CN108206523A - 港口供电系统随机功率潮流协调控制器 - Google Patents
港口供电系统随机功率潮流协调控制器 Download PDFInfo
- Publication number
- CN108206523A CN108206523A CN201611167381.8A CN201611167381A CN108206523A CN 108206523 A CN108206523 A CN 108206523A CN 201611167381 A CN201611167381 A CN 201611167381A CN 108206523 A CN108206523 A CN 108206523A
- Authority
- CN
- China
- Prior art keywords
- signal processing
- processing unit
- digital signal
- unit
- port
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 claims description 8
- 230000005611 electricity Effects 0.000 claims description 4
- 238000006243 chemical reaction Methods 0.000 claims description 2
- 230000006641 stabilisation Effects 0.000 abstract description 3
- 238000011105 stabilization Methods 0.000 abstract description 3
- 239000003990 capacitor Substances 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000010355 oscillation Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611167381.8A CN108206523B (zh) | 2016-12-16 | 2016-12-16 | 港口供电系统随机功率潮流协调控制器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611167381.8A CN108206523B (zh) | 2016-12-16 | 2016-12-16 | 港口供电系统随机功率潮流协调控制器 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108206523A true CN108206523A (zh) | 2018-06-26 |
CN108206523B CN108206523B (zh) | 2024-09-27 |
Family
ID=62601369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611167381.8A Active CN108206523B (zh) | 2016-12-16 | 2016-12-16 | 港口供电系统随机功率潮流协调控制器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108206523B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022227817A1 (zh) * | 2021-04-27 | 2022-11-03 | 保定钰鑫电气科技有限公司 | 一种多端口内部无源无荷随机潮流电网络的故障监测方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103501017A (zh) * | 2013-09-26 | 2014-01-08 | 北京北变微电网技术有限公司 | 微电网稳定控制器 |
CN105356608A (zh) * | 2015-11-20 | 2016-02-24 | 国家电网公司 | 一种港口岸电综合管理系统 |
CN105548777A (zh) * | 2016-01-27 | 2016-05-04 | 成都府河电力自动化成套设备有限责任公司 | 基于双cpu并行录波存储的故障录波装置 |
CN206389116U (zh) * | 2016-12-16 | 2017-08-08 | 上海宝钢安大电能质量有限公司 | 港口供电系统随机功率潮流协调控制器 |
-
2016
- 2016-12-16 CN CN201611167381.8A patent/CN108206523B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103501017A (zh) * | 2013-09-26 | 2014-01-08 | 北京北变微电网技术有限公司 | 微电网稳定控制器 |
CN105356608A (zh) * | 2015-11-20 | 2016-02-24 | 国家电网公司 | 一种港口岸电综合管理系统 |
CN105548777A (zh) * | 2016-01-27 | 2016-05-04 | 成都府河电力自动化成套设备有限责任公司 | 基于双cpu并行录波存储的故障录波装置 |
CN206389116U (zh) * | 2016-12-16 | 2017-08-08 | 上海宝钢安大电能质量有限公司 | 港口供电系统随机功率潮流协调控制器 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022227817A1 (zh) * | 2021-04-27 | 2022-11-03 | 保定钰鑫电气科技有限公司 | 一种多端口内部无源无荷随机潮流电网络的故障监测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108206523B (zh) | 2024-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106033891B (zh) | 一种低压负荷并行在线自动换相装置及其操作方法 | |
CN102088209B (zh) | 配电网自愈控制方法 | |
CN107271899B (zh) | 一种多规格电压发电机组的测试方法 | |
CN105226657B (zh) | 一种用于配电网低电压治理的串并联综合补偿装置 | |
CN206389116U (zh) | 港口供电系统随机功率潮流协调控制器 | |
CN205450212U (zh) | 高压电力断路器故障智能诊断系统 | |
CN103855722A (zh) | 一种微电网并网装置 | |
CN109936140A (zh) | 用于港口供电系统的随机功率潮流协调控制系统及方法 | |
CN108206523A (zh) | 港口供电系统随机功率潮流协调控制器 | |
CN103532221A (zh) | 一种自适应330kV变电站接线及运行方式的线路备自投实现方法 | |
CN202696117U (zh) | 一种基于dsp与fpga的svg控制系统拓扑结构 | |
CN203289112U (zh) | 一种快速投切低压智能无功补偿装置 | |
CN205104912U (zh) | 一种新型集中式三相无损耗平衡负荷装置 | |
CN201188544Y (zh) | 智能分相无功功率补偿电路 | |
CN204441905U (zh) | 一种储能变流器的自启动系统 | |
CN101995557B (zh) | 一种大功率变流器短路故障承受能力测试方法 | |
CN201928091U (zh) | 智能型配电电能管理集控柜 | |
CN204668950U (zh) | 一种电网的自适应系统 | |
CN210608699U (zh) | 一种电网变电运行作业倒闸操作系统 | |
CN202550689U (zh) | 一种用于增强小型电网稳定性的智能管理控制系统 | |
Jiang et al. | Valve base controller (VBC) used in HVDC flexible system | |
CN111257663B (zh) | 一种投切试验电路 | |
CN205427079U (zh) | 多节点高压电力电容器在线监测系统 | |
CN207234393U (zh) | 自检测新型过压监控设备 | |
CN105071249A (zh) | 一种智能化低压配电箱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Country or region after: China Address after: Room 1906, Block B, Dongding International, Lane 600 Mohe Road, Baoshan District, Shanghai, 2019 Applicant after: Shanghai Anda Power Quality Co.,Ltd. Applicant after: TONGSHENG ELECTRICITY POWER Co.,Ltd. Address before: No. 668, Baoshan District Road, Shanghai Applicant before: SHANGHAI ISSON POWER QUALITY CO.,LTD. Country or region before: China Applicant before: TONGSHENG ELECTRICITY POWER Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |