CN108183809A - Improve the log equipment lifecycle management platform implementation method of O&M efficiency - Google Patents
Improve the log equipment lifecycle management platform implementation method of O&M efficiency Download PDFInfo
- Publication number
- CN108183809A CN108183809A CN201611120625.7A CN201611120625A CN108183809A CN 108183809 A CN108183809 A CN 108183809A CN 201611120625 A CN201611120625 A CN 201611120625A CN 108183809 A CN108183809 A CN 108183809A
- Authority
- CN
- China
- Prior art keywords
- data
- management
- efficiency
- carried out
- log
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000013461 design Methods 0.000 claims abstract description 11
- 238000012217 deletion Methods 0.000 claims abstract description 7
- 230000037430 deletion Effects 0.000 claims abstract description 7
- 238000012360 testing method Methods 0.000 claims abstract description 6
- 238000007792 addition Methods 0.000 claims abstract description 4
- 238000012423 maintenance Methods 0.000 claims description 10
- 241001269238 Data Species 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 230000004083 survival effect Effects 0.000 claims description 3
- 230000008859 change Effects 0.000 abstract description 5
- 230000006872 improvement Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 31
- 238000005516 engineering process Methods 0.000 description 5
- 238000011161 development Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000006855 networking Effects 0.000 description 2
- 230000027455 binding Effects 0.000 description 1
- 238000009739 binding Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/02—Standardisation; Integration
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/02—Standardisation; Integration
- H04L41/0213—Standardised network management protocols, e.g. simple network management protocol [SNMP]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0631—Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The present invention relates to a kind of log equipment lifecycle management platform implementation methods for improving O&M efficiency, comprise the steps of:(1) project platform architecture design is carried out:Interval scan is carried out to core switch using scanner, newest ARP data is obtained, is then stored in database, latest equipment information is obtained, while change by additions and deletions and look into update the data library data by inquiring database;(2) database design is carried out;(3) it is scanned device exploitation;(4) exploitation of main platform is operated:It is developed using DEPHI, designed according to demand, which is made of three equipment management, network segment management, O&M log management modules;(5) test run is carried out.The present invention has the beneficial effect that:The network program development ability of information teams and groups is further improved, excites the creative thinking of crewmember;Management level is effectively promoted, the project implementation integrates a variety of behaves such as O&M means innovation, service management, personnel's skill improvement, information O&M efficiency is made to be highly improved.
Description
Technical field
Operation management technology more particularly to a kind of full life of log equipment for improving O&M efficiency the present invention relates to network
Cycle management platform implementation method.
Background technology
With the rapid development of information network, in addition to the PC that handles official business, video monitoring, on-line monitoring, network attendance machine, network are beaten
Each Terminal Type such as print machine, IP phone, access control equipment even more explosively increases, and the information network of company is just from traditional computer
Network develops to Internet of Things direction, this just brings very big difficulty to the operation management of network, mainly there is following difficulty:
First, non-PC equipment management is difficult, at present to Intranet PC terminals due to being unable to installing terminal management system, management
It is mainly recorded by operation maintenance personnel, as data volume growth is more, O&M with regard to error-prone, causes inconsistent for a long time
Situation happen occasionally.
Second, PC machine is difficult to regulate, and Intranet PC carries out IP+MAC+ port bindings, and user needs to fill out in networking and migration
It writes request slip and walks application process, it can be achieved that management and control;But although when user's PC machine logout also need to fill in logout Shen as requested
Please, but user often ignores this process, and operation maintenance personnel actively discovers subscriber computer there is no good means at present and moves back
Net, this just brings very big difficulty to the supervision of PC machine.
Third, address administration is difficult, since not good means are managed non-PC equipment, in addition cannot actively send out
The logout behavior of existing terminal device, this just brings the distribution of IP address very big difficulty, an IP address can not be by after being assigned
It withdraws, new equipment is constantly needed to new IP address again, and the waste for causing IP address is serious.
In addition, terminal O&M is to be connected to a task (such as terminal access task) at present, a task is completed, is connected to one
It alerts (such as terminal fault report), handles an alarm, work fragmentation is serious, and logging is imperfect not in time, is not
System property carries out equipment tracking, and leading to the O&M in later stage, unfavorable (such as IP is not corresponding with personnel, and IP is not corresponding with interchanger, IP and MAC
It is not corresponding etc.), meanwhile, with simplifying for operation maintenance personnel, terminal maintenance work is even more to be too tired to deal with, and inefficiency, an end
For end equipment from networking again to their logouts, information O&M department is completely uncontrollable;Terminal maintenance work is badly in need of one and meets us
With our terminal O&M efficiency of raising, strong information technology is provided for business development for the management tool of working service demand
It ensures.
Therefore, in view of the above, needing effectively to innovate the prior art.
Invention content
For disadvantages described above, it is real that the present invention provides a kind of log equipment lifecycle management platform for improving O&M efficiency
Existing method, to solve many deficiencies of the prior art.
To achieve the above object, the present invention uses following technical scheme:
A kind of log equipment lifecycle management platform implementation method for improving O&M efficiency, comprises the steps of:
(1) first, project platform architecture design is carried out:Interval scan is carried out to core switch using scanner, is obtained
Newest ARP data, are then stored in database, and latest equipment information is obtained, while change by additions and deletions by inquiring database
It looks into update the data library data;
(2) then, database design is carried out:Platform architecture use MSSQL sever2008, for by terminal device data into
Row is more comprehensively collected, and provide support for daily O&M, is designed multiple tables of data, is as far as possible included in all kinds of terminal datas
Wherein, the collection of daily operation/maintenance data to be supported to summarize and count;
(3) it is scanned device exploitation:Scanner is by scanning of the core switch data every 15 minutes, obtaining terminal
The newest survival information of equipment and by its in store database, the snmp protocol that develops and uses of scanner reads core switch
Arp cache data determine the data format that the SNMP application programming interfaces of DEPHI and H3C are provided, after data format
Output;
(4) exploitation of main platform is operated:It is developed using DEPHI, designed according to demand, the platform is by equipment management, the network segment
Three management, O&M log management module compositions;
(5) finally, test run is carried out.
Snmp protocol reads core switch ARP.
The equipment management provides terminal device data query, and editor and deletion function, primary terminal information have terminal to set
Standby department, user, IP address, MAC Address, place interchanger, corresponding ports, affiliated VLAN, wall box number, installation position
It puts, telephone number, in net state, final online time.
The sector disrtibution and service condition of the network segment used in the network segment management offer company, the dividing condition of VLAN improve
The utilization rate of IP address;
The O&M log management provides record and the inquiry of daily O&M daily record, can inquire the fortune at exact date by date
Dimension data facilitates problem to trace.
The beneficial effect of the log equipment lifecycle management platform implementation method of the present invention for improving O&M efficiency
Fruit is:
(1) by this log equipment lifecycle management platform project construction, the net of information teams and groups is further improved
Network program development ability excites the creative thinking of crewmember, team spirit, learning ability, the professional skill of crewmember
Energy, innovation ability etc. are obtained for further promotion, and collective cohesion is strengthened;Effectively promote management level, the project implementation
Integrate a variety of behaves such as O&M means innovation, service management, personnel's skill improvement so that information O&M efficiency has obtained larger carry
It rises;
(2) using log equipment lifecycle management platform as information O&M support platform and effective tool, information fortune
Dimension failure solve time average be also reduced to 12.36 minutes by 22.25 minutes before, Measure of Process Capability also by activity before
0.65 is increased to 1.11, greatly improves information network troubleshooting efficiency;
(3) it is determined that failure solves flow, proves that the flow is practical by repeatedly testing, to shorten network failure solution
The certainly time improves information O&M efficiency and provides strong administrative skill support.
Description of the drawings
The present invention is described in further detail below according to attached drawing.
Fig. 1 is the log equipment lifecycle management platform implementation method that O&M efficiency is improved described in the embodiment of the present invention
Platform technology configuration diagram;
Fig. 2 is the log equipment lifecycle management platform implementation method that O&M efficiency is improved described in the embodiment of the present invention
Intranet failure solve flow diagram.
Specific embodiment
As shown in Figs. 1-2, the log equipment lifecycle management of the raising O&M efficiency described in the embodiment of the present invention is put down
Platform implementation method, mainly comprises the steps of:
(1) first, project platform architecture design is carried out:Interval scan is carried out to core switch using scanner, is obtained
Newest ARP data, are then stored in database, and latest equipment information is obtained, while change by additions and deletions by inquiring database
It looks into update the data library data;
(2) then, database design is carried out:Platform architecture use MSSQL sever2008, for by terminal device data into
Row is more comprehensively collected, and provide support for daily O&M, is designed multiple tables of data, is as far as possible included in all kinds of terminal datas
Wherein, the collection of daily operation/maintenance data to be supported to summarize and count;
Concrete database design is as follows:
(3) simultaneously, it is scanned device exploitation:Since the network access of any terminal is required for carrying out by core switch
Data forwarding, will preserve the IP address and MAC of each terminal in core switch in this way, and scanner passes through to core switch data
Every the scanning of 15 minutes, the newest survival information of terminal device is obtained and by its in store database, the exploitation of scanner needs
Snmp protocol to be utilized to read the arp cache data of core switch, needs to study the SNMP application programming interfaces of dephi, with
And the data format that H3C is provided, it will be exported after data format;
(4) exploitation of main platform is operated:Developed using DEPHI, designed according to demand, the platform mainly by equipment management,
Three network segment management, O&M log management module compositions:
Equipment management:Terminal device data query is provided, editor and deletion function, primary terminal information have terminal device institute
In department, user, IP address, MAC Address, place interchanger, corresponding ports, affiliated VLAN, wall box number, installation site,
Telephone number, in net state, final online time;
Network segment management:The sector disrtibution and service condition of the network segment used in offer company, the dividing condition of VLAN, with improving IP
The utilization rate of location;
O&M log management:Record and the inquiry of daily O&M daily record are provided, the O&M at exact date can be inquired by date
Data facilitate problem to trace;
(5) finally, test run is carried out:After the completion of platform development, test shows that the platform stable is reliable, easy to operate
Practicality, it is powerful, it is the good assistant of commodity network O&M, the operation maintenance personnel that can effectively help carries out failure to terminal device
Processing improves information O&M efficiency.
Above technological difficulties are:
Snmp protocol reads core switch ARP:The newest ARP tables of data of core switch is read using snmp protocol,
It needs to study the SNMP application programming interfaces of Dephi and the data format of H3C offers, will be exported after data format;
Comparing algorithm designs:After obtaining newest ARP table, the ARP data and the terminal recorded at present how are judged
Whether data are consistent, this will carry out the comparison one by one of data, to find new access device, change the tool of equipment and change
Body information, this, which needs to design a set of proper algorithm and carries out data, quickly and efficiently judges and screens.
The above-mentioned description to embodiment is it will be appreciated that and using this for the ease of those skilled in the art
Case technology, person skilled in the art obviously can easily make these examples various modifications, and described herein one
As principle be applied in other embodiments without having to go through creative labor.Therefore, this case is not limited to above example, ability
For the technical staff in domain according to the announcement of this case, the improvement made for this case and modification all should be in the protection domains of this case.
Claims (5)
1. a kind of log equipment lifecycle management platform implementation method for improving O&M efficiency, which is characterized in that by following
Step forms:
(1) first, project platform architecture design is carried out:Interval scan is carried out to core switch using scanner, is obtained newest
ARP data, be then stored in database, latest equipment information obtained by inquiring database, at the same changed by additions and deletions look into come
Update the data library data;
(2) then, database design is carried out:Platform architecture uses MSSQL sever2008, for terminal device data are carried out more
Support is provided comprehensively to collect, and for daily O&M, multiple tables of data is designed, all kinds of terminal datas is included in it as far as possible
In, summarize and count with the collection for supporting daily operation/maintenance data;
(3) it is scanned device exploitation:Scanner is by scanning of the core switch data every 15 minutes, obtaining terminal device
Newest survival information and by its in store database, the ARP for developing and using snmp protocol and reading core switch of scanner
It is data cached, determine the data format that the SNMP application programming interfaces of DEPHI and H3C are provided, it will be defeated after data format
Go out;
(4) exploitation of main platform is operated:Developed using DEPHI, designed according to demand, the platform by equipment management, network segment management,
Three module compositions of O&M log management;
(5) finally, test run is carried out.
2. the log equipment lifecycle management platform implementation method according to claim 1 for improving O&M efficiency,
It is characterized in that:Snmp protocol reads core switch ARP.
3. the log equipment lifecycle management platform implementation method according to claim 1 for improving O&M efficiency,
It is characterized in that:The equipment management provides terminal device data query, and editor and deletion function, primary terminal information have terminal to set
Standby department, user, IP address, MAC Address, place interchanger, corresponding ports, affiliated VLAN, wall box number, installation position
It puts, telephone number, in net state, final online time.
4. the log equipment lifecycle management platform implementation method according to claim 1 for improving O&M efficiency,
It is characterized in that:The sector disrtibution and service condition of the network segment used in the network segment management offer company, the dividing condition of VLAN improve
The utilization rate of IP address.
5. the log equipment lifecycle management platform implementation method according to claim 1 for improving O&M efficiency,
It is characterized in that:The O&M log management provides record and the inquiry of daily O&M daily record, can by date inquire exact date
Operation/maintenance data facilitates problem to trace.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611120625.7A CN108183809A (en) | 2016-12-08 | 2016-12-08 | Improve the log equipment lifecycle management platform implementation method of O&M efficiency |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611120625.7A CN108183809A (en) | 2016-12-08 | 2016-12-08 | Improve the log equipment lifecycle management platform implementation method of O&M efficiency |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108183809A true CN108183809A (en) | 2018-06-19 |
Family
ID=62544740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611120625.7A Pending CN108183809A (en) | 2016-12-08 | 2016-12-08 | Improve the log equipment lifecycle management platform implementation method of O&M efficiency |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108183809A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114095800A (en) * | 2021-09-03 | 2022-02-25 | 复旦大学 | Large-scale wireless local area network data acquisition and processing method based on multiple data sources |
-
2016
- 2016-12-08 CN CN201611120625.7A patent/CN108183809A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114095800A (en) * | 2021-09-03 | 2022-02-25 | 复旦大学 | Large-scale wireless local area network data acquisition and processing method based on multiple data sources |
CN114095800B (en) * | 2021-09-03 | 2023-08-25 | 复旦大学 | Large-scale wireless local area network data acquisition and processing method based on multiple data sources |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105207853B (en) | A kind of LAN method for managing and monitoring | |
CN105631522A (en) | IT system operation and maintenance management system | |
CN103546343B (en) | The network traffics methods of exhibiting of network traffic analysis system and system | |
CN104052631A (en) | Equipment information collecting method, device and system | |
US20100223382A1 (en) | Embedded collection and inventory system and method for facilitating network support for an install-base network | |
CN103339611A (en) | Remote access appliance having mss functionality | |
CN105553733A (en) | Resource monitoring and management system | |
CN109714206A (en) | Electric power monitoring system Generating Network Topology Map, network bus topological diagram | |
CN105450654A (en) | Smart home development platform based on middleware technology and business development method thereof | |
CN102497427A (en) | Method and device for realizing data acquisition services of renewable energy source monitoring system | |
CN1063898C (en) | Central operation and maintenance system of analog movable communication network B | |
CN110163484A (en) | Suporting structure intelligence operation management system Internet-based and method | |
CN103944763A (en) | Network-assistant management system and method of electrical power system | |
CN101998687A (en) | Method and device for collecting network parameters of WLAN (Wireless Local Area Network) | |
CN107179977A (en) | Database Full-automatic monitoring system based on mpm models | |
CN110430265A (en) | A kind of method and device obtaining server and inter-exchange corresponding relationship | |
CN108540541A (en) | Information processing method, information processing unit and interchanger | |
CN104219100A (en) | Information acquiring method and device | |
CN105607606B (en) | A kind of data acquisition device and method based on double mainboard frameworks | |
CN203340096U (en) | Interactive electric power communication network simulator | |
CN117751567A (en) | Dynamic process distribution for utility communication networks | |
CN207968542U (en) | A kind of police service information acquisition system | |
CN201655244U (en) | Display control system based on network | |
CN108183809A (en) | Improve the log equipment lifecycle management platform implementation method of O&M efficiency | |
CN106851644A (en) | A kind of base station access method and system based on cloud framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180619 |
|
WD01 | Invention patent application deemed withdrawn after publication |