CN108197361A - A kind of modeling method of railways train operation three-dimensional simulation model - Google Patents

A kind of modeling method of railways train operation three-dimensional simulation model Download PDF

Info

Publication number
CN108197361A
CN108197361A CN201711406026.6A CN201711406026A CN108197361A CN 108197361 A CN108197361 A CN 108197361A CN 201711406026 A CN201711406026 A CN 201711406026A CN 108197361 A CN108197361 A CN 108197361A
Authority
CN
China
Prior art keywords
signal
semaphore
model
track
train operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711406026.6A
Other languages
Chinese (zh)
Other versions
CN108197361B (en
Inventor
李阳阳
苗铮
朱韶东
张瑞
赵明宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN THINKING INFORMATION TECHNOLOGY Co Ltd
Original Assignee
HENAN THINKING INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN THINKING INFORMATION TECHNOLOGY Co Ltd filed Critical HENAN THINKING INFORMATION TECHNOLOGY Co Ltd
Priority to CN201711406026.6A priority Critical patent/CN108197361B/en
Publication of CN108197361A publication Critical patent/CN108197361A/en
Application granted granted Critical
Publication of CN108197361B publication Critical patent/CN108197361B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

A kind of modeling method of railways train operation three-dimensional simulation model:The first step:Semaphore model and special model trajectory are modeled in advance;Second step:Incoming semator related data, special track segment data;Second step:The semaphore modeled in advance is transferred according to the semaphore related data of input and special track segment data and special model trajectory automatically generates railways train operation model.The dynamic model that this method of the present invention carries out creates so that according to the practical situation of each circuit, carrying out the work of full line modeling can fully phase out.Same 3D models can be simultaneously applied on a plurality of circuit.Thus greatly reduce the workload involved by 3D modeling.

