CN108189874A - A kind of concreting transit wagon - Google Patents

A kind of concreting transit wagon Download PDF

Info

Publication number
CN108189874A
CN108189874A CN201711434241.7A CN201711434241A CN108189874A CN 108189874 A CN108189874 A CN 108189874A CN 201711434241 A CN201711434241 A CN 201711434241A CN 108189874 A CN108189874 A CN 108189874A
Authority
CN
China
Prior art keywords
support plate
hopper
block
concreting
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711434241.7A
Other languages
Chinese (zh)
Other versions
CN108189874B (en
Inventor
曾子强
杨建卫
曾揽祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Jiangshan New Building Materials Co., Ltd.
Original Assignee
曾子强
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 曾子强 filed Critical 曾子强
Priority to CN201711434241.7A priority Critical patent/CN108189874B/en
Publication of CN108189874A publication Critical patent/CN108189874A/en
Application granted granted Critical
Publication of CN108189874B publication Critical patent/CN108189874B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B1/00Hand carts having only one axis carrying one or more transport wheels; Equipment therefor
    • B62B1/10Hand carts having only one axis carrying one or more transport wheels; Equipment therefor in which the load is intended to be transferred totally to the wheels
    • B62B1/14Hand carts having only one axis carrying one or more transport wheels; Equipment therefor in which the load is intended to be transferred totally to the wheels involving means for grappling or securing in place objects to be carried; Loading or unloading equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B1/00Hand carts having only one axis carrying one or more transport wheels; Equipment therefor
    • B62B1/10Hand carts having only one axis carrying one or more transport wheels; Equipment therefor in which the load is intended to be transferred totally to the wheels
    • B62B1/16Hand carts having only one axis carrying one or more transport wheels; Equipment therefor in which the load is intended to be transferred totally to the wheels involving tiltably-mounted containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B2203/00Grasping, holding, supporting the objects
    • B62B2203/70Comprising means for facilitating loading or unloading

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of transit wagon more particularly to a kind of concreting transit wagons.The technical problem to be solved in the present invention is to provide a kind of concreting transit wagons easy to use, can controlling the amount for pouring out concrete.In order to solve the above technical problem, the present invention provides such a concreting transit wagons, include N-shaped stent, supporting leg, wheel, riser, hopper, discharging device, automechanism etc.;N-shaped stent left part front and rear sides are symmetrically connected with supporting leg, N-shaped stent right part front and rear sides are symmetrically installed with wheel, riser is symmetrically connected with before and after on the right side of N-shaped cradle top, rotary type is connected with bull stick at the top of two risers, hopper is connected between two bull sticks, the N-shaped cradle top leftmost side is connected with support plate.The present invention can be poured out the concrete in hopper, by automechanism, the controllable amount for pouring out concrete so as to control discharging device according to demand, by resetting-mechanism, can make hopper reset by discharging device.

Description

A kind of concreting transit wagon
Technical field
The present invention relates to a kind of transit wagon more particularly to a kind of concreting transit wagons.
Background technology
Concrete refers to the general designation of the cementing integral engineered composite material of aggregate by cementitious material.The coagulation usually said A native word refers to make cementitious material, sand, masonry aggregate with cement;Match by a certain percentage with water (additive and admixture can be contained) Close, it is agitated obtained by cement concrete, also referred to as normal concrete, it is widely used in civil engineering.
In construction site, it is often necessary to transit wagon is used, and existing transit wagon is not only inconvenient to use, but also cannot control System pours out the amount of concrete, therefore is used there is an urgent need for researching and developing a kind of concreting easy to use, can controlling the amount for pouring out concrete Transit wagon.
Invention content
(1) technical problems to be solved
The present invention is not only inconvenient to use in order to overcome existing transit wagon, but also cannot control the amount for pouring out concrete Shortcoming, the technical problem to be solved in the present invention is to provide it is a kind of it is easy to use, the concrete for the amount for pouring out concrete can be controlled to pour It builds and uses transit wagon.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a concreting transit wagons, include N-shaped Stent, supporting leg, wheel, riser, hopper, discharging device, automechanism, bull stick, guide rod, the first in command and support plate, N-shaped stent are left Portion front and rear sides are symmetrically connected with supporting leg, and N-shaped stent right part front and rear sides are symmetrically installed with wheel, on the right side of N-shaped cradle top before After be symmetrically connected with riser, rotary types are connected with bull stick at the top of two risers, and hopper, N-shaped branch are connected between two bull sticks The top of the trellis leftmost side is connected with support plate, and support plate right upper portion is equipped with discharging device, and topmost is equipped with automatic machine on the left of support plate Structure, automechanism are connect with discharging device, and guide rod is symmetrically connected with before and after support plate left upper portion, and two guide rod left ends are respectively connected with The first in command.
Preferably, discharging device includes link block, the second in command, the first drawstring, guide roller, guide sleeve, connecting rod, cunning Set, slide bar, the first spring, installing plate, gear, ratchet and arc-shaped rack, the guide rod bottom left of front are connected with link block, even It connects block bottom and is hingedly connected with the second in command, second in command's right part is connected with the first drawstring, and left part is installed on front side of the guide rod of front There is a guide roller, movable on the guide rod of front to be equipped with guide sleeve, the first drawstring end connects around guide roller and with intermediate on the left of guide sleeve It connects, connecting rod is connected among guide sleeve bottom, support plate forward upper is connected with sliding sleeve, and sliding sleeve inner sliding type is equipped with slide bar, slide bar Left end is connected with connecting rod lower right side, and the first spring, the first spring position are connected between connecting rod right side on the left of sliding sleeve On the outside of slide bar, support plate right upper portion is connected with installing plate, and installing plate installed in front has gear, and gear front side is intermediate to be equipped with spine Wheel, hopper left side are equipped with arc-shaped rack, and arc-shaped rack is engaged with gear.
Preferably, automechanism includes sliding rail, sliding block, block, second spring, fixed block, the first fixed pulley, second fixed Pulley and belt, support plate left side topmost are equipped with sliding rail, and slidingtype is equipped with sliding block on sliding rail, and the sliding rail bottom leftmost side is connected with Block is connected with second spring between block right side and sliding block left side, and sliding block installed in front has the first fixed pulley, guide sleeve top right Side is connected with fixed block, and ratchet front side is intermediate to be equipped with the second fixed pulley, is connected between the second fixed pulley and the first fixed pulley Belt.
Preferably, resetting-mechanism has been further included, resetting-mechanism includes minor sprocket, big sprocket wheel, chain, support plate and shakes Bar, N-shaped cradle top front left side are connected with support plate, and support plate installed in front has big sprocket wheel, and big sprocket wheel front side is intermediate to be connected with Rocking bar, bull stick front end are equipped with minor sprocket, chain are connected between minor sprocket and big sprocket wheel.
Preferably, material-clearing device has been further included, upper back is equipped with material-clearing device in hopper, and material-clearing device includes axis Bearing, shaft, inclined plate, scraper plate, third spring and driving lever, upper back is equipped with bearing block in hopper, is connected in bearing block Shaft, shaft left side are connected with inclined plate, are provided with opening in the middle part of inclined plate, movable equipped with scraper plate, scraper plate and hopper in opening Top left side contacts, and third spring is connected between scraper plate right part and shaft left side, is tilted on the right side of shaft and is connected with driving lever.
Preferably, the second drawstring and draw ring have been further included, scraper plate right part is connected with the second drawstring, is provided in the middle part of shaft logical Hole, the second drawstring pass through through-hole and are connected with draw ring.
