CN108207008A - A kind of management method and device for virtualizing network element - Google Patents

A kind of management method and device for virtualizing network element Download PDF

Info

Publication number
CN108207008A
CN108207008A CN201611182006.0A CN201611182006A CN108207008A CN 108207008 A CN108207008 A CN 108207008A CN 201611182006 A CN201611182006 A CN 201611182006A CN 108207008 A CN108207008 A CN 108207008A
Authority
CN
China
Prior art keywords
network element
adapter assembly
need
vnfm
virtualization network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201611182006.0A
Other languages
Chinese (zh)
Inventor
方亚东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201611182006.0A priority Critical patent/CN108207008A/en
Priority to PCT/CN2017/116002 priority patent/WO2018113571A1/en
Publication of CN108207008A publication Critical patent/CN108207008A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The embodiment of the invention discloses a kind of management methods and device for virtualizing network element;This method can include:Receive the life cycle modification information for virtualization network element sent by the network function manager VNFM virtualized;Judge and determine the corresponding adapter assembly of the virtualization network element;The operation requests for being directed to the adapter assembly are sent to the VNFM according to the life cycle modification information of the virtualization network element;The life cycle modification information and resource modification information of the adapter assembly are obtained from the VNFM.

Description

A kind of management method and device for virtualizing network element
Technical field
The present invention relates to network technology more particularly to a kind of management methods and device for virtualizing network element.
Background technology
In the management domain of mobile communication network, generally require to carry out operation and maintenance for different types of network element, because This, Operation and Maintenance Unit just needs to be concurrently in charge of for different type network element simultaneously.But between different types of network element, very To same type network element with the variation of commercial evolution, the knot of Operation and Maintenance communications protocol and Operation and Maintenance interactive information can be all caused There is also differences for structure.
For the above problem, technical solution is used by current operation maintenance unit:For different network elements type or Dedicated adapter assembly is developed for there are the same type network elements of communications protocol or Operation and Maintenance interactive information difference, needs to illustrate , the effect of adapter assembly is the different communications protocol of adaptation and parses different Operation and Maintenance interactive information, it is adapted to Into the form of Operation and Maintenance Unit uniform requirement.That is, after the processing of adapter assembly, all Operation and Maintenance are handed over The difference that mutual information will remove different communications protocol or caused by message structure, into consistent Operation and Maintenance tupe.
Because can not predict Operation and Maintenance Unit needs to manage the network element of which type, usually when version is issued, operation The software package of maintenance unit is often all to be packaged the adapter assembly of the NE type of itself all support.So as to be transported in version During row, Operation and Maintenance Unit will start the adapter assembly of all NE types that can be supported, this so that some are unnecessary Adapter assembly occupies the resource of system
With the development of virtualization technology and the popularization of Internet of Things, the NE type of mobile communication network can be richer It is rich various, and network type carries out evolution and superseded speed and can also greatly speed up, so when version is run, Operation and Maintenance Adapter assembly of the unit due to starting all NE types that can be supported, the operation of useless component will increase to money The consumption and waste in source.
Invention content
In order to solve the above technical problems, an embodiment of the present invention is intended to provide a kind of management methods and dress for virtualizing network element It puts;The operation of useless component, which can be reduced, will increase consumption and waste to resource.
The technical proposal of the invention is realized in this way:
In a first aspect, an embodiment of the present invention provides a kind of management method for virtualizing network element, the method includes:
It receives and letter is changed by the life cycle for virtualization network element that the network function manager VNFM virtualized is sent Breath;
Judge and determine the corresponding adapter assembly of the virtualization network element;
It is sent according to the life cycle modification information of the virtualization network element to the VNFM for the adapter assembly Operation requests;
The life cycle modification information and resource modification information of the adapter assembly are obtained from the VNFM.
In said program, the life cycle modification information of the virtualization network element, including:The virtualization net that need to be instantiated The attribute information of member.
It is described to judge and determine the corresponding adapter assembly of the virtualization network element in said program, it specifically includes:
Judged according to the attribute information of virtualization network element that need to be instantiated and determine the virtualization that need to be instantiated The corresponding adapter assembly that need to be instantiated of network element;Wherein, the attribute information of virtualization network element that need to be instantiated includes:Virtually Change element name, virtualize NE type, virtualize network element version.
In said program, the life cycle modification information according to the virtualization network element sends needle to the VNFM To the operation requests of the adapter assembly, specifically include:
During the adapter assembly not running that need to be instantiated when described, adapter assembly instantiation request is sent to the VNFM;Its In, the adapter assembly instantiation request includes:The adapter assembly type that need to be instantiated and adaptation blueprint mark;It is described suitable The adapter assembly blueprint that need to be instantiated, and root are obtained according to the adaptation blueprint mark for the VNFM with blueprint mark Resource required when the adapter assembly that need to be instantiated is run is calculated according to the adapter assembly blueprint that need to be instantiated.
It is described to obtain the life cycle modification information of the adapter assembly and resource change from the VNFM in said program More information specifically includes:
Resource bid request is received from the VNFM;Wherein, resource bid request is for asking described to need to instantiate Adapter assembly operation when required resource;
It is asked to send resource authorization information to VNFM according to the resource bid;Wherein, the resource authorization information is used for It is required when the adapter assembly that need to be instantiated is run to indicate that VNFM is distributed to virtualization infrastructure device management system VIM requests Resource;
Receive the resource allocation result that the VNFM is sent;
Receive the adapter assembly corresponding instance completion notice that need to be instantiated that the VNFM is sent.
In said program, the life cycle modification information of the virtualization network element includes:The virtualization network element of termination Attribute information;Wherein, the attribute information of the virtualization network element of termination includes title, the network element class of the virtualization network element of the termination Type, network element version, network element instance number.
It is described to judge and determine the corresponding adapter assembly of the virtualization network element in said program, it specifically includes:
End is needed according to the virtualization network element of the attribute information of the virtualization network element of the termination acquisition termination is corresponding Adapter assembly only.
In said program, the life cycle modification information according to the virtualization network element sends needle to the VNFM To the operation requests of adapter assembly, specifically include:
Determine the operating status of the adapter assembly that need to be terminated;
When the adapter assembly that need to be terminated is currently running, the corresponding instance number of the adapter assembly that need to be terminated is determined And the termination virtualization NE type it is identical network element it is whether in operating status;
When the identical network element of virtualization NE type of the termination is not on operating status, sent to the VNFM Adapter assembly terminates request;Wherein, the adapter assembly terminates the instance number that request includes the adapter assembly that need to be terminated.
It is described to obtain the life cycle modification information of adapter assembly and resource change letter from the VNFM in said program Breath, specifically includes:
Receive the VNFM terminate it is transmitted for the adaptation that need to be terminated after the adapter assembly that need to be terminated The termination completion notice of component;
The VNFM is received after the resource release of the adapter assembly that need to be terminated is completed, the release of transmitted resource Notice.
In said program, the life cycle modification information of the virtualization network element includes:Virtualization network element before upgrading Virtualization network element attribute information after attribute information and upgrading.
It is described to judge and determine the corresponding adapter assembly of the virtualization network element in said program, it specifically includes:
Determine that the virtualization network element after the upgrading is corresponding according to the attribute information of the virtualization network element after the upgrading The adapter assembly that need to be instantiated.
In said program, the life cycle modification information according to the virtualization network element sends needle to the VNFM To the operation requests of adapter assembly, specifically include:
During the adapter assembly not running that need to be instantiated when the virtualization network element after the upgrading is corresponding, sent out to the VNFM Send the instantiation request for the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading;Wherein, the liter The corresponding adapter assembly instantiation request that need to be instantiated of virtualization network element after grade includes:Virtualization network element after the upgrading The corresponding adapter assembly type that need to be instantiated and adaptation blueprint mark;The adaptation blueprint mark is for the VNFM according to institute It states adaptation blueprint mark and obtains the corresponding adapter assembly blueprint that need to be instantiated of virtualization network element after the upgrading, and according to institute It states the corresponding adapter assembly blueprint that need to be instantiated of the virtualization network element after upgrading and calculates the virtualization network element pair after the upgrading Required resource during the adapter assembly operation for the need instantiation answered.
It is described to obtain the life cycle modification information of adapter assembly and resource change letter from the VNFM in said program Breath, specifically includes:
Resource bid request is received from the VNFM;Wherein, resource bid request is for asking described to need to instantiate Adapter assembly operation when required resource;
It is asked to send resource authorization information to the VNFM according to the resource bid;The resource authorization information is used to refer to Show the VNFM to the corresponding adapter assembly operation when institute that need to be instantiated of the virtualization network element that VIM requests are distributed after the upgrading The resource needed;
And receive the resource allocation result that the VNFM is sent;
And receive the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading that the VNFM is sent Corresponding instance completion notice.
It is described to judge and determine the corresponding adapter assembly of the virtualization network element in said program, it specifically includes:
It is corresponding according to the virtualization network element that the attribute information of the virtualization network element before the upgrading is obtained before the upgrading Adapter assembly.
In said program, the life cycle modification information according to the virtualization network element sends needle to the VNFM To the operation requests of adapter assembly, specifically include:
Determine the operating status of the corresponding adapter assembly of virtualization network element before the upgrading;
When the corresponding adapter assembly of virtualization network element before the upgrading is currently running, obtain virtual before the upgrading Change the corresponding instance number of the corresponding adapter assembly of network element;
When determine with before the upgrading virtualize NE type it is identical network element it is in operating status when, to described VNFM sends adapter assembly and terminates request;Wherein, the adapter assembly, which terminates, asks to include the virtualization network element before the upgrading The instance number of corresponding adapter assembly.
It is described to obtain the life cycle modification information of adapter assembly and resource change letter from the VNFM in said program Breath, specifically includes:
Being directed to transmitted by receiving after the corresponding adapter assembly of virtualization network element before the VNFM terminates the upgrading The termination completion notice of the corresponding adapter assembly of virtualization network element before the upgrading;
After the resource release completion for receiving the corresponding adapter assemblies of virtualization network element of the VNFM before the upgrading, Transmitted resource release notice.
In said program, the method further includes:
Receive update request;Wherein, the update request includes Operation and Maintenance packet mark to be updated, operation to be updated Safeguard the file path of packet and fresh information explanation;
After determining that the Operation and Maintenance to be updated is packed in library according to the Operation and Maintenance packet mark to be updated, by institute It states the blueprint file in Operation and Maintenance packet to be updated to preserve to blueprint catalogue Catalog, and according to the Operation and Maintenance packet File path preserves Software Mirroring packet to software storage;
The fresh information includes the support instruction information of newly-increased NE type in illustrating when, according to Operation and Maintenance packet mark Know the blueprint file obtained in Catalog;
The mapping table of network element attribute and adapter assembly in the blueprint file is updated to local.
Second aspect, an embodiment of the present invention provides a kind of managing device for virtualizing network element, described device includes:It receives Unit, acquiring unit, transmitting element;Wherein,
The receiving unit is directed to virtualization network element for receiving by what the network function manager VNFM virtualized was sent Life cycle modification information;
The acquiring unit, for judging and determining the corresponding adapter assembly of the virtualization network element;
The transmitting element, for sending needle to the VNFM according to the life cycle modification information of the virtualization network element To the operation requests of the adapter assembly;
The receiving unit becomes for obtaining the life cycle modification information of the adapter assembly and resource from the VNFM More information.
In said program, the life cycle modification information of the virtualization network element, including:The virtualization net that need to be instantiated The attribute information of member.
In said program, the acquiring unit is used for:
Judged according to the attribute information of virtualization network element that need to be instantiated and determine the virtualization that need to be instantiated The corresponding adapter assembly that need to be instantiated of network element;Wherein, the attribute information of virtualization network element that need to be instantiated includes:Virtually Change element name, virtualize NE type, virtualize network element version.
In said program, the transmitting element is used for:
During the adapter assembly not running that need to be instantiated when described, adapter assembly instantiation request is sent to the VNFM;Its In, the adapter assembly instantiation request includes:The adapter assembly type that need to be instantiated and adaptation blueprint mark;It is described suitable The adapter assembly blueprint that need to be instantiated, and root are obtained according to the adaptation blueprint mark for the VNFM with blueprint mark Resource required when the adapter assembly that need to be instantiated is run is calculated according to the adapter assembly blueprint that need to be instantiated.
In said program, the receiving unit, for receiving resource bid request from the VNFM;Wherein, the money Required resource when source application request is for asking the adapter assembly that need to be instantiated to run;
The transmitting element sends resource authorization information for the application information according to the VNFM to VNFM;Wherein, institute State resource authorization information be used to indicate VNFM to virtualization infrastructure device management system VIM request distribution it is described need to instantiate it is suitable Distribution assembly resource required when running;
The receiving unit, for receiving the resource allocation result that the VNFM is sent;And
Receive the adapter assembly corresponding instance completion notice that need to be instantiated that the VNFM is sent.
In said program, the life cycle modification information of the virtualization network element includes:The virtualization network element of termination Attribute information;Wherein, the attribute information of the virtualization network element of termination includes title, the network element class of the virtualization network element of the termination Type, network element version, network element instance number.
In said program, the acquiring unit is used for:
End is needed according to the virtualization network element of the attribute information of the virtualization network element of the termination acquisition termination is corresponding Adapter assembly only.
In said program, the transmitting element is used for:
Determine the operating status of the adapter assembly that need to be terminated;
When the adapter assembly that need to be terminated is currently running, the corresponding instance number of the adapter assembly that need to be terminated is determined And the termination virtualization NE type it is identical network element it is whether in operating status;
When the identical network element of virtualization NE type of the termination is not on operating status, sent to the VNFM Adapter assembly terminates request;Wherein, the adapter assembly terminates the instance number that request includes the adapter assembly that need to be terminated.
In said program, the receiving unit, for receive the VNFM terminate the adapter assembly that need to be terminated it The transmitted termination completion notice for the adapter assembly that need to be terminated afterwards;And
The VNFM is received after the resource release of the adapter assembly that need to be terminated is completed, the release of transmitted resource Notice.
In said program, the life cycle modification information of the virtualization network element includes:Virtualization network element before upgrading Virtualization network element attribute information after attribute information and upgrading.
In said program, the acquiring unit is used for:
Determine that the virtualization network element after the upgrading is corresponding according to the attribute information of the virtualization network element after the upgrading The adapter assembly that need to be instantiated.
In said program, the transmitting element is used for:
During the adapter assembly not running that need to be instantiated when the virtualization network element after the upgrading is corresponding, sent out to the VNFM Send the instantiation request for the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading;Wherein, the liter The corresponding adapter assembly instantiation request that need to be instantiated of virtualization network element after grade includes:Virtualization network element after the upgrading The corresponding adapter assembly type that need to be instantiated and adaptation blueprint mark;The adaptation blueprint mark is for the VNFM according to institute It states adaptation blueprint mark and obtains the corresponding adapter assembly blueprint that need to be instantiated of virtualization network element after the upgrading, and according to institute It states the corresponding adapter assembly blueprint that need to be instantiated of the virtualization network element after upgrading and calculates the virtualization network element pair after the upgrading Required resource during the adapter assembly operation for the need instantiation answered.
In said program, the receiving unit, for receiving resource bid request from the VNFM;Wherein, the money Required resource when source application request is for asking the adapter assembly that need to be instantiated to run;
The transmitting element, for being asked to send resource authorization information to the VNFM according to the resource bid;It is described Resource authorization information is used to indicate the VNFM asks the virtualization network element after the distribution upgrading is corresponding to need to instantiate to VIM Adapter assembly operation when required resource;
The receiving unit, for receiving the resource allocation result that the VNFM is sent;
And receive the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading that the VNFM is sent Corresponding instance completion notice.
In said program, the acquiring unit is used for:
It is corresponding according to the virtualization network element that the attribute information of the virtualization network element before the upgrading is obtained before the upgrading Adapter assembly.
In said program, the transmitting element is used for:
Determine the operating status of the corresponding adapter assembly of virtualization network element before the upgrading;
When the corresponding adapter assembly of virtualization network element before the upgrading is currently running, obtain virtual before the upgrading Change the corresponding instance number of the corresponding adapter assembly of network element;
When determine with before the upgrading virtualize NE type it is identical network element it is in operating status when, to described VNFM sends adapter assembly and terminates request;Wherein, the adapter assembly, which terminates, asks to include the virtualization network element before the upgrading The instance number of corresponding adapter assembly.
In said program, the receiving unit, for receiving the virtualization network element before the VNFM terminates the upgrading The transmitted termination for the corresponding adapter assembly of virtualization network element before the upgrading is completed after corresponding adapter assembly Notice;And
After the resource release completion for receiving the corresponding adapter assemblies of virtualization network element of the VNFM before the upgrading, Transmitted resource release notice.
In said program, the receiving unit is additionally operable to receive update request;Wherein, the update request includes treating Newer Operation and Maintenance packet mark, the file path of Operation and Maintenance packet to be updated and fresh information explanation;
Described device further includes storage unit, for being treated more according to the Operation and Maintenance packet mark to be updated is determining New Operation and Maintenance is packed in after library, and the blueprint file in the Operation and Maintenance packet to be updated is preserved to blueprint catalogue Catalog, and preserved Software Mirroring packet to software storage according to the file path of the Operation and Maintenance packet;
The acquiring unit is additionally operable to the support instruction information for including newly-increased NE type during the fresh information illustrates When, the blueprint file obtained in Catalog is identified according to Operation and Maintenance packet;
Described device further includes updating unit, for by the mapping table of network element attribute and adapter assembly in the blueprint file It is updated to local.
An embodiment of the present invention provides a kind of management methods and device for virtualizing network element;It is virtualized and compiled by network function Arrange device (NFVO, NFV Orchestration) and according to the change of the life cycle state of virtualization network element is corresponding will be virtual The life cycle state for changing the adapter assembly of network element is changed, so as to change in the life cycle state of virtualization network element When, NE management (EM, Element Manager) need not carry out terminating operation or escalation process, reduce useless adapter assembly Operation caused by resource consumption and waste.
Description of the drawings
Figure 1A virtualizes (NFV, Network Function for a kind of network function provided in an embodiment of the present invention Virtualization) configuration diagram;
Figure 1B is another kind NFV configuration diagrams provided in an embodiment of the present invention;
Fig. 2 is a kind of management method flow diagram for virtualizing network element provided in an embodiment of the present invention;
Fig. 3 is the flow diagram of specific embodiment one provided in an embodiment of the present invention;
Fig. 4 is the flow diagram of specific embodiment two provided in an embodiment of the present invention;
Fig. 5 is the flow diagram of specific embodiment three provided in an embodiment of the present invention;
Fig. 6 is the flow diagram of specific embodiment four provided in an embodiment of the present invention;
Fig. 7 is a kind of managing device structure diagram for virtualizing network element provided in an embodiment of the present invention;
Fig. 8 is another managing device structure diagram for virtualizing network element provided in an embodiment of the present invention;
Fig. 9 is a kind of management equipment structure diagram for virtualizing network element provided in an embodiment of the present invention.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes.
Figure 1A is a kind of NFV system architecture schematic diagrams, and as shown in Figure 1A, which can include:NFV manage and Layout device (NFV MANO, NFV Management and Orchestration) 101, NFV infrastructure layers (NFVI, NFV Infrastructure) 102, multiple virtual network functions (VNF, Virtual Network Function) 103, multiple network elements Manage (EM, Element Manager) 104, network service, VNF and infrastructure description (Network Service, VNF And Infrastructure Description) 105 and business support managing device (OSS/BSS, Operation- Support System/Business Support System)106.Wherein, NFV-MANO101 can include:NFV composers (NFVO, NFV Orchestrator) 1011, one or more VNF managers (VNFM, VNF Manager) 1012, Yi Jixu Planization infrastructure manager (VIM, Virtualized Infrastructure Manager) 1013;NFV MANO101 masters It is used to that VNF103 and NFVI102 to be monitored and managed;NFVO1011 in NFV MANO101, which is mainly used for receiving, to be come from The resource association requests of one or more VNFM1012 concurrently send configuration information to collect the state letter of VNF103 to VNFM1012 Breath, in addition, NFVO1011 is additionally operable to communicate with VIM1013, to realize that the distribution of resource and/or reserved and exchange virtualization are hard The configuration of part resource and status information;VNFM1012 is mainly used for managing one or more VNF103, such as:It instantiates, update, look into Ask, scale and/or terminate VNF103 etc.;VIM1013 mainly performs the function of resource management, such as management infrastructure resource Distribution (such as increasing resource to virtual container) and operating function (as collected NFVI fault messages).
NFVI 102 can include computing hardware 1021, storage hardware 1022, the network hardware 1023, virtualization layer (Virtualization Layer), virtual computing 1024, virtual memory 1025 and virtual network 1026.Inside NFVI102 Virtualization layer can be abstracted hardware resource and decoupling VNF103 from physical layer, to provide virtualization resource to VNF103, virtually Calculating 1024 and virtual memory 1025 can be supplied to VNF103 in the form of virtual machine, and/or other virtual containers, for example, One or more VNF103 can be deployed on a virtual machine (VM, Virtual Machine).Virtualization layer is abstracted For the network hardware 1023 so as to form virtual network 1026, virtual network 1026 can include virtual switch (Virtual Switch), virtual switch can be used for providing the connection communication between the VM on VNF103 and other VM.
In embodiments of the present invention, as shown in Figure 1B, NFV frameworks can include:Network function virtualizes composer (NFVO, NFV Orchestration), VNF managers (VNFM, VNF Manager), blueprint catalogue Catalog, software storage (SWR, SoftWare Repository), NE management (EM, Element Manager) and virtualization infrastructure device management system It unites (VIM, Virtual Infrastructure Manager);Wherein, VNFM is responsible for the life cycle management of VNF examples, example Network element is such as instantiated, terminates network element and updating network element etc.;Catalog is preserves various blueprints and mating included in software package File, and download is provided;SWR provides download to preserve software image file included in software package, for example preserves and place VNF Package, the Package further include the various supporting papers of VNF and match text other than Software Mirroring packet Part, such as all NE types of EM Package supports and mating adapter assembly list etc.;EM is in this system All VNF provide Operation and Maintenance function;VIM is then network function virtualized infrastructure (NFVI, Network Function Virtualization Infrastructure) control and management are provided.
It should be noted that the network element described in the embodiment of the present invention, is virtualization network element, it is by virtualizing network Function is completed and is realized.
Based on the framework shown in Figure 1A and Figure 1B, the following embodiment of the application is proposed.
Embodiment one
Referring to Fig. 2, it illustrates a kind of management method for virtualizing network element provided in an embodiment of the present invention, this method can be with Applied to the NFVO in NFV frameworks, this method can include:
S201:Receive the life cycle modification information for virtualization network element sent by VNFM;
S202:Judge and determine the corresponding adapter assembly of virtualization network element;
S203:It please for the operation of adapter assembly to VNFM transmissions according to the life cycle modification information of virtualization network element It asks;
S204:The life cycle modification information of adapter assembly and resource modification information are obtained from VNFM.
It should be noted that in the present embodiment, virtualization network element can be for example VNF network elements, subsequently repeat no more.
For the life cycle change corresponding to virtualization network element and for the corresponding adapter assembly of virtualization network element Operation is the operation for respective life cycle;It specifically, can be with for the life cycle change corresponding to virtualization network element Including:Virtualize network element instantiation, virtualization network element terminates, virtualizes the operations such as network element updating;And corresponding to virtualization network element Instantiation, operation can include the instantiation of adapter assembly to adapter assembly accordingly;It is terminated corresponding to virtualization network element, adaptation group The example that part operation accordingly can include adapter assembly terminates;Corresponding to virtualization network element updating, adapter assembly is grasped accordingly Work includes:After upgrading before the instantiation and upgrading of adapter assembly adapter assembly termination.
It is to be appreciated that in the subsequent embodiment of the present embodiment and the application, term " instantiation " (or example Change) meaning represent in virtualized infrastructure, virtualization network element by certain communication network elements or function with available The virtualization network function of itself is set up, opens, activating, creating or being carried out to certain mode.
Through the above scheme, it can be seen that the life cycle of adapter assembly is opposite according to the life cycle of virtualization network element Should, it is therefore not necessary to when version is run, start the adapter assembly of all NE types that can be supported of EM, reduce useless suitable Resource consumption and waste caused by the operation of distribution assembly;And EM is when the life cycle of VNF and adapter assembly change, The life cycle variation of VNF and adapter assembly can be adapted to automatically without terminating operation.
Technical solution shown in Fig. 2 is illustrated below by way of the virtualization specific life cycle state of network element.
Illustratively, after the completion of virtualization network element instantiation, the life cycle modification information of the virtualization network element, packet It includes:The attribute information of virtualization network element that need to be instantiated.It is described to judge and determine the virtualization network element pair for step S202 The adapter assembly answered, specifically includes:The attribute information of virtualization network element according to that need to instantiate judges and determines described to need example The corresponding adapter assembly that need to be instantiated of virtualization network element of change.
Specifically, the attribute information of virtualization network element that need to be instantiated can include:Element name is virtualized, virtualizes net The information such as element type, virtualization network element version.NFVO can be virtual by searching for adapter assembly and NE type, network element version etc. Change the mapping table between network element attribute information to obtain the adapter assembly that need to be instantiated.
It should be noted that different virtualization NE types can correspond to different adapter assemblies;And for same type Virtualization network element, different network element versions can also correspond to different adapter assemblies;Therefore, in practical application, adapter assembly There can be mapping relations between more than one virtualization network element attribute information.
Accordingly for step S203, the life cycle modification information according to virtualization network element sends needle to VNFM To the operation requests of adapter assembly, specifically include:
When the adapter assembly not running that need to be instantiated, adapter assembly instantiation request is sent to VNFM;Wherein, it is described suitable Distribution assembly instantiation request includes:The adapter assembly type and adaptation blueprint mark that need to be instantiated;Adaptation blueprint mark is used for VNFM obtains the adapter assembly blueprint that need to be instantiated according to adaptation blueprint mark, and blue according to the adapter assembly that need to be instantiated Figure calculates resource required when the adapter assembly that need to be instantiated is run.
It is described to obtain the life cycle modification information of adapter assembly and resource change from VNFM accordingly for step S204 More information specifically includes:
Resource bid request is received from the VNFM;Wherein, resource bid request is for asking described to need to instantiate Adapter assembly operation when required resource;
And it is asked to send resource authorization information to VNFM according to resource bid;The resource authorization information is used to indicate VNFM distributes resource required when the adapter assembly that need to be instantiated is run to VIM requests;
And receive the resource allocation result that VNFM is sent;
And receive the adapter assembly corresponding instance completion notice that need to be instantiated that VNFM is sent.
Specifically, VNFM is calculated after resource required when the adapter assembly that need to be instantiated is run, Ke Yixiang The system resources such as the resource needed for NFVO application adapter assembly operations, such as Internet resources, memory source, cpu resource;And VNFM can ask VIM to distribute resource after the resource authorization information for receiving NFVO returns;When VIM checks required money When source can provide, resource can be distributed and return to resource allocation completion notice to VFNM;VNFM is informed about the money needed for NFVO Source will be adapted component use, and the virtualization network element that the required instantiations of VNFM instantiation operation maintenance units EM are completed Adapter assembly after, notice NFVO need to instantiate adapter assembly instantiation complete.
It should be noted that for this example, for new type network element after online implementing, corresponding adapter assembly can be therewith Operation so that Operation and Maintenance Unit EM need not upgrade or stop running, you can support the management to new type network element, adaptation group The operation of part can adapt to the variation for the network element that EM is managed automatically.
Illustratively, after the completion of virtualization network element terminates, the life cycle modification information of the virtualization network element includes: The attribute information of the virtualization network element of termination.For step S202, can specifically include:
The virtualization network element of the termination is obtained according to the attribute information of the virtualization network element of termination corresponding need to terminate Adapter assembly;
Specifically, the attribute information of the virtualization network element of termination can include:The title of the virtualization network element of termination, network element Type, network element version, network element instance number etc..NFVO can be by searching between the attribute information of adapter assembly and virtualization network element Mapping table obtain the adapter assembly that need to be terminated.
Accordingly for step S203, can specifically include:
Determine the operating status of adapter assembly that need to be terminated;
When the adapter assembly that need to be terminated is currently running, the corresponding instance number of the adapter assembly that need to be terminated is determined And the termination virtualization NE type it is identical network element it is whether in operating status;
When the identical network element of virtualization NE type of the termination is not on operating status, sent to the VNFM Adapter assembly terminates request;Wherein, the adapter assembly terminates the instance number that request includes the adapter assembly that need to be terminated.
It is described to obtain the life cycle modification information of adapter assembly and resource change from VNFM accordingly for step S204 More information specifically includes:
The adapter assembly that need to be terminated is directed to transmitted by after the reception VNFM terminations adapter assembly that need to be terminated Termination completion notice;
VNFM is received after the resource release of the adapter assembly that need to be terminated is completed, the release of transmitted resource is logical Know.
Specifically, VNFM can return to operation task number after receiving adapter assembly and terminating request to NFVO, in order to NFVO can initiate the inquiry for task operating state;And after VNFM terminates the adapter assembly that need to be terminated, NFVO Termination operation for the adapter assembly that need to be terminated has been completed;VNFM notices VIM discharges the adaptation group that need to be terminated The occupied resource of part, and after the completion of VIM notice VNFM resource releases, VNFM notice NFVO, the adaptation group that need to be terminated The occupied resource of part has discharged, resource using status update.
It should be noted that for this example, with virtualization network element the running abort in system of certain NE type, Its corresponding adapter assembly can terminate therewith so that Operation and Maintenance Unit EM voluntarily need not upgrade or stop running, you can eventually Only resource is discharged without necessary adapter assembly is run.
Illustratively, after the completion of virtualizing network element updating, the life cycle modification information of the virtualization network element includes:It rises The attribute information of virtualization network element before the attribute information of virtualization network element after grade and upgrading.It should be noted that due to It is related to virtualizing the upgrading of network element, correspondingly, for the operation of the adapter assembly of virtualization network element, can includes starting operation The virtualization network element before the corresponding adapter assembly that need to be instantiated of virtualization network element and termination upgrading after upgrading is corresponding suitable Two aspects of distribution assembly.
On the one hand, it for the corresponding adapter assembly that need to be instantiated of virtualization network element after operation upgrades is started, needs Bright is:
It is described to judge and determine the corresponding adapter assembly of the virtualization network element for step S202, it specifically includes:
The corresponding adaptation of virtualization network element after the upgrading is determined according to the attribute information of the virtualization network element after upgrading Component.
Specifically, the attribute information of the virtualization network element after upgrading can include:After element name, NE type, upgrading Network element version, the information such as network element instance identification.NFVO can be by searching for the network element after adapter assembly and NE type, upgrading Version etc. virtualizes the mapping table between network element attribute information to obtain the adapter assembly that need to be instantiated.
For step S203, the life cycle modification information according to virtualization network element is sent to the VNFM for suitable The operation requests of distribution assembly, specifically include:
During the adapter assembly not running that need to be instantiated when the virtualization network element after upgrading is corresponding, sent to VNFM for liter The instantiation request of the corresponding adapter assembly that need to be instantiated of virtualization network element after grade;Wherein, the virtualization after the upgrading The corresponding adapter assembly instantiation request that need to be instantiated of network element includes:Virtualization network element after upgrading is corresponding to be instantiated Adapter assembly type and adaptation blueprint mark;It is adapted to blueprint mark and the void after upgrading is obtained according to adaptation blueprint mark for VNFM The corresponding adapter assembly blueprint that need to be instantiated of planization network element, and need example according to the virtualization network element after the upgrading is corresponding The adapter assembly blueprint of change calculates required when the corresponding adapter assembly that need to be instantiated of the virtualization network element after the upgrading is run Resource.
It is described to obtain the life cycle modification information of adapter assembly and resource modification information from VNFM for step S204, It specifically includes:
Resource bid request is received from the VNFM;Wherein, resource bid request is for asking described to need to instantiate Adapter assembly operation when required resource;
And it is asked to send resource authorization information to VNFM according to resource bid;The resource authorization information is used to indicate The virtualization network element corresponding adapter assemblies that need to instantiate of the VNFM after VIM request distribution upgrading money required when running Source;
And receive the resource allocation result that VNFM is sent;
And it receives the corresponding adapter assembly that need to be instantiated of the virtualization network element after the upgrading that VNFM is sent and corresponds to Instantiate completion notice.