Description

A kind of modeling method of railways train operation three-dimensional simulation model
Technical field
The present invention relates to railways train operation three-dimensional simulation model fields, and in particular to a kind of railways train operation three-dimensional simulation model Modeling method.
Background technology
In the analog simulation instructional device of fast railway general at present and high-speed railway, each producer generally introduces 3D outdoor scenes and regards Figure.For more realistically showing driving operational process, strengthen the validity of simulated teaching rehearsal, enhance the substitution sense of personnel.And And this design can also be used to intuitively show that the actual signal of ground signal is shown, and simulative display sleety weather, with And some improper driving conditions such as falling rocks, fire, the rehearsal range of analog simulation instructional device can be expanded.
General producer builds this view by the way of three-dimensional modeling, but the way generally used is first along reality Border circuit shooting is honourable on the way.The information such as record circuit semaphore, interchange of position, bend everywhere, tunnel, bridge.Then in 3D This complete circuit is rebuild in system.When final software product is offered, an independent circuit modeling expense is generally comprised. And this expense cost is considerable, and is the private data of each project, it is not possible to shared.
Invention content
To solve the above problems, the present invention provides a kind of modeling method of railways train operation three-dimensional simulation model.
Technical scheme of the present invention is specially:
A kind of modeling method of railways train operation three-dimensional simulation model:
The first step:Semaphore model and special model trajectory are modeled in advance;
Second step:Incoming semator related data, special track segment data;
Second step:The semaphore that models in advance and special is transferred according to the semaphore related data of input and special track segment data Model trajectory automatically generates railways train operation model.
Further:The railways train operation model automatically generated can be adjusted, adjusted after generation railways train operation model Journey is as follows;
The first step:The selected railways train operation model scope for needing to adjust;
Second step:Incoming semator related data, special track segment data:
Third walks:Railway is automatically generated in selected range according to the semaphore related data of input and special track segment data Driving model.
Further:Railways train operation model is adjusted process and is divided into trapped orbit adjustment semaphore mode and normal generation Mode.
Further:In the incoming semator related data, special track segment data, the data of input can input absolutely Data and relative data;Data are the data in entire railways train operation model in absolute data, and relative data is selected Data in driving model.
Further:Use 3D modeling Software Create railways train operation model.
Further:The semaphore related data includes the attribute of semaphore:Home signal, exit signal, into Road semaphore passes through semaphore, obstruction signal, distant signal, shunting signal, hump signal, hump auxiliary signal Machine, repeating signal;Semaphore title:Uplink and downlink, direction, station track information are included in semaphore title;Semaphore location information; Special track segment data:Tunnel location and length, Bridge position and length, the relevant curvature of bend, position, length.
Further:Station and station track are automatically generated between home signal and semaphore of going to war;Home signal Or the semaphore and by generating common Crane Rail between semaphore of going to war;By generating common Crane Rail between semaphore; Hump signal instruction gradient track vertex, hump subsidiary signal instruction gradient track starting point, according to the starting point of gradient track Gradient track is generated with vertex;Route signal position represents the intersection point of route track and main road track, is existed according to orbital node Extend route track on main road track;Shunting signal instruction is shunt the intersection point of track and main road track, according to orbital node Extend track of shunting on main road track;Rule are set according to the obstruction signal that obstruction signal position and the Ministry of Railways issue Then, the high-risk place such as generation landslide falling rocks near obstruction signal;Distant signal and repeating signal are according under the Ministry of Railways The semaphore of hair sets rule in home signal, exit signal, route signal, passes through semaphore, obstruction signal, tune Engine man's indicator, hump signal, hump subsidiary signal are nearby set;Tunnel is automatically generated according to the tunnel location of input and length Road;Bridge position and length automatically generate bridge;, the relevant curvature of bend, position, length automatically generate bend track.
Further:Home signal, route signal, passes through semaphore, obstruction signal, advance notice at exit signal Semaphore, shunting signal, hump signal, hump subsidiary signal, repeating signal, tunnel, bridge threedimensional model use In advance modeling, when automatically generating railways train operation model carry out model calling mode carry out home signal, exit signal, into Road semaphore passes through semaphore, obstruction signal, distant signal, shunting signal, hump signal, hump auxiliary signal The model generation of machine, repeating signal, tunnel, bridge.
Relative to the prior art, technique effect of the invention is that the dynamic model that this method carries out creates so that foundation The practical situation of each circuit, carrying out the work of full line modeling can fully phase out.Same 3D models can answer simultaneously With on a plurality of circuit.Thus greatly reduce the workload involved by 3D modeling.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific embodiment
For driving emulates, most important information is the location information of Wayside signal and by signal out of the station in fact The station circle of machine mark(For showing station and its attached station track, track switch).There are these information, we in fact can use dynamic The mode of state modeling is placed Wayside signal in suitable position automatically, shows that station and its attached station track, track switch and station are attached Belong to building.
The location information of Wayside signal is a numerical value, can at any time be read during emulation of driving a vehicle. The relative distance of front signal machine and the attribute of front signal machine can be shown in LKJ screen displays at any time(By semaphore still into Exit signal).Our softwares can accomplish the semaphore position letter in 3D views and analogue simulation unit in actual motion The accurate matching of breath.There is deviation needing the practical parking stall of rehearsal locomotive and semaphore position(Advanced or lag)Situation when, we Model can also change at any time front signal machine appearance position, simulation such case true to nature.
When carrying out railways train operation modeling, the attribute of incoming semator in 3D modeling software:Home signal, outbound letter It is number machine, route signal, auxiliary by semaphore, obstruction signal, distant signal, shunting signal, hump signal, hump Help semaphore, repeating signal;Semaphore title:According to semaphore nomenclature principle, uplink and downlink, side are included in semaphore title To, station track information;Semaphore location information;Special track segment information:Tunnel location and length, Bridge position and length, bend Relevant curvature, position, length.
According to the semaphore attribute of input, semaphore title, special track segment information 3D modeling software according to following rules Automatically generate railways train operation three-dimensional simulation model.Wherein station and vehicle are automatically generated between home signal and semaphore of going to war It stands track;Home signal or the semaphore and by generating common Crane Rail between semaphore of going to war;By between semaphore Generate common Crane Rail;Hump signal instruction gradient track vertex, hump subsidiary signal instruction gradient track starting point, root Gradient track can be generated according to the starting point of gradient track and vertex;Route signal position represents route track and main road track Intersection point extends route track according to orbital node on main road track;Shunting signal indicates shunt track and main road track Intersection point track of shunting is extended on main road track according to orbital node;It is issued according to obstruction signal position and the Ministry of Railways Obstruction signal setting rule, the high-risk place such as generation landslide falling rocks, provides for high-risk driving stimulation near obstruction signal Analog site only need to can just simulate the high danger conditions such as landslide falling rocks in the high-risk analog signal of external input in the place;Advance notice letter The semaphore setting rule that number machine and repeating signal are issued according to the Ministry of Railways is believed in home signal, exit signal, route Number machine passes through semaphore, obstruction signal, shunting signal, hump signal, hump subsidiary signal and nearby sets;According to The tunnel location and length of input automatically generate tunnel;Bridge position and length automatically generate bridge;The relevant curvature of bend, position It puts, length automatically generates bend track.
The home signal of required generation in the above method, route signal, passes through semaphore, hides exit signal Break signal machine, distant signal, shunting signal, hump signal, hump subsidiary signal, repeating signal, tunnel, bridge Threedimensional model can model storage in a computer in advance, and advance storage is directly invoked when carrying out railways train operation auto-building model Model, improve railways train operation model formation efficiency, multiplexing is carried out to threedimensional model, and to reduce railways train operation auto-building model difficult Degree.
The model automatically generated can be adjusted after entire railways train operation auto-building model, it is selected first to need to adjust Range, then determine adjustment mode.Mode 1:The track of fixed generation, adjustment semaphore position;Mode 2:Track and letter Number machine is all adjusted.The semaphore related data to be adjusted and special track segment data are inputted, carries out local railway row Vehicle model generates.When being adjusted data input, absolute data and relative data can be inputted, absolute data represents input Data are the data in entire railways train operation model, and relative data is the data in selected range railways train operation model.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those skilled in the art, Under the premise of general idea of the present invention is not departed from, several changes and improvements can also be made, these should also be considered as the present invention's Protection domain.

Claims (8)

1. a kind of modeling method of railways train operation three-dimensional simulation model, it is characterised in that:
The first step:Semaphore model and special model trajectory are modeled in advance;
Second step:Incoming semator related data, special track segment data;
Second step:The semaphore that models in advance and special is transferred according to the semaphore related data of input and special track segment data Model trajectory automatically generates railways train operation model.
2. a kind of modeling method of railways train operation three-dimensional simulation model as described in claim 1, it is characterised in that:Generate railway The railways train operation model automatically generated can be adjusted after driving model, adjustment process is as follows;
The first step:The selected railways train operation model scope for needing to adjust;
Second step:Incoming semator related data, special track segment data:
Third walks:Advance modeling is transferred in selected range according to the semaphore related data of input and special track segment data Semaphore and special model trajectory automatically generate railways train operation model.
3. a kind of modeling method of railways train operation three-dimensional simulation model as claimed in claim 2, it is characterised in that:Railways train operation Model is adjusted process and is divided into trapped orbit adjustment semaphore mode and normal generating mode.
4. a kind of modeling method of railways train operation three-dimensional simulation model as claimed in claim 2, it is characterised in that:The input In semaphore related data, special track segment data, the data of input can input absolute data and relative data;In absolute data Data are the data in entire railways train operation model, and relative data is the data in selected driving model.
5. a kind of modeling method of railways train operation three-dimensional simulation model as described in claim 1, it is characterised in that:It is built using 3D Mould Software Create railways train operation model.
6. a kind of modeling method of railways train operation three-dimensional simulation model as described in claim 1, it is characterised in that:The signal Machine related data includes the attribute of semaphore:Home signal, route signal, passes through semaphore, blocking letter at exit signal Number machine, distant signal, shunting signal, hump signal, hump subsidiary signal, repeating signal;Semaphore title:Letter Uplink and downlink, direction, station track information are included in number machine title;Semaphore location information;Special track segment data:Tunnel location and length Degree, Bridge position and length, the relevant curvature of bend, position, length.
7. a kind of modeling method of railways train operation three-dimensional simulation model as claimed in claim 6, it is characterised in that:Home signal Station and station track are automatically generated between machine and semaphore of going to war;Home signal or go to war semaphore with by semaphore it Between generate common Crane Rail;By generating common Crane Rail between semaphore;Hump signal instruction gradient track vertex, Hump subsidiary signal indicates gradient track starting point, and gradient track is generated according to the starting point of gradient track and vertex;Route signal The intersection point for representing route track and main road track is put in seat in the plane, extends route track on main road track according to orbital node;It adjusts Engine man's indicator instruction is shunt the intersection point of track and main road track, extends track of shunting on main road track according to orbital node; Rule is set according to the obstruction signal that obstruction signal position and the Ministry of Railways issue, landslide is generated near obstruction signal and is fallen The high-risk place such as stone;The semaphore setting rule that distant signal and repeating signal are issued according to the Ministry of Railways is in home signal Machine, route signal, passes through semaphore, obstruction signal, shunting signal, hump signal, hump auxiliary at exit signal Semaphore is nearby set;Tunnel is automatically generated according to the tunnel location of input and length;Bridge position and length automatically generate bridge Beam;, the relevant curvature of bend, position, length automatically generate bend track.
8. a kind of modeling method of railways train operation three-dimensional simulation model as claimed in claim 6, it is characterised in that:Home signal Machine, route signal, passes through semaphore, obstruction signal, distant signal, shunting signal, humping signal at exit signal Machine, hump subsidiary signal, repeating signal, tunnel, bridge threedimensional model automatically generate railways train operation mould using modeling in advance During type carry out model calling mode carry out home signal, exit signal, route signal, by semaphore, blocking believe Number machine, distant signal, shunting signal, hump signal, hump subsidiary signal, repeating signal, tunnel, bridge mould Type generates.
CN201711406026.6A 2017-12-22 2017-12-22 Modeling method of railway train three-dimensional simulation model Active CN108197361B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711406026.6A CN108197361B (en) 2017-12-22 2017-12-22 Modeling method of railway train three-dimensional simulation model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711406026.6A CN108197361B (en) 2017-12-22 2017-12-22 Modeling method of railway train three-dimensional simulation model

Publications (2)

Publication Number Publication Date
CN108197361A true CN108197361A (en) 2018-06-22
CN108197361B CN108197361B (en) 2021-09-28

Family

ID=62583363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711406026.6A Active CN108197361B (en) 2017-12-22 2017-12-22 Modeling method of railway train three-dimensional simulation model

Country Status (1)

Country Link
CN (1) CN108197361B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113696935A (en) * 2021-10-28 2021-11-26 北京全路通信信号研究设计院集团有限公司 Signal equipment primitive data model establishing method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004094649A (en) * 2002-08-30 2004-03-25 Yaskawa Electric Corp Positioning control device
CN101482894A (en) * 2009-01-22 2009-07-15 北京全路通信信号研究设计院 Simulation system and method for combined train operation control
CN102385658A (en) * 2011-11-18 2012-03-21 铁道第三勘察设计院集团有限公司 Method for 3D parameterization modeling of high-speed railroad bridge under virtual reality environment
CN103021221A (en) * 2012-12-28 2013-04-03 成都运达科技股份有限公司 Simulation system and simulation method for virtual driving behavior of drivers of subway trains
CN103236084A (en) * 2013-05-15 2013-08-07 中南大学 Dynamic modeling method of large-scale track lines
CN105894568A (en) * 2014-11-17 2016-08-24 郑州捷安高科股份有限公司 Image recognition based railway signal equipment three-dimensional modeling method
CN106844840A (en) * 2016-12-14 2017-06-13 广州地铁设计研究院有限公司 A kind of method that subway station rapid modeling is realized based on BIM

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004094649A (en) * 2002-08-30 2004-03-25 Yaskawa Electric Corp Positioning control device
CN101482894A (en) * 2009-01-22 2009-07-15 北京全路通信信号研究设计院 Simulation system and method for combined train operation control
CN102385658A (en) * 2011-11-18 2012-03-21 铁道第三勘察设计院集团有限公司 Method for 3D parameterization modeling of high-speed railroad bridge under virtual reality environment
CN103021221A (en) * 2012-12-28 2013-04-03 成都运达科技股份有限公司 Simulation system and simulation method for virtual driving behavior of drivers of subway trains
CN103236084A (en) * 2013-05-15 2013-08-07 中南大学 Dynamic modeling method of large-scale track lines
CN105894568A (en) * 2014-11-17 2016-08-24 郑州捷安高科股份有限公司 Image recognition based railway signal equipment three-dimensional modeling method
CN106844840A (en) * 2016-12-14 2017-06-13 广州地铁设计研究院有限公司 A kind of method that subway station rapid modeling is realized based on BIM

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李少伟,陈永生: "城市轨道交通系统运行仿真平台的设计与实现", 《计算机应用》 *
王怀松,陈荣武,杨城: "基于MSTS 的列车运行视景仿真系统三维建模", 《系统仿真技术》 *
王怀松,陈荣武等: "视景仿真技术在郑州地铁1号线列车自动监控系统中的应用", 《城市轨道交通研究》 *
黄友能, 唐 涛, 宋晓伟: "虚拟仿真技术在地铁列车运行仿真系统中的研究", 《系统仿真学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113696935A (en) * 2021-10-28 2021-11-26 北京全路通信信号研究设计院集团有限公司 Signal equipment primitive data model establishing method and system
CN113696935B (en) * 2021-10-28 2022-04-08 北京全路通信信号研究设计院集团有限公司 Signal equipment primitive data model establishing method and system

Also Published As

Publication number Publication date
CN108197361B (en) 2021-09-28

Similar Documents

Publication Publication Date Title
CN107507488A (en) A kind of track traffic virtual electronic sand table simulation training system and method
CN104637370A (en) Photogrammetry and remote sensing comprehensive teaching method and system
CN107844635A (en) Realize BIM information and traffic simulation information integrated system and its integrated approach
CN103021221A (en) Simulation system and simulation method for virtual driving behavior of drivers of subway trains
CN102467589A (en) Interactive traffic simulation system
EP1735766A1 (en) Method and apparatus for simulating a train and track
CN105608946A (en) Deepwater ocean platform anchoring simulation-training simulation platform and simulation method thereof
Otero et al. Wind energy development in Cantabria, Spain. Methodological approach, environmental, technological and social issues
CN104537911A (en) Railway engineering training system based on virtual reality
Ezer Numerical modeling of the impact of hurricanes on ocean dynamics: sensitivity of the Gulf Stream response to storm’s track
CN108197361A (en) A kind of modeling method of railways train operation three-dimensional simulation model
CN110688770B (en) Recurrence simulation method for experience effect of large-scale amusement facility
CN104835375A (en) High-efficient satellite communication simulated teaching and training system
Vanichchanunt et al. Virtual reality for railway signaling system training
RU2596042C1 (en) Simulator for professional training of locomotive operators and maintenance personnel
CN110363844A (en) A kind of coal mine roadway three-dimensional modeling method and system
CN113361144B (en) BIM-based road driving simulation environment establishment method
CN102519738A (en) Simulation system for large-sized track detection vehicle
CN202339277U (en) Large track inspection vehicle simulating device
CN103106683B (en) The construction method of three-dimensional visual simulation pilot instrument based on Google Earth
RU147846U1 (en) RAILWAY OPERATOR SIMULATOR
Nie et al. Image-based 3D scene reconstruction and rescue simulation framework for railway accidents
KR102597812B1 (en) Miniature Model of the Personal Type Simulator for the Electric Multiple Unit
CN202584131U (en) Overhead road mark and marking simulation system
Estévez et al. Development of a shotcrete training simulator for civil works

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant