CN1082133A CN 93108851 CN93108851A CN1082133A CN 1082133 A CN1082133 A CN 1082133A CN 93108851 CN93108851 CN 93108851 CN 93108851 A CN93108851 A CN 93108851A CN 1082133 A CN1082133 A CN 1082133A
Authority
CN
China
Prior art keywords
pile
steel pipe
cross
concrete
locator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 93108851
Other languages
Chinese (zh)
Inventor
王启顺
刘俊卿
郝铭莲
叶增仁
郑国梁
赵双全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING DESIGN AND RESEARCH ACADEMY OF URBAN CONSTRUCTION
No3 City Construction Engineering Co Beijing
Original Assignee
BEIJING DESIGN AND RESEARCH ACADEMY OF URBAN CONSTRUCTION
No3 City Construction Engineering Co Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING DESIGN AND RESEARCH ACADEMY OF URBAN CONSTRUCTION, No3 City Construction Engineering Co Beijing filed Critical BEIJING DESIGN AND RESEARCH ACADEMY OF URBAN CONSTRUCTION
Priority to CN 93108851 priority Critical patent/CN1082133A/en
Publication of CN1082133A publication Critical patent/CN1082133A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

A kind of cross castinplace pile and piling method thereof, the section of perfusion pile body is cross.The piling method feature is to adopt special-purpose machinery grab bucket grooving, the across slotted eye; With slurry coat method cycle operation cleaning pile bottom sediment; On the foundation pile pile body, during the constructing structure post, the steel pipe locator is set on steel pipe top.The steel pipe locator is provided with the adjustment bolt, can adjust the verticality of steel pipe and steel pipe locator.Advantage is, bearing capacity of single pile improves, and the sedimentation displacement reduces, and adopts existing construction of continuous concrete wall plant construction, all operations on the ground, stake, construction molding of post.Be applicable to various bored concrete pile foundation constructions.

Description

Cross castinplace pile and piling method thereof
The invention belongs to the cast-in-place concrete pile and the bore forming method thereof of the stake in the Foundation Design, particularly cross section.
At present, in the foundation construction of building, often adopt cast-in-place concrete pile, the section of castinplace pile mostly is round, and its piling method is to adopt auger machine boring, perfusion mud off, descending reinforcing cage, concrete perfusion, pile.Along with the development of industry with civilian construction, some piles and industrial premises require the bearing capacity of stake bigger, and bearing stratum is darker.When building has the multilayer underground structure, often need construction underground structure post on the pile body of round foundation pile, just need foundation pile that bigger bearing capacity is arranged this moment.
The bearing capacity of round section driven cast-in-place pile, be subjected to the restriction of its construction technology and section configuration, can not be very big, this is because the bearing capacity of the foundation pile of round section depends on due to cross-sectional area and the peripheral length, therefore need to change the section configuration of stake, to improve the bearing capacity and the frictional resistance of stake.Simultaneously, the piling method of circle cross section castinplace pile adopts machine drill boring at present, utilizes rig to fetch earth, and need join special-purpose machines and tools in addition for stake point soil (being pile bottom sediment) and clear up, and also brings the loaded down with trivial details of construction.
When building had the multilayer underground structure, existing job practices was machine drill boring, the pouring foundation pile is provided with casing on foundation pile, personnel are lowered in the casing, the working face of cleaning foundation pile, the center of calibration structure post is provided with the structural column steel pipe, the concrete of reperfusion structure post, casing is removed in segmentation again, be that foundation pile and structural column are the gradation perfusions, it is loaded down with trivial details to construct, and personnel are safety inadequately.
In the construction of underground structure, as the supporting barricade, often adopt continuous underground wall structure, the construction of continuous concrete wall method is to adopt special-purpose machinery grab bucket grooving, creep mud off, descending reinforcing cage, pouring underwater concrete, moulding.When the slurry coat method cycle operation, needn't change plant, just can eluriate and clean out the sediment at the bottom of the continuous wall groove, guarantee that the diaphragm wall substrate is solid, enough bearing capacities are arranged.Can be used to solve the sediment cleaning of castinplace pile.
The objective of the invention is, design a kind of castinplace pile of cross section,, reduce sedimentation and deformation to improve bearing capacity of single pile; Adopt the range of equipment equipment cutting slots of construction of diaphragm wall, cleaning sediment, pouring underwater concrete, pile, can realize the grooving of cross stake, not change facility and clear up stake point soil, stake, post one-shot forming immediately, avoid underground work, handled easily, safe construction.
Cross castinplace pile of the present invention by reinforcing cage and concrete form, is characterized in that, the pile body section of castinplace pile is cross, horizontal, vertical two to aileron be orthogonal;
The piling method of cross castinplace pile of the present invention is, grooving, and retaining wall, descending reinforcing cage, pouring underwater concrete is characterized in that, adopts special-purpose machinery grab bucket grooving, becomes cross slotted eye; When mud off, with slurry coat method cycle operation cleaning pile bottom sediment;
When constructing structure post on the foundation pile pile body, its piling method is that employing special-purpose machinery grab bucket grooving becomes cross slotted eye; With slurry coat method cycle operation cleaning pile bottom sediment; Following cross foundation pile reinforcing cage; Hang steel pipe column, insert in the reinforcing cage its lower end, on steel pipe top the steel pipe locator is set; After adjusting contraposition, following tremie is to stake trench bottom, pouring underwater concrete; When underwater concrete is filled into foundation pile design elevation place, drop into rubble, push down the concrete surface of cross section part; Continuation is at the pipe top of pouring concrete within steel pipe to steel pipe, pile.
The steel pipe locator is made up of locating flange, framework, cat ladder, on the upper and lower crossbeam of framework, be symmetrical arranged 4 locator verticality and adjust leading screw, on the middle cross beam of framework, be symmetrical arranged 4 steel pipe verticality and adjust bolt, on the framework top panel, be symmetrical arranged 4 steel pipe horizontal movements around the locating flange and adjust bolt.
The advantage that the present invention has is, the stake of the more round section of castinplace pile of cross section, and bearing capacity is improved, and the sedimentation displacement reduces greatly; Adopt existing construction of continuous concrete wall plant, needn't be equipped with drilling machine and scarfing cinder equipment, stake, post one-shot forming, cost saving, easy to operate; Needn't personnel's underground work, construction safety is reliable.
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is the structural representation of cross castinplace pile
Fig. 2 is the A-A sectional drawing of Fig. 1
Fig. 3 is a steel pipe locator constructional drawing
Fig. 4 is that the piling method of cross castinplace pile is implemented illustration
As seen from the figure, when the lid of underground construction dug reverse construction, the aileron section of cross castinplace pile 1 was 300 * 60 centimetres, and dark 30 meters, at 17 meters of the degree of depth, steel pipe 2 diameters that are connected to structural column are 630 centimetres.The piling method of cross castinplace pile is:
The grab bucket grooving, excavate horizontal, vertical aileron groove after, become cross slotted eye;
Mud off, slurry coat method are filled with whole slotted eye;
Start the mud circulation pump, utilize the cycle operation of slurry coat method, the cleaning pile bottom sediment;
Descending reinforcing cage is to bottom land;
Hang steel pipe column, insert in the reinforcing cage its lower end, on steel pipe top the steel pipe locator is set, adjust the steel pipe horizontal movement earlier and adjust bolt, adjust the adjustment leading screw of verticality of steel pipe locator and the adjustment bolt of steel pipe verticality again, adjust the steel pipe column center, and locate after the center of foundation pile;
Following tremie is to the stake end, pouring underwater concrete;
Underwater concrete is filled into the design elevation (promptly-17 meter) of foundation pile and locates, and throws in rubble on cross section, pushes down concrete surface;
In steel pipe, continue concrete perfusion, to the mouth of pipe of steel pipe, pile.
The steel pipe locator is made up of locating flange 3, framework 4, cat ladder 5, on the upper and lower crossbeam of framework, be symmetrical arranged 4 locator verticality and adjust leading screw 6, on the middle cross beam of framework, be symmetrical arranged 4 steel pipe verticality and adjust bolt 7, on the framework top panel, be symmetrical arranged 4 steel pipe horizontal movements around the locating flange and adjust bolt 8.

Claims (4)

