CN108193699A - 基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法 - Google Patents
基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法 Download PDFInfo
- Publication number
- CN108193699A CN108193699A CN201711479444.8A CN201711479444A CN108193699A CN 108193699 A CN108193699 A CN 108193699A CN 201711479444 A CN201711479444 A CN 201711479444A CN 108193699 A CN108193699 A CN 108193699A
- Authority
- CN
- China
- Prior art keywords
- filling
- construction
- bag
- bag body
- filling bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/10—Placing gravel or light material under water inasmuch as not provided for elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
本发明涉及一种基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法,包括如下步骤:1、施工准备:2、施工操作:(1)根据原袋布尺寸进行分隔加工,将袋体分隔成需求的相连小袋体;(2)当潮位在低水位时,需要及时铺设已加工好的充填袋袋布,并进行固定;(3)首先将吹砂管相连,再分别连接充填袋体的袖口;(4)选择中间位置小充填袋进行打设至袋体饱满,过程中再对两侧小充填袋进行打设;(5)直至袋体饱满为止,并找平继续进行下一步施工。本发明克服了潮汐作用下,袋体受潮水影响发生偏移和损毁的情况,减少了土工材料和充填料的浪费;在可以使充填袋施工效率更高更快,也更稳定,可以保证施工的连贯性,缩短了不必要的窝工时间。
Description
技术领域
本发明属于水工技术领域,特别是涉及一种基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法。
背景技术
充填袋结构围堰已广泛应用于各地工程围海造陆工程中,其施工具有适用力强、施工速度快、造价低等优点,目前在中国河、海堤坝及护岸工程中得到广泛采用。东营港广利港区航道工程位于东营市东城东南,渤海莱洲湾西岸,广利河河口处,距东营市市中心约20km。该区域属淤积型泥沙质海岸,基本由陆上三角洲平原和水下三角洲平原构成。水下三角洲系陆上三角洲向水下延伸部分,从高潮线始,外延伸展至水深10~22m,并呈环带状分布。吹填围埝区泥面在+0.20~-0.92m之间,码头区泥面在+1.43m~-0.65之间,南防沙堤泥面在+1.42m~-5.82之间,总体自然坡降小于1/2000,沿岸水浅、滩宽、地势平坦,表层沉积物近岸以粉土为主,远岸以淤泥质土为主。施工区域为淤泥质海岸潮间带,受水深条件限制,充填袋在施工过程中无法使用传统的船舶定位法进行充填袋袋体的铺设和定位工作,只能低平潮时期由人工进行铺设,但是由于潮汐影响平潮时间较短,且采用就地取粉土作为充填料进行充填袋打设,袋体内砂浆沉积慢,不易成型,导致袋体容易被涨潮水流冲刷,导致充填袋整体位移和损毁。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种克服了潮汐作用下,袋体受潮水影响发生偏移和损毁的情况,减少了土工材料和充填料的浪费;在可以使充填袋施工效率更高更快,也更稳定,可以保证施工的连贯性,缩短了不必要的窝工时间的基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:
一种基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法,包括如下步骤:
1、施工准备:施工前,对现场土质进行采样、实验,掌握取砂区土质情况,对水文和气象资料要进行详细的了解,并掌握潮汐规律,同时应熟悉充填袋施工工艺相关图纸、技术要求、材料规格、尺寸以及相应行业规范,编写详细的施工组织设计,组织相关施工人员进行技术、质量、环保和职业健康安全交底;
2、施工操作:
(1)根据袋布尺寸进行分隔加工,将袋体分隔成需求的相连小袋体;
(2)当潮位在低水位时,需要及时铺设已加工好的充填袋袋布,并进行固定;
(3)首先将吹砂管相连,再分别连接充填袋体的袖口;
(4)选择中间位置小充填袋进行打设至袋体饱满,过程中再对两侧小充填袋进行打设;
(5)直至袋体饱满为止,并找平继续进行下一步施工。
本发明具有的优点和积极效果是:为了防止淤泥质海岸充填袋施工过程中,由于潮汐影响导致的袋体被冲刷损毁的情况出现。于是在原尺寸充填袋的基础上进行了简单加工,形成了一个能够进行快速充填的施工方法。施工原理大体与传统充填袋施工相同,主要利用充填袋越小成形速度越快的特点,将原尺寸充填袋进行简单的加工,使之分割成几个独立且相连的小充填袋,先打设中间部分使其快速成形且能够固定住整个袋体,再对其他小充填袋进行充填施工并最终成形。从而抵消潮汐作用下,防止了在充填袋成型前受潮流影响下容易发生位移和损毁的情况发生,提高了充填袋打设的质量和稳定性。
附图说明
图1是本施工工艺图;
图中:1、原袋布;2、小袋体。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1,一种基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法,包括如下步骤:
1、施工准备:施工前,对现场土质进行采样、实验,掌握取砂区土质情况,对水文和气象资料要进行详细的了解,并掌握潮汐规律,同时应熟悉充填袋施工工艺相关图纸、技术要求、材料规格、尺寸以及相应行业规范,编写详细的施工组织设计,组织相关施工人员进行技术、质量、环保和职业健康安全交底;
2、施工操作:
(1)根据袋布尺寸进行分隔加工,将袋体分隔成需求的相连小袋体2;此袋布选择现有的袋布;
(2)当潮位在低水位时,需要及时铺设已加工好的充填袋袋布,并进行固定;
(3)首先将吹砂管相连,再分别连接充填袋体的袖口;
(4)选择中间位置小充填袋进行打设至袋体饱满,过程中再对两侧小充填袋进行打设;
(5)直至袋体饱满为止,并找平继续进行下一步施工。
3、工程实施过程中的要点
(1)由于充填袋是沿轴线方向上逐步进行打设,所以充填袋的分隔方向要与轴线方向长度一致,以确保充填袋在打设饱满之后能够截住水流,减少涨落潮流的来回冲刷。
(2)为达到充填袋整体固定的效果,可将原尺寸充填袋根据需求分隔,中间加筋隔离,即保证小充填袋的独立,也确保袋体的完整,这样确保了充填袋的迅速成形增加自重,也可以保证充填袋整体不会因强度不够而被潮水冲刷。
(3)独立小充填袋的打设顺序,首先对中间充填袋进行打设,在中间充填袋袋体充填料达到1/2,袋体能够稳定住时,再对两侧的小充填袋进行施工,直至饱满,但一定要达到同一标高,确保整体充填袋平整,以保证再上一层充填袋铺设的效果。
以上所述仅是对本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所做的任何简单修改,等同变化与修饰,均属于本发明技术方案的范围内。
Claims (1)
1.一种基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法,其特征在于:包括如下步骤:
1)、施工准备:施工前,对现场土质进行采样、实验,掌握取砂区土质情况,对水文和气象资料要进行详细的了解,并掌握潮汐规律,同时应熟悉充填袋施工工艺相关图纸、技术要求、材料规格、尺寸以及相应行业规范,编写详细的施工组织设计,组织相关施工人员进行技术、质量、环保和职业健康安全交底;
2)、施工操作:
(1)根据袋布尺寸进行分隔加工,将袋体分隔成需求的相连小袋体;
(2)当潮位在低水位时,需要及时铺设已加工好的充填袋袋布,并进行固定;
(3)首先将吹砂管相连,再分别连接充填袋体的袖口;
(4)选择中间位置小充填袋进行打设至袋体饱满,过程中再对两侧小充填袋进行打设;
(5)直至袋体饱满为止,并找平继续进行下一步施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711479444.8A CN108193699A (zh) | 2017-12-29 | 2017-12-29 | 基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711479444.8A CN108193699A (zh) | 2017-12-29 | 2017-12-29 | 基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108193699A true CN108193699A (zh) | 2018-06-22 |
Family
ID=62586614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711479444.8A Pending CN108193699A (zh) | 2017-12-29 | 2017-12-29 | 基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108193699A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114451205A (zh) * | 2022-01-14 | 2022-05-10 | 北京正和恒基滨水生态环境治理股份有限公司 | 滨海潮间带生态修复体系及其构建方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10237840A (ja) * | 1996-12-26 | 1998-09-08 | Toa Harbor Works Co Ltd | 砂袋マットへの砂の充填方法 |
CN1820132A (zh) * | 2003-07-11 | 2006-08-16 | 史蒂夫·A·斯莱特 | 分段的互锁屏障袋 |
CN101130944A (zh) * | 2007-09-27 | 2008-02-27 | 中铁十局集团有限公司 | 跨河大桥水中墩土工充泥管袋围堰及其制备方法 |
CN203684242U (zh) * | 2013-12-30 | 2014-07-02 | 浙江工业大学 | 滩涂区土工袋泥浆复合围堰式水中施工平台 |
-
2017
- 2017-12-29 CN CN201711479444.8A patent/CN108193699A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10237840A (ja) * | 1996-12-26 | 1998-09-08 | Toa Harbor Works Co Ltd | 砂袋マットへの砂の充填方法 |
CN1820132A (zh) * | 2003-07-11 | 2006-08-16 | 史蒂夫·A·斯莱特 | 分段的互锁屏障袋 |
CN101130944A (zh) * | 2007-09-27 | 2008-02-27 | 中铁十局集团有限公司 | 跨河大桥水中墩土工充泥管袋围堰及其制备方法 |
CN203684242U (zh) * | 2013-12-30 | 2014-07-02 | 浙江工业大学 | 滩涂区土工袋泥浆复合围堰式水中施工平台 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114451205A (zh) * | 2022-01-14 | 2022-05-10 | 北京正和恒基滨水生态环境治理股份有限公司 | 滨海潮间带生态修复体系及其构建方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Shin et al. | Coastal erosion prevention by geotextile tube technology | |
Oh et al. | Using submerged geotextile tubes in the protection of the E. Korean shore | |
CN102733351B (zh) | 一种治理江河入海口方法 | |
CN1256531C (zh) | 管道穿越河流施工方法 | |
CN105970875A (zh) | 利用自然能量在海滩促淤固砂的方法 | |
CN109137943A (zh) | 一种围填海的土方填筑施工工艺 | |
CN203429664U (zh) | 用于沉管管段注浆基础的阻浆及锁定装置 | |
CN108193699A (zh) | 基于淤泥质海岸潮间带充填袋围堰快速充填的施工方法 | |
CN106120825A (zh) | 利用小型绞吸挖泥船打设充填袋围堰的施工系统及方法 | |
CN107761668A (zh) | 一种滨海滨库造地型护岸结构及其建筑方法 | |
CN110679228B (zh) | 一种海堤前沿滩涂湿地及其恢复方法 | |
CN103510486A (zh) | 一种沿海岸线围堰进行南水北调的方法 | |
Zheng et al. | Hydrodynamic and morphological processes in Yangtze Estuary: State-of-the-art research and its applications by Hohai University | |
CN104141285A (zh) | 一种防渗海堤 | |
CN109723029A (zh) | 一种半开敞式吹填淤泥滩涂及其造滩方法 | |
CN204174576U (zh) | 防渗海堤 | |
CN201062353Y (zh) | 组合式防浪拦沙堤 | |
CN111270646A (zh) | 一种软土地区滩涂自补偿的沿海岸线调水方法 | |
CN106544986B (zh) | 珊瑚礁岛机场护岸的高聚物注浆、柔性护岸的加固方法 | |
CN201588242U (zh) | 活塞式土方输送船 | |
CN105256764A (zh) | 波式生态河岸结构 | |
CN206090592U (zh) | 利用小型绞吸挖泥船打设充填袋围堰的施工系统 | |
CN103711115A (zh) | 一种整体浮运式取水头部的地基加固与接头及施工方法 | |
Chien et al. | Geotextile tubes application on beach nourishment in UAE | |
CN205116087U (zh) | 波式生态河岸结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180622 |