CN108178069A - Container handling operation intelligent early-warning system - Google Patents

Container handling operation intelligent early-warning system Download PDF

Info

Publication number
CN108178069A
CN108178069A CN201810037970.7A CN201810037970A CN108178069A CN 108178069 A CN108178069 A CN 108178069A CN 201810037970 A CN201810037970 A CN 201810037970A CN 108178069 A CN108178069 A CN 108178069A
Authority
CN
China
Prior art keywords
data
container
warning system
unit
acquisition module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810037970.7A
Other languages
Chinese (zh)
Inventor
王培宏
李阳
冯晓婷
廖志雪
刘伟
陈鹏
赵顺
曾华鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN RUIMIN TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
TIANJIN RUIMIN TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN RUIMIN TECHNOLOGY DEVELOPMENT Co Ltd filed Critical TIANJIN RUIMIN TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201810037970.7A priority Critical patent/CN108178069A/en
Publication of CN108178069A publication Critical patent/CN108178069A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear
    • B66C15/06Arrangements or use of warning devices
    • B66C15/065Arrangements or use of warning devices electrical

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

本发明公开了一种集装箱装卸作业智能预警系统,包括安装在吊架上的数据采集模块和安装在司机操作室的数据处理模块;其中,数据采集模块中设有称重传感器和倾角传感器;控制及数据整合单元通过无线通讯传输单元将传感器数据传送给数据处理模块;数据处理模块中设有工控一体机和与工控一体机相连的电气联控单元,电气联控单元通过继电器对外输出多个开关量信号;工控一体机还连接高分贝声光报警单元和电源管理单元。本发明能够从源头上杜绝偏载、偏重的集装箱装上车,保障铁路运输安全,实现集装箱装卸自动化和智能化,提高集装箱装卸效率,具有重要意义。

The invention discloses an intelligent early warning system for container loading and unloading operations, which includes a data acquisition module installed on a hanger and a data processing module installed in the driver's cab; wherein, the data acquisition module is provided with a weighing sensor and an inclination sensor; the control And the data integration unit transmits the sensor data to the data processing module through the wireless communication transmission unit; the data processing module is equipped with an industrial control all-in-one machine and an electrical joint control unit connected to the industrial control all-in-one machine, and the electrical joint control unit outputs multiple switches through relays Quantity signal; the industrial control all-in-one machine is also connected to a high-decibel sound and light alarm unit and a power management unit. The present invention can eliminate unbalanced and heavy containers from the source, ensure the safety of railway transportation, realize the automation and intelligence of container loading and unloading, and improve the efficiency of container loading and unloading, which is of great significance.

Description

集装箱装卸作业智能预警系统Intelligent early warning system for container loading and unloading operations

技术领域technical field

本发明涉及装卸设备领域,具体是一种集装箱装卸作业智能预警系统。The invention relates to the field of loading and unloading equipment, in particular to an intelligent early warning system for container loading and unloading operations.

背景技术Background technique

装卸是现代物流的构成要素和重要环节,也是铁路货运的重要组成部分。而集装箱运输则是现代物流业的发展方向。近年来,我国铁路货运中集装箱运输所占的比重逐年上升,也研发、配置了许多与集装化相适应的装卸机械和属具索具。但是在集装箱装卸过程中的倾覆现象,给安全运输带来很大的影响。Loading and unloading is an integral element and an important link of modern logistics, and it is also an important part of railway freight. Container transportation is the development direction of modern logistics industry. In recent years, the proportion of container transportation in my country's railway freight has been increasing year by year, and many loading and unloading machinery and attachments and rigging suitable for containerization have also been developed and deployed. However, the overturning phenomenon in the process of container loading and unloading has a great impact on safe transportation.

因此,研究一套门式起重机集装箱偏载、偏重监测及FTR锁作业智能预警系统,在网络控制和三维立体显示的基础上,通过自动控制设备,在门吊司机室中即可实现集装箱装卸的智能化控制,从源头上杜绝偏载、偏重的集装箱装上车,保障铁路运输安全,实现集装箱装卸自动化和智能化,提高集装箱装卸效率,具有重要意义。Therefore, a set of gantry crane container eccentric load, eccentric monitoring and FTR lock operation intelligent early warning system is studied. On the basis of network control and three-dimensional display, through automatic control equipment, container loading and unloading can be realized in the gantry crane driver's cab. Intelligent control is of great significance to eliminate unbalanced and heavy containers from the source, ensure the safety of railway transportation, realize the automation and intelligence of container loading and unloading, and improve the efficiency of container loading and unloading.