Specifically, the corresponding adapter assembly operation that need to be instantiated of the virtualization network element after the upgrading is calculated in VNFM After the resource of Shi Suoxu, it can apply for the resource needed for adapter assembly operation to NFVO, such as Internet resources, memory source, The system resources such as cpu resource;And VNFM can ask VIM to distribute after the resource authorization information for receiving NFVO returns Resource;When VIM checks that required resource can provide, resource can be distributed and return to resource allocation completion notice to VFNM; The resource that VNFM is informed about needed for NFVO will be adapted component use, and required for VNFM instantiation operation maintenance units EM Instantiation complete virtualization network element adapter assembly after, notice NFVO need to instantiate adapter assembly instantiation complete.
On the other hand, for the corresponding adapter assembly of virtualization network element terminated before upgrading, it should be noted that:
It is described to judge and determine the corresponding adapter assembly of the virtualization network element for step S202, it specifically includes:
The corresponding adaptation of virtualization network element before the upgrading is obtained according to the attribute information of the virtualization network element before upgrading Component;
Specifically, the attribute information of the virtualization network element before upgrading can include:Virtualize element name, NE type, Network element version, network element instance number before upgrading etc..NFVO can be by searching for adapter assembly and the virtualization network element before upgrading Mapping table between attribute information obtains the corresponding adapter assembly of virtualization network element before upgrading.
For step S203, the life cycle modification information according to virtualization network element is sent to VNFM for adaptation group The operation requests of part, specifically include:
Determine the operating status of the corresponding adapter assembly of virtualization network element before upgrading;
When the corresponding adapter assembly of virtualization network element before upgrading is currently running, the virtualization network element pair before upgrading is obtained The corresponding instance number of adapter assembly answered;
When determining that network element not identical with the virtualization NE type before upgrading is in operating status, sent to VNFM Adapter assembly terminates request;Wherein, adapter assembly terminates the corresponding adapter assembly of virtualization network element before asking to include upgrading Instance number.
It is described to obtain the life cycle modification information of adapter assembly and resource modification information from VNFM for step S204, It specifically includes:
Receive VNFM terminate it is transmitted for described after the corresponding adapter assembly of virtualization network element before the upgrading The termination completion notice of the corresponding adapter assembly of virtualization network element before upgrading;
After the resource release completion for receiving the corresponding adapter assemblies of virtualization network element of the VNFM before the upgrading, sent out The resource release notice sent.
Specifically, VNFM can return to operation task number after receiving adapter assembly and terminating request to NFVO, in order to NFVO can initiate the inquiry for task operating state;And it is corresponding suitable that VNFM terminates the virtualization network element before the upgrading After distribution assembly, the termination operation that NFVO is directed to the corresponding adapter assembly of virtualization network element before the upgrading has been completed; VNFM notices VIM discharges the occupied resource of the corresponding adapter assembly of virtualization network element before the upgrading, and VIM is notified After the completion of the release of VNFM resources, VNFM notifies NFVO, and the corresponding adapter assembly of virtualization network element before the upgrading is occupied Resource has discharged, resource using status update.
It should be noted that by above-mentioned for the virtualization network element pair started after operation upgrades after the corresponding upgrading of network element The corresponding adaptation group of virtualization network element before the adapter assembly for the need instantiation answered and termination upgrading before the corresponding upgrading of network element Implementation of the part in terms of the two, it can be realized that, after network element updating is virtualized, it is necessary to for network element pair after upgrading The corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading answered is instantiated, and network element before upgrading is corresponded to Upgrading before the corresponding adapter assembly of virtualization network element terminated, specific implementation process is referred to be directed in aforementioned exemplary Scheme that the corresponding adapter assemblies of VNF after the completion of instantiation are run and for the corresponding adaptation groups of VNF after termination The scheme that part is terminated, the present embodiment do not repeat this.
Illustratively, when EM increases the NE type that can be supported newly, the method further includes:
NFVO receives update request;Wherein, update request includes Operation and Maintenance packet mark to be updated, operation to be updated Safeguard the file path of packet and fresh information explanation;
After NFVO determines that the Operation and Maintenance to be updated is packed in library according to Operation and Maintenance packet mark to be updated, it will treat Blueprint file in newer Operation and Maintenance packet is preserved to Catalog, and according to the file path of Operation and Maintenance packet by software mirror As packet is preserved to software storage;
Fresh information includes the support instruction information of newly-increased NE type in illustrating when, NFVO is according to Operation and Maintenance packet mark Know the blueprint file obtained in Catalog;
The mapping table of network element attribute and adapter assembly in blueprint file is updated to local by NFVO.
It should be noted that for this example, it is real to illustrate that Operation and Maintenance Unit EM increases the NE type that can be supported newly Process is applied, when core thinking is the NE type of newly-increased support, by NE type and adaptation caused by newly-increased support NE type Component mapping table, newly-increased adapter assembly Software Mirroring packet are saved in Catalog and software storage.So as to which EM increases the net of support newly During element type, without upgrading or stop running.And new network element adapter assembly will not be run immediately, but be subsequently System really starts the true operating condition adaptation of operation and system network element when needs.
A kind of management method for virtualizing network element provided in this embodiment, by NFVO according to the Life Cycle of virtualization network element The corresponding life cycle state by the adapter assembly for virtualizing network element of change of phase state is changed, so as in virtualization net When the life cycle state of member changes, EM need not carry out terminating operation or escalation process, reduce useless adapter assembly Resource consumption and waste caused by operation.
Embodiment two
Based on the identical technical concept of above-described embodiment, the present embodiment is by specific examples below to above-described embodiment Specific implementation process is illustrated.Following embodiments can be applied to the network architecture shown in FIG. 1, and the NFVO in framework can To include:Command checksum module, life cycle management module, resource distribution module, component correction verification module and packet management module.
Specific embodiment one
Referring to Fig. 3, after VNF network elements instantiate, this specific embodiment can include:
S301:VNFM sends the first notification message to NFVO life cycle managements module, is used to indicate the instantiation of VNF network elements It completes;
Wherein, title, instance number and the net used of virtualization network element that need to be instantiated are included in the first notification message First blueprint mark.
S302:NFVO life cycle managements send second notification message to NFVO components correction verification module, are used to indicate VNF nets Meta-instanceization is completed;
It is to be appreciated that the title of virtualization network element that need to be instantiated, NE type, network element are included in second notification message The attribute informations such as version.
S303:NFVO components correction verification module is according to the element name included in second notification message, NE type, network element version This grade attribute information, according to the adapter assembly that mapping table search need to instantiate between adapter assembly and network element attribute information.
Specifically, in the present embodiment, network element attribute information is preferably VNF NE types.
S304:NFVO components correction verification module initiates inquiry request to NFVO life cycle managements module, and reality is needed for inquiring Whether the adapter assembly of exampleization is in operating status;
Wherein, inquiry request includes the adapter assembly title that need to be instantiated and the adapter assembly blueprint that need to be instantiated mark.
S305:NFVO life cycle managements module is according to the instance lifecycle state of self maintained, to NFVO components school Whether the adapter assembly that testing module feedback need to instantiate runs.
S306:When the adapter assembly not running that need to be instantiated, NFVO components correction verification module is to NFVO command checksum modules Initiate adapter assembly instantiation request;
It is to be appreciated that this is also the update to Operation and Maintenance Unit EM instance;Instantiation request includes needing reality The adapter assembly title of exampleization and the adapter assembly blueprint mark that need to be instantiated.
S307:The verification adapter assembly instantiation request of NFVO command checksums module;
Specifically, NFVO command checksums module may determine that whether the initiator of adapter assembly instantiation request has order Necessary information such as adapter assembly type in permission and adapter assembly instantiation request, adaptation blueprint identifies whether complete etc..
S308:After verification passes through, adapter assembly instantiation request is transmitted to NFVO Life Cycles by NFVO command checksums module Period management module.
S309:NFVO life cycle managements module initiates adapter assembly instantiation request to VNFM.
It is it is to be appreciated that blue comprising the adapter assembly type that need to be instantiated and the adapter assembly that need to be instantiated in request command Map logo.
S310:VNFM is the adapter assembly allocation example number and this operation task number that need to be instantiated, and is fed back to NFVO life cycle management modules.
Specifically, allocation example number is easy for VNFM and avoids instance number point when receiving multi-party instantiation request parallel processing With conflict, task number carries out the inquiry of task status convenient for NFVO.
S311:VNFM is identified according to adapter assembly type and blueprint in adapter assembly instantiation request, under Catallog Carry the blueprint of adapter assembly.
S312:VNFM downloads adapter assembly Software Mirroring packet in software storage SWR.
S313:VNFM analyzes adapter assembly blueprint, resource needed for calculating.
S314:Resource needed for VFNM to NFVO resource management modules application operation adapter assembly;
Wherein, resource can include the system resources such as network, memory, CPU.
S315:NFVO resource management modules return to resource authorization information to VNFM.
S316:VNFM request VIM distribution resources;
S317:VIM checks whether required resource can provide, if it is then distributing resource and to return to resource allocation complete Into notice to VFNM.
S318:VNFM notifies NFVO resource management modules resource to use the adapter assembly that need to be instantiated.
S319:The corresponding adapter assembly of VNF network elements after being instantiated in VNFM instantiation operation maintenance units EM.
S320:After the completion of adapter assembly instantiation, VNFM notifies the adaptation that NFVO life cycle managements module need to instantiate Component instanceization is completed.
The effect of this specific embodiment is, with new NE type reaching the standard grade in system, corresponding adapter assembly meeting It runs therewith so that Operation and Maintenance Unit EM need not upgrade or stop running, you can support the management to new NE type. The automatic variation for adapting to NE type of operation of adapter assembly.
Specific embodiment two
Referring to Fig. 4, after VNF network elements terminate, this specific embodiment can include:
S401:VNFM sends third notice message to NFVO life cycle managements module, has been used to indicate the termination of VNF network elements It completes;
Wherein, third notice message includes the title of the VNF network elements terminated, NE type, network element version, network element instance number Wait attribute informations.
S402:NFVO life cycle managements send the 4th notification message to NFVO components correction verification module;It has been used to indicate VNF Network element, which terminates, to be completed, and the element name terminated, NE type, network element version, network element instance number are also included in the 4th notification message Wait attribute informations.
S403:Attribute information of the NFVO components correction verification module in the 4th notification message, according to adapter assembly and network element Correspondence between attribute information determines the adapter assembly that need to be terminated.
Specifically, in the present embodiment, network element attribute information is preferably VNF NE types.
S404:NFVO components correction verification module initiates inquiry request to NFVO life cycle managements module, and end is needed for inquiring Whether adapter assembly only is in operating status.
Wherein, inquiry request includes the adapter assembly title that need to be terminated and the adapter assembly blueprint that need to be terminated mark.
S405:NFVO life cycle managements module is according to the instance lifecycle state of self maintained, to NFVO components school Whether the adapter assembly that testing module feedback need to terminate runs, and is currently running if adapter assembly need to be terminated, and return needs end simultaneously Adapter assembly instance number only.
S406:If adapter assembly operation in, NFVO components correction verification module to NFVO life cycle managements module initiate with The inquiry request whether the VNF network element same type network element examples of termination run.
S407:NFVO life cycle managements module is according to the instance lifecycle state of self maintained, to NFVO components school It tests module feedback and whether is run with the VNF network element same type network element examples terminated.
S408:If be in operation without same type network element, NFVO components correction verification module is to NFVO command checksum modules It initiates adapter assembly and terminates request,
It is to be appreciated that this is also the update to Operation and Maintenance Unit EM instance.Being included in request command needs to terminate Adapter assembly instance number.
S409:NFVO command checksums module verification adapter assembly terminates request;
Specifically, NFVO command checksums module may determine that adapter assembly terminates whether request originator has imperium Whether limit and adapter assembly terminate necessary information in request complete if you need to the adapter assembly instance number of termination.
S410:After verification passes through, adapter assembly is terminated request forwarding NFVO life cycle pipes by NFVO command checksums module Manage module.
Wherein, the adapter assembly instance number that need to be terminated is included in request command.
S411:Adapter assembly is terminated request and is sent to VNFM by NFVO life cycle managements module.
It is to be appreciated that the adapter assembly instance number that need to be terminated is included in request command.
S412:VNFM returns to this operation task number to NFVO life cycle management modules.
It is to be appreciated that operation task number can initiate the inquiry of task operating state convenient for NFVO.
S413:The adapter assembly that VNFM terminations need to terminate.
S414:The termination of the adapter assembly operation that VNFM notice NFVO life cycle managements modules need to terminate has been completed.
S415:The resource that the adapter assembly that VNFM notice VIM releases need to terminate occupies.
S416:VIM notice VNFM resource releases are completed.
S417:VNFM notifies NFVO resource management modules;
Specifically, the resource of adapter assembly that content of announcement can be used for illustrating to terminate has discharged, and indicate NFVO Carry out resource using status update.
The effect of the present embodiment is, as a kind of NE type is in the termination of system, corresponding adapter assembly can be therewith It terminates so that Operation and Maintenance Unit EM need not upgrade or stop running, you can terminate without the necessary component of operation, release money Source.The automatic variation for adapting to network element and terminating of the operation of adapter assembly.
Specific embodiment three
Referring to Fig. 5, after VNF network element updatings, this specific embodiment can include:
S501:VNFM sends the 5th notification message to NFVO life cycle managements module, has been used to indicate VNF network element updatings It completes;
Wherein, the 5th notification message includes:The title of updating network element, NE type, network element version before upgrading, net after upgrading The attribute informations such as first version, network element instance number.
S502:NFVO life cycle managements send the 6th notification message to NFVO components correction verification module;It has been used to indicate VNF Network element updating is completed, and the title of updating network element, NE type, network element version before upgrading, after upgrading are included in the 6th notification message Network element version, network element instance number.
It should be noted that the upgrading due to being related to VNF network elements, for the behaviour of the adapter assembly of VNF network elements Make, it is corresponding that the VNF network elements for starting the corresponding adapter assembly of VNF network elements after operation upgrades and terminating before upgrading can be included Two aspects of adapter assembly.Accordingly for the corresponding adapter assembly of VNF network elements after operation upgrades is started, Fig. 5 may refer to Shown in step A series;For terminating the corresponding adapter assembly of VNF network elements before upgrading, the step shown in Fig. 5 may refer to Rapid B series.Step A series and step B series can be carried out concurrently.
Here is the detailed description of step A series:
S503A:NFVO components correction verification module is according to the element name included in the 6th notification message, NE type, upgrading The attribute informations such as network element version afterwards, according to the adapter assembly that mapping table search need to instantiate between adapter assembly and network element attribute.
Specifically, in the present embodiment, network element attribute information is preferably the VNF network element versions after upgrading.
S504A:NFVO components correction verification module initiates inquiry request to NFVO life cycle managements module, and reality is needed for inquiring Whether the adapter assembly of exampleization is in operating status;
Wherein, inquiry request includes the adapter assembly title that need to be instantiated and the adapter assembly blueprint that need to be instantiated mark.
S505A:NFVO life cycle managements module is according to the instance lifecycle state of self maintained, to NFVO components school Whether the adapter assembly that testing module feedback need to instantiate runs.
S506A:When the adapter assembly not running that need to be instantiated, NFVO components correction verification module is to NFVO command checksum modules Adapter assembly instantiation request is initiated,
It is to be appreciated that this is also the update to Operation and Maintenance Unit EM instAnce.Being included in request command needs example The adapter assembly type of change and the adapter assembly blueprint mark that need to be instantiated.
S507A:The verification adapter assembly instantiation request of NFVO command checksums module;
Specifically, NFVO command checksums module may determine that whether the initiator of adapter assembly instantiation request has order Necessary information such as adapter assembly type in permission and adapter assembly instantiation request, adaptation blueprint identifies whether complete etc..
S508A:After verification passes through, adapter assembly instantiation request is transmitted to NFVO Life Cycles by NFVO command checksums module Period management module.
S509A:NFVO life cycle managements module initiates adapter assembly instantiation request to VNFM.
It is it is to be appreciated that blue comprising the adapter assembly type that need to be instantiated and the adapter assembly that need to be instantiated in request command Map logo.
S510A:VNFM is the adapter assembly allocation example number and this operation task number that need to be instantiated, and is fed back to NFVO life cycle management modules.
Specifically, allocation example number is easy for VNFM and avoids instance number point when receiving multi-party instantiation request parallel processing With conflict, task number carries out the inquiry of task status convenient for NFVO.
S511A:VNFM is identified according to adapter assembly type and blueprint in adapter assembly instantiation request, under Catallog Carry the blueprint of adapter assembly.
S512A:VNFM downloads adapter assembly Software Mirroring packet in software storage SWR.
S513A:VNFM analyzes adapter assembly blueprint, resource needed for calculating.
S514A:Resource needed for VFNM to NFVO resource management modules application operation adapter assembly;
Wherein, resource can include the system resources such as network, memory, CPU.
S515A:NFVO resource management modules return to resource authorization information to VNFM.
S516A:VNFM request VIM distribution resources;
S517A:VIM checks whether required resource can provide, if it is then distributing resource and to return to resource allocation complete Into notice to VFNM.
S518A:VNFM notifies NFVO resource management modules resource to use the adapter assembly that need to be instantiated.
S519A:The corresponding adapter assembly of VNF network elements after upgrading in VNFM instantiation operation maintenance units EM.
S520A:After the completion of adapter assembly instantiation, VNFM notifies the adaptation that NFVO life cycle managements module need to instantiate Component instanceization is completed.
Here is the detailed description of step B series:
S503B:NFVO components correction verification module is according to the title of updating network element included in the 6th notification message, network element class Type, the attribute informations such as network element version before upgrading, determines to need end according to the correspondence between adapter assembly and network element attribute information Adapter assembly only.
Wherein, in the present embodiment, VNF network element versions before network element attribute information preferably upgrades.
S504B:NFVO components correction verification module initiates inquiry request to NFVO life cycle managements module, and end is needed for inquiring Whether adapter assembly only is in operating status.
Wherein, inquiry request includes the adapter assembly title that need to be terminated and the adapter assembly blueprint that need to be terminated mark.
S505B:NFVO life cycle managements module is according to the instance lifecycle state of self maintained, to NFVO components school Whether the adapter assembly that testing module feedback need to terminate runs, and is currently running if adapter assembly need to be terminated, and return needs end simultaneously Adapter assembly instance number only.
S506B:If adapter assembly operation in, NFVO components correction verification module to NFVO life cycle managements module initiate with The inquiry request whether the VNF network element same type network element examples of termination run.
S507B:NFVO life cycle managements module is according to the instance lifecycle state of self maintained, to NFVO components school It tests module feedback and whether is run with the VNF network element same type network element examples terminated.
S508B:If be in operation without same type network element, NFVO components correction verification module is to NFVO command checksum modules It initiates adapter assembly and terminates request,
It is to be appreciated that this is also the update to Operation and Maintenance Unit EM instance.Being included in request command needs to terminate Adapter assembly instance number.
S509B NFVO command checksums module verification adapter assembly terminates request;
Specifically, NFVO command checksums module may determine that adapter assembly terminates whether request originator has imperium Whether limit and adapter assembly terminate necessary information in request complete if you need to the adapter assembly instance number of termination.
S510B:After verification passes through, adapter assembly is terminated request forwarding NFVO life cycle pipes by NFVO command checksums module Manage module.
Wherein, the adapter assembly instance number that need to be terminated is included in request command.
S511B:Adapter assembly is terminated request and is sent to VNFM by NFVO life cycle managements module.
It is to be appreciated that the adapter assembly instance number that need to be terminated is included in request command.
S512B:VNFM returns to this operation task number to NFVO life cycle management modules.
It is to be appreciated that operation task number can initiate the inquiry of task operating state convenient for NFVO.
S513B:The adapter assembly that VNFM terminations need to terminate.
S514B:The termination of the adapter assembly operation that VNFM notice NFVO life cycle managements modules need to terminate has been completed.
S515B:The resource that the adapter assembly that VNFM notice VIM releases need to terminate occupies.
S516B:VIM notice VNFM resource releases are completed.
S517B:VNFM notifies NFVO resource management modules;
Specifically, the resource of adapter assembly that content of announcement can be used for illustrating to terminate has discharged, and indicate NFVO Carry out resource using status update.
The effect of the present embodiment is, with the upgrading of network element, the corresponding adapter assembly of network element after upgrading can be run therewith, The corresponding adapter assembly of network element before upgrading can terminate therewith.Operation and Maintenance Unit EM need not upgrade or stop running, you can Support the management of network element after upgrading.The automatic variation for adapting to network element updating of operation of adapter assembly.
Specific embodiment four
Referring to Fig. 6, when EM increases the NE type of support newly, core thinking is that the newly-increased NE type supported neither upgrades Operation and Maintenance Unit EM does not terminate the normal operation of EM yet.But it by NE type caused by newly-increased support NE type and fits Distribution assembly mapping table, newly-increased adapter assembly Software Mirroring packet are saved in Catalog and software storage.The operation of adapter assembly is still It is so that the network element for carrying out and running according to the network element truth of system is consistent.This specific embodiment can include:
S601:Operator or other docking units initiate the update request of Operation and Maintenance packet;
Wherein, update request includes Operation and Maintenance packet ID, Operation and Maintenance APMB package path and filename and fresh information Illustrate.
S602:NFVO command checksums module verifies update request;
Specifically, NFVO command checksums module may determine that whether update request promoter has corresponding operating permission, with And the Operation and Maintenance packet ID that update request includes, Operation and Maintenance APMB package path and filename, this fresh information illustrate It is whether complete.
S603:After verification passes through, NFVO command checksums module is transmitted to NFVO packet management modules by request is updated;
It is to be appreciated that the information in the update request of forwarding still includes Operation and Maintenance packet ID, Operation and Maintenance APMB package Path and filename etc. are included in forward command.
S604:After NFVO packet management modules receive the update request of Operation and Maintenance packet, being judged according to Operation and Maintenance packet ID should Whether Operation and Maintenance packet has been put in storage, if be not put in storage, returns to error information.It, will be virtual in packet if be put in storage The blueprints files such as network function descriptor (VNFD, Virtualised Network Function Descriptor) are deposited into Catalog。
S605:Software Mirroring packet is stored in software storage by NFVO packets management module.
S606:NFVO packet management modules judge whether fresh information includes the adaptation branch to increasing NE type newly in illustrating It holds;If comprising the mapping table between NFVO components correction verification module update NE type and adapter assembly is notified.
It is to be appreciated that comprising newer Operation and Maintenance packet ID in the notice, the path on filename and Catalog.
S607:NFVO packets management module notice NFVO component correction verification module mapping tables have update.
S608:Downloaded on NFVO component correction verification modules to Catalog after update NE type and adapter assembly mapping table into Row is local to be preserved.
S609:NFVO components correction verification module notice NFVO assures reason module map table and downloads completion.
S610:The notice NFVO life cycle management modules packet update operation of NFVO packets management module has been completed.
S611:NFVO life cycle management modules notify operator or initiate other docking unit operations maintenance of operation Packet update is completed.
The effect of the present embodiment is, when Operation and Maintenance Unit EM supports new NE type, without upgrading or stops Operation.And new network element adapter assembly will not be run immediately, but really start operation when follow-up system needs, It is adapted to the true operating condition of system network element.
The technical solution in embodiment one is illustrated above by four specific embodiments, by NFVO according to VNF The life cycle state of the corresponding adapter assembly by VNF network elements of change of the life cycle state of network element is changed, so as to When the life cycle state of VNF network elements changes, EM need not carry out terminating operation or escalation process, reduce useless adaptation Resource consumption and waste caused by the operation of component.
Embodiment three
Based on the identical technical concept of previous embodiment, referring to Fig. 7, it illustrates a kind of void provided in an embodiment of the present invention The managing device 70 of planization network element, the device 70 can be applied in NFVO, which includes:Receiving unit 701 obtains list Member 702, transmitting element 703;Wherein,
The receiving unit 701 is directed to virtualization for receiving by what the network function manager VNFM virtualized was sent The life cycle modification information of network element;
The acquiring unit 702, for judging and determining the corresponding adapter assembly of the virtualization network element;
The transmitting element 703, for being sent out according to the life cycle modification information of the virtualization network element to the VNFM Send the operation requests for the adapter assembly;
The receiving unit 701, for obtaining the life cycle modification information and money of the adapter assembly from the VNFM Source modification information.
Illustratively, the life cycle modification information of the virtualization network element, including:The virtualization network element that need to be instantiated Attribute information.
Further, the acquiring unit 702, is used for:
Judged according to the attribute information of virtualization network element that need to be instantiated and determine the virtualization that need to be instantiated The corresponding adapter assembly that need to be instantiated of network element;Wherein, the attribute information of virtualization network element that need to be instantiated includes:Virtually Change element name, virtualize NE type, virtualize network element version.
Further, the transmitting element 703, is used for:
During the adapter assembly not running that need to be instantiated when described, adapter assembly instantiation request is sent to the VNFM;Its In, the adapter assembly instantiation request includes:The adapter assembly type that need to be instantiated and adaptation blueprint mark;It is described suitable The adapter assembly blueprint that need to be instantiated, and root are obtained according to the adaptation blueprint mark for the VNFM with blueprint mark Resource required when the adapter assembly that need to be instantiated is run is calculated according to the adapter assembly blueprint that need to be instantiated.
Further, the receiving unit 701, for receiving resource bid request from the VNFM;Wherein, the resource Required resource when application request is for asking the adapter assembly that need to be instantiated to run;
The transmitting element 703 sends resource authorization information for the application information according to the VNFM to VNFM;Its In, the resource authorization information is used to indicate VNFM needs example to virtualization infrastructure device management system VIM request distribution is described Required resource during the adapter assembly operation of change;
The receiving unit 701, for receiving the resource allocation result that the VNFM is sent;And
Receive the adapter assembly corresponding instance completion notice that need to be instantiated that the VNFM is sent.
Illustratively, the life cycle modification information of the virtualization network element includes:The attribute of the virtualization network element of termination Information;Wherein, the attribute information of the virtualization network element of termination include the virtualization title of network element of the termination, NE type, Network element version, network element instance number.
Further, the acquiring unit 702, is used for:
End is needed according to the virtualization network element of the attribute information of the virtualization network element of the termination acquisition termination is corresponding Adapter assembly only.
Further, the transmitting element 703, is used for:
Determine the operating status of the adapter assembly that need to be terminated;
When the adapter assembly that need to be terminated is currently running, the corresponding instance number of the adapter assembly that need to be terminated is determined And the termination virtualization NE type it is identical network element it is whether in operating status;
When the identical network element of virtualization NE type of the termination is not on operating status, sent to the VNFM Adapter assembly terminates request;Wherein, the adapter assembly terminates the instance number that request includes the adapter assembly that need to be terminated.
Further, the receiving unit 701, for receiving after the VNFM terminates the adapter assembly that need to be terminated The transmitted termination completion notice for the adapter assembly that need to be terminated;And
The VNFM is received after the resource release of the adapter assembly that need to be terminated is completed, the release of transmitted resource Notice.
Illustratively, the life cycle modification information of the virtualization network element includes:Virtualization network element attribute before upgrading Virtualization network element attribute information after information and upgrading.
Further, the acquiring unit 702, is used for:
Determine that the virtualization network element after the upgrading is corresponding according to the attribute information of the virtualization network element after the upgrading The adapter assembly that need to be instantiated.
Further, the transmitting element 703, is used for:
During the adapter assembly not running that need to be instantiated when the virtualization network element after the upgrading is corresponding, sent out to the VNFM Send the instantiation request for the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading;Wherein, the liter The corresponding adapter assembly instantiation request that need to be instantiated of virtualization network element after grade includes:Virtualization network element after the upgrading The corresponding adapter assembly type that need to be instantiated and adaptation blueprint mark;The adaptation blueprint mark is for the VNFM according to institute It states adaptation blueprint mark and obtains the corresponding adapter assembly blueprint that need to be instantiated of virtualization network element after the upgrading, and according to institute It states the corresponding adapter assembly blueprint that need to be instantiated of the virtualization network element after upgrading and calculates the virtualization network element pair after the upgrading Required resource during the adapter assembly operation for the need instantiation answered.
Further, the receiving unit 701, for receiving resource bid request from the VNFM;Wherein, the resource Required resource when application request is for asking the adapter assembly that need to be instantiated to run;
The transmitting element 703, for being asked to send resource authorization information to the VNFM according to the resource bid;Institute Stating resource authorization information and being used to indicate the VNFM needs example to the virtualization network element that VIM requests are distributed after the upgrading is corresponding Required resource during the adapter assembly operation of change;
The receiving unit 701, for receiving the resource allocation result that the VNFM is sent;
And receive the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading that the VNFM is sent Corresponding instance completion notice.
Further, the acquiring unit 702, is used for:
It is corresponding according to the virtualization network element that the attribute information of the virtualization network element before the upgrading is obtained before the upgrading Adapter assembly.
Further, the transmitting element 703, is used for:
Determine the operating status of the corresponding adapter assembly of virtualization network element before the upgrading;
When the corresponding adapter assembly of virtualization network element before the upgrading is currently running, obtain virtual before the upgrading Change the corresponding instance number of the corresponding adapter assembly of network element;
When determine with before the upgrading virtualize NE type it is identical network element it is in operating status when, to described VNFM sends adapter assembly and terminates request;Wherein, the adapter assembly, which terminates, asks to include the virtualization network element before the upgrading The instance number of corresponding adapter assembly.
Further, the receiving unit 701, for receiving the virtualization network element pair before the VNFM terminates the upgrading The transmitted termination for the corresponding adapter assembly of virtualization network element before the upgrading is completed logical after the adapter assembly answered Know;And
After the resource release completion for receiving the corresponding adapter assemblies of virtualization network element of the VNFM before the upgrading, Transmitted resource release notice.
Illustratively, the receiving unit 701 is additionally operable to receive update request;Wherein, the update request includes treating more New Operation and Maintenance packet mark, the file path of Operation and Maintenance packet to be updated and fresh information explanation;
Referring to Fig. 8, described device 70 further includes storage unit 704, for according to the Operation and Maintenance packet mark to be updated Know and determine that the Operation and Maintenance to be updated is packed in after library, the blueprint file in the Operation and Maintenance packet to be updated is preserved Software Mirroring packet is preserved to software storage to blueprint catalogue Catalog, and according to the file path of the Operation and Maintenance packet;
The acquiring unit 702 is additionally operable to the support instruction for including newly-increased NE type during the fresh information illustrates During information, the blueprint file obtained in Catalog is identified according to Operation and Maintenance packet;
Referring to Fig. 8, described device 70 further includes updating unit 705, for by network element attribute in the blueprint file and suitable The mapping table of distribution assembly is updated to local.
It should be noted that device 70 involved in the present embodiment is applied to NFVO, therefore, the function in device 70 Unit can be realized by the specific functional modules in NFVO in embodiment two, therefore, involved work(in the present embodiment Energy unit can correspond to the concrete function mould in embodiment two during each specific embodiment for realizing embodiment two Block, the application repeat no more this.
Example IV
Based on the identical technical concept of previous embodiment, referring to Fig. 9, it illustrates a kind of void provided in an embodiment of the present invention The management equipment 90 of planization network element, can include:Communication interface 901, memory 902, processor 903 and bus 904;Wherein,
The bus 904 for connect the communication interface 901, the processor 903 and the memory 902 and this Being in communication with each other between a little devices;
The communication interface 901, for carrying out data transmission with ext nal network element;
The memory 902, for storing instruction and data;
The processor 903 performs described instruction and is used for:It is corresponding to indicate that the communication interface 901 receives business to be transmitted Business description information;
It is and described to be passed according to preset configuration strategy and the corresponding business description information generation of the business to be transmitted The corresponding wireless resource configuration of defeated business;
And radio-resource-configuration is carried out according to the wireless resource configuration;
And indicate that the wireless resource configuration is sent to terminal by the communication interface 901.
In practical applications, above-mentioned memory 902 can be volatile memory (volatile memory), such as with Machine access memory (RAM, Random-Access Memory);Or nonvolatile memory (non-volatile Memory), such as read-only memory (ROM, Read-Only Memory), flash memory (flash memory), hard disk (HDD, Hard Disk Drive) or solid state disk (SSD, Solid-State Drive);Or the memory of mentioned kind Combination, and provide instruction and data to processor 903.
Above-mentioned processor 903 can be application-specific IC (ASIC, Application Specific Integrated Circuit), digital signal processor (DSP, Digital Signal Processor), Digital Signal Processing Device (DSPD, Digital Signal Processing Device), programmable logic device (PLD, Programmable Logic Device), field programmable gate array (FPGA, Field Programmable Gate Array), central processing unit At least one of (CPU, Central Processing Unit), controller, microcontroller, microprocessor.It is appreciated that Ground, for different equipment, it can also be other to be used to implement the electronic device of above-mentioned processor function, and the embodiment of the present invention is not Make specific limit.
It should be understood by those skilled in the art that, the embodiment of the present invention can be provided as method, system or computer program Product.Therefore, the shape of the embodiment in terms of hardware embodiment, software implementation or combination software and hardware can be used in the present invention Formula.Moreover, the present invention can be used can use storage in one or more computers for wherein including computer usable program code The form of computer program product that medium is implemented on (including but not limited to magnetic disk storage and optical memory etc.).
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that it can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided The processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that the instruction performed by computer or the processor of other programmable data processing devices is generated for real The device of function specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction generation being stored in the computer-readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted Series of operation steps are performed on calculation machine or other programmable devices to generate computer implemented processing, so as in computer or The instruction offer performed on other programmable devices is used to implement in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.

Claims (34)

1. a kind of management method for virtualizing network element, which is characterized in that the method includes:
Receive the life cycle modification information for virtualization network element sent by the network function manager VNFM virtualized;
Judge and determine the corresponding adapter assembly of the virtualization network element;
The operation for being directed to the adapter assembly is sent to the VNFM according to the life cycle modification information of the virtualization network element Request;
The life cycle modification information and resource modification information of the adapter assembly are obtained from the VNFM.
2. according to the method described in claim 1, it is characterized in that, the life cycle modification information of the virtualization network element, packet It includes:The attribute information of virtualization network element that need to be instantiated.
3. according to the method described in claim 2, it is characterized in that, described judge and determine that the virtualization network element is corresponding suitable Distribution assembly specifically includes:
Judged according to the attribute information of virtualization network element that need to be instantiated and determine the virtualization network element that need to be instantiated The corresponding adapter assembly that need to be instantiated;Wherein, the attribute information of virtualization network element that need to be instantiated includes:Virtualize net First title virtualizes NE type, virtualizes network element version.
4. according to the method described in claim 3, it is characterized in that, the life cycle according to the virtualization network element changes Information sends the operation requests for the adapter assembly to the VNFM, specifically includes:
During the adapter assembly not running that need to be instantiated when described, adapter assembly instantiation request is sent to the VNFM;Wherein, institute Adapter assembly instantiation request is stated to include:The adapter assembly type that need to be instantiated and adaptation blueprint mark;The adaptation is blue Map logo obtains the adapter assembly blueprint that need to be instantiated, and according to institute for the VNFM according to the adaptation blueprint mark The adapter assembly blueprint that stating need to instantiate calculates resource required when the adapter assembly that need to be instantiated is run.
5. the according to the method described in claim 4, it is characterized in that, life that the adapter assembly is obtained from the VNFM Periodic change information and resource modification information, specifically include:
Resource bid request is received from the VNFM;Wherein, resource bid request for ask it is described need to instantiate it is suitable Distribution assembly resource required when running;
It is asked to send resource authorization information to VNFM according to the resource bid;Wherein, the resource authorization information is used to indicate VNFM distributes money required when the adapter assembly that need to be instantiated is run to virtualization infrastructure device management system VIM requests Source;
Receive the resource allocation result that the VNFM is sent;
Receive the adapter assembly corresponding instance completion notice that need to be instantiated that the VNFM is sent.
6. the according to the method described in claim 1, it is characterized in that, life cycle modification information packet of the virtualization network element It includes:The attribute information of the virtualization network element of termination;Wherein, the attribute information of the virtualization network element of termination includes the void of the termination Title, NE type, network element version, the network element instance number of planization network element.
7. according to the method described in claim 6, it is characterized in that, described judge and determine that the virtualization network element is corresponding suitable Distribution assembly specifically includes:
The virtualization network element of the termination is obtained according to the attribute information of the virtualization network element of the termination corresponding need to terminate Adapter assembly.
8. the method according to the description of claim 7 is characterized in that the life cycle according to the virtualization network element changes Information sends the operation requests for adapter assembly to the VNFM, specifically includes:
Determine the operating status of the adapter assembly that need to be terminated;
When the adapter assembly that need to be terminated is currently running, determine the corresponding instance number of the adapter assembly that need to be terminated and Whether the network element that the virtualization NE type of the termination is identical is in operating status;
When the identical network element of virtualization NE type of the termination is not on operating status, sends and be adapted to the VNFM Component terminates request;Wherein, the adapter assembly terminates the instance number that request includes the adapter assembly that need to be terminated.
9. the according to the method described in claim 8, it is characterized in that, life cycle that adapter assembly is obtained from the VNFM Modification information and resource modification information, specifically include:
Receive the VNFM terminate it is transmitted for the adapter assembly that need to be terminated after the adapter assembly that need to be terminated Termination completion notice;
The VNFM is received after the resource release of the adapter assembly that need to be terminated is completed, the release of transmitted resource is logical Know.
10. the according to the method described in claim 1, it is characterized in that, life cycle modification information packet of the virtualization network element It includes:The virtualization network element attribute information after virtualization network element attribute information and upgrading before upgrading.
11. according to the method described in claim 10, it is characterized in that, described judge and determine that the virtualization network element is corresponding Adapter assembly specifically includes:
Determining that the virtualization network element after the upgrading is corresponding according to the attribute information of the virtualization network element after the upgrading needs reality The adapter assembly of exampleization.
12. according to the method for claim 11, which is characterized in that the life cycle according to the virtualization network element becomes More information sends the operation requests for adapter assembly to the VNFM, specifically includes:
During the adapter assembly not running that need to be instantiated when the virtualization network element after the upgrading is corresponding, needle is sent to the VNFM The instantiation of the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading is asked;Wherein, after the upgrading Virtualization network element it is corresponding need to instantiate adapter assembly instantiation request include:Virtualization network element after the upgrading corresponds to Need instantiation adapter assembly type and adaptation blueprint mark;The adaptation blueprint mark is for the VNFM according to described suitable The corresponding adapter assembly blueprint that need to be instantiated of virtualization network element after the upgrading is obtained, and according to the liter with blueprint mark The virtualization network element that the corresponding adapter assembly blueprint that need to be instantiated of virtualization network element after grade is calculated after the upgrading is corresponding Required resource during the adapter assembly operation that need to be instantiated.
13. according to the method for claim 12, which is characterized in that the Life Cycle that adapter assembly is obtained from the VNFM Phase modification information and resource modification information, specifically include:
Resource bid request is received from the VNFM;Wherein, resource bid request for ask it is described need to instantiate it is suitable Distribution assembly resource required when running;
It is asked to send resource authorization information to the VNFM according to the resource bid;The resource authorization information is used to indicate institute It states required when the virtualization network element corresponding adapter assemblies that need to instantiate of the VNFM after the VIM request distribution upgrading is run Resource;
And receive the resource allocation result that the VNFM is sent;
And it receives the corresponding adapter assembly that need to be instantiated of the virtualization network element after the upgrading that the VNFM is sent and corresponds to Instantiate completion notice.
14. according to the method described in claim 10, it is characterized in that, described judge and determine that the virtualization network element is corresponding Adapter assembly specifically includes:
The corresponding adaptation of virtualization network element before the upgrading is obtained according to the attribute information of the virtualization network element before the upgrading Component.
15. according to the method for claim 14, which is characterized in that the life cycle according to the virtualization network element becomes More information sends the operation requests for adapter assembly to the VNFM, specifically includes:
Determine the operating status of the corresponding adapter assembly of virtualization network element before the upgrading;
When the corresponding adapter assembly of virtualization network element before the upgrading is currently running, the virtualization net before the upgrading is obtained The corresponding instance number of the corresponding adapter assembly of member;
When determining that network element not identical with the virtualization NE type before the upgrading is in operating status, to the VNFM It sends adapter assembly and terminates request;Wherein, the adapter assembly, which terminates, asks to include the virtualization network element correspondence before the upgrading Adapter assembly instance number.
16. according to the method for claim 15, which is characterized in that the Life Cycle that adapter assembly is obtained from the VNFM Phase modification information and resource modification information, specifically include:
Receive the VNFM terminate it is transmitted for described after the corresponding adapter assembly of virtualization network element before the upgrading The termination completion notice of the corresponding adapter assembly of virtualization network element before upgrading;
After the resource release completion for receiving the corresponding adapter assemblies of virtualization network element of the VNFM before the upgrading, sent out The resource release notice sent.
17. according to claim 1 to 16 any one of them method, which is characterized in that the method further includes:
Receive update request;Wherein, the update request includes Operation and Maintenance packet mark to be updated, Operation and Maintenance to be updated The file path of packet and fresh information explanation;
After determining that the Operation and Maintenance to be updated is packed in library according to the Operation and Maintenance packet mark to be updated, treated described Blueprint file in newer Operation and Maintenance packet is preserved to blueprint catalogue Catalog, and according to the file of the Operation and Maintenance packet Path preserves Software Mirroring packet to software storage;
The fresh information includes the support instruction information of newly-increased NE type in illustrating when, obtained according to Operation and Maintenance packet mark Take the blueprint file in Catalog;
The mapping table of network element attribute and adapter assembly in the blueprint file is updated to local.
18. a kind of managing device for virtualizing network element, which is characterized in that described device includes:Receiving unit, acquiring unit, hair Send unit;Wherein,
The receiving unit, for receiving the life for virtualization network element sent by the network function manager VNFM virtualized Order periodic change information;
The acquiring unit, for judging and determining the corresponding adapter assembly of the virtualization network element;
The transmitting element, for being sent according to the life cycle modification information of the virtualization network element to the VNFM for institute State the operation requests of adapter assembly;
The receiving unit, for obtaining the life cycle modification information of the adapter assembly and resource change letter from the VNFM Breath.
19. device according to claim 18, which is characterized in that the life cycle modification information of the virtualization network element, Including:The attribute information of virtualization network element that need to be instantiated.
20. device according to claim 19, which is characterized in that the acquiring unit is used for:
Judged according to the attribute information of virtualization network element that need to be instantiated and determine the virtualization network element that need to be instantiated The corresponding adapter assembly that need to be instantiated;Wherein, the attribute information of virtualization network element that need to be instantiated includes:Virtualize net First title virtualizes NE type, virtualizes network element version.
21. device according to claim 20, which is characterized in that the transmitting element is used for:
During the adapter assembly not running that need to be instantiated when described, adapter assembly instantiation request is sent to the VNFM;Wherein, institute Adapter assembly instantiation request is stated to include:The adapter assembly type that need to be instantiated and adaptation blueprint mark;The adaptation is blue Map logo obtains the adapter assembly blueprint that need to be instantiated, and according to institute for the VNFM according to the adaptation blueprint mark The adapter assembly blueprint that stating need to instantiate calculates resource required when the adapter assembly that need to be instantiated is run.
22. device according to claim 21, which is characterized in that
The receiving unit, for receiving resource bid request from the VNFM;Wherein, the resource bid asks to ask The adapter assembly that need to be instantiated resource required when running;
The transmitting element sends resource authorization information for the application information according to the VNFM to VNFM;Wherein, the money Source authorization message is used to indicate VNFM and distributes the adaptation group that need to be instantiated to virtualization infrastructure device management system VIM requests Part resource required when running;
The receiving unit, for receiving the resource allocation result that the VNFM is sent;And
Receive the adapter assembly corresponding instance completion notice that need to be instantiated that the VNFM is sent.
23. device according to claim 18, which is characterized in that the life cycle modification information packet of the virtualization network element It includes:The attribute information of the virtualization network element of termination;Wherein, the attribute information of the virtualization network element of termination includes the void of the termination Title, NE type, network element version, the network element instance number of planization network element.
24. device according to claim 23, which is characterized in that the acquiring unit is used for:
The virtualization network element of the termination is obtained according to the attribute information of the virtualization network element of the termination corresponding need to terminate Adapter assembly.
25. device according to claim 24, which is characterized in that the transmitting element is used for:
Determine the operating status of the adapter assembly that need to be terminated;
When the adapter assembly that need to be terminated is currently running, determine the corresponding instance number of the adapter assembly that need to be terminated and Whether the network element that the virtualization NE type of the termination is identical is in operating status;
When the identical network element of virtualization NE type of the termination is not on operating status, sends and be adapted to the VNFM Component terminates request;Wherein, the adapter assembly terminates the instance number that request includes the adapter assembly that need to be terminated.
26. device according to claim 25, which is characterized in that the receiving unit terminates for receiving the VNFM The transmitted termination completion notice for the adapter assembly that need to be terminated after the adapter assembly that need to be terminated;And
The VNFM is received after the resource release of the adapter assembly that need to be terminated is completed, the release of transmitted resource is logical Know.
27. device according to claim 18, which is characterized in that the life cycle modification information packet of the virtualization network element It includes:The virtualization network element attribute information after virtualization network element attribute information and upgrading before upgrading.
28. device according to claim 27, which is characterized in that the acquiring unit is used for:
Determining that the virtualization network element after the upgrading is corresponding according to the attribute information of the virtualization network element after the upgrading needs reality The adapter assembly of exampleization.
29. device according to claim 28, which is characterized in that the transmitting element is used for:
During the adapter assembly not running that need to be instantiated when the virtualization network element after the upgrading is corresponding, needle is sent to the VNFM The instantiation of the corresponding adapter assembly that need to be instantiated of virtualization network element after the upgrading is asked;Wherein, after the upgrading Virtualization network element it is corresponding need to instantiate adapter assembly instantiation request include:Virtualization network element after the upgrading corresponds to Need instantiation adapter assembly type and adaptation blueprint mark;The adaptation blueprint mark is for the VNFM according to described suitable The corresponding adapter assembly blueprint that need to be instantiated of virtualization network element after the upgrading is obtained, and according to the liter with blueprint mark The virtualization network element that the corresponding adapter assembly blueprint that need to be instantiated of virtualization network element after grade is calculated after the upgrading is corresponding Required resource during the adapter assembly operation that need to be instantiated.
30. device according to claim 29, which is characterized in that
The receiving unit, for receiving resource bid request from the VNFM;Wherein, the resource bid asks to ask The adapter assembly that need to be instantiated resource required when running;
The transmitting element, for being asked to send resource authorization information to the VNFM according to the resource bid;The resource Authorization message be used to indicate the VNFM to the virtualization network element that VIM requests are distributed after the upgrading it is corresponding need to instantiate fit Distribution assembly resource required when running;
The receiving unit, for receiving the resource allocation result that the VNFM is sent;
And it receives the corresponding adapter assembly that need to be instantiated of the virtualization network element after the upgrading that the VNFM is sent and corresponds to Instantiate completion notice.
31. device according to claim 27, which is characterized in that the acquiring unit is used for:
The corresponding adaptation of virtualization network element before the upgrading is obtained according to the attribute information of the virtualization network element before the upgrading Component.
32. device according to claim 31, which is characterized in that the transmitting element is used for:
Determine the operating status of the corresponding adapter assembly of virtualization network element before the upgrading;
When the corresponding adapter assembly of virtualization network element before the upgrading is currently running, the virtualization net before the upgrading is obtained The corresponding instance number of the corresponding adapter assembly of member;
When determining that network element not identical with the virtualization NE type before the upgrading is in operating status, to the VNFM It sends adapter assembly and terminates request;Wherein, the adapter assembly, which terminates, asks to include the virtualization network element correspondence before the upgrading Adapter assembly instance number.
33. device according to claim 32, which is characterized in that the receiving unit terminates for receiving the VNFM The transmitted virtualization network element pair being directed to before the upgrading after the corresponding adapter assembly of virtualization network element before the upgrading The termination completion notice for the adapter assembly answered;And
After the resource release completion for receiving the corresponding adapter assemblies of virtualization network element of the VNFM before the upgrading, sent out The resource release notice sent.
34. according to claim 18 to 33 any one of them device, which is characterized in that the receiving unit is additionally operable to receive Update request;Wherein, the update request include Operation and Maintenance packet to be updated identify, the file of Operation and Maintenance packet to be updated Path and fresh information explanation;
Described device further includes storage unit, described to be updated for being determined according to the Operation and Maintenance packet mark to be updated Operation and Maintenance is packed in after library, and the blueprint file in the Operation and Maintenance packet to be updated is preserved to blueprint catalogue Catalog, And Software Mirroring packet is preserved to software storage according to the file path of the Operation and Maintenance packet;
The acquiring unit, when being additionally operable to the support instruction information for including newly-increased NE type during the fresh information illustrates, The blueprint file obtained in Catalog is identified according to Operation and Maintenance packet;
Described device further includes updating unit, for the mapping table of network element attribute and adapter assembly in the blueprint file to be updated To local.
CN201611182006.0A 2016-12-19 2016-12-19 A kind of management method and device for virtualizing network element Withdrawn CN108207008A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201611182006.0A CN108207008A (en) 2016-12-19 2016-12-19 A kind of management method and device for virtualizing network element
PCT/CN2017/116002 WO2018113571A1 (en) 2016-12-19 2017-12-13 Virtualized network element management method and device, and computer storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611182006.0A CN108207008A (en) 2016-12-19 2016-12-19 A kind of management method and device for virtualizing network element

Publications (1)

Publication Number Publication Date
CN108207008A true CN108207008A (en) 2018-06-26

Family

ID=62603038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611182006.0A Withdrawn CN108207008A (en) 2016-12-19 2016-12-19 A kind of management method and device for virtualizing network element

Country Status (2)

Country Link
CN (1) CN108207008A (en)
WO (1) WO2018113571A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110086652A (en) * 2019-03-25 2019-08-02 北京天地互连信息技术有限公司 A kind of management system and its method for service network element in 5G core net
WO2020011214A1 (en) * 2018-07-13 2020-01-16 华为技术有限公司 Method and device for managing virtualized resource
CN110896407A (en) * 2018-09-13 2020-03-20 亿阳信通股份有限公司 NFVO component configuration management, request forwarding method and request processing device
WO2020093976A1 (en) * 2018-11-05 2020-05-14 南京中兴软件有限责任公司 Resource change method and device, apparatus, and storage medium
CN111586081A (en) * 2019-02-18 2020-08-25 宁波方太厨具有限公司 Internet of things implementation method based on object model
CN112217654A (en) * 2019-07-11 2021-01-12 华为技术有限公司 Service resource license management method and related equipment
CN113726541A (en) * 2020-05-25 2021-11-30 中移(苏州)软件技术有限公司 Network element configuration method, device, electronic equipment and storage medium

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110943967A (en) * 2018-09-21 2020-03-31 中兴通讯股份有限公司 Authentication method, device and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104253866A (en) * 2014-09-20 2014-12-31 华为技术有限公司 Software deployment method and system of virtual network function network element and relevant equipment
WO2015113282A1 (en) * 2014-01-29 2015-08-06 华为技术有限公司 Wireless communication network and device
CN105871570A (en) * 2015-01-20 2016-08-17 中兴通讯股份有限公司 Method and device of managing virtualized network function (VNF)
CN105934919A (en) * 2014-12-17 2016-09-07 华为技术有限公司 Method and system for automatically adjusting network service capability

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103414589B (en) * 2013-08-13 2016-11-23 华为技术有限公司 A kind of method and device managing resource information
US9887959B2 (en) * 2014-08-19 2018-02-06 Futurewei Technologies, Inc. Methods and system for allocating an IP address for an instance in a network function virtualization (NFV) system
CN106209924B (en) * 2015-04-29 2019-06-25 中国移动通信集团公司 The method, apparatus and network function for disposing Virtual NE virtualize dispatch server
CN105354076B (en) * 2015-10-23 2019-01-25 北京云端光科技术有限公司 Application deployment method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015113282A1 (en) * 2014-01-29 2015-08-06 华为技术有限公司 Wireless communication network and device
CN104253866A (en) * 2014-09-20 2014-12-31 华为技术有限公司 Software deployment method and system of virtual network function network element and relevant equipment
CN105934919A (en) * 2014-12-17 2016-09-07 华为技术有限公司 Method and system for automatically adjusting network service capability
CN105871570A (en) * 2015-01-20 2016-08-17 中兴通讯股份有限公司 Method and device of managing virtualized network function (VNF)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
CHINA MOBILE: ""S3-152328-Discussion on SA5 related management security of virtualized networks (81_clean)"", 《3GPP TSG_SA\WG3_SECURITY》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110716788B (en) * 2018-07-13 2022-07-26 华为技术有限公司 Method and device for managing virtualized resources
WO2020011214A1 (en) * 2018-07-13 2020-01-16 华为技术有限公司 Method and device for managing virtualized resource
CN110716788A (en) * 2018-07-13 2020-01-21 华为技术有限公司 Method and device for managing virtualized resources
CN110896407A (en) * 2018-09-13 2020-03-20 亿阳信通股份有限公司 NFVO component configuration management, request forwarding method and request processing device
CN110896407B (en) * 2018-09-13 2023-03-10 亿阳信通股份有限公司 NFVO component configuration management, request forwarding method and request processing device
WO2020093976A1 (en) * 2018-11-05 2020-05-14 南京中兴软件有限责任公司 Resource change method and device, apparatus, and storage medium
CN111586081A (en) * 2019-02-18 2020-08-25 宁波方太厨具有限公司 Internet of things implementation method based on object model
CN111586081B (en) * 2019-02-18 2022-01-11 宁波方太厨具有限公司 Internet of things implementation method based on object model
CN110086652A (en) * 2019-03-25 2019-08-02 北京天地互连信息技术有限公司 A kind of management system and its method for service network element in 5G core net
CN112217654A (en) * 2019-07-11 2021-01-12 华为技术有限公司 Service resource license management method and related equipment
CN112217654B (en) * 2019-07-11 2022-06-07 华为技术有限公司 Service resource license management method and related equipment
CN113726541A (en) * 2020-05-25 2021-11-30 中移(苏州)软件技术有限公司 Network element configuration method, device, electronic equipment and storage medium
CN113726541B (en) * 2020-05-25 2023-11-07 中移(苏州)软件技术有限公司 Method and device for configuring network element, electronic equipment and storage medium

Also Published As

Publication number Publication date
WO2018113571A1 (en) 2018-06-28

Similar Documents

Publication Publication Date Title
CN108207008A (en) A kind of management method and device for virtualizing network element
US10496503B2 (en) Healing cloud services during upgrades
CN106301829B (en) A kind of method and apparatus of network service dilatation
US10700947B2 (en) Life cycle management method and device for network service
CN110365502A (en) A kind of method, apparatus and storage medium of service upgrade management
CN107070705B (en) A kind of method of combination of cloud resource
CN107967140B (en) Software modification initiating method, metadata publishing method and device
US8533714B2 (en) Dynamic virtual machine domain configuration and virtual machine relocation management
CN106528224A (en) Content updating method and system for Docker container, and server
CN106375101A (en) Life cycle management method and apparatus
CN104601680B (en) A kind of method for managing resource and device
CN112035121B (en) Edge application deployment method and system
JP7377965B2 (en) Network resource management methods, systems, network equipment and readable storage media
CN105589731A (en) Virtual machine migration method and device
EP4369183A1 (en) Cloud platform management architecture, method and device, and storage medium
CN107534577A (en) A kind of method and apparatus of Network instantiation
CN108471373B (en) Resource application and VNF instance creation method and device
CN108062239B (en) Accelerator loading method and system and accelerator loading device
CN111399968B (en) Virtual resource management method, device and system based on container
CN111726241A (en) Network resource management method, system, network device and readable storage medium
KR102135651B1 (en) Management method and device for management function target
CN106254440A (en) The upgrade method of a kind of AP and device
CN107357603A (en) A kind of method for loading software, equipment and system
CN107810475A (en) Method and apparatus for the software life cycle management of virtual computation environmental
CN110351104A (en) A kind of VIM selection method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180626