A kind of concreting transit wagon
Technical field
The present invention relates to a kind of transit wagon more particularly to a kind of concreting transit wagons.
Background technology
Concrete refers to the general designation of the cementing integral engineered composite material of aggregate by cementitious material.The coagulation usually said
A native word refers to make cementitious material, sand, masonry aggregate with cement;Match by a certain percentage with water (additive and admixture can be contained)
Close, it is agitated obtained by cement concrete, also referred to as normal concrete, it is widely used in civil engineering.
In construction site, it is often necessary to transit wagon is used, and existing transit wagon is not only inconvenient to use, but also cannot control
System pours out the amount of concrete, therefore is used there is an urgent need for researching and developing a kind of concreting easy to use, can controlling the amount for pouring out concrete
Transit wagon.
Invention content
(1) technical problems to be solved
The present invention is not only inconvenient to use in order to overcome existing transit wagon, but also cannot control the amount for pouring out concrete
Shortcoming, the technical problem to be solved in the present invention is to provide it is a kind of it is easy to use, the concrete for the amount for pouring out concrete can be controlled to pour
It builds and uses transit wagon.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a concreting transit wagons, include N-shaped
Stent, supporting leg, wheel, riser, hopper, discharging device, automechanism, bull stick, guide rod, the first in command and support plate, N-shaped stent are left
Portion front and rear sides are symmetrically connected with supporting leg, and N-shaped stent right part front and rear sides are symmetrically installed with wheel, on the right side of N-shaped cradle top before
After be symmetrically connected with riser, rotary types are connected with bull stick at the top of two risers, and hopper, N-shaped branch are connected between two bull sticks
The top of the trellis leftmost side is connected with support plate, and support plate right upper portion is equipped with discharging device, and topmost is equipped with automatic machine on the left of support plate
Structure, automechanism are connect with discharging device, and guide rod is symmetrically connected with before and after support plate left upper portion, and two guide rod left ends are respectively connected with
The first in command.
Preferably, discharging device includes link block, the second in command, the first drawstring, guide roller, guide sleeve, connecting rod, cunning
Set, slide bar, the first spring, installing plate, gear, ratchet and arc-shaped rack, the guide rod bottom left of front are connected with link block, even
It connects block bottom and is hingedly connected with the second in command, second in command's right part is connected with the first drawstring, and left part is installed on front side of the guide rod of front
There is a guide roller, movable on the guide rod of front to be equipped with guide sleeve, the first drawstring end connects around guide roller and with intermediate on the left of guide sleeve
It connects, connecting rod is connected among guide sleeve bottom, support plate forward upper is connected with sliding sleeve, and sliding sleeve inner sliding type is equipped with slide bar, slide bar
Left end is connected with connecting rod lower right side, and the first spring, the first spring position are connected between connecting rod right side on the left of sliding sleeve
On the outside of slide bar, support plate right upper portion is connected with installing plate, and installing plate installed in front has gear, and gear front side is intermediate to be equipped with spine
Wheel, hopper left side are equipped with arc-shaped rack, and arc-shaped rack is engaged with gear.
Preferably, automechanism includes sliding rail, sliding block, block, second spring, fixed block, the first fixed pulley, second fixed
Pulley and belt, support plate left side topmost are equipped with sliding rail, and slidingtype is equipped with sliding block on sliding rail, and the sliding rail bottom leftmost side is connected with
Block is connected with second spring between block right side and sliding block left side, and sliding block installed in front has the first fixed pulley, guide sleeve top right
Side is connected with fixed block, and ratchet front side is intermediate to be equipped with the second fixed pulley, is connected between the second fixed pulley and the first fixed pulley
Belt.
Preferably, resetting-mechanism has been further included, resetting-mechanism includes minor sprocket, big sprocket wheel, chain, support plate and shakes
Bar, N-shaped cradle top front left side are connected with support plate, and support plate installed in front has big sprocket wheel, and big sprocket wheel front side is intermediate to be connected with
Rocking bar, bull stick front end are equipped with minor sprocket, chain are connected between minor sprocket and big sprocket wheel.
Preferably, material-clearing device has been further included, upper back is equipped with material-clearing device in hopper, and material-clearing device includes axis
Bearing, shaft, inclined plate, scraper plate, third spring and driving lever, upper back is equipped with bearing block in hopper, is connected in bearing block
Shaft, shaft left side are connected with inclined plate, are provided with opening in the middle part of inclined plate, movable equipped with scraper plate, scraper plate and hopper in opening
Top left side contacts, and third spring is connected between scraper plate right part and shaft left side, is tilted on the right side of shaft and is connected with driving lever.
Preferably, the second drawstring and draw ring have been further included, scraper plate right part is connected with the second drawstring, is provided in the middle part of shaft logical
Hole, the second drawstring pass through through-hole and are connected with draw ring.
Preferably, first baffle and second baffle have been further included, support plate right upper portion is connected with first baffle, first baffle
Above installing plate, topmost is connected with second baffle on the left of hopper.
Operation principle:When needing using the present invention, the present invention is moved to designated position by operating personnel, then will be appropriate
Concrete pour into hopper, then by concrete delivery to designated position, at this point, operating personnel control discharging device, make hopper
It is tilted to the right, if only needing to pour out suitable concrete, then discharging device is controlled to drive automechanism running, make hopper slow
It is tilted to the right, so as to control discharging device according to demand.
Because discharging device includes link block, the second in command, the first drawstring, guide roller, guide sleeve, connecting rod, sliding sleeve, cunning
Bar, the first spring, installing plate, gear, ratchet and arc-shaped rack, the guide rod bottom left of front are connected with link block, link block
Bottom is hingedly connected with the second in command, and second in command's right part is connected with the first drawstring, and the guide rod front side left part of front, which is equipped with, leads
Line wheel, movable on the guide rod of front to be equipped with guide sleeve, the first drawstring end connect around guide roller and with intermediate on the left of guide sleeve, leads
Set is connected with connecting rod among bottom, and support plate forward upper is connected with sliding sleeve, and sliding sleeve inner sliding type is equipped with slide bar, slide bar left end with
Connecting rod lower right side is connected with, and is connected with the first spring between connecting rod right side on the left of sliding sleeve, the first spring is located at slide bar
Outside, support plate right upper portion are connected with installing plate, and installing plate installed in front has gear, and gear front side is intermediate to be equipped with ratchet, expects
Bucket left side is equipped with arc-shaped rack, and arc-shaped rack is engaged with gear.When initial, slide bar is located between two teeth of ratchet, and ratchet is not
It can rotate counterclockwise.Operating personnel gently catch the first in command and the second in command, guide sleeve is driven to moving to left by the first drawstring
It is dynamic, connecting rod is driven to be moved to the left, so as to be moved to the left with moving slide-bar, slide bar is made to be detached from ratchet, makes ratchet that can turn counterclockwise
Dynamic, so as to make gear that can rotate counterclockwise, under the gravity of concrete, hopper is tilted to the right, by the concrete in hopper
It pours out.After all pouring out, the first in command and the second in command are decontroled.
Because automechanism includes sliding rail, sliding block, block, second spring, fixed block, the first fixed pulley, the second fixed cunning
Wheel and belt, support plate left side topmost are equipped with sliding rail, and slidingtype is equipped with sliding block on sliding rail, and the sliding rail bottom leftmost side is connected with gear
Block is connected with second spring between block right side and sliding block left side, and sliding block installed in front has the first fixed pulley, guide sleeve top right side
Fixed block is connected with, ratchet front side is intermediate to be equipped with the second fixed pulley, and skin is connected between the second fixed pulley and the first fixed pulley
Band.If only needing to pour out suitable concrete, operating personnel keep a firm hand on the first in command and the second in command, are moved to the left fixed block
Sliding block is touched, is moved to the left sliding block, is moved to the left the first fixed pulley, by tension on belt, reduces turning counterclockwise for ratchet
Dynamic speed rotates counterclockwise speed so as to reduce gear so that hopper is slowly tilted to the right, so as to control the according to demand
Second chief.
Because having further included resetting-mechanism, resetting-mechanism includes minor sprocket, big sprocket wheel, chain, support plate and rocking bar, n
Type cradle top front left side is connected with support plate, and support plate installed in front has big sprocket wheel, and big sprocket wheel front side is intermediate to be connected with rocking bar,
Bull stick front end is equipped with minor sprocket, and chain is connected between minor sprocket and big sprocket wheel.When the concrete in hopper is all poured out,
Hopper is in heeling condition, at this point, operating personnel rotate clockwise rocking bar, big sprocket wheel is driven to rotate clockwise, passes through chain band
Dynamic minor sprocket rotates clockwise, so as to which hopper be driven to rotate clockwise reset.After reset, stop operating rocking bar.
Because having further included material-clearing device, upper back is equipped with material-clearing device in hopper, and material-clearing device includes bearing
Seat, shaft, inclined plate, scraper plate, third spring and driving lever, upper back is equipped with bearing block in hopper, is connected with and turns in bearing block
Axis, shaft left side are connected with inclined plate, are provided with opening in the middle part of inclined plate, movable in opening to be equipped with scraper plate, scraper plate and hopper top
Third spring is connected between on the left of portion's left contact, scraper plate right part and shaft, is tilted on the right side of shaft and is connected with driving lever.Such as fruit
There is concrete not pour out in bucket, operating personnel stir to the right scraper plate, and scraper plate is made to be contacted with left upper portion in hopper, is then held
Firmly driving lever rotates clockwise, and scraper plate is driven to rotate clockwise, third telescopic spring so that and scraper plate contacts always with hopper inner wall,
So as to which concrete remaining in hopper is scraped.
Because having further included the second drawstring and draw ring, scraper plate right part is connected with the second drawstring, and through-hole is provided in the middle part of shaft, the
Two drawstrings pass through through-hole and are connected with draw ring.Operating personnel pull to the right draw ring, and scraper plate is driven to move right, and operating personnel are just not
Need to stir scraper plate with hand, make concrete it is in one's hands on.
Because having further included first baffle and second baffle, support plate right upper portion is connected with first baffle, first baffle position
Above installing plate, topmost is connected with second baffle on the left of hopper.First baffle and second baffle can prevent concrete from pouring into
When in hopper, hopper is tilted to the left.
(3) advantageous effect
Concrete in hopper can be poured out by discharging device, by automechanism, can control and pour out coagulation by the present invention
The amount of soil, so as to control discharging device according to demand, by resetting-mechanism, can make hopper reset.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the enlarged diagram of discharging device of the present invention and automechanism.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the schematic cross-sectional view of the first front view of hopper of the present invention.
Fig. 5 is the schematic cross-sectional view of second of front view of hopper of the present invention.
Fig. 6 is the third main structure diagram of the present invention.
Label in attached drawing for:1-n type stents, 2- supporting legs, 3- wheels, 4- risers, 5- hoppers, 6- discharging devices, 601-
Link block, the 602- second in command, the first drawstrings of 603-, 604- guide rollers, 605- guide sleeves, 606- connecting rods, 607- sliding sleeves, 608-
Slide bar, the first springs of 609-, 610- installing plates, 611- gears, 612- ratchets, 613- arc-shaped racks, 7- automechanisms, 71- are slided
Rail, 72- sliding blocks, 73- blocks, 74- second springs, 75- fixed blocks, the first fixed pulleys of 76-, the second fixed pulleys of 77-, 78- belts,
8- resetting-mechanisms, 81- minor sprockets, 82- big sprocket wheels, 83- chains, 84- support plates, 85- rocking bars, 9- material-clearing devices, 91- bearings
Seat, 92- shafts, 93- inclined plates, 94- openings, 95- scraper plates, 96- third springs, 97- driving levers, 10- bull sticks, 11- guide rods, 12- the
Leader, 13- support plates, 14- through-holes, the second drawstrings of 15-, 16- draw rings, 17- first baffles, 18- second baffles.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4,
Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent
Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent
Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10
The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate
Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two
A 11 left end of guide rod is respectively connected with the first in command 12.
Embodiment 2
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4,
Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent
Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent
Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10
The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate
Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two
A 11 left end of guide rod is respectively connected with the first in command 12.
Discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve 605, connects
Extension bar 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack 613, it is preceding
11 bottom left of guide rod in face is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the second in command
602 right parts are connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, lives on the guide rod 11 of front
Dynamic formula is equipped with guide sleeve 605, and 603 end of the first drawstring among 605 left side of guide sleeve around guide roller 604 and with connecting, 605 bottom of guide sleeve
Connecting rod 606 is connected among portion, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with slide bar 608,
608 left end of slide bar is connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod are connected with first between 606 right side
Spring 609, the first spring 609 are located at the outside of slide bar 608, and 13 right upper portion of support plate is connected with installing plate 610, before installing plate 610
Side is equipped with gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack 613, arc
Rack 613 is engaged with gear 611.
Embodiment 3
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4,
Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent
Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent
Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10
The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate
Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two
A 11 left end of guide rod is respectively connected with the first in command 12.
Discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve 605, connects
Extension bar 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack 613, it is preceding
11 bottom left of guide rod in face is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the second in command
602 right parts are connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, lives on the guide rod 11 of front
Dynamic formula is equipped with guide sleeve 605, and 603 end of the first drawstring among 605 left side of guide sleeve around guide roller 604 and with connecting, 605 bottom of guide sleeve
Connecting rod 606 is connected among portion, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with slide bar 608,
608 left end of slide bar is connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod are connected with first between 606 right side
Spring 609, the first spring 609 are located at the outside of slide bar 608, and 13 right upper portion of support plate is connected with installing plate 610, before installing plate 610
Side is equipped with gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack 613, arc
Rack 613 is engaged with gear 611.
Automechanism 7 include sliding rail 71, sliding block 72, block 73, second spring 74, fixed block 75, the first fixed pulley 76,
Second fixed pulley 77 and belt 78,13 left side topmost of support plate are equipped with sliding rail 71, and slidingtype is equipped with sliding block 72 on sliding rail 71, sliding
The 71 bottom leftmost side of rail is connected with block 73, and 73 right side of block and sliding block are connected with second spring 74, sliding block 72 between 72 left side
Installed in front has the first fixed pulley 76, and 605 top right side of guide sleeve is connected with fixed block 75, and 612 front side of ratchet is intermediate to be equipped with the
Two fixed pulleys 77 are connected with belt 78 between second fixed pulley 77 and the first fixed pulley 76.
Embodiment 4
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4,
Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent
Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent
Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10
The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate
Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two
A 11 left end of guide rod is respectively connected with the first in command 12.
Discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve 605, connects
Extension bar 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack 613, it is preceding
11 bottom left of guide rod in face is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the second in command
602 right parts are connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, lives on the guide rod 11 of front
Dynamic formula is equipped with guide sleeve 605, and 603 end of the first drawstring among 605 left side of guide sleeve around guide roller 604 and with connecting, 605 bottom of guide sleeve
Connecting rod 606 is connected among portion, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with slide bar 608,
608 left end of slide bar is connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod are connected with first between 606 right side
Spring 609, the first spring 609 are located at the outside of slide bar 608, and 13 right upper portion of support plate is connected with installing plate 610, before installing plate 610
Side is equipped with gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack 613, arc
Rack 613 is engaged with gear 611.
Automechanism 7 include sliding rail 71, sliding block 72, block 73, second spring 74, fixed block 75, the first fixed pulley 76,
Second fixed pulley 77 and belt 78,13 left side topmost of support plate are equipped with sliding rail 71, and slidingtype is equipped with sliding block 72 on sliding rail 71, sliding
The 71 bottom leftmost side of rail is connected with block 73, and 73 right side of block and sliding block are connected with second spring 74, sliding block 72 between 72 left side
Installed in front has the first fixed pulley 76, and 605 top right side of guide sleeve is connected with fixed block 75, and 612 front side of ratchet is intermediate to be equipped with the
Two fixed pulleys 77 are connected with belt 78 between second fixed pulley 77 and the first fixed pulley 76.
Resetting-mechanism 8 is further included, resetting-mechanism 8 includes minor sprocket 81, big sprocket wheel 82, chain 83,84 and of support plate
Rocking bar 85, is connected with support plate 84 on front side of 1 top left of N-shaped stent, and 84 installed in front of support plate has a big sprocket wheel 82, before big sprocket wheel 82
Rocking bar 85 is connected among side, 10 front end of bull stick is equipped with minor sprocket 81, chain is connected between minor sprocket 81 and big sprocket wheel 82
83。
Material-clearing device 9 is further included, upper back is equipped with material-clearing device 9 in hopper 5, and material-clearing device 9 includes bearing
Seat 91, shaft 92, inclined plate 93, scraper plate 95, third spring 96 and driving lever 97, upper back is equipped with bearing block 91, axis in hopper 5
Shaft 92 is connected in bearing 91,92 left side of shaft is connected with inclined plate 93, and 93 middle part of inclined plate is provided with opening 94, is open in 94
Movable to be equipped with scraper plate 95, scraper plate 95 contacts with 5 top left side of hopper, on the left of 95 right part of scraper plate and shaft 92 between be connected with the
Three springs 96,92 right side of shaft, which tilts, is connected with driving lever 97.
The second drawstring 15 and draw ring 16 are further included, 95 right part of scraper plate is connected with the second drawstring 15, and 92 middle part of shaft is provided with
Through-hole 14, the second drawstring 15 pass through through-hole 14 and are connected with draw ring 16.
First baffle 17 and second baffle 18 are further included, 13 right upper portion of support plate is connected with first baffle 17, first gear
Plate 17 is located at 610 top of installing plate, and 5 left side topmost of hopper is connected with second baffle 18.
Operation principle:When needing using the present invention, the present invention is moved to designated position by operating personnel, then will be appropriate
Concrete pour into hopper 5, then by concrete delivery to designated position, at this point, operating personnel control discharging device 6, make material
Bucket 5 is tilted to the right, if only needing to pour out suitable concrete, then controls discharging device 6 that automechanism 7 is driven to operate, makes material
Bucket 5 is slowly tilted to the right, so as to control discharging device 6 according to demand.
Because discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve
605th, connecting rod 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack
613,11 bottom left of guide rod of front is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the
602 right part of second chief is connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, the guide rod of front
Movable on 11 to be equipped with guide sleeve 605,603 end of the first drawstring is led around guide roller 604 and with being connect among 605 left side of guide sleeve
It covers and connecting rod 606 is connected among 605 bottoms, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with
Slide bar 608,608 left end of slide bar are connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod connect between 606 right side
The first spring 609 is connected to, the first spring 609 is located at 608 outside of slide bar, and 13 right upper portion of support plate is connected with installing plate 610, installs
610 installed in front of plate has gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack
613, arc-shaped rack 613 is engaged with gear 611.When initial, slide bar 608 is located between two teeth of ratchet 612, and ratchet 612 cannot
It rotates counterclockwise.Operating personnel gently catch the first in command 12 and the second in command 602, pass through the first drawstring 603 drive guide sleeve
605 are moved to the left, and connecting rod 606 is driven to be moved to the left, and so as to be moved to the left with moving slide-bar 608, make slide bar 608 and ratchet 612
It is detached from, makes ratchet 612 that can rotate counterclockwise, so as to make gear 611 that can rotate counterclockwise, under the gravity of concrete, material
Bucket 5 is tilted to the right, and the concrete in hopper 5 is poured out.After all pouring out, the first in command 12 and the second in command 602 are decontroled.
Because it is calmly sliding that automechanism 7 includes sliding rail 71, sliding block 72, block 73, second spring 74, fixed block 75, first
The 76, second fixed pulley 77 and belt 78 are taken turns, 13 left side topmost of support plate is equipped with sliding rail 71, and slidingtype is equipped with sliding block on sliding rail 71
72, the 71 bottom leftmost side of sliding rail is connected with block 73, and 73 right side of block and sliding block are connected with second spring 74 between 72 left side, sliding
72 installed in front of block has the first fixed pulley 76, and 605 top right side of guide sleeve is connected with fixed block 75, and 612 front side of ratchet is intermediate to install
There is the second fixed pulley 77, belt 78 is connected between the second fixed pulley 77 and the first fixed pulley 76.If it only needs to pour out appropriate
Concrete, operating personnel keep a firm hand on the first in command 12 and the second in command 602, are moved to the left fixed block 75 and touch sliding block 72,
Sliding block 72 is moved to the left, the first fixed pulley 76 is moved to the left, belt 78 is tensed, reduces rotating counterclockwise for ratchet 612
Speed rotates counterclockwise speed so that hopper 5 is slowly tilted to the right, so as to control according to demand so as to reduce gear 611
The second in command 602.
Because having further included resetting-mechanism 8, resetting-mechanism 8 includes minor sprocket 81, big sprocket wheel 82, chain 83, support plate
84 and rocking bar 85, support plate 84 is connected on front side of 1 top left of N-shaped stent, and 84 installed in front of support plate has big sprocket wheel 82, big sprocket wheel
82 front sides are intermediate to be connected with rocking bar 85, and 10 front end of bull stick is equipped with minor sprocket 81, is connected between minor sprocket 81 and big sprocket wheel 82
Chain 83.When the concrete in hopper 5 is all poured out, hopper 5 is in heeling condition, at this point, operating personnel rotate clockwise
Rocking bar 85 drives big sprocket wheel 82 to rotate clockwise, and minor sprocket 81 is driven to rotate clockwise by chain 83, so as to drive hopper 5
Rotate clockwise reset.After reset, stop operating rocking bar 85.
Because having further included material-clearing device 9, upper back is equipped with material-clearing device 9 in hopper 5, and material-clearing device 9 includes
Bearing block 91, shaft 92, inclined plate 93, scraper plate 95, third spring 96 and driving lever 97, upper back is equipped with bearing block in hopper 5
91, shaft 92 is connected in bearing block 91,92 left side of shaft is connected with inclined plate 93, and 93 middle part of inclined plate is provided with opening 94, opens
Movable in mouth 94 to be equipped with scraper plate 95, scraper plate 95 is contacted with 5 top left side of hopper, and 95 right part of scraper plate and shaft connect between 92 left side
Third spring 96 is connected to, 92 right side of shaft, which tilts, is connected with driving lever 97.If also having concrete not pour out in hopper 5, operate
Personnel stir to the right scraper plate 95, and scraper plate 95 is made to be contacted with left upper portion in hopper 5, then hold driving lever 97 and rotate clockwise, band
Dynamic scraper plate 95 rotates clockwise, and third spring 96 is flexible so that scraper plate 95 contacts always with 5 inner wall of hopper, so as to by hopper 5
Interior remaining concrete scrapes.
Because having further included the second drawstring 15 and draw ring 16,95 right part of scraper plate is connected with the second drawstring 15,92 middle part of shaft
Through-hole 14 is provided with, the second drawstring 15 passes through through-hole 14 and is connected with draw ring 16.Operating personnel pull to the right draw ring 16, drive scraper plate
95 move right, operating personnel there is no need to stir scraper plate 95 with hand, make concrete it is in one's hands on.
Because having further included first baffle 17 and second baffle 18,13 right upper portion of support plate is connected with first baffle 17, the
One baffle 17 is located at 610 top of installing plate, and 5 left side topmost of hopper is connected with second baffle 18.First baffle 17 and second gear
When plate 18 can prevent the concrete from pouring into hopper 5, hopper 5 is tilted to the left.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.