发明内容Contents of the invention

本发明就是为了解决上述问题,提供了一种集装箱装卸作业智能预警系统,实现了集装箱装卸自动化和智能化,提高集装箱装卸效率,保障铁路运输安全,通过对集装箱吊装作业流程的研究,设计出一套适用于在集装箱吊装作业中检测集装箱是否偏载、偏重、FTR锁是否脱钩的智能预警系统,主要是对正在进行吊装作业的集装箱状态数据进行实时采集和分析,将数据通过无线传输至上位机,对造成集装箱倾斜的原因进行智能分析识别,分级判定集装箱超偏载状态及FTR锁有没有脱钩并做出相应预警及联动处理。In order to solve the above problems, the present invention provides an intelligent early warning system for container loading and unloading, which realizes the automation and intelligence of container loading and unloading, improves the efficiency of container loading and unloading, and ensures the safety of railway transportation. It is an intelligent early warning system suitable for detecting whether the container is unbalanced or heavy, and whether the FTR lock is uncoupled during the container hoisting operation. It mainly collects and analyzes the status data of the container being hoisted in real time, and transmits the data to the host computer through wireless. , intelligently analyze and identify the causes of container tilting, judge the container's overload and unbalanced load status and whether the FTR lock has been uncoupled, and make corresponding early warning and linkage processing.

本发明是按照以下技术方案实施的。The present invention is implemented according to the following technical solutions.

一种集装箱装卸作业智能预警系统,所述预警系统包括安装在吊架上的数据采集模块和安装在司机操作室的数据处理模块;其中,数据采集模块包括,安装在吊架四角受力锁销上用于采集集装箱实时重量的称重传感器,安装在采集设备盒内用于采集集装箱实时倾斜度的倾角传感器,通过数据总线分别与倾角传感器和称重传感器相连的控制及数据整合单元;控制及数据整合单元通过无线通讯传输单元将数据传送给数据处理模块;数据采集模块中还设有智能低功耗电源管理单元;数据处理模块中包括工控一体机,工控一体机通过无线通讯传输单元接收来自数据采集模块的数据信息,通过显示设备将处理后的数据信息以三维动画的形式展示在软件界面上;数据处理模块中还设有与工控一体机相连的电气联控单元,所述电气联控单元通过继电器对外输出多个开关量信号;工控一体机还连接高分贝声光报警单元和电源管理单元。An intelligent early warning system for container loading and unloading operations, the early warning system includes a data acquisition module installed on the hanger and a data processing module installed in the driver's cab; The load cell used to collect the real-time weight of the container, the inclination sensor installed in the collection equipment box to collect the real-time inclination of the container, and the control and data integration unit connected to the inclination sensor and the load cell through the data bus; the control and The data integration unit transmits data to the data processing module through the wireless communication transmission unit; the data acquisition module is also equipped with an intelligent low-power power management unit; the data processing module includes an industrial control integrated machine, and the industrial control integrated machine receives data from The data information of the data acquisition module displays the processed data information on the software interface in the form of three-dimensional animation through the display device; the data processing module is also provided with an electrical joint control unit connected to the industrial control integrated machine, and the electrical joint control The unit outputs multiple switching signals through the relay; the industrial control integrated machine is also connected to the high-decibel sound and light alarm unit and the power management unit.

进一步的,所述无线通讯传输单元为Wi-Fi无线通讯模块。Further, the wireless communication transmission unit is a Wi-Fi wireless communication module.

进一步的,低功耗电源模块输出12V直流电源,输入电源来自吊架自有的电源或外加太阳能板和蓄电池组件实现自供电。Further, the low power consumption power supply module outputs 12V DC power, and the input power comes from the hanger's own power supply or external solar panels and battery components to realize self-power supply.

进一步的,倾角传感器与数据采集模块通过串口通讯,采集频率设置为50/100Hz,滤波后每秒向上位机上传10次数据;倾角传感器采用双轴测量,分别测量集装箱长、宽两个方向上的倾斜状态并换算成集装箱偏角。Further, the inclination sensor communicates with the data acquisition module through the serial port, and the acquisition frequency is set to 50/100Hz. After filtering, the data is uploaded to the host computer 10 times per second; The inclination state of the container is converted into the container deflection angle.

本发明获得了如下有益效果。The present invention obtains the following beneficial effects.

本发明在网络控制和三维立体显示的基础上,通过自动控制设备,在门吊司机室中即可实现集装箱装卸的智能化控制,从源头上杜绝偏载、偏重的集装箱装上车,保障铁路运输安全,实现集装箱装卸自动化和智能化,提高集装箱装卸效率,具有重要意义。On the basis of network control and three-dimensional display, the present invention can realize the intelligent control of container loading and unloading in the door crane driver's cab through the automatic control equipment, and prevent unbalanced and heavy containers from being loaded on the vehicle from the source, and ensure the safety of railways. It is of great significance to ensure the safety of transportation, realize the automation and intelligence of container loading and unloading, and improve the efficiency of container loading and unloading.

(一)通过对高速无线网络、先进可控的传感器和一体化集成方式的应用,不用现场检查而在显示设备上对集装箱是否偏载、偏重以及FTR锁是否脱钩的情况进行监测,解决集装箱吊装和吊卸过程中出现的各种安全问题。(1) Through the application of high-speed wireless network, advanced and controllable sensors and integrated integration methods, it is possible to monitor whether the container is unbalanced and heavy and whether the FTR lock is uncoupled on the display device without on-site inspection, so as to solve the problem of container hoisting. And various safety problems that arise during the lifting and unloading process.

(二)能大大提高吊装吊卸作业的质量,简化日常的管理流程,减轻现场工作人员的压力,保证集装箱吊装吊卸作业的安全。(2) It can greatly improve the quality of hoisting and unloading operations, simplify the daily management process, reduce the pressure of on-site staff, and ensure the safety of container hoisting and unloading operations.

(三)保证了集装箱运输安全,节约了集装箱吊装吊卸作业时间以及大量的人力物力,可为铁路生产带来较大的直接经济效益,应用前景广泛。(3) It ensures the safety of container transportation, saves container hoisting and unloading operation time and a lot of manpower and material resources, can bring greater direct economic benefits to railway production, and has broad application prospects.

附图说明Description of drawings

图1是本发明的系统结构框图;Fig. 1 is a system structure block diagram of the present invention;

图2是本发明系统工作的流程图。Fig. 2 is a flow chart of the system work of the present invention.

具体实施方式Detailed ways

下面参照附图和实施例对本发明进行详细说明。The present invention will be described in detail below with reference to the accompanying drawings and embodiments.

如图1、2所示,一种集装箱装卸作业智能预警系统,所述预警系统包括安装在吊架上的数据采集模块和安装在司机操作室的数据处理模块;其中,数据采集模块包括,安装在吊架四角受力锁销上用于采集集装箱实时重量的称重传感器,安装在采集设备盒内用于采集集装箱实时倾斜度的倾角传感器,通过数据总线分别与倾角传感器和称重传感器相连的控制及数据整合单元;控制及数据整合单元通过无线通讯传输单元将数据传送给数据处理模块;数据采集模块中还设有智能低功耗电源管理单元;数据处理模块中包括工控一体机,工控一体机通过无线通讯传输单元接收来自数据采集模块的数据信息,通过显示设备将处理后的数据信息以三维动画的形式展示在软件界面上;数据处理模块中还设有与工控一体机相连的电气联控单元,所述电气联控单元通过继电器对外输出多个开关量信号;工控一体机还连接高分贝声光报警单元和电源管理单元。As shown in Figures 1 and 2, an intelligent early warning system for container loading and unloading operations, the early warning system includes a data acquisition module installed on the hanger and a data processing module installed in the driver's cab; wherein, the data acquisition module includes, installed The load cell used to collect the real-time weight of the container on the force lock pins at the four corners of the hanger is installed in the collection device box to collect the real-time inclination of the container. Control and data integration unit; the control and data integration unit transmits data to the data processing module through the wireless communication transmission unit; the data acquisition module is also equipped with an intelligent low-power power management unit; the data processing module includes an industrial control integrated machine, an industrial control integrated The machine receives the data information from the data acquisition module through the wireless communication transmission unit, and displays the processed data information on the software interface in the form of three-dimensional animation through the display device; A control unit, the electrical joint control unit outputs a plurality of switching signals through a relay; the industrial control integrated machine is also connected to a high-decibel sound and light alarm unit and a power management unit.

所述无线通讯传输单元为Wi-Fi无线通讯模块。The wireless communication transmission unit is a Wi-Fi wireless communication module.

低功耗电源模块输出12V直流电源,输入电源来自吊架自有的电源或外加太阳能板和蓄电池组件实现自供电。The low-power power supply module outputs 12V DC power, and the input power comes from the hanger's own power supply or external solar panels and battery components to achieve self-power supply.

倾角传感器与数据采集模块通过串口通讯,采集频率设置为50/100Hz,滤波后每秒向上位机上传10次数据;倾角传感器采用双轴测量,分别测量集装箱长、宽两个方向上的倾斜状态并换算成集装箱偏角。The inclination sensor communicates with the data acquisition module through the serial port, and the acquisition frequency is set to 50/100Hz. After filtering, the data is uploaded to the host computer 10 times per second; the inclination sensor adopts dual-axis measurement, which measures the inclination state of the container in the two directions of length and width. And converted into container deflection angle.

本发明的使用方法为:The using method of the present invention is:

集装箱偏载、偏重监测及FTR锁作业智能预警系统分为安装在吊架上的数据采集模块和安装在司机室的数据展示模块两部分。其中,数据采集模块包含安装在吊架四角受力锁销上的称重传感器采集集装箱实时重量、安装在采集设备盒内的倾角传感器采集集装箱实时倾斜度,再将采集数据进行初步整理和滤波后传给司机室的数据展示模块。数据展示模块结合重量数据和倾角数据,经过数据动态处理相关算法,计算出FTR锁的脱钩情况及集装箱的总重、偏重、偏心数据,以三维动画的形式展示在软件界面上,并给出最简便的操作按钮。最后,系统提供一组继电器输出,方便用户实现其控制功能。集装箱偏载、偏重监测及FTR锁作业智能预警系统界面直观,操作简单,方便驾驶员学习和使用。系统组成如图1所示。The container eccentric load, eccentric weight monitoring and FTR lock operation intelligent early warning system is divided into two parts: the data acquisition module installed on the hanger and the data display module installed in the driver's cab. Among them, the data acquisition module includes the load cell installed on the force lock pins at the four corners of the hanger to collect the real-time weight of the container, the inclination sensor installed in the collection equipment box to collect the real-time inclination of the container, and then the collected data is preliminarily sorted and filtered The data display module transmitted to the driver's cab. The data display module combines the weight data and inclination data, and through data dynamic processing related algorithms, calculates the decoupling of the FTR lock and the total weight, partial weight, and eccentric data of the container, and displays it on the software interface in the form of 3D animation, and gives the most Easy operation buttons. Finally, the system provides a set of relay outputs, which is convenient for users to realize their control functions. The interface of the intelligent early warning system for container eccentric load, eccentric weight monitoring and FTR lock operation is intuitive, easy to operate, and convenient for drivers to learn and use. The composition of the system is shown in Figure 1.

数据采集模块包含低功耗电源模块、称重传感器供电及数据采集模块、倾角传感器供电及数据采集模块、Wi-Fi无线通讯模块。数据采集模块主体是一块带MCU的电路板,负责传感器的数据采集、数据处理和数据上传。整个数据采集模块采用工业一体化设计,达到IP65防水防尘标准,可根据现场吊架情况选择适当的位置进行安装。The data acquisition module includes a low-power power supply module, a load cell power supply and data acquisition module, an inclination sensor power supply and data acquisition module, and a Wi-Fi wireless communication module. The main body of the data acquisition module is a circuit board with MCU, which is responsible for data acquisition, data processing and data upload of the sensor. The entire data acquisition module adopts an industrial integration design, which meets the IP65 waterproof and dustproof standard, and can be installed at an appropriate location according to the on-site hanger situation.

低功耗电源模块,采用12VDC电源,共有2种供电方式:大部分四滑轮吊架上有电源,系统根据吊架提供电源具体情况配置适配器;少数吊架上没有电源,系统额外配置太阳能板+蓄电池实现自供电。电路板采用电池供电时,感应到震动后系统满负荷工作,没有震动时系统低功耗休眠用以省电,休眠前关闭上述所以外设电源。测试时上位机可通过发命令取消和进入休眠机制。Low power consumption power module, using 12VDC power supply, there are 2 power supply methods: most of the four pulley hangers have power supply, and the system configures the adapter according to the specific power supply provided by the hanger; a few hangers have no power supply, and the system is additionally equipped with solar panels+ The storage battery realizes self-power supply. When the circuit board is powered by batteries, the system will work at full capacity after the vibration is sensed. When there is no vibration, the system will sleep with low power consumption to save power. Before sleep, turn off the power supply of all the above-mentioned peripherals. During the test, the host computer can cancel and enter the dormancy mechanism by sending commands.

称重传感器供电及数据采集模块,在吊具四角分别装有集装箱旋锁专用的称重传感器,配有独立高速四路数据传输系统,即时快速测量得到四角重量。各重量值通过无线Wi-Fi上传至司机室的一体机内,换算成集装箱的总重量、偏载量、偏重量,判断出FTR锁有没有脱钩,并在吊装作业过程中实时、多侧面多角度形象准确的展示在一体机显示屏上。The load cell power supply and data acquisition module is equipped with special load cells for container twist locks at the four corners of the spreader, and is equipped with an independent high-speed four-way data transmission system, which can measure the weight of the four corners in real time and quickly. Each weight value is uploaded to the all-in-one machine in the driver's cab through wireless Wi-Fi, and converted into the total weight, partial load, and partial weight of the container to determine whether the FTR lock has been decoupled. The angle image is accurately displayed on the display screen of the all-in-one machine.

倾角传感器供电及数据采集模块,通过串口与MCU通讯,采集频率设置为50/100Hz,滤波后每秒上传10次至上位机。倾角传感器采用双轴测量,分别测量集装箱长、宽两个方向上的倾斜状态并换算成集装箱偏角。该倾角传感器是采用国际先进的高性能敏感技术制作的标准型倾角传感器,任何情况下传感器监测精度高于1度,静态下高于0.1度。The power supply and data acquisition module of the inclination sensor communicates with the MCU through the serial port, and the acquisition frequency is set to 50/100Hz, and uploaded to the host computer 10 times per second after filtering. The inclination sensor adopts biaxial measurement, which measures the inclination state of the container in the two directions of length and width respectively and converts it into the container deflection angle. The inclination sensor is a standard inclination sensor manufactured with international advanced high-performance sensitive technology. The sensor monitoring accuracy is higher than 1 degree under any circumstances, and higher than 0.1 degree under static conditions.

加速度传感器数据采集及唤醒模块,负责每100ms向上位机发送一次加速度数据,同时可通过上位机设置加速度传感器。该模块在系统休眠时依然工作,负责感应震动唤醒MCU。The acceleration sensor data acquisition and wake-up module is responsible for sending acceleration data to the upper computer every 100ms, and the acceleration sensor can be set through the upper computer at the same time. This module still works when the system is in sleep mode, and is responsible for sensing vibration and waking up the MCU.

Wi-Fi无线通讯模块,设备和司机室通过Wi-Fi无线通讯模块进行通讯,供电电源要求可控,低功耗时停止供电。实际使用时一辆吊车(一个司机室)可能会配多个吊架(多个采集设备),故而采集设备为服务器端,司机室为客户端,通讯时由司机室连采集设备。Wi-Fi wireless communication module, the equipment and the cab communicate through the Wi-Fi wireless communication module, the power supply requirements are controllable, and the power supply is stopped when the power consumption is low. In actual use, a crane (one driver's cab) may be equipped with multiple hangers (multiple acquisition devices), so the acquisition device is the server side, the driver's cab is the client, and the driver's cab is connected to the acquisition device during communication.

预警系统数据处理模块包含工控一体机、智能预警软件、高分贝声光报警单元、电气联控单元、无线通讯传输单元以及电源管理单元,安装在司机操作室中,方便司机在进行作业的同时观察集装箱及FTR锁所处状态。The data processing module of the early warning system includes industrial control integrated machine, intelligent early warning software, high-decibel sound and light alarm unit, electrical joint control unit, wireless communication transmission unit and power management unit, which are installed in the driver's cab to facilitate the driver to observe while working The status of the container and FTR lock.

工控一体机达到工业级标准,稳定性高,串口种类丰富,可适应各种类型的信号输入输出。The industrial control all-in-one machine meets industrial standards, has high stability, and has a variety of serial ports, which can adapt to various types of signal input and output.

智能预警软件具有集装箱偏载偏重及FTR锁作业智能预警功能。在卸车的时候FTR锁未脱钩和装车的时候集装箱倾斜超过预设值的时候进行报警,人机界面三维实时显示四个传感器的重量数值和吊具倾角值,计算集装箱实时状态,当测量值达到设定的临界值时,PLC控制系统将禁止吊运集装箱,同时发出警报,人机界面自动声光报警及文字警示,提醒司机注意检查货物是否装偏或F-TR锁未正常脱离。通过测量四个传感器重量、倾角传感器数据值,根据传感器重量差、倾角等建立数学模型分析、判断是否偏载及FTR锁是否脱钩。The intelligent early warning software has the intelligent early warning function of container unbalanced load and heavy load and FTR lock operation. When the FTR lock is not released during unloading and when the container tilt exceeds the preset value during loading, an alarm will be given. The human-machine interface will display the weight values of the four sensors and the inclination angle of the spreader in real time in 3D, and calculate the real-time status of the container. When the measured value When the set critical value is reached, the PLC control system will prohibit the lifting of the container and send out an alarm at the same time. The human-machine interface will automatically sound and light alarm and text warning to remind the driver to pay attention to check whether the goods are loaded incorrectly or the F-TR lock is not released normally. By measuring the weight of the four sensors and the data values of the inclination sensors, a mathematical model is established according to the weight difference and inclination of the sensors to analyze and judge whether the load is eccentric and whether the FTR lock is uncoupled.

智能预警软件可以根据集装箱装载状态显示不同的声光报警并限制吊钩起降。当吊具下负载达到起重机最大载重量的95%时,报警指示灯显示,能起升和下降;当吊具下负载达到起重机最大允许载重量时,声光同时报警,控制吊钩禁止起升,只能下降。控制吊钩起降采用PLC控制技术。The intelligent early warning software can display different sound and light alarms according to the loading status of the container and restrict the lifting and landing of the hook. When the load under the spreader reaches 95% of the maximum load of the crane, the alarm indicator will display, and it can be lifted and lowered; when the load under the spreader reaches the maximum allowable load of the crane, the sound and light will alarm at the same time, and the hook will be controlled to prohibit lifting , can only drop. PLC control technology is used to control the lifting and landing of the hook.

智能预警软件具有三维动态展示功能,以三维动画的形式将集装箱状态、重心位置实时形象地显示在软件界面上,并能用三维动态展示图显示集装箱偏角和偏心的准确数值以及重心位置、偏重量、偏载量等相关数据,多侧面多角度形象准确的体现出集装箱所处状态,以及FTR锁有没有脱钩。系统可以通过集装箱的主视图、顶视图、侧视图、三视图进行展示,多方位多角度的观察集装箱工作状态。卸车时,集装箱展示添加平板车的显示,方便观察集装箱脱离状态,并根据卸车过程中的规定对集装箱状态进行计算、报警;装车时,可以根据装车过程中的规定对集装箱状态进行计算、报警。The intelligent early warning software has the function of three-dimensional dynamic display, which displays the status of the container and the position of the center of gravity on the software interface in real time in the form of three-dimensional animation. Relevant data such as weight and partial load, and multi-sided and multi-angle images accurately reflect the status of the container and whether the FTR lock is decoupled. The system can be displayed through the front view, top view, side view, and three views of the container, and the working status of the container can be observed from multiple directions and angles. When unloading, the display of the container is added with the display of the flatbed truck, which is convenient for observing the detached state of the container, and calculates and alarms the status of the container according to the regulations during the unloading process; when loading, it can calculate and alarm the status of the container according to the regulations during the loading process .

Claims (4)

1.一种集装箱装卸作业智能预警系统,其特征在于,所述预警系统包括安装在吊架上的数据采集模块和安装在司机操作室的数据处理模块;其中,数据采集模块包括,安装在吊架四角受力锁销上用于采集集装箱实时重量的称重传感器,安装在采集设备盒内用于采集集装箱实时倾斜度的倾角传感器,通过数据总线分别与倾角传感器和称重传感器相连的控制及数据整合单元;控制及数据整合单元通过无线通讯传输单元将数据传送给数据处理模块;数据采集模块中还设有智能低功耗电源管理单元;数据处理模块中包括工控一体机,工控一体机通过无线通讯传输单元接收来自数据采集模块的数据信息,通过显示设备将处理后的数据信息以三维动画的形式展示在软件界面上;数据处理模块中还设有与工控一体机相连的电气联控单元,所述电气联控单元通过继电器对外输出多个开关量信号;工控一体机还连接高分贝声光报警单元和电源管理单元。1. An intelligent early warning system for container loading and unloading operations, characterized in that the early warning system includes a data acquisition module installed on the hanger and a data processing module installed in the driver's cab; wherein the data acquisition module includes, installed on the hanger The load cell used to collect the real-time weight of the container on the force lock pins at the four corners of the frame, the inclination sensor installed in the collection equipment box to collect the real-time inclination of the container, and the control and control devices connected to the inclination sensor and the load cell through the data bus Data integration unit; the control and data integration unit transmits data to the data processing module through the wireless communication transmission unit; the data acquisition module is also equipped with an intelligent low-power power management unit; the data processing module includes an industrial control integrated machine, and the industrial control integrated machine passes The wireless communication transmission unit receives the data information from the data acquisition module, and displays the processed data information on the software interface in the form of three-dimensional animation through the display device; the data processing module is also equipped with an electrical joint control unit connected to the industrial control integrated machine , the electrical joint control unit outputs a plurality of switching signals to the outside through the relay; the industrial control integrated machine is also connected to a high-decibel sound and light alarm unit and a power management unit. 2.如权利要求1所述的一种集装箱装卸作业智能预警系统,其特征在于:所述无线通讯传输单元为Wi-Fi无线通讯模块。2. An intelligent early warning system for container loading and unloading operations according to claim 1, wherein the wireless communication transmission unit is a Wi-Fi wireless communication module. 3.如权利要求1所述的一种集装箱装卸作业智能预警系统,其特征在于:低功耗电源模块输出12V直流电源,输入电源来自吊架自有的电源或外加太阳能板和蓄电池组件实现自供电。3. An intelligent warning system for container loading and unloading operations as claimed in claim 1, characterized in that: the low power consumption power supply module outputs 12V DC power supply, and the input power comes from the own power supply of the hanger or an additional solar panel and battery assembly to realize automatic monitoring. powered by. 4.如权利要求1所述的一种集装箱装卸作业智能预警系统,其特征在于:倾角传感器与数据采集模块通过串口通讯,采集频率设置为50/100Hz,滤波后每秒向上位机上传10次数据;倾角传感器采用双轴测量,分别测量集装箱长、宽两个方向上的倾斜状态并换算成集装箱偏角。4. An intelligent early warning system for container loading and unloading operations as claimed in claim 1, characterized in that: the inclination sensor communicates with the data acquisition module through a serial port, the acquisition frequency is set to 50/100Hz, and after filtering, it uploads to the host computer 10 times per second Data; the inclination sensor uses biaxial measurement to measure the inclination state of the container in the two directions of length and width respectively and convert it into the container deflection angle.
CN201810037970.7A 2018-01-16 2018-01-16 Container handling operation intelligent early-warning system Pending CN108178069A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810037970.7A CN108178069A (en) 2018-01-16 2018-01-16 Container handling operation intelligent early-warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810037970.7A CN108178069A (en) 2018-01-16 2018-01-16 Container handling operation intelligent early-warning system

Publications (1)

Publication Number Publication Date
CN108178069A true CN108178069A (en) 2018-06-19

Family

ID=62550747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810037970.7A Pending CN108178069A (en) 2018-01-16 2018-01-16 Container handling operation intelligent early-warning system

Country Status (1)

Country Link
CN (1) CN108178069A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067450A (en) * 2019-05-30 2019-07-30 郑州福斯特电子有限公司 FTR for container hanging box locks intelligence control system and control method
CN110171779A (en) * 2019-06-26 2019-08-27 中国铁道科学研究院集团有限公司运输及经济研究所 Front handling mobile crane lifts by crane safely control system and control method
CN111174890A (en) * 2019-12-13 2020-05-19 湖南亚兴特种电子衡器有限公司 A calibration device and adjustment method of a spreader-type container over-eccentric load detection and weighing system
CN111874801A (en) * 2020-08-26 2020-11-03 杭州华新机电工程有限公司 Remote control system of grab ship unloader
CN111942412A (en) * 2020-08-11 2020-11-17 中车株洲电力机车有限公司 Freight transportation motor train unit load management system and management method
CN114394531A (en) * 2022-01-20 2022-04-26 单人煌 Method for preventing empty and wrong loading of container

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799314A (en) * 2009-12-14 2010-08-11 郑州恒科实业有限公司 Weighing system device for detecting overloading and unbalanced loading of container
CN201961977U (en) * 2011-01-27 2011-09-07 北京东方威特称重设备系统有限公司 Weight unbalance-loading detection system for container of gantry crane
CN205740066U (en) * 2016-05-05 2016-11-30 天津锐敏科技发展有限责任公司 The monitoring of gantry crane container unbalance-loading and intelligent early-warning system
CN207932926U (en) * 2018-01-16 2018-10-02 天津锐敏科技发展有限责任公司 Container handling operation intelligent early-warning system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799314A (en) * 2009-12-14 2010-08-11 郑州恒科实业有限公司 Weighing system device for detecting overloading and unbalanced loading of container
CN201961977U (en) * 2011-01-27 2011-09-07 北京东方威特称重设备系统有限公司 Weight unbalance-loading detection system for container of gantry crane
CN205740066U (en) * 2016-05-05 2016-11-30 天津锐敏科技发展有限责任公司 The monitoring of gantry crane container unbalance-loading and intelligent early-warning system
CN207932926U (en) * 2018-01-16 2018-10-02 天津锐敏科技发展有限责任公司 Container handling operation intelligent early-warning system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067450A (en) * 2019-05-30 2019-07-30 郑州福斯特电子有限公司 FTR for container hanging box locks intelligence control system and control method
CN110171779A (en) * 2019-06-26 2019-08-27 中国铁道科学研究院集团有限公司运输及经济研究所 Front handling mobile crane lifts by crane safely control system and control method
CN111174890A (en) * 2019-12-13 2020-05-19 湖南亚兴特种电子衡器有限公司 A calibration device and adjustment method of a spreader-type container over-eccentric load detection and weighing system
CN111942412A (en) * 2020-08-11 2020-11-17 中车株洲电力机车有限公司 Freight transportation motor train unit load management system and management method
CN111942412B (en) * 2020-08-11 2022-11-08 中车株洲电力机车有限公司 Freight transportation motor train unit load management system and management method
CN111874801A (en) * 2020-08-26 2020-11-03 杭州华新机电工程有限公司 Remote control system of grab ship unloader
CN114394531A (en) * 2022-01-20 2022-04-26 单人煌 Method for preventing empty and wrong loading of container

Similar Documents

Publication Publication Date Title
CN108178069A (en) Container handling operation intelligent early-warning system
CN201686411U (en) Crane lifting monitoring system
CN202379636U (en) Measuring and controlling device for running state of tower crane
CN201762043U (en) Safety monitoring device of tower crane with two horizontal arms
CN101780926B (en) Crawler crane moment limiting system
CN108275560A (en) A kind of the drop lock monitoring method and monitoring system of container F-TR locks
CN103204442B (en) System and method for online monitoring structural deformation of tower crane
CN104340895A (en) Monitoring system and monitoring method for safety of tower crane
CN106501811A (en) A kind of truck prevents the device that slings
CN108383003B (en) The double-hung posture and safety monitoring system and method for a kind of crane for steelworks use
CN207932926U (en) Container handling operation intelligent early-warning system
CN110467117A (en) A kind of tower crane with monitoring system
CN204359477U (en) Based on the bucket-wheel stacker reclaimer cantilever shalving ground connection power on-line monitoring system of PLC
CN102701079A (en) Container crane load monitoring system on basis of weighing of spin locks
CN210193236U (en) Large-scale machinery cooperation hoist and mount data early warning device
CN210438290U (en) Safety detection monitoring system for railway container loading and unloading operation
CN109969960A (en) A crane load monitoring system and method
CN109405944A (en) A kind of weighing system and load-carrying monitoring method
CN205740066U (en) The monitoring of gantry crane container unbalance-loading and intelligent early-warning system
CN201224662Y (en) Non-load sensing type elevating capacity stopper
CN108382999A (en) Integrate the gantry crane driver driving technology assessment system and appraisal procedure of software and hardware
CN202704827U (en) Wireless weighing device of crane hook
CN201924579U (en) Safety protection device for attached lifting scaffolds
CN207347018U (en) A kind of railway container handling anti-derail unit
CN218453903U (en) Safety monitoring device for loading and unloading operation of railway container F-TR lock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180619