on rotor plate 11 Groove 12,11 antetheca of rotor plate are connect with head rod 8, and warning sign 35 is uniformly connected on 11 antetheca of rotor plate.
Motor 14, the second bull stick 15, runner 16, fixture block 17, belt pulley 18 and flat belt 19 are further included, before placing box 2 Motor 14 is connected on the right side of wall, 14 front side of motor is connected with the second bull stick 15, runner 16, runner 16 are connected on the second bull stick 15 On be connected with fixture block 17, fixture block 17 coordinates with groove 12, and belt pulley 18 is respectively connected on the first bull stick 7 and the second bull stick 15, Belt pulley 18 on one bull stick 7 is between first bearing seat 6 and head rod 8, the belt pulley on the second bull stick 15 18 In the front side of runner 16, flat belt 19 is wound between the belt pulley 18 of the left and right sides.
Embodiment 3
A kind of transport vehicle of constructing tunnel with alarm function as shown in Figs. 1-5, includes transport vehicle 1, placing box 2, drawing liquid Pump 3, outlet tube 5, first bearing seat 6, the first bull stick 7, head rod 8, endless glide 9, the first sliding block 10, turns inlet tube 4 Movable plate 11, strut 13 and warning sign 35,1 top of transport vehicle are connected with placing box 2, and 2 left wall of placing box is connected with drawing liquid pump 3, takes out 3 upside of liquid pump is connected with inlet tube 4, and 4 end of inlet tube is located in placing box 2, and 3 downside of drawing liquid pump is connected with outlet tube 5, places First bearing seat 6 is connected among 2 antetheca of case, the first bull stick 7 is connected in first bearing seat 6,7 front end of the first bull stick is connected with Head rod 8,2 antetheca lower part of the placing box left and right sides are respectively connected with strut 13, endless glide 9, ring are connected on strut 13 Slidingtype is connected with the first sliding block 10 on shape sliding rail 9, and rotor plate 11 is connected on the first sliding block 10, is uniformly provided on rotor plate 11 Groove 12,11 antetheca of rotor plate are connect with head rod 8, and warning sign 35 is uniformly connected on 11 antetheca of rotor plate.
Motor 14, the second bull stick 15, runner 16, fixture block 17, belt pulley 18 and flat belt 19 are further included, before placing box 2 Motor 14 is connected on the right side of wall, 14 front side of motor is connected with the second bull stick 15, runner 16, runner 16 are connected on the second bull stick 15 On be connected with fixture block 17, fixture block 17 coordinates with groove 12, and belt pulley 18 is respectively connected on the first bull stick 7 and the second bull stick 15, Belt pulley 18 on one bull stick 7 is between first bearing seat 6 and head rod 8, the belt pulley on the second bull stick 15 18 In the front side of runner 16, flat belt 19 is wound between the belt pulley 18 of the left and right sides.
Mounting rod 20, second bearing seat 21, third bull stick 22 and stirring rod 23 are further included, among 2 inner top of placing box Mounting rod 20 is connected with, the left and right sides of mounting rod 20 is respectively connected with second bearing seat 21, the second bearing seat 21 of the left and right sides On be respectively connected with third bull stick 22, be uniformly connected with stirring rod 23 on third bull stick 22, the stirring rod 23 of the left and right sides is mutually wrong It opens.
Embodiment 4
A kind of transport vehicle of constructing tunnel with alarm function as shown in Figs. 1-5, includes transport vehicle 1, placing box 2, drawing liquid Pump 3, outlet tube 5, first bearing seat 6, the first bull stick 7, head rod 8, endless glide 9, the first sliding block 10, turns inlet tube 4 Movable plate 11, strut 13 and warning sign 35,1 top of transport vehicle are connected with placing box 2, and 2 left wall of placing box is connected with drawing liquid pump 3, takes out 3 upside of liquid pump is connected with inlet tube 4, and 4 end of inlet tube is located in placing box 2, and 3 downside of drawing liquid pump is connected with outlet tube 5, places First bearing seat 6 is connected among 2 antetheca of case, the first bull stick 7 is connected in first bearing seat 6,7 front end of the first bull stick is connected with Head rod 8,2 antetheca lower part of the placing box left and right sides are respectively connected with strut 13, endless glide 9, ring are connected on strut 13 Slidingtype is connected with the first sliding block 10 on shape sliding rail 9, and rotor plate 11 is connected on the first sliding block 10, is uniformly provided on rotor plate 11 Groove 12,11 antetheca of rotor plate are connect with head rod 8, and warning sign 35 is uniformly connected on 11 antetheca of rotor plate.
Motor 14, the second bull stick 15, runner 16, fixture block 17, belt pulley 18 and flat belt 19 are further included, before placing box 2 Motor 14 is connected on the right side of wall, 14 front side of motor is connected with the second bull stick 15, runner 16, runner 16 are connected on the second bull stick 15 On be connected with fixture block 17, fixture block 17 coordinates with groove 12, and belt pulley 18 is respectively connected on the first bull stick 7 and the second bull stick 15, Belt pulley 18 on one bull stick 7 is between first bearing seat 6 and head rod 8, the belt pulley on the second bull stick 15 18 In the front side of runner 16, flat belt 19 is wound between the belt pulley 18 of the left and right sides.
Mounting rod 20, second bearing seat 21, third bull stick 22 and stirring rod 23 are further included, among 2 inner top of placing box Mounting rod 20 is connected with, the left and right sides of mounting rod 20 is respectively connected with second bearing seat 21, the second bearing seat 21 of the left and right sides On be respectively connected with third bull stick 22, be uniformly connected with stirring rod 23 on third bull stick 22, the stirring rod 23 of the left and right sides is mutually wrong It opens.
Sector gear 24, the first sliding rail 25, the second sliding block 26, the second connecting rod 27, mounting blocks 28, spring are further included 29th, rack 30 and first gear 31 are connected with sector gear 24 on second bull stick 15, and sector gear 24 is located at motor 14 and runner Between 16, the antetheca top of placing box 2 is connected with the first sliding rail 25, and slidingtype is connected with the second sliding block 26 on the first sliding rail 25, Second sliding block, 26 antetheca is connected with the second connecting rod 27, and 27 upper and lower ends of the second connecting rod are respectively connected with rack 30, the tooth of downside Item 30 is engaged with sector gear 24, and 2 antetheca upper left-hand of placing box is connected with mounting blocks 28, the second sliding block 26 and mounting blocks 28 it Between be connected with spring 29,22 top of third bull stick of the left and right sides is respectively connected with first gear 31, and the rack 30 of upside is located at the One gear, 31 front side, first gear 31 are engaged with rack 30, and rack 30 is located at the rear side of endless glide 9.
It further included l-shaped rod 32, struck block 33 and LED light 34,30 left end of rack of upside is connected with l-shaped rod 32, l-shaped rod 32 Bottom rear, which is connected with, strikes block 33, strikes the left side that block 33 is located at placing box 2,2 antetheca of placing box or so and is respectively connected with four sides up and down LED light 34.
Operation principle:Tunnel, which can generate a large amount of dust when being constructed, to be needed to spray a certain amount of dedusting agent, when need When wanting dedusting agent, suitable dedusting agent can be placed in placing box 2 by staff, and be transported to phase by transport vehicle 1 The place answered when needing to take, need to only be extracted out by drawing liquid pump 3.And when transport vehicle 1 reach job location stop with Afterwards, manually it can attract pedestrian note that thus pedestrian and driver can be caused to notice herein by rotating warning sign 35 Hot work in progress improves prompting dynamics.
Because motor 14, the second bull stick 15, runner 16, fixture block 17, belt pulley 18 and flat belt 19, placing box are further included Motor 14 is connected on the right side of 2 antethecas, 14 front side of motor is connected with the second bull stick 15, is connected with runner 16 on the second bull stick 15, turns Fixture block 17 is connected on wheel 16, fixture block 17 coordinates with groove 12, and belt pulley is respectively connected on the first bull stick 7 and the second bull stick 15 18, the belt pulley 18 on the first bull stick 7 is between first bearing seat 6 and head rod 8, the belt pulley on the second bull stick 15 18 are located at the front side of runner 16, and flat belt 19 is wound between the belt pulley 18 of the left and right sides.It pedestrian and is driven when carrying out prompting During the person of sailing, staff starts motor 14, and motor 14 drives runner 16 and fixture block 17 constantly to rotate counterclockwise, because of fixture block 17 Coordinate with groove 12, runner 16 and continuous rotate counterclockwise of fixture block 17 will drive rotor plate 11 and warning sign 35 intermittently to turn Dynamic, the warning sign 35 rotated in this way can either improve appeal, and intermittent rotary can also make warning sign 35 is of short duration to stop It stays so that it is convenient to which pedestrian and driver observe the word on warning sign 35, saving manpower.
Because having further included mounting rod 20, second bearing seat 21, third bull stick 22 and stirring rod 23,2 inner top of placing box Centre is connected with mounting rod 20, and the left and right sides of mounting rod 20 is respectively connected with second bearing seat 21, the second bearing of the left and right sides Third bull stick 22 is respectively connected on seat 21, stirring rod 23,23 phase of stirring rod of the left and right sides are uniformly connected on third bull stick 22 Mutually it is staggered.Dedusting agent can generate precipitation after placing for a long time, influence dust removing effects, so when needing to be sufficiently mixed dedusting agent When, staff rotates third bull stick 22, and stirring rod 23 is driven constantly to rotate, so as to fulfill the effect of stirring dedusting agent.
Because sector gear 24, the first sliding rail 25, the second sliding block 26, the second connecting rod 27, mounting blocks 28, bullet are further included Spring 29, rack 30 and first gear 31, sector gear 24 is connected on the second bull stick 15, and sector gear 24 is located at motor 14 and turns Between wheel 16, the antetheca top of placing box 2 is connected with the first sliding rail 25, and slidingtype is connected with the second sliding block on the first sliding rail 25 26,26 antetheca of the second sliding block is connected with the second connecting rod 27, and 27 upper and lower ends of the second connecting rod are respectively connected with rack 30, downside Rack 30 is engaged with sector gear 24, and 2 antetheca upper left-hand of placing box is connected with mounting blocks 28, the second sliding block 26 and mounting blocks 28 Between be connected with spring 29,22 top of third bull stick of the left and right sides is respectively connected with first gear 31, and the rack 30 of upside is located at 31 front side of first gear, first gear 31 are engaged with rack 30, and rack 30 is located at the rear side of endless glide 9.When motor 14 is electronic When second bull stick 15 rotates counterclockwise, sector gear 24 also rotates counterclockwise therewith, when sector gear 24 and the rack 30 of downside During engagement, to left movement, spring 29 compresses the rack 30 of upper and lower both sides, and first gear 31 drives third bull stick 22 to turn clockwise Dynamic, when shape gear is detached with the rack 30 of downside, under the elastic force effect of spring 29, the rack 30 of upper and lower both sides is transported to the right Dynamic, first gear 31 drives third bull stick 22 to rotate counterclockwise, and such sector gear 24 constantly rotates counterclockwise, it will be able to real Existing stirring rod 23 constantly rotates clockwise and anticlockwise, so as to fulfill that need not stir dedusting agent by artificial, saves manpower.
Because having further included l-shaped rod 32, having struck block 33 and LED light 34,30 left end of rack of upside is connected with l-shaped rod 32, L-type 32 bottom rear of bar, which is connected with, strikes block 33, strikes the left side that block 33 is located at placing box 2,2 antetheca of placing box or so and connects four sides up and down It is connected to LED light 34.When 30 continuous side-to-side movement of rack, l-shaped rod 32 and the also continuous side-to-side movement of block 33 is struck, so as to fulfill The effect of placing box 2 is beaten, placing box 2 can be shaken, so as to further prevent having sediment appearance in dedusting agent, and in light In the case of line is insufficient, LED light 34 can be opened, illuminates warning sign 35, further improves warning dynamics.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. transport vehicle of a kind of constructing tunnel with alarm function, which is characterized in that include transport vehicle(1), placing box (2), drawing liquid pump(3), inlet tube(4), outlet tube(5), first bearing seat(6), the first bull stick(7), head rod(8), ring Shape sliding rail(9), the first sliding block(10), rotor plate(11), strut(13)And warning sign(35), transport vehicle(1)Top, which is connected with, puts Put case(2), placing box(2)Left wall is connected with drawing liquid pump(3), drawing liquid pump(3)Upside is connected with inlet tube(4), inlet tube(4)End End is located at placing box(2)It is interior, drawing liquid pump(3)Downside is connected with outlet tube(5), placing box(2)First axle is connected among antetheca Bearing(6), first bearing seat(6)On be connected with the first bull stick(7), the first bull stick(7)Front end is connected with head rod(8), Placing box(2)Strut is respectively connected at left and right sides of antetheca lower part(13), strut(13)On be connected with endless glide(9), it is annular sliding Rail(9)Upper slidingtype is connected with the first sliding block(10), the first sliding block(10)On be connected with rotor plate(11), rotor plate(11)It is upper equal It is even to be provided with groove(12), rotor plate(11)Antetheca and head rod(8)Connection, rotor plate(11)Police is uniformly connected on antetheca Show board(35).
2. transport vehicle of a kind of constructing tunnel with alarm function according to claim 1, which is characterized in that further include There is motor(14), the second bull stick(15), runner(16), fixture block(17), belt pulley(18)And flat belt(19), placing box(2)Before Motor is connected on the right side of wall(14), motor(14)Front side is connected with the second bull stick(15), the second bull stick(15)On be connected with runner (16), runner(16)On be connected with fixture block(17), fixture block(17)With groove(12)Cooperation, the first bull stick(7)With the second bull stick (15)On be respectively connected with belt pulley(18), the first bull stick(7)On belt pulley(18)Positioned at first bearing seat(6)With the first connection Bar(8)Between, the second bull stick(15)On belt pulley(18)Positioned at runner(16)Front side, the belt pulley of the left and right sides(18)It Between be wound with flat belt(19).
3. transport vehicle of a kind of constructing tunnel with alarm function according to claim 2, which is characterized in that further include There is mounting rod(20), second bearing seat(21), third bull stick(22)And stirring rod(23), placing box(2)It is connected among inner top There is mounting rod(20), mounting rod(20)The left and right sides be respectively connected with second bearing seat(21), the second bearing seat of the left and right sides (21)On be respectively connected with third bull stick(22), third bull stick(22)On be uniformly connected with stirring rod(23), the stirring of the left and right sides Bar(23)It mutually staggers.
4. transport vehicle of a kind of constructing tunnel with alarm function according to claim 3, which is characterized in that further include There is sector gear(24), the first sliding rail(25), the second sliding block(26), the second connecting rod(27), mounting blocks(28), spring(29)、 Rack(30)And first gear(31), the second bull stick(15)On be connected with sector gear(24), sector gear(24)Positioned at motor (14)And runner(16)Between, placing box(2)Antetheca top be connected with the first sliding rail(25), the first sliding rail(25)Upper slidingtype It is connected with the second sliding block(26), the second sliding block(26)Antetheca is connected with the second connecting rod(27), the second connecting rod(27)Upper and lower two End is respectively connected with rack(30), the rack of downside(30)With sector gear(24)Engagement, placing box(2)Antetheca upper left-hand connects There are mounting blocks(28), the second sliding block(26)With mounting blocks(28)Between be connected with spring(29), the third bull stick of the left and right sides (22)Top is respectively connected with first gear(31), the rack of upside(30)Positioned at first gear(31)Front side, first gear(31) With rack(30)Engagement, rack(30)Positioned at endless glide(9)Rear side.
5. transport vehicle of a kind of constructing tunnel with alarm function according to claim 4, which is characterized in that further include There is l-shaped rod(32), strike block(33)And LED light(34), the rack of upside(30)Left end is connected with l-shaped rod(32), l-shaped rod(32)Bottom It is connected on rear side of portion and strikes block(33), strike block(33)Positioned at placing box(2)Left side, placing box(2)Four sides are equal up and down for antetheca or so It is connected with LED light(34).
CN201711494027.0A 2017-12-31 2017-12-31 Transport vehicle with warning function for tunnel construction Active CN108215982B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711494027.0A CN108215982B (en) 2017-12-31 2017-12-31 Transport vehicle with warning function for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711494027.0A CN108215982B (en) 2017-12-31 2017-12-31 Transport vehicle with warning function for tunnel construction

Publications (2)

Publication Number Publication Date
CN108215982A true CN108215982A (en) 2018-06-29
CN108215982B CN108215982B (en) 2020-05-29

Family

ID=62642369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711494027.0A Active CN108215982B (en) 2017-12-31 2017-12-31 Transport vehicle with warning function for tunnel construction

Country Status (1)

Country Link
CN (1) CN108215982B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07232586A (en) * 1994-02-22 1995-09-05 Ebatsuku:Kk Traffic regulating vehicle
CN2732544Y (en) * 2003-12-19 2005-10-12 武汉铁路江岸车辆段紫云工贸公司 Railroad vehicle faults emergency repair truck
CN1887616A (en) * 2006-05-29 2007-01-03 陈林 Multifunctional transport
JP2007176465A (en) * 2005-12-28 2007-07-12 Kyokuto Kaihatsu Kogyo Co Ltd Truck
CN204095626U (en) * 2014-09-22 2015-01-14 衡阳奔腾特车科技有限公司 A kind of anti-explosion electric sampling vehicle
CN206127921U (en) * 2016-09-29 2017-04-26 淮安鑫一元交通电子科技有限公司 Reputation of construction warning device that waves a flag is maintained in road traffic control
CN206510812U (en) * 2017-02-19 2017-09-22 左思润 A kind of emergency communication command car

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07232586A (en) * 1994-02-22 1995-09-05 Ebatsuku:Kk Traffic regulating vehicle
CN2732544Y (en) * 2003-12-19 2005-10-12 武汉铁路江岸车辆段紫云工贸公司 Railroad vehicle faults emergency repair truck
JP2007176465A (en) * 2005-12-28 2007-07-12 Kyokuto Kaihatsu Kogyo Co Ltd Truck
CN1887616A (en) * 2006-05-29 2007-01-03 陈林 Multifunctional transport
CN204095626U (en) * 2014-09-22 2015-01-14 衡阳奔腾特车科技有限公司 A kind of anti-explosion electric sampling vehicle
CN206127921U (en) * 2016-09-29 2017-04-26 淮安鑫一元交通电子科技有限公司 Reputation of construction warning device that waves a flag is maintained in road traffic control
CN206510812U (en) * 2017-02-19 2017-09-22 左思润 A kind of emergency communication command car

Also Published As

Publication number Publication date
CN108215982B (en) 2020-05-29

Similar Documents

Publication Publication Date Title
CN106935140B (en) Notice board is used in a kind of construction of sedimentation basin
CN107780349A (en) A kind of construction building protection alarming device
CN107905508A (en) A kind of finishing paint spraying equipment
CN107386149B (en) A kind of road construction warning signboard
CN107130108B (en) A kind of type rare-earth feed liquid deoiling device easy to clean
CN203858835U (en) Novel auto-rotating advertising device for gas lamp
CN202753284U (en) Orbit concrete mixer truck
CN206570592U (en) A kind of grey dust remover of energy-saving clothing
CN108215982A (en) A kind of transport vehicle of constructing tunnel with alarm function
CN102116008B (en) Energy-saving vehicle-mounted road surface shot-blasting machine
CN108401968A (en) A kind of water circular oxygenation device
CN206823262U (en) Aerated grit chamber dross removing device
CN206027585U (en) Highway is liquid fertilizer rapid mixing device for greenbelt
CN108163941A (en) A kind of Industrial Wastewater Treatment coagulant draft machine
CN107028505B (en) A kind of solid material feeding system of intelligent cooking apparatus
CN103801451A (en) Novel iron removing device
CN203206982U (en) Novel aerator for fish farming
CN110227604A (en) A kind of quartz sand mining area mining tailing processing unit
CN204540695U (en) A kind of jujube pitter
CN104691712A (en) Lake surface garbage cleaning device
CN203682519U (en) Automatic coal removing machine
CN207974848U (en) A kind of constructing tunnel dust-extraction unit
CN106393133B (en) A kind of high attractability Electrical Safety propaganda machine people
CN205164942U (en) Bulk grain rubber belt conveyor deironing device
CN201603840U (en) Sand loosening machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200430

Address after: 325000 room 105, building 14, Nanpu peacock, Nanhui street, Lucheng District, Wenzhou City, Zhejiang Province

Applicant after: Huang Haiying

Address before: 510632 mailbox, Jinan University, Whampoa Road West, Guangzhou, Guangdong, 227

Applicant before: Xie Chunli

GR01 Patent grant
GR01 Patent grant