1, a kind of cross castinplace pile by reinforcing cage and concrete form, is characterized in that, the pile body section of castinplace pile is cross, horizontal, vertical two to aileron be orthogonal.
2, a kind of piling method of cross castinplace pile is, grooving, and retaining wall, descending reinforcing cage, pouring underwater concrete is characterized in that, adopts special-purpose machinery grab bucket grooving, becomes cross slotted eye; When mud off, with slurry coat method cycle operation cleaning pile bottom sediment.
3, the piling method of cross castinplace pile as claimed in claim 2, when constructing structure post on the foundation pile pile body, its job practices is that employing special-purpose machinery grab bucket grooving becomes cross slotted eye; During mud off, with slurry coat method cycle operation cleaning pile bottom sediment; Following cross foundation pile reinforcing cage; Hang the reinforcing bar post, insert in the reinforcing cage its lower end, on steel pipe top the steel pipe locator is set; After adjusting contraposition, following tremie is to stake trench bottom, pouring underwater concrete; When underwater concrete is filled into foundation pile design elevation place, drop into rubble, push down the concrete surface of cross section part; Continuation is at the pipe top of pouring concrete within steel pipe to steel pipe, pile.
4, as claim 2,3 described cross bored pile piling methods, it is characterized in that, the steel pipe locator is made up of locating flange, framework, cat ladder, on the upper and lower crossbeam of framework, be symmetrical arranged 4 locator verticality and adjust leading screw, on the middle cross beam of framework, be symmetrical arranged 4 steel pipe verticality and adjust bolt, on the framework top panel, be symmetrical arranged 4 steel pipe horizontal movements around the locating flange and adjust bolt.
CN 93108851 1993-07-26 1993-07-26 Cross castinplace pile and piling method thereof Pending CN1082133A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93108851 CN1082133A (en) 1993-07-26 1993-07-26 Cross castinplace pile and piling method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93108851 CN1082133A (en) 1993-07-26 1993-07-26 Cross castinplace pile and piling method thereof

Publications (1)

Publication Number Publication Date
CN1082133A true CN1082133A (en) 1994-02-16

Family

ID=4987353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93108851 Pending CN1082133A (en) 1993-07-26 1993-07-26 Cross castinplace pile and piling method thereof

Country Status (1)

Country Link
CN (1) CN1082133A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100420797C (en) * 2005-12-08 2008-09-24 王国奋 Piling sinking pipe for precast reinforced concrete bottom-expanding pile
CN100445471C (en) * 2007-03-14 2008-12-24 东南大学 Cross-shaped vibration wing
CN101298773B (en) * 2005-12-08 2010-06-02 王国奋 Pile-formation sunken tube of pedestal pile
CN101298774B (en) * 2005-12-08 2010-06-09 王国奋 Pile-formation sunken tube
CN109469087A (en) * 2018-12-24 2019-03-15 南京科技职业学院 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100420797C (en) * 2005-12-08 2008-09-24 王国奋 Piling sinking pipe for precast reinforced concrete bottom-expanding pile
CN101298773B (en) * 2005-12-08 2010-06-02 王国奋 Pile-formation sunken tube of pedestal pile
CN101298774B (en) * 2005-12-08 2010-06-09 王国奋 Pile-formation sunken tube
CN100445471C (en) * 2007-03-14 2008-12-24 东南大学 Cross-shaped vibration wing
CN109469087A (en) * 2018-12-24 2019-03-15 南京科技职业学院 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room

Similar Documents

Publication Publication Date Title
CN105887813A (en) Large-diameter super-long pile construction method in karst area through full-casing pipe full rotating and rotary drilling
CN111622224B (en) Construction method of connected column pile in reverse construction method
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN111395330B (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN1654749A (en) Lean correcting and foundation consolidating method for building by filling water
CN212477725U (en) Pile machine of split combined type full-pile casing
CN111456055A (en) Foundation pit dewatering construction method
CN113373925B (en) Method and device for mounting steel sheet pile in sandstone stratum by rotary drilling rig
CN1082133A (en) Cross castinplace pile and piling method thereof
CN117211271A (en) Double-pile-casing positioning pile-forming construction method for deep and thick filling layer filling pile of sea wall
CN109989346B (en) Bridge large-diameter precast concrete tubular column foundation and construction method thereof
CN102031780A (en) Water flushing construction method of static tubular pile of sand pile tip
CN111764378A (en) Drilling and wall protecting method, pouring method and pouring structure for flow-plastic sludge layer
CN207828995U (en) Open caisson construction structure
CN1258785A (en) Construction method and device of underground continuous wall
CN1190567C (en) Steel pipe pile wall-retaining construction method
CN1027911C (en) Drilling pile method construction technology
CN112064640B (en) Pile driver of split combined type full pile casing and construction process thereof
CN216041380U (en) Dig sediment detector at bottom of stake pore-forming pile soon
CN218542153U (en) Spiral drilling machine suitable for ultra-deep cast-in-place pile
CN1273690C (en) Steel pipe pile wall-retaining structure
CN2547769Y (en) Multifunctional hydraulic multi-immersed tube bored concrete pile machine
CN2630318Y (en) Steel pipe pile retaining wall structure
CN115125939B (en) Prefabricated ultra-deep pile construction equipment and construction method for soft soil foundation

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination