CN108179730A - A kind of construction method of dam spillway ruggedized construction - Google Patents

A kind of construction method of dam spillway ruggedized construction Download PDF

Info

Publication number
CN108179730A
CN108179730A CN201711480609.3A CN201711480609A CN108179730A CN 108179730 A CN108179730 A CN 108179730A CN 201711480609 A CN201711480609 A CN 201711480609A CN 108179730 A CN108179730 A CN 108179730A
Authority
CN
China
Prior art keywords
casing
slip casting
plate
grouting pipe
dam spillway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711480609.3A
Other languages
Chinese (zh)
Other versions
CN108179730B (en
Inventor
刘凯
傅朝亮
姜康
梁威
王芳
戴冬凌
张祥
李瑶
谢泓州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huangshan Development Investment Group Co.,Ltd.
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN201711480609.3A priority Critical patent/CN108179730B/en
Publication of CN108179730A publication Critical patent/CN108179730A/en
Application granted granted Critical
Publication of CN108179730B publication Critical patent/CN108179730B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of construction method of dam spillway ruggedized construction, which carries out as follows:Step 1:Along the water (flow) direction of dam spillway, cylindrical casing plate hole position is opened up in 1 both sides side slope of dam spillway by setting spacing, line position of going forward side by side puts mark;Step 2:Casing board is corresponded to press-in dam spillway both sides side slope using static(al) method of press-fitting to open up in cylindrical casing plate hole position;Step 3:In the casing that Grouting Pipe is corresponded to plunging press-in casing board using static(al) successively;Step 4:Slip casting plate is set on dam spillway both sides side slope upper berth, the slurry hole of crossing on slip casting plate with the Grouting Pipe on corresponding position is docked one by one, earthing is filled on slip casting plate and is compacted;Step 5:Dam spillway both sides side slope is carried out at the same time slip casting, and slurry carries out slip casting by the injected hole of slip casting plate upper surface, forms the slip casting plate full of slurry, while diffuse in corresponding Grouting Pipe by the slurry hole of crossing of slip casting plate lower surface.The V-arrangement one waterproofing reinforcement structure that the present invention is formed greatly improves the side slope intensity and water resistance of dam spillway.

Description

A kind of construction method of dam spillway ruggedized construction
Technical field
The present invention relates to dam spillway strengthening construction fields, and one kind of waterproofing reinforcement is specifically carried out using slurry The construction method of dam spillway ruggedized construction.
Background technology
Spillway is the flood protection device and discharge structure of the water constructions object such as reservoir, builds in the side of dam more, and overflow flood Road generally infrequently works, but the important building in reservoir hinge.Spillway is as a large trough, for leading planning library off Hold the flood that cannot be accommodated, when water level is more than margin of safety in reservoir, water is just downstream flowed out from spillway, prevents dam It is destroyed.So spillway is self-evident to the importance of dam.However dam spillway is directly exposed among air, The influence of natural environment is undergo, basis is susceptible to more typical seepage flow erosion attack.This seepage flow erosion attack is to big The harm of dam spillway is mainly manifested in:Basic earth particle be lost in, formed cavity, and and then spillway bottom plate is caused to collapse, The normal use of dam spillway is influenced, reduces the service life of dam spillway.Therefore, dam spillway is reinforced not Only it is the important guarantee of the strength and stability of dam spillway, while can is that the service life creation for extending dam spillway has Sharp condition.
Existing dam spillway waterproofing reinforcement measure, which mainly has, is laid with compound water-proof or composite geo-membrane, whitewashing anchoring Reinforcement technique, Soil-nailed technology and slurry injection technique etc..Composite geo-membrane is combined not with geotextile and geomembrane Seepy material, selected material are high molecular material, can be used in unconventiona temperature environment, but compound water-proof or multiple Closing the seam of geotechnological mould often becomes penetrating passage;Whitewashing anchoring reinforcement technique is by anchor pole, rock mass, bar-mat reinforcement and concrete surface Layer works together to improve the structural strength of slope ground and resistance to deformation rigidity, reduces Rock And Soil lateral deformation, but it is this plus Gu technology is higher with design requirement to controlling.Eum-Orthic Anthrosols are that certain length and the soil nailing of distribution density are placed in the soil body Body, and native collective effect, to make up the deficiency of soil body self-strength.Soil body overall stiffness is not only increased, and compensates for soil The low weakness of the tension and shearing strength of body, significantly improves overall stability, but soil nailing body in the side slope of dam both sides not It can be distributed well.It is existing most efficient method to carry out dam waterproofing reinforcement using slurry injection technique, it is will be certain In curable slurries injection Rock soil Foundation crack or hole, by replacing, filling, the modes such as squeezing and reinforced.Slip casting Slurries include chemical grout, cement grout, mixed serum.In these types of slurries, high polymer slurry is anti-due to its generation chemistry Should after can rapid expanding and curing, and its dilatancy is high and preferentially elected.
Therefore, in order to which slurry injection technique is allowed further to be developed in the reinforcing of dam spillway, we compel to be essential Research and develop new grouting device, come push slurry injection technique dam spillway reinforcing in extensive use, improve construction efficiency with And reduce construction cost.
Invention content
The object of the present invention is to provide a kind of construction methods of dam spillway ruggedized construction, and one is formed with dam spillway Body ruggedized construction, slip casting polyvinyl chloride, shortens the duration, greatly improves the side slope intensity and water proofing property of dam spillway Energy.
The technical solution adopted by the present invention is as follows:
A kind of construction method of dam spillway ruggedized construction, the construction method carry out as follows:
Step 1:Along the water (flow) direction of dam spillway 1, cylinder is opened up in 1 both sides side slope of dam spillway by setting spacing Casing plate hole position, line position of going forward side by side puts mark;Casing board 17 includes casing group 18, setting of casing group 19, upper casing group 18 with Setting of casing group 19 is linked into an integrated entity by lapping plate 15, and upper casing group 18, setting of casing group 19 are by the semicolumn being intervally arranged Shape casing is formed, and is linked into an integrated entity between adjacent semi-cylindrical casing by casing connection plate 14, upper casing group 18, setting of casing group The corresponding casing 13 for being combined into full circle cylindricality of 19 semi-cylindrical casing, and have between corresponding two semi-cylindrical casings There is limit card slot 16;The cooperation corresponding with cylindrical casing plate hole position of 13 outer wall of casing of full circle cylindricality, what is be intervally arranged is whole Cylindrical 13 inner wall of casing cooperation corresponding with 2 outer wall of Grouting Pipe, guiding protecting 5, the grout outlet 4 of Grouting Pipe 2 sequentially pass through The limit card slot 16 of casing board 17;
Step 2:Casing board 17 is corresponded to by 1 both sides side slope of press-in dam spillway using static(al) method of press-fitting and opens up cylindrical set In tubesheet holes position;
Step 3:In the casing 13 that Grouting Pipe 2 is corresponded to plunging press-in casing board 17 using static(al) successively;
Step 4:Slip casting plate 3 is set on 1 both sides side slope upper berth of dam spillway, slurry hole 12 and corresponding position will be crossed on slip casting plate 3 On Grouting Pipe 2 dock one by one, earthing is filled on slip casting plate 3 and is compacted;
Step 5:1 both sides side slope of dam spillway is carried out at the same time slip casting, and slurry is carried out by the injected hole 9 of 3 upper surface of slip casting plate Slip casting forms the slip casting plate 3 full of slurry, while diffuses to corresponding Grouting Pipe 2 by the slurry hole 12 of crossing of 3 lower surface of slip casting plate In;
Step 6:Slurry is diffused in the tube chamber 7 of Grouting Pipe 2 and surrounding soil 20, in Grouting Pipe 2 and surrounding soil 20 Slurry curing ultimately forms continuous V-type one waterproofing reinforcement structure.
2 front end of Grouting Pipe is equipped with the conehead 6 of cone, and 6 both sides of conehead are respectively equipped with guiding protecting 5, are oriented to shield Being intervally arranged right over plate 5 has multiple grout outlets 4, and the length of 5 horizontal plane of guiding protecting projection, width are not less than right over it The length of 4 horizontal plane of grout outlet projection, width, and guiding protecting 5 is for protecting grout outlet 4.
5 outer surface of guiding protecting of the Grouting Pipe 2 is parallel with 4 center line of grout outlet.
The slip casting plate 3 is hollow thin-wall slip casting plate, and 3 upper surface of slip casting plate is arranged at intervals with the injected hole 9 protruded upward With gas vent 11,3 lower surface of slip casting plate is arranged at intervals with the slurry hole 12 excessively protruded out downwards;Injected hole 9, gas vent 11 and mistake are starched Hole 12 is communicated by the cavity of slip casting plate 3, and 3 both ends of slip casting plate are respectively equipped with connecting plate 8, connecting pole 10, be provided on connecting plate 8 with 10 matched connecting hole of connecting pole, adjacent two slip casting plates 3 are linked into an integrated entity by connecting plate 8 and connecting pole 10.
Compared with prior art, the present invention has the beneficial effect that:
1st, the present invention reinforces dam Spillway Slope using slip casting plate and Grouting Pipe, the slip casting plate after the completion of constructing, note Slurry pipe and the soil body of surrounding are closely cemented together, and integrated ruggedized construction is formed with dam spillway, greatly improve big The side slope intensity and water resistance of dam spillway.
2nd, slip casting plate of the invention can dock more Grouting Pipes, be integrally formed Grouting Pipe, slip casting polyvinyl chloride is not required to Health is wanted, greatly shortens the duration.
3rd, Grouting Pipe both sides of the invention carry the guiding protecting and grout outlet of reversed acanthoid so that the Grouting Pipe and surrounding soil The cohesive force of body is higher than other Grouting Pipes, forms the withdrawal resistance than other Grouting Pipe biggers.Meanwhile high polymer slurry passes through pulp Pipe is penetrated into the soil body, closely cemented together with Grouting Pipe surrounding soil, can preferably play the reinforcement effect of Grouting Pipe. In addition, guiding protecting can determine Grouting Pipe pressing direction, additionally it is possible to protect the grout outlet of both sides.
4th, the casing board in the present invention can fix multiple Grouting Pipes simultaneously, when Grouting Pipe is pressed into, guiding protecting, grout outlet By the position-limiting action of limit card slot so that Grouting Pipe remains on the same line when being pressed into, and reduces difficulty of construction, and energy Enough prevent the pressing direction of Grouting Pipe from larger deviation occur, while the casing of the casing board is open, can preferably be made Grouting Pipe is contacted with surrounding soil, does not influence the cementing of the soil body and Grouting Pipe between adjacent Grouting Pipe after the completion of slip casting.
5th, the present invention will be pressed into side slope using static(al) method of press-fitting with barbed Grouting Pipe, and low noise is without friction, environment It pollutes small.
Description of the drawings
Fig. 1 is the overall schematic of ruggedized construction of the present invention.
Fig. 2 is the staggered schematic diagram of Grouting Pipe.
Fig. 3 is the structure diagram of Grouting Pipe.
Fig. 4 is the structure diagram of slip casting plate.
Fig. 5 is the internal structure schematic diagram of slip casting plate.
Fig. 6 is the front view of casing board.
Fig. 7 is the stereoscopic schematic diagram of casing board.
Fig. 8 is casing board and the front view of Grouting Pipe cooperation.
Fig. 9 is casing board and the stereogram of Grouting Pipe cooperation.
Figure label is:1 dam spillway, 2 Grouting Pipes, 3 slip casting plates, 4 grout outlets, 5 guiding protectings, 6 coneheads, 7 tube chambers, 8 connecting plates, 9 injected holes, 10 connecting poles, 11 cross slurry hole, 12 gas vents, 13 whole cylinder-shaped sleeves, 14 casing connection plates, 15 overlap joints Plate, 16 limit card slots, 17 casing boards, casing group on 18,19 setting of casing groups, 20 soil bodys.
Specific embodiment
Referring to attached drawing, a kind of construction method of dam spillway ruggedized construction, the construction method carries out as follows:
Step 1:Along the water (flow) direction of dam spillway 1, cylinder is opened up in 1 both sides side slope of dam spillway by setting spacing Casing plate hole position, line position of going forward side by side puts mark;Casing board 17 includes casing group 18, setting of casing group 19, upper casing group 18 with Setting of casing group 19 is linked into an integrated entity by lapping plate 15, and upper casing group 18, setting of casing group 19 are by the semicolumn being intervally arranged Shape casing is formed, and is linked into an integrated entity between adjacent semi-cylindrical casing by casing connection plate 14, upper casing group 18, setting of casing group The corresponding casing 13 for being combined into full circle cylindricality of 19 semi-cylindrical casing, and have between corresponding two semi-cylindrical casings There is limit card slot 16;The cooperation corresponding with cylindrical casing plate hole position of 13 outer wall of casing of full circle cylindricality, what is be intervally arranged is whole Cylindrical 13 inner wall of casing cooperation corresponding with 2 outer wall of Grouting Pipe, guiding protecting 5, the grout outlet 4 of Grouting Pipe 2 sequentially pass through The limit card slot 16 of casing board 17;
Step 2:Casing board 17 is corresponded to by 1 both sides side slope of press-in dam spillway using static(al) method of press-fitting and opens up cylindrical set In tubesheet holes position;
Step 3:In the casing 13 that Grouting Pipe 2 is corresponded to plunging press-in casing board 17 using static(al) successively;
Step 4:Slip casting plate 3 is set on 1 both sides side slope upper berth of dam spillway, slurry hole 12 and corresponding position will be crossed on slip casting plate 3 On Grouting Pipe 2 dock one by one, earthing is filled on slip casting plate 3 and is compacted;
Step 5:1 both sides side slope of dam spillway is carried out at the same time slip casting, and slurry is carried out by the injected hole 9 of 3 upper surface of slip casting plate Slip casting forms the slip casting plate 3 full of slurry, while diffuses to corresponding Grouting Pipe 2 by the slurry hole 12 of crossing of 3 lower surface of slip casting plate In;
Step 6:Slurry is diffused in the tube chamber 7 of Grouting Pipe 2 and surrounding soil 20, in Grouting Pipe 2 and surrounding soil 20 Slurry curing ultimately forms continuous V-type one waterproofing reinforcement structure.
2 front end of Grouting Pipe is equipped with the conehead 6 of cone, and 6 both sides of conehead are respectively equipped with guiding protecting 5, and guiding protecting 5 is just Top, which is intervally arranged, multiple grout outlets 4, and the length of 5 horizontal plane of guiding protecting projection, width are not less than going out right over it Length, the width of 4 horizontal plane of pipe projection are starched, and guiding protecting 5 is used to protect grout outlet 4;5 appearance of guiding protecting of Grouting Pipe 2 Face is parallel with 4 center line of grout outlet;Slip casting plate 3 is hollow thin-wall slip casting plate, and 3 upper surface of slip casting plate is arranged at intervals with upward convex The injected hole 9 and gas vent 11 stretched, 3 lower surface of slip casting plate are arranged at intervals with the slurry hole 12 excessively protruded out downwards;Injected hole 9, exhaust Hole 11 and slurry hole 12 excessively are communicated by the cavity of slip casting plate 3, and 3 both ends of slip casting plate are respectively equipped with connecting plate 8, connecting pole 10, even It is provided on fishplate bar 8 and is connected with 10 matched connecting hole of connecting pole, adjacent two slip casting plates 3 by connecting plate 8 and connecting pole 10 It is connected into one.

Claims (4)

1. a kind of construction method of dam spillway ruggedized construction, which is characterized in that the construction method carries out as follows:
Step 1:Along dam spillway(1)Water (flow) direction, by setting spacing in dam spillway(1)Both sides side slope opens up circle The casing plate hole position of cylindricality, line position of going forward side by side put mark;Casing board(17)Include casing group(18), setting of casing group(19), on Casing group(18)With setting of casing group(19)Pass through lapping plate(15)It links into an integrated entity, and upper casing group(18), setting of casing group(19) It is made of the semi-cylindrical casing being intervally arranged, passes through casing connection plate between adjacent semi-cylindrical casing(14)Connect into one Body, upper casing group(18), setting of casing group(19)The corresponding casing for being combined into full circle cylindricality of semi-cylindrical casing(13), and phase There is limit card slot between corresponding two semi-cylindrical casings(16);The casing of full circle cylindricality(13)Outer wall and cylindrical set The corresponding cooperation in tubesheet holes position, the casing of full circle cylindricality being intervally arranged(13)Inner wall and Grouting Pipe(2)The corresponding cooperation of outer wall, Grouting Pipe(2)Guiding protecting(5), grout outlet(4)Sequentially pass through casing board(17)Limit card slot(16);
Step 2:Using static(al) method of press-fitting by casing board(17)Corresponding press-in dam spillway(1)Both sides side slope opens up cylinder Casing plate hole position in;
Step 3:Successively by Grouting Pipe(2)Plunging press-in casing board is corresponded to using static(al)(17)Casing(13)In;
Step 4:In dam spillway(1)Both sides side slope upper berth sets slip casting plate(3), by slip casting plate(3)On cross slurry hole(12)With Grouting Pipe on corresponding position(2)It docks one by one, in slip casting plate(3)On fill earthing and be compacted;
Step 5:Dam spillway(1)Both sides side slope is carried out at the same time slip casting, and slurry passes through slip casting plate(3)The injected hole of upper surface (9)Slip casting is carried out, forms the slip casting plate full of slurry(3), while pass through slip casting plate(3)Slurry hole is crossed in lower surface(12)It diffuses to Corresponding Grouting Pipe(2)In;
Step 6:Slurry diffuses to the tube chamber of Grouting Pipe (2)(7)And surrounding soil(20)In, Grouting Pipe(2)And surrounding soil Body(20)In slurry curing, ultimately form continuous V-type one waterproofing reinforcement structure.
2. the construction method of dam spillway ruggedized construction according to claim 1, which is characterized in that the Grouting Pipe(2) Front end is equipped with the conehead of cone(6), conehead(6)Both sides are respectively equipped with guiding protecting(5), guiding protecting(5)Between surface Every being placed with multiple grout outlets(4), and guiding protecting(5)The length of horizontal plane projection, width are not less than the pulp right over it Pipe(4)The length of horizontal plane projection, width, and guiding protecting(5)For protecting grout outlet(4).
3. the construction method of dam spillway ruggedized construction according to claim 1, which is characterized in that the Grouting Pipe(2) Guiding protecting(5)Outer surface and grout outlet(4)Center line is parallel.
4. the ruggedized construction of dam spillway according to claim 1, which is characterized in that the slip casting plate(3)It is hollow thin Wall slip casting plate, slip casting plate(3)Upper surface is arranged at intervals with the injected hole protruded upward(9)And gas vent(11), slip casting plate(3) Lower surface is arranged at intervals with the slurry hole excessively protruded out downwards(12);Injected hole(9), gas vent(11)And cross slurry hole(12)Pass through note Pulpboard(3)Cavity communicate, slip casting plate(3)Both ends are respectively equipped with connecting plate(8), connecting pole(10), connecting plate(8)On be provided with Connecting pole(10)Matched connecting hole, adjacent two slip casting plates(3)Pass through connecting plate(8)With connecting pole(10)Connect into one Body.
CN201711480609.3A 2017-12-29 2017-12-29 A kind of construction method of dam spillway ruggedized construction Active CN108179730B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711480609.3A CN108179730B (en) 2017-12-29 2017-12-29 A kind of construction method of dam spillway ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711480609.3A CN108179730B (en) 2017-12-29 2017-12-29 A kind of construction method of dam spillway ruggedized construction

Publications (2)

Publication Number Publication Date
CN108179730A true CN108179730A (en) 2018-06-19
CN108179730B CN108179730B (en) 2019-10-11

Family

ID=62549097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711480609.3A Active CN108179730B (en) 2017-12-29 2017-12-29 A kind of construction method of dam spillway ruggedized construction

Country Status (1)

Country Link
CN (1) CN108179730B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075192A (en) * 2022-07-11 2022-09-20 中化学生态水利建设有限公司 Method and device for processing high slope of spillway of hydro-junction engineering

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3222873A (en) * 1961-07-31 1965-12-14 Chester I Williams Groutable rock anchor
CN205152955U (en) * 2015-11-18 2016-04-13 长安大学 Multiple wing steel sleeve valve pipe reinforcing apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3222873A (en) * 1961-07-31 1965-12-14 Chester I Williams Groutable rock anchor
CN205152955U (en) * 2015-11-18 2016-04-13 长安大学 Multiple wing steel sleeve valve pipe reinforcing apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075192A (en) * 2022-07-11 2022-09-20 中化学生态水利建设有限公司 Method and device for processing high slope of spillway of hydro-junction engineering
CN115075192B (en) * 2022-07-11 2023-10-03 中化学生态水利建设有限公司 Method and device for treating spillway high slope of hydraulic junction engineering

Also Published As

Publication number Publication date
CN108179730B (en) 2019-10-11

Similar Documents

Publication Publication Date Title
CN109629566B (en) Vacuum drainage anchor rod and construction method thereof
KR100776304B1 (en) Direct punching simultaneous poruing equipment and grouting construction method
KR101259364B1 (en) Ground reinforcing apparatus
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
CN106522959B (en) A kind of borehole wall steel construction waterproof connecting plate and its construction technology
CN108179730B (en) A kind of construction method of dam spillway ruggedized construction
CN113005837B (en) Construction method of HAS powder spraying pile for quickly reinforcing soft soil roadbed
CN108104132B (en) A kind of the slip casting limiting device and construction method of dam spillway
KR100638548B1 (en) Drain combination pressurization grouting equipment and this was used upward type using slope and ground reinforcement method of construction
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN107642101A (en) A kind of rocky bed steel cofferdam back cover leak stopping and guarded drainage construction method
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN104594369B (en) Karst high pressure group hole replacement grouting method and its structure
CN108179750B (en) A kind of ruggedized construction of dam spillway
CN106013137A (en) Prestressed concrete pile and spliced wall adopting pile
CN105735206A (en) Repair structure and construction method of pathological concrete gravity dam in severe cold area
CN202323941U (en) Retaining wall device for manual hole digging pile
CN109611134B (en) Grouting anchor cable for filling loose body strips and strip filling method
CN104912057B (en) Construction method of underground continuous wall
CN114197403A (en) Elevation and extension seepage-proofing system for grouted stone gravity dam and construction method
CN209162798U (en) The anti-by-pass means of underground continuous wall connector
CN209243728U (en) A kind of OPT interlocking pile slip casting around pile pipe device
KR101303534B1 (en) Apparatus for yieldable arch umbrella arch reinforcement and construction method for yieldable arch umbrella arch reinforcement
KR19990007552A (en) Waterproofing grouting method on the back surface of leakage of concrete structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201231

Address after: 245000 No. 50, Meilin Avenue, Huangshan Economic Development Zone, Anhui Province

Patentee after: Huangshan Development Investment Group Co.,Ltd.

Address before: 230009 No. 193, Tunxi Road, Hefei, Anhui

Patentee before: Hefei University of Technology

TR01 Transfer of patent right