Preferably, first baffle and second baffle have been further included, support plate right upper portion is connected with first baffle, first baffle Above installing plate, topmost is connected with second baffle on the left of hopper.
Operation principle:When needing using the present invention, the present invention is moved to designated position by operating personnel, then will be appropriate Concrete pour into hopper, then by concrete delivery to designated position, at this point, operating personnel control discharging device, make hopper It is tilted to the right, if only needing to pour out suitable concrete, then discharging device is controlled to drive automechanism running, make hopper slow It is tilted to the right, so as to control discharging device according to demand.
Because discharging device includes link block, the second in command, the first drawstring, guide roller, guide sleeve, connecting rod, sliding sleeve, cunning Bar, the first spring, installing plate, gear, ratchet and arc-shaped rack, the guide rod bottom left of front are connected with link block, link block Bottom is hingedly connected with the second in command, and second in command's right part is connected with the first drawstring, and the guide rod front side left part of front, which is equipped with, leads Line wheel, movable on the guide rod of front to be equipped with guide sleeve, the first drawstring end connect around guide roller and with intermediate on the left of guide sleeve, leads Set is connected with connecting rod among bottom, and support plate forward upper is connected with sliding sleeve, and sliding sleeve inner sliding type is equipped with slide bar, slide bar left end with Connecting rod lower right side is connected with, and is connected with the first spring between connecting rod right side on the left of sliding sleeve, the first spring is located at slide bar Outside, support plate right upper portion are connected with installing plate, and installing plate installed in front has gear, and gear front side is intermediate to be equipped with ratchet, expects Bucket left side is equipped with arc-shaped rack, and arc-shaped rack is engaged with gear.When initial, slide bar is located between two teeth of ratchet, and ratchet is not It can rotate counterclockwise.Operating personnel gently catch the first in command and the second in command, guide sleeve is driven to moving to left by the first drawstring It is dynamic, connecting rod is driven to be moved to the left, so as to be moved to the left with moving slide-bar, slide bar is made to be detached from ratchet, makes ratchet that can turn counterclockwise Dynamic, so as to make gear that can rotate counterclockwise, under the gravity of concrete, hopper is tilted to the right, by the concrete in hopper It pours out.After all pouring out, the first in command and the second in command are decontroled.
Because automechanism includes sliding rail, sliding block, block, second spring, fixed block, the first fixed pulley, the second fixed cunning Wheel and belt, support plate left side topmost are equipped with sliding rail, and slidingtype is equipped with sliding block on sliding rail, and the sliding rail bottom leftmost side is connected with gear Block is connected with second spring between block right side and sliding block left side, and sliding block installed in front has the first fixed pulley, guide sleeve top right side Fixed block is connected with, ratchet front side is intermediate to be equipped with the second fixed pulley, and skin is connected between the second fixed pulley and the first fixed pulley Band.If only needing to pour out suitable concrete, operating personnel keep a firm hand on the first in command and the second in command, are moved to the left fixed block Sliding block is touched, is moved to the left sliding block, is moved to the left the first fixed pulley, by tension on belt, reduces turning counterclockwise for ratchet Dynamic speed rotates counterclockwise speed so as to reduce gear so that hopper is slowly tilted to the right, so as to control the according to demand Second chief.
Because having further included resetting-mechanism, resetting-mechanism includes minor sprocket, big sprocket wheel, chain, support plate and rocking bar, n Type cradle top front left side is connected with support plate, and support plate installed in front has big sprocket wheel, and big sprocket wheel front side is intermediate to be connected with rocking bar, Bull stick front end is equipped with minor sprocket, and chain is connected between minor sprocket and big sprocket wheel.When the concrete in hopper is all poured out, Hopper is in heeling condition, at this point, operating personnel rotate clockwise rocking bar, big sprocket wheel is driven to rotate clockwise, passes through chain band Dynamic minor sprocket rotates clockwise, so as to which hopper be driven to rotate clockwise reset.After reset, stop operating rocking bar.
Because having further included material-clearing device, upper back is equipped with material-clearing device in hopper, and material-clearing device includes bearing Seat, shaft, inclined plate, scraper plate, third spring and driving lever, upper back is equipped with bearing block in hopper, is connected with and turns in bearing block Axis, shaft left side are connected with inclined plate, are provided with opening in the middle part of inclined plate, movable in opening to be equipped with scraper plate, scraper plate and hopper top Third spring is connected between on the left of portion's left contact, scraper plate right part and shaft, is tilted on the right side of shaft and is connected with driving lever.Such as fruit There is concrete not pour out in bucket, operating personnel stir to the right scraper plate, and scraper plate is made to be contacted with left upper portion in hopper, is then held Firmly driving lever rotates clockwise, and scraper plate is driven to rotate clockwise, third telescopic spring so that and scraper plate contacts always with hopper inner wall, So as to which concrete remaining in hopper is scraped.
Because having further included the second drawstring and draw ring, scraper plate right part is connected with the second drawstring, and through-hole is provided in the middle part of shaft, the Two drawstrings pass through through-hole and are connected with draw ring.Operating personnel pull to the right draw ring, and scraper plate is driven to move right, and operating personnel are just not Need to stir scraper plate with hand, make concrete it is in one's hands on.
Because having further included first baffle and second baffle, support plate right upper portion is connected with first baffle, first baffle position Above installing plate, topmost is connected with second baffle on the left of hopper.First baffle and second baffle can prevent concrete from pouring into When in hopper, hopper is tilted to the left.
(3) advantageous effect
Concrete in hopper can be poured out by discharging device, by automechanism, can control and pour out coagulation by the present invention The amount of soil, so as to control discharging device according to demand, by resetting-mechanism, can make hopper reset.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the enlarged diagram of discharging device of the present invention and automechanism.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the schematic cross-sectional view of the first front view of hopper of the present invention.
Fig. 5 is the schematic cross-sectional view of second of front view of hopper of the present invention.
Fig. 6 is the third main structure diagram of the present invention.
Label in attached drawing for:1-n type stents, 2- supporting legs, 3- wheels, 4- risers, 5- hoppers, 6- discharging devices, 601- Link block, the 602- second in command, the first drawstrings of 603-, 604- guide rollers, 605- guide sleeves, 606- connecting rods, 607- sliding sleeves, 608- Slide bar, the first springs of 609-, 610- installing plates, 611- gears, 612- ratchets, 613- arc-shaped racks, 7- automechanisms, 71- are slided Rail, 72- sliding blocks, 73- blocks, 74- second springs, 75- fixed blocks, the first fixed pulleys of 76-, the second fixed pulleys of 77-, 78- belts, 8- resetting-mechanisms, 81- minor sprockets, 82- big sprocket wheels, 83- chains, 84- support plates, 85- rocking bars, 9- material-clearing devices, 91- bearings Seat, 92- shafts, 93- inclined plates, 94- openings, 95- scraper plates, 96- third springs, 97- driving levers, 10- bull sticks, 11- guide rods, 12- the Leader, 13- support plates, 14- through-holes, the second drawstrings of 15-, 16- draw rings, 17- first baffles, 18- second baffles.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4, Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10 The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two A 11 left end of guide rod is respectively connected with the first in command 12.
Embodiment 2
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4, Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10 The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two A 11 left end of guide rod is respectively connected with the first in command 12.
Discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve 605, connects Extension bar 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack 613, it is preceding 11 bottom left of guide rod in face is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the second in command 602 right parts are connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, lives on the guide rod 11 of front Dynamic formula is equipped with guide sleeve 605, and 603 end of the first drawstring among 605 left side of guide sleeve around guide roller 604 and with connecting, 605 bottom of guide sleeve Connecting rod 606 is connected among portion, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with slide bar 608, 608 left end of slide bar is connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod are connected with first between 606 right side Spring 609, the first spring 609 are located at the outside of slide bar 608, and 13 right upper portion of support plate is connected with installing plate 610, before installing plate 610 Side is equipped with gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack 613, arc Rack 613 is engaged with gear 611.
Embodiment 3
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4, Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10 The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two A 11 left end of guide rod is respectively connected with the first in command 12.
Discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve 605, connects Extension bar 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack 613, it is preceding 11 bottom left of guide rod in face is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the second in command 602 right parts are connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, lives on the guide rod 11 of front Dynamic formula is equipped with guide sleeve 605, and 603 end of the first drawstring among 605 left side of guide sleeve around guide roller 604 and with connecting, 605 bottom of guide sleeve Connecting rod 606 is connected among portion, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with slide bar 608, 608 left end of slide bar is connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod are connected with first between 606 right side Spring 609, the first spring 609 are located at the outside of slide bar 608, and 13 right upper portion of support plate is connected with installing plate 610, before installing plate 610 Side is equipped with gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack 613, arc Rack 613 is engaged with gear 611.
Automechanism 7 include sliding rail 71, sliding block 72, block 73, second spring 74, fixed block 75, the first fixed pulley 76, Second fixed pulley 77 and belt 78,13 left side topmost of support plate are equipped with sliding rail 71, and slidingtype is equipped with sliding block 72 on sliding rail 71, sliding The 71 bottom leftmost side of rail is connected with block 73, and 73 right side of block and sliding block are connected with second spring 74, sliding block 72 between 72 left side Installed in front has the first fixed pulley 76, and 605 top right side of guide sleeve is connected with fixed block 75, and 612 front side of ratchet is intermediate to be equipped with the Two fixed pulleys 77 are connected with belt 78 between second fixed pulley 77 and the first fixed pulley 76.
Embodiment 4
A kind of concreting transit wagon, as shown in figures 1 to 6, include N-shaped stent 1, supporting leg 2, wheel 3, riser 4, Hopper 5, discharging device 6, automechanism 7, bull stick 10, guide rod 11, the first in command 12 and support plate 13, two before and after 1 left part of N-shaped stent Side is symmetrically connected with supporting leg 2, and 1 right part front and rear sides of N-shaped stent are symmetrically installed with wheel 3, right before and after 1 top right side of N-shaped stent Title is connected with riser 4, and two 4 top rotary types of riser are connected with bull stick 10, hopper 5, N-shaped are connected between two bull sticks 10 The 1 top leftmost side of stent is connected with support plate 13, and 13 right upper portion of support plate is equipped with discharging device 6,13 left side topmost peace of support plate Equipped with automechanism 7, automechanism 7 is connect with discharging device 6, is symmetrically connected with guide rod 11 before and after 13 left upper portion of support plate, and two A 11 left end of guide rod is respectively connected with the first in command 12.
Discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve 605, connects Extension bar 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack 613, it is preceding 11 bottom left of guide rod in face is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the second in command 602 right parts are connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, lives on the guide rod 11 of front Dynamic formula is equipped with guide sleeve 605, and 603 end of the first drawstring among 605 left side of guide sleeve around guide roller 604 and with connecting, 605 bottom of guide sleeve Connecting rod 606 is connected among portion, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with slide bar 608, 608 left end of slide bar is connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod are connected with first between 606 right side Spring 609, the first spring 609 are located at the outside of slide bar 608, and 13 right upper portion of support plate is connected with installing plate 610, before installing plate 610 Side is equipped with gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack 613, arc Rack 613 is engaged with gear 611.
Automechanism 7 include sliding rail 71, sliding block 72, block 73, second spring 74, fixed block 75, the first fixed pulley 76, Second fixed pulley 77 and belt 78,13 left side topmost of support plate are equipped with sliding rail 71, and slidingtype is equipped with sliding block 72 on sliding rail 71, sliding The 71 bottom leftmost side of rail is connected with block 73, and 73 right side of block and sliding block are connected with second spring 74, sliding block 72 between 72 left side Installed in front has the first fixed pulley 76, and 605 top right side of guide sleeve is connected with fixed block 75, and 612 front side of ratchet is intermediate to be equipped with the Two fixed pulleys 77 are connected with belt 78 between second fixed pulley 77 and the first fixed pulley 76.
Resetting-mechanism 8 is further included, resetting-mechanism 8 includes minor sprocket 81, big sprocket wheel 82, chain 83,84 and of support plate Rocking bar 85, is connected with support plate 84 on front side of 1 top left of N-shaped stent, and 84 installed in front of support plate has a big sprocket wheel 82, before big sprocket wheel 82 Rocking bar 85 is connected among side, 10 front end of bull stick is equipped with minor sprocket 81, chain is connected between minor sprocket 81 and big sprocket wheel 82 83。
Material-clearing device 9 is further included, upper back is equipped with material-clearing device 9 in hopper 5, and material-clearing device 9 includes bearing Seat 91, shaft 92, inclined plate 93, scraper plate 95, third spring 96 and driving lever 97, upper back is equipped with bearing block 91, axis in hopper 5 Shaft 92 is connected in bearing 91,92 left side of shaft is connected with inclined plate 93, and 93 middle part of inclined plate is provided with opening 94, is open in 94 Movable to be equipped with scraper plate 95, scraper plate 95 contacts with 5 top left side of hopper, on the left of 95 right part of scraper plate and shaft 92 between be connected with the Three springs 96,92 right side of shaft, which tilts, is connected with driving lever 97.
The second drawstring 15 and draw ring 16 are further included, 95 right part of scraper plate is connected with the second drawstring 15, and 92 middle part of shaft is provided with Through-hole 14, the second drawstring 15 pass through through-hole 14 and are connected with draw ring 16.
First baffle 17 and second baffle 18 are further included, 13 right upper portion of support plate is connected with first baffle 17, first gear Plate 17 is located at 610 top of installing plate, and 5 left side topmost of hopper is connected with second baffle 18.
Operation principle:When needing using the present invention, the present invention is moved to designated position by operating personnel, then will be appropriate Concrete pour into hopper 5, then by concrete delivery to designated position, at this point, operating personnel control discharging device 6, make material Bucket 5 is tilted to the right, if only needing to pour out suitable concrete, then controls discharging device 6 that automechanism 7 is driven to operate, makes material Bucket 5 is slowly tilted to the right, so as to control discharging device 6 according to demand.
Because discharging device 6 includes link block 601, the second in command 602, the first drawstring 603, guide roller 604, guide sleeve 605th, connecting rod 606, sliding sleeve 607, slide bar 608, the first spring 609, installing plate 610, gear 611, ratchet 612 and arc-shaped rack 613,11 bottom left of guide rod of front is connected with link block 601, and 601 bottom of link block is hingedly connected with the second in command 602, the 602 right part of second chief is connected with the first drawstring 603, and the 11 front side left part of guide rod of front is equipped with guide roller 604, the guide rod of front Movable on 11 to be equipped with guide sleeve 605,603 end of the first drawstring is led around guide roller 604 and with being connect among 605 left side of guide sleeve It covers and connecting rod 606 is connected among 605 bottoms, 13 forward upper of support plate is connected with sliding sleeve 607, and 607 inner sliding type of sliding sleeve is equipped with Slide bar 608,608 left end of slide bar are connected with 606 lower right side of connecting rod, and 607 left side of sliding sleeve and connecting rod connect between 606 right side The first spring 609 is connected to, the first spring 609 is located at 608 outside of slide bar, and 13 right upper portion of support plate is connected with installing plate 610, installs 610 installed in front of plate has gear 611, and 611 front side of gear is intermediate to be equipped with ratchet 612, and 5 left side of hopper is equipped with arc-shaped rack 613, arc-shaped rack 613 is engaged with gear 611.When initial, slide bar 608 is located between two teeth of ratchet 612, and ratchet 612 cannot It rotates counterclockwise.Operating personnel gently catch the first in command 12 and the second in command 602, pass through the first drawstring 603 drive guide sleeve 605 are moved to the left, and connecting rod 606 is driven to be moved to the left, and so as to be moved to the left with moving slide-bar 608, make slide bar 608 and ratchet 612 It is detached from, makes ratchet 612 that can rotate counterclockwise, so as to make gear 611 that can rotate counterclockwise, under the gravity of concrete, material Bucket 5 is tilted to the right, and the concrete in hopper 5 is poured out.After all pouring out, the first in command 12 and the second in command 602 are decontroled.
Because it is calmly sliding that automechanism 7 includes sliding rail 71, sliding block 72, block 73, second spring 74, fixed block 75, first The 76, second fixed pulley 77 and belt 78 are taken turns, 13 left side topmost of support plate is equipped with sliding rail 71, and slidingtype is equipped with sliding block on sliding rail 71 72, the 71 bottom leftmost side of sliding rail is connected with block 73, and 73 right side of block and sliding block are connected with second spring 74 between 72 left side, sliding 72 installed in front of block has the first fixed pulley 76, and 605 top right side of guide sleeve is connected with fixed block 75, and 612 front side of ratchet is intermediate to install There is the second fixed pulley 77, belt 78 is connected between the second fixed pulley 77 and the first fixed pulley 76.If it only needs to pour out appropriate Concrete, operating personnel keep a firm hand on the first in command 12 and the second in command 602, are moved to the left fixed block 75 and touch sliding block 72, Sliding block 72 is moved to the left, the first fixed pulley 76 is moved to the left, belt 78 is tensed, reduces rotating counterclockwise for ratchet 612 Speed rotates counterclockwise speed so that hopper 5 is slowly tilted to the right, so as to control according to demand so as to reduce gear 611 The second in command 602.
Because having further included resetting-mechanism 8, resetting-mechanism 8 includes minor sprocket 81, big sprocket wheel 82, chain 83, support plate 84 and rocking bar 85, support plate 84 is connected on front side of 1 top left of N-shaped stent, and 84 installed in front of support plate has big sprocket wheel 82, big sprocket wheel 82 front sides are intermediate to be connected with rocking bar 85, and 10 front end of bull stick is equipped with minor sprocket 81, is connected between minor sprocket 81 and big sprocket wheel 82 Chain 83.When the concrete in hopper 5 is all poured out, hopper 5 is in heeling condition, at this point, operating personnel rotate clockwise Rocking bar 85 drives big sprocket wheel 82 to rotate clockwise, and minor sprocket 81 is driven to rotate clockwise by chain 83, so as to drive hopper 5 Rotate clockwise reset.After reset, stop operating rocking bar 85.
Because having further included material-clearing device 9, upper back is equipped with material-clearing device 9 in hopper 5, and material-clearing device 9 includes Bearing block 91, shaft 92, inclined plate 93, scraper plate 95, third spring 96 and driving lever 97, upper back is equipped with bearing block in hopper 5 91, shaft 92 is connected in bearing block 91,92 left side of shaft is connected with inclined plate 93, and 93 middle part of inclined plate is provided with opening 94, opens Movable in mouth 94 to be equipped with scraper plate 95, scraper plate 95 is contacted with 5 top left side of hopper, and 95 right part of scraper plate and shaft connect between 92 left side Third spring 96 is connected to, 92 right side of shaft, which tilts, is connected with driving lever 97.If also having concrete not pour out in hopper 5, operate Personnel stir to the right scraper plate 95, and scraper plate 95 is made to be contacted with left upper portion in hopper 5, then hold driving lever 97 and rotate clockwise, band Dynamic scraper plate 95 rotates clockwise, and third spring 96 is flexible so that scraper plate 95 contacts always with 5 inner wall of hopper, so as to by hopper 5 Interior remaining concrete scrapes.
Because having further included the second drawstring 15 and draw ring 16,95 right part of scraper plate is connected with the second drawstring 15,92 middle part of shaft Through-hole 14 is provided with, the second drawstring 15 passes through through-hole 14 and is connected with draw ring 16.Operating personnel pull to the right draw ring 16, drive scraper plate 95 move right, operating personnel there is no need to stir scraper plate 95 with hand, make concrete it is in one's hands on.
Because having further included first baffle 17 and second baffle 18,13 right upper portion of support plate is connected with first baffle 17, the One baffle 17 is located at 610 top of installing plate, and 5 left side topmost of hopper is connected with second baffle 18.First baffle 17 and second gear When plate 18 can prevent the concrete from pouring into hopper 5, hopper 5 is tilted to the left.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of concreting transit wagon, which is characterized in that include N-shaped stent (1), supporting leg (2), wheel (3), riser (4), hopper (5), discharging device (6), automechanism (7), bull stick (10), guide rod (11), the first in command (12) and support plate (13), N-shaped stent (1) left part front and rear sides are symmetrically connected with supporting leg (2), and N-shaped stent (1) right part front and rear sides are symmetrically installed with wheel (3), riser (4) is symmetrically connected with before and after N-shaped stent (1) top right side, rotary type is connected with bull stick at the top of two risers (4) (10), hopper (5) is connected between two bull sticks (10), the leftmost side is connected with support plate (13), support plate at the top of N-shaped stent (1) (13) right upper portion is equipped with discharging device (6), and topmost is equipped with automechanism (7), automechanism (7) on the left of support plate (13) It is connect with discharging device (6), guide rod (11) is symmetrically connected with before and after support plate (13) left upper portion, two guide rod (11) left ends connect It is connected to the first in command (12).
2. a kind of concreting transit wagon according to claim 1, which is characterized in that discharging device (6) includes Link block (601), the first drawstring (603), guide roller (604), guide sleeve (605), connecting rod (606), is slided the second in command (602) Cover (607), slide bar (608), the first spring (609), installing plate (610), gear (611), ratchet (612) and arc-shaped rack (613), guide rod (11) bottom left of front is connected with link block (601), and link block (601) bottom is hingedly connected with second Hand (602), the second in command (602) right part are connected with the first drawstring (603), and left part is equipped with conducting wire on front side of the guide rod (11) of front It takes turns (604), movable on the guide rod (11) of front to be equipped with guide sleeve (605), the first drawstring (603) end bypasses guide roller (604) And connect with intermediate on the left of guide sleeve (605), connecting rod (606), support plate (13) forward upper are connected among guide sleeve (605) bottom Sliding sleeve (607) is connected with, sliding sleeve (607) inner sliding type is equipped with slide bar (608), slide bar (608) left end and connecting rod (606) right side Lower part is connected with, and the first spring (609), the first spring are connected between connecting rod (606) right side on the left of sliding sleeve (607) (609) on the outside of slide bar (608), support plate (13) right upper portion is connected with installing plate (610), installing plate (610) installed in front There is gear (611), gear (611) front side is intermediate to be equipped with ratchet (612), and arc-shaped rack (613) is equipped on the left of hopper (5), Arc-shaped rack (613) is engaged with gear (611).
3. a kind of concreting transit wagon according to claim 2, which is characterized in that automechanism (7) includes Sliding rail (71), sliding block (72), block (73), second spring (74), fixed block (75), the first fixed pulley (76), the second fixed pulley (77) and belt (78), support plate (13) left side topmost are equipped with sliding rail (71), and slidingtype is equipped with sliding block (72) on sliding rail (71), Sliding rail (71) bottom leftmost side is connected with block (73), and second spring is connected between sliding block (72) left side on the right side of block (73) (74), sliding block (72) installed in front has the first fixed pulley (76), and guide sleeve (605) top right side is connected with fixed block (75), ratchet (612) front side is intermediate is equipped with the second fixed pulley (77), and skin is connected between the second fixed pulley (77) and the first fixed pulley (76) Band (78).
4. a kind of concreting transit wagon according to claim 3, which is characterized in that further included resetting-mechanism (8), resetting-mechanism (8) includes minor sprocket (81), big sprocket wheel (82), chain (83), support plate (84) and rocking bar (85), N-shaped It is connected with support plate (84) on front side of stent (1) top left, support plate (84) installed in front has a big sprocket wheel (82), before big sprocket wheel (82) Rocking bar (85) is connected among side, bull stick (10) front end is equipped with minor sprocket (81), between minor sprocket (81) and big sprocket wheel (82) It is connected with chain (83).
5. a kind of concreting transit wagon according to claim 4, which is characterized in that further included material-clearing device (9), hopper (5) interior upper back is equipped with material-clearing device (9), material-clearing device (9) include bearing block (91), shaft (92), Inclined plate (93), scraper plate (95), third spring (96) and driving lever (97), hopper (5) interior upper back are equipped with bearing block (91), axis Shaft (92) is connected in bearing (91), shaft (92) left side is connected with inclined plate (93), opening is provided in the middle part of inclined plate (93) (94), movable in opening (94) to be equipped with scraper plate (95), scraper plate (95) is contacted with hopper (5) top left side, scraper plate (95) right part Third spring (96) is connected between shaft (92) left side, is tilted on the right side of shaft (92) and is connected with driving lever (97).
6. a kind of concreting transit wagon according to claim 5, which is characterized in that further included the second drawstring (15) and draw ring (16), scraper plate (95) right part are connected with the second drawstring (15), through-hole (14) are provided in the middle part of shaft (92), second draws Rope (15) across through-hole (14) and is connected with draw ring (16).
7. a kind of concreting transit wagon according to claim 6, which is characterized in that further included first baffle (17) and second baffle (18), support plate (13) right upper portion are connected with first baffle (17), and first baffle (17) is positioned at installing plate (610) top, hopper (5) left side topmost are connected with second baffle (18).
CN201711434241.7A 2017-12-26 2017-12-26 A kind of concreting transit wagon Active CN108189874B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711434241.7A CN108189874B (en) 2017-12-26 2017-12-26 A kind of concreting transit wagon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711434241.7A CN108189874B (en) 2017-12-26 2017-12-26 A kind of concreting transit wagon

Publications (2)

Publication Number Publication Date
CN108189874A true CN108189874A (en) 2018-06-22
CN108189874B CN108189874B (en) 2019-10-01

Family

ID=62584220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711434241.7A Active CN108189874B (en) 2017-12-26 2017-12-26 A kind of concreting transit wagon

Country Status (1)

Country Link
CN (1) CN108189874B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109807427A (en) * 2018-12-21 2019-05-28 徐福长 A kind of electric specialty weldering circuit board auxiliary device
CN111942906A (en) * 2020-07-14 2020-11-17 肖春莲 Sand and soil collection device for building
CN112324142A (en) * 2020-10-20 2021-02-05 温州春桦秋时科技有限公司 Cement feeding funnel for building construction
CN112405315A (en) * 2020-11-30 2021-02-26 张淑敏 Large-scale spheroid grinding device
CN114524013A (en) * 2022-02-25 2022-05-24 连辉远 Dregs handling device of building site

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7309072B2 (en) * 2004-12-23 2007-12-18 Storm David B Water caddy
US20120273537A1 (en) * 2011-04-26 2012-11-01 Alfred Thomas Newman Self-Leveling Receptacle With a Positioning Lock
CN202923679U (en) * 2012-12-11 2013-05-08 朱志明 Electric dumper truck
CN104354740A (en) * 2014-11-10 2015-02-18 重庆市腾瀚工贸有限公司 Transfer trolley for chips removed from factory
CN204775359U (en) * 2015-06-21 2015-11-18 河南宝润机械有限公司 Patching machine boxcar
CN205381283U (en) * 2016-02-20 2016-07-13 将乐县国通隧道机械有限公司 Automatic extendible tunnel construction is with upset handcart

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7309072B2 (en) * 2004-12-23 2007-12-18 Storm David B Water caddy
US20120273537A1 (en) * 2011-04-26 2012-11-01 Alfred Thomas Newman Self-Leveling Receptacle With a Positioning Lock
CN202923679U (en) * 2012-12-11 2013-05-08 朱志明 Electric dumper truck
CN104354740A (en) * 2014-11-10 2015-02-18 重庆市腾瀚工贸有限公司 Transfer trolley for chips removed from factory
CN204775359U (en) * 2015-06-21 2015-11-18 河南宝润机械有限公司 Patching machine boxcar
CN205381283U (en) * 2016-02-20 2016-07-13 将乐县国通隧道机械有限公司 Automatic extendible tunnel construction is with upset handcart

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109807427A (en) * 2018-12-21 2019-05-28 徐福长 A kind of electric specialty weldering circuit board auxiliary device
CN109807427B (en) * 2018-12-21 2021-01-29 徐福长 Electric specialty welds circuit board auxiliary device
CN111942906A (en) * 2020-07-14 2020-11-17 肖春莲 Sand and soil collection device for building
CN111942906B (en) * 2020-07-14 2022-07-22 湖北梨木建筑工程有限公司 Sand and soil collection device for building
CN112324142A (en) * 2020-10-20 2021-02-05 温州春桦秋时科技有限公司 Cement feeding funnel for building construction
CN112405315A (en) * 2020-11-30 2021-02-26 张淑敏 Large-scale spheroid grinding device
CN114524013A (en) * 2022-02-25 2022-05-24 连辉远 Dregs handling device of building site
CN114524013B (en) * 2022-02-25 2024-02-02 新疆哈建建筑工程有限责任公司 Dregs handling device of building site

Also Published As

Publication number Publication date
CN108189874B (en) 2019-10-01

Similar Documents

Publication Publication Date Title
CN108189874A (en) A kind of concreting transit wagon
CN109331903B (en) Simple casting of five metals is pressed from both sides with crucible
CN108193881A (en) A kind of concreting planisher
CN107472328B (en) A kind of construction site cement handling device
DE486168C (en) Excavator-like device for mechanical loading of the conveyor bucket
CN109441132A (en) A kind of flooring sewer pipe preformed hole, which is filled up, uses auxiliary device
CN108525754A (en) A kind of building monitoring cement solution block device
JP2004154611A (en) Scum discharging apparatus
CN207739610U (en) A kind of hanging basket
US1784371A (en) Concrete mixer
US1759003A (en) Conveyer for mixers
US2703893A (en) Davit apparatus having a carrier member
CN208512635U (en) A kind of building monitoring cement solution block device
CN208763149U (en) A kind of sewage conduct
JPS5817607Y2 (en) Sand raking machine
CN108797352A (en) A kind of bridge construction laying apparatus
CN221090897U (en) Material conveying vehicle for constructional engineering
US1762523A (en) Excavator trip
US1206374A (en) Excavating and conveying apparatus.
US1873764A (en) Grab bucket and skip hoist
CN210791454U (en) Concrete distributing device for prefabricated parts
US1313378A (en) Sewer-cleaniitg device
SU685750A1 (en) Apparatus for cleaning vertical dirt-trapping screen
US441192A (en) Apparatus for operating oyster-tongs
US804268A (en) Clam-shell bucket.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190813

Address after: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province

Applicant after: Hefei dragon totem Information Technology Co., Ltd.

Address before: 315800 Ningbo Vocational and Technical College, No. 1069-2 Xinda Road, Beilun District, Ningbo City, Zhejiang Province

Applicant before: Zeng Ziqiang

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190906

Address after: Pizhou City, Jiangsu province 221300 Xuzhou City Zhao Pearl Industrial Park

Applicant after: Xuzhou Jiangshan New Building Materials Co., Ltd.

Address before: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province

Applicant before: Hefei dragon totem Information Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant