CN108171616A - A kind of three-dimensional power grid application platform - Google Patents

A kind of three-dimensional power grid application platform Download PDF

Info

Publication number
CN108171616A
CN108171616A CN201711223260.5A CN201711223260A CN108171616A CN 108171616 A CN108171616 A CN 108171616A CN 201711223260 A CN201711223260 A CN 201711223260A CN 108171616 A CN108171616 A CN 108171616A
Authority
CN
China
Prior art keywords
data
instruction
database
power
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711223260.5A
Other languages
Chinese (zh)
Inventor
张子谦
陈俣
李重阳
王磊
赵希超
张艳燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Information and Communication Technology Co
Original Assignee
Nari Information and Communication Technology Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Information and Communication Technology Co filed Critical Nari Information and Communication Technology Co
Priority to CN201711223260.5A priority Critical patent/CN108171616A/en
Publication of CN108171616A publication Critical patent/CN108171616A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of three-dimensional power grid application platforms, including sequentially connected data Layer, platform layer, application layer and client layer, data Layer is power network development database, power network development database purchase content includes power grid internal data and power grid external data, and application layer includes three-dimensional display unit, analytic unit, decision package and achievements exhibition unit.It is of the invention to integrate power grid internal data and external data comprehensively, the regional virtual power grid of structure, the comprehensive management in a manner of three-dimensional visualization, build operational platform, true reduction operation of power networks environment and operating condition, formed it is accurate it is full and accurate, content is intuitive, calls convenient information integral job applications, the application functions such as exploitation auxiliary programming, auxiliary evaluation, support Electric Power Network Planning and evaluation.

Description

A kind of three-dimensional power grid application platform
Technical field
The present invention relates to a kind of three-dimensional power grid application platforms, belong to big data acquisition, analysis and application field.
Background technology
Electric power be big data theory, technology and methods power industry practice.Electric power big data be related to power generation, it is defeated Electricity, power transformation, distribution, electricity consumption, each link of scheduling, being can across unit, multi-disciplinary, trans-sectoral business data analysis and excavation and data Depending on change.It is just being given birth to as the rapid development of intelligent grid construction makes Information and Communication Technology with unprecedented range, depth and power grid Production, business administration rapid fusion, information communication system have become " nervous centralis " of intelligent grid, support power grid life of new generation Production and the application of management development.
Currently, electrical network business data are roughly divided into three classes:When electric power enterprise creation data, such as generated energy, voltage stabilization The data of property etc.;Second is that electric power enterprise operation data, such as the data of pricing, electricity sales amount, Electricity customers etc.;Three It is Management of Electrical Enterprise data, such as the data of ERP, unified platform, synergetic office work etc..
As power grid scale constantly expands, data sustainable growth is managed, the method for operation and running environment are increasingly sophisticated, planning Information exchange, the contradiction of the demand and information dispersion, sharing difference of work collaboration become increasingly conspicuous in the process, electric power netting safe running pressure Power constantly increases.There is an urgent need for specialty analysis ability is strong, social development information and research in policy are deep supports for prefecture-level electric company Platform provides decision-making foundation for Corporate development planning, strengthens power grid construction and transformation, and electric network coordinations at different levels is promoted to develop, and realization is held Continuous power network development mode and development of company mode change.
Invention content
In order to solve the above technical problem, the present invention provides a kind of three-dimensional power grid application platforms.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of three-dimensional power grid application platform, including sequentially connected data Layer, platform layer, application layer and client layer, data Layer is power network development database, and power network development database purchase content includes power grid internal data and power grid external data, application Layer includes three-dimensional display unit, analytic unit, decision package and achievements exhibition unit.
Power network development database is special including operation of power networks database, composite basis database, geographic information database, space Inscribe database and grid equipment database;
Operation of power networks database purchase content includes system operation data and electric load;Composite basis database purchase content packet Include industrial policy data, national economy data, communications and transportation data and geographical data;Geographic information database storage content Including terrain data, relief data, electronic map and image data;Space thematic data base storage content includes nature reserve area Data, soil erosion protection distribution map, land-use map, mineral resource distribution figure, estate planning area data and geological disaster area Data;Grid equipment database purchase content includes city model, substation's typical model and shaft tower typical model.
Client layer is client.
Three-dimensional display Elementary Function realizes step,
Layout data model is established in data server, including city model, substation's typical model and shaft tower typical model;
Receive the instruction of client layer;
If instruction is three-dimensional display acquisition instruction, instruction specified data and data mould are transferred in power network development database Type;
The data input data model that will be transferred, obtains three-dimensional display relation data;
Three-dimensional display relation data is shown according to default.
Analytic unit function realizes step,
Receive the instruction of client layer;
If instruction is instructed for data acquisition, instruction specified data is transferred in operation of power networks database according to keyword, and It is shown according to default;
If described instruction is instructed for load prediction, the number specified is transferred in operation of power networks database according to keyword According to bringing the digital map regional load distribution map in geographic information database into;
If instruction is instructed for present situation power network frame analysis, the number specified is transferred in operation of power networks database according to keyword According to bringing into the corresponding data model of grid equipment database, obtain present situation rack relation data, and according to default carry out present situation Rack is shown.
Decision package function realizes step,
Receive the instruction of client layer;
If instruction is instructed for auxiliary programming, instruction specified data, band are transferred in operation of power networks database according to keyword Enter existing Electric Power Network Planning analysis software and carry out issue management and performance analysis;
If instruction is auxiliary evaluation instruction, client layer designing scheme digitlization input function is opened, is designed scheme typing And management, evaluation course management and evaluation data management flow are carried out after storage;
If instruction is instructed for project library management, the library management of client layer planned project, planned project condition managing and rule are opened Item data management function is drawn, realizes project library overall process data management.
Achievements exhibition Elementary Function realizes step,
Receive the instruction of client layer;
If instruction is the displaying instruction of present situation rack three dimensions, instruction is transferred in operation of power networks database according to keyword and is referred to Fixed data, i.e. rack data, then bring rack data into the data model of grid equipment database, obtain rack three-dimensional Show relation data;And according to default progress present situation rack three-dimensional display application;
If instruction is shown for program results rack three dimensions, instruction is transferred in operation of power networks database according to keyword and is referred to Fixed data, bring existing Electric Power Network Planning analysis software prediction layout data into, and then bringing prediction layout data into power grid sets In the corresponding data model of standby database, planning three-dimensional display relation data is obtained, and according to default progress program results rack Three-dimensional display;
If instruction is shown for specific analysis data, the number specified is transferred in operation of power networks database according to keyword According to bringing existing Electric Power Network Planning analysis software into and carry out specific analysis, be then shown analysis data according to default.
The advantageous effect that the present invention is reached:1st, the present invention integrates power grid internal data and external data comprehensively, builds area The virtual power grid of domain property, the comprehensive management in a manner of three-dimensional visualization build operational platform, it is true restore operation of power networks environment and Operating condition, formation is accurately full and accurate, content is intuitive, calls convenient information integral job applications, and exploitation auxiliary programming assists The application functions such as evaluation, support Electric Power Network Planning and evaluation;
2nd, supplement improves data resource, realizes quick-searching, calling, excavation and the analysis of all kinds of big datas, whole in basic data The functions such as on the basis of conjunction and partial function module are realized, exploitation auxiliary fortune is examined, auxiliary emergent, scheduling information, Power marketing, are opened up Exhibition industry business application function, realizes business cooperation application;
3rd, iteration proofreads Data Analysis Model and according to feedback is used, and optimization big data is excavated with analyzing related algorithm and function, Last stage application function is improved, the business such as support planning for the expansion of power grids, economic evaluation are realized and provided towards full-service based on development Data analysis and the intuitive aid decision application platform of three-dimensional precision, convenient control power network development operation situation.
Description of the drawings
Fig. 1 is the framework relation schematic diagram of the present invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention Technical solution, and be not intended to limit the protection scope of the present invention and limit the scope of the invention.
As shown in Figure 1, a kind of three-dimensional power grid application platform, including sequentially connected infrastructure layer, data Layer, platform branch Support layer, application layer and client layer.
Infrastructure layer includes multiple graphics workstations and application service station, and graphics workstation and application service station are existing Hardware technology is not stated herein tired.Platform layer is specially to apply Microsoft .Net+ NARI-RealWorld technologies, Realize data management, operation management, application service and the secondary development application of data center, this is also the prior art, herein It is not stated tired.
Client layer is client, can be PC ends, tablet end, mobile phone terminal or display screen.
Data Layer is power network development database, and power network development database purchase content is included outside power grid internal data and power grid Portion's data.
Power network development database is special including operation of power networks database, composite basis database, geographic information database, space Database and grid equipment database are inscribed, these databases carry out Data Data construction and integration power network development database;Power grid is transported Content in row database and grid equipment database is power grid internal data, composite basis database, geographic information database It is power grid external data with the content in the thematic data base of space.
Operation of power networks database purchase content includes system operation data and electric load;In composite basis database purchase Appearance includes industrial policy data, national economy data, communications and transportation data and geographical data;Geographic information database stores Content includes terrain data, relief data, electronic map and image data;Space thematic data base storage content is protected including nature Protect area's data, soil erosion protection distribution map, land-use map, mineral resource distribution figure, estate planning area data and geology calamity Evil area's data;Grid equipment database purchase content includes city model, substation's typical model and shaft tower typical model.
The mode of establishing of above-mentioned operation of power networks database is accessed including data full dose(It is PMS2.0, GIS, scheduling automated System and other existing network systems)With manual importing(Integrated data, including threedimensional model, Municipal division of the power supply area, electricity Net economic data etc.), power network development database is integrated into after foundation, layout data model is established in data server, is being answered Service, data analysis service, data exhibiting service are calculated, and realize that auxiliary programming should in client with realization data in server With, present situation rack displaying application, grid plan modification displaying application, planning effect displaying application three-dimensional applications.
It needs to define operation of power networks data progress attribute when storing operation of power networks data, specifically including qualitative number It defining and is transported according to power grid according to quantitative data, data structure, data update period, data refresh mode and data volume Operation of power networks data are carried out data mapping by the needs of row relational model.Specifically, when storing operation of power networks data, first Operation of power networks source data is obtained, by the extraction of operation of power networks source data, conversion and the storage for loading and then realizing operation of power networks data. For different form, the source data of different attribute, when taking different data pick-up interfaces and determining extraction mode respectively, extract Machine, decimation periods;After data pick-up, carry out data conversion, the data conversion refer to operation of power networks source data to extraction into The conversion of row data such as cleaning, splits, summarizes at the processing, ensures different dimensions, the consistency of the data of different-format and complete Property, and data conversion technique and strategy determines according to actual conditions;Data loading be will extract, transformed data are loaded and are deposited Storage.
Application layer includes three-dimensional display unit, analytic unit, decision package and achievements exhibition unit.To realize that exploitation is auxiliary Help the service applications functions such as planning, evaluation, construction management, fortune inspection, emergent, scheduling information, Power marketing.
Three-dimensional display Elementary Function includes:Space special topic three-dimensional applications displaying, the displaying of power grid thematic data three-dimensional applications, three Dimension platform is shown substantially.Space special topic three-dimensional applications displaying includes territory data, multi-energy data, urban planning and municipal data; The displaying of power grid thematic data three-dimensional applications includes Net Frame of Electric Network space, electric power resource management, Distributing network structure and grid equipment inquiry Positioning;Three-dimensional platform is shown substantially including environment viewing, Query Location, map label and three-dimensional spatial analysis.
The function of three-dimensional display unit realizes step:
S11, establishes layout data model in data server, and data model refers to the fortune that category data are carried out with calculation process The set of formula is calculated, including city model, substation's typical model and shaft tower typical model;
S12 receives the instruction of client layer;
S13 if instruction is three-dimensional display acquisition instruction, transfers instruction specified data in power network development database(Here Data be to be obtained in operation of power networks database, composite basis database, geographic information database and space thematic data base It takes), and the called data model in grid equipment database;
S14, the data input data model that will be transferred, obtains three-dimensional display relation data;
Three-dimensional display relation data is shown by S15 according to default.
According to above-mentioned realization step, Ke Yi《City three-dimensional auxiliary programming system》Middle three-dimensional city geographic information data (.XPL)On the basis of, power grid is distributed progress overall picture three-dimensional and is showed.
Analytic unit function includes:Load prediction and present situation power network frame analysis.
Analytic unit function realizes step:
S21 receives the instruction of client layer;
If instruction is instructed for data acquisition, the number specified is transferred according to keyword in operation of power networks database by S22 According to, and be shown according to default;Displaying is one or more of data content classification in power network development database, works as needs When the content of display is more than one, then split screen display available is taken;
S23 if described instruction is instructed for load prediction, transfers what is specified according to keyword in operation of power networks database Data bring the digital map regional load distribution map in geographic information database into;It is different power load thresholds in advance It is worth section and corresponding colouring information is set, obtains on electronic map corresponding to threshold interval where the power load in each area Colouring information is labeled using colouring information on area;Further obtain the current year in each area and load over the years letter Breath, and compared, historical load comparative information is obtained, generates historical load comparison diagram;
S24 if instruction is instructed for present situation power network frame analysis, transfers what is specified according to keyword in operation of power networks database Data are brought into the corresponding data model of grid equipment database, obtain present situation rack relation data, and showed according to default Shape rack is shown.
Decision package function includes:Auxiliary programming unit, auxiliary evaluation unit and project library management.Decision package function is real Existing step:
S31 receives the instruction of client layer;
If instruction is instructed for auxiliary programming, the number specified is transferred according to keyword in operation of power networks database by S32 According to bringing existing Electric Power Network Planning analysis software into and carry out issue management and performance analysis;
S33 if instruction is auxiliary evaluation instruction, opens client layer designing scheme digitlization input function, is designed scheme Typing and management carry out evaluation course management and evaluation data management flow after storage;Auxiliary is evaluated to carry out power grid project The scheme evaluatings middle ring such as feasibility study, Preliminary design, plant-grid connection system schema joint number evidence, node control;
S34, if instruction is instructed for project library management, open client layer planned project library management, planned project condition managing with And planned project data management function, realize project library overall process data management.
Achievements exhibition Elementary Function includes the displaying of present situation rack three dimensions, program results rack three dimensions is shown and special Topic analysis data displaying.Achievements exhibition Elementary Function realizes step,
S41 receives the instruction of client layer;
If instruction is the displaying instruction of present situation rack three dimensions, finger is transferred according to keyword in operation of power networks database by S42 Specified data, i.e. rack data are enabled, then rack data is brought into the data model of grid equipment database, obtains rack Three-dimensional display relation data;And according to default progress present situation rack three-dimensional display application;
If instruction is shown for program results rack three dimensions, finger is transferred according to keyword in operation of power networks database by S43 Specified data is enabled, existing Electric Power Network Planning analysis software prediction layout data is brought into, then brings prediction layout data into electricity In the corresponding data model of net device databases, planning three-dimensional display relation data is obtained, and according to default carry out program results Rack three-dimensional display;
S44 if instruction is shown for specific analysis data, transfers what is specified according to keyword in operation of power networks database Data bring existing Electric Power Network Planning analysis software into and carry out specific analysis, are then shown analysis data according to default.
Above-mentioned platform integrates power grid internal data and external data, the regional virtual power grid of structure, with three-dimensional visible comprehensively Change mode comprehensive management, builds operational platform, true to restore operation of power networks environment and operating condition, formed it is accurate it is full and accurate, Content is intuitive, calls convenient information integral job applications, the application functions such as exploitation auxiliary programming, auxiliary evaluation, support electricity Network planning is drawn and evaluation.
Above-mentioned platform supplement improves data resource, realizes quick-searching, calling, excavation and the analysis of all kinds of big datas, On the basis of foundation data conformity and partial function module are realized, exploitation assists emergent fortune inspection, auxiliary, scheduling information, electricity consumption to seek The functions such as pin, branch out application function, realizes business cooperation application.
Above-mentioned platform iteration proofreads Data Analysis Model and according to feedback is used, and optimization big data excavates calculate related to analysis Method and function, improve last stage application function, and the business such as support planning for the expansion of power grids, economic evaluation are realized and carried towards full-service For being based on development dataset analysis and the intuitive aid decision application platform of three-dimensional precision, convenient control power network development operation situation.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformation can also be made, these are improved and deformation Also it should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of three-dimensional power grid application platform, including sequentially connected data Layer, platform layer, application layer and client layer, It is characterized in that:Data Layer is power network development database, and power network development database purchase content includes power grid internal data and power grid External data, application layer include three-dimensional display unit, analytic unit, decision package and achievements exhibition unit.
2. a kind of three-dimensional power grid application platform according to claim 1, it is characterised in that:Power network development database includes electricity Network operation database, composite basis database, geographic information database, space thematic data base and grid equipment database;
Operation of power networks database purchase content includes system operation data and electric load;Composite basis database purchase content packet Include industrial policy data, national economy data, communications and transportation data and geographical data;Geographic information database storage content Including terrain data, relief data, electronic map and image data;Space thematic data base storage content includes nature reserve area Data, soil erosion protection distribution map, land-use map, mineral resource distribution figure, estate planning area data and geological disaster area Data;Grid equipment database purchase content includes city model, substation's typical model and shaft tower typical model.
3. a kind of three-dimensional power grid application platform according to claim 1, it is characterised in that:Client layer is client.
4. a kind of three-dimensional power grid application platform according to claim 2, it is characterised in that:Three-dimensional display Elementary Function is realized Step,
Layout data model is established in data server, including city model, substation's typical model and shaft tower typical model;
Receive the instruction of client layer;
If instruction is three-dimensional display acquisition instruction, instruction specified data and data mould are transferred in power network development database Type;
The data input data model that will be transferred, obtains three-dimensional display relation data;
Three-dimensional display relation data is shown according to default.
5. a kind of three-dimensional power grid application platform according to claim 2, it is characterised in that:Analytic unit function realizes step Suddenly,
Receive the instruction of client layer;
If instruction is instructed for data acquisition, instruction specified data is transferred in operation of power networks database according to keyword, and It is shown according to default;
If described instruction is instructed for load prediction, the number specified is transferred in operation of power networks database according to keyword According to bringing the digital map regional load distribution map in geographic information database into;
If instruction is instructed for present situation power network frame analysis, the number specified is transferred in operation of power networks database according to keyword According to bringing into the corresponding data model of grid equipment database, obtain present situation rack relation data, and according to default carry out present situation Rack is shown.
6. a kind of three-dimensional power grid application platform according to claim 2, it is characterised in that:Decision package function realizes step Suddenly,
Receive the instruction of client layer;
If instruction is instructed for auxiliary programming, instruction specified data, band are transferred in operation of power networks database according to keyword Enter existing Electric Power Network Planning analysis software and carry out issue management and performance analysis;
If instruction is auxiliary evaluation instruction, client layer designing scheme digitlization input function is opened, is designed scheme typing And management, evaluation course management and evaluation data management flow are carried out after storage;
If instruction is instructed for project library management, the library management of client layer planned project, planned project condition managing and rule are opened Item data management function is drawn, realizes project library overall process data management.
7. a kind of three-dimensional power grid application platform according to claim 2, it is characterised in that:Achievements exhibition Elementary Function is realized Step,
Receive the instruction of client layer;
If instruction is the displaying instruction of present situation rack three dimensions, instruction is transferred in operation of power networks database according to keyword and is referred to Fixed data, i.e. rack data, then bring rack data into the data model of grid equipment database, obtain rack three-dimensional Show relation data;And according to default progress present situation rack three-dimensional display application;
If instruction is shown for program results rack three dimensions, instruction is transferred in operation of power networks database according to keyword and is referred to Fixed data, bring existing Electric Power Network Planning analysis software prediction layout data into, and then bringing prediction layout data into power grid sets In the corresponding data model of standby database, planning three-dimensional display relation data is obtained, and according to default progress program results rack Three-dimensional display;
If instruction is shown for specific analysis data, the number specified is transferred in operation of power networks database according to keyword According to bringing existing Electric Power Network Planning analysis software into and carry out specific analysis, be then shown analysis data according to default.
CN201711223260.5A 2017-11-29 2017-11-29 A kind of three-dimensional power grid application platform Pending CN108171616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711223260.5A CN108171616A (en) 2017-11-29 2017-11-29 A kind of three-dimensional power grid application platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711223260.5A CN108171616A (en) 2017-11-29 2017-11-29 A kind of three-dimensional power grid application platform

Publications (1)

Publication Number Publication Date
CN108171616A true CN108171616A (en) 2018-06-15

Family

ID=62524117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711223260.5A Pending CN108171616A (en) 2017-11-29 2017-11-29 A kind of three-dimensional power grid application platform

Country Status (1)

Country Link
CN (1) CN108171616A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109697059A (en) * 2018-12-13 2019-04-30 国网江西省电力有限公司电力科学研究院 A kind of power distribution network data three-dimensional visual system architecture based on virtual reality
CN109857819A (en) * 2018-11-20 2019-06-07 国网能源研究院有限公司 A kind of global energy geography multimedia interactive display systems
CN109902332A (en) * 2018-12-14 2019-06-18 仙居县恒信电力有限公司 A kind of power matching network system based on Three-dimension
CN110706566A (en) * 2019-10-14 2020-01-17 国网安徽省电力有限公司蚌埠供电公司 Virtual display training navigation integrated system of substation
CN111798117A (en) * 2020-06-29 2020-10-20 国家电网有限公司 System and method for managing release of three-dimensional design universal model of transformer substation
CN111881131A (en) * 2020-06-18 2020-11-03 广东电网有限责任公司广州供电局 Three-dimensional GIS platform applied to power grid planning

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093392A (en) * 2011-10-31 2013-05-08 河南省电力公司 Electrical power system three-dimensional digitalization operation platform
CN103093008A (en) * 2011-10-31 2013-05-08 河南省电力公司 System and method for power transmission and transformation project three-dimensional-aided preliminary design
KR20130057663A (en) * 2011-11-24 2013-06-03 한전케이디엔주식회사 Dynamic modeling of electrical system and visualization system based on gis and driving method of the same
CN103218694A (en) * 2013-04-28 2013-07-24 北京臻迪科技有限公司 Power emergency monitoring method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093392A (en) * 2011-10-31 2013-05-08 河南省电力公司 Electrical power system three-dimensional digitalization operation platform
CN103093008A (en) * 2011-10-31 2013-05-08 河南省电力公司 System and method for power transmission and transformation project three-dimensional-aided preliminary design
KR20130057663A (en) * 2011-11-24 2013-06-03 한전케이디엔주식회사 Dynamic modeling of electrical system and visualization system based on gis and driving method of the same
CN103218694A (en) * 2013-04-28 2013-07-24 北京臻迪科技有限公司 Power emergency monitoring method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭敏: ""基于GIS的智能电网一体化探讨与部分功能实现"", 《中国优秀硕士学位论文全文数据库(工程科技II辑)》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109857819A (en) * 2018-11-20 2019-06-07 国网能源研究院有限公司 A kind of global energy geography multimedia interactive display systems
CN109857819B (en) * 2018-11-20 2021-02-05 国网能源研究院有限公司 Global energy geography multimedia interactive display system
CN109697059A (en) * 2018-12-13 2019-04-30 国网江西省电力有限公司电力科学研究院 A kind of power distribution network data three-dimensional visual system architecture based on virtual reality
CN109902332A (en) * 2018-12-14 2019-06-18 仙居县恒信电力有限公司 A kind of power matching network system based on Three-dimension
CN110706566A (en) * 2019-10-14 2020-01-17 国网安徽省电力有限公司蚌埠供电公司 Virtual display training navigation integrated system of substation
CN111881131A (en) * 2020-06-18 2020-11-03 广东电网有限责任公司广州供电局 Three-dimensional GIS platform applied to power grid planning
CN111798117A (en) * 2020-06-29 2020-10-20 国家电网有限公司 System and method for managing release of three-dimensional design universal model of transformer substation
CN111798117B (en) * 2020-06-29 2024-02-02 国家电网有限公司 System and method for managing release of three-dimensional design general model of transformer substation

Similar Documents

Publication Publication Date Title
CN108171616A (en) A kind of three-dimensional power grid application platform
CN111737234A (en) Multi-platform energy information management system with multi-source fusion
CN108733850A (en) A kind of power grid big data analysis excavation application system
CN105023188B (en) Digital city management data sharing system based on cloud data
CN108694244A (en) A kind of electric network synthetic application platform based on three-dimensional data
CN101908165A (en) Geographic information system (GIS)-based industrial cluster information integration service system and method
CN106296445A (en) A kind of power customer label construction method
CN103093392A (en) Electrical power system three-dimensional digitalization operation platform
Azaz The use of geographic information systems (GIS) in business
Karabegovic et al. Geoportal as decision support system with spatial data warehouse
CN104408564A (en) Digital water resource system
CN112036766A (en) Gridding distribution network service management method and device, computer equipment and storage medium
CN103646091A (en) Generation method and device of grid graph data
Gao et al. An agent-based simulation system for evaluating gridding urban management strategies
CN112380246A (en) Planning service-oriented multi-terminal visual application system and line planning method
CN109284314A (en) A kind of high pressure customer access system and method based on power grid visualization
Keenan Concepts and theories of GIS in business
Ding et al. Mobility industry call center location selection under sustainability: a two-phase decision-making approach
Bin et al. Decision oriented intelligent transport information platform design research–case study of Hangzhou City
Huang et al. Research on smart grid planning and construction based on gis resource allocation technology
Cico et al. Implementation of enterprise GIS in power distribution utilities
CN102324060A (en) Method for acquiring multidimensional space-time power-engineering geological information and device
Wang et al. Spatial aided decision-making system for E-Government
CN108170720A (en) Plan display system
Kim A Study on the construction of desirable model of the national spatial data infrastructure policy promotion system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180615

RJ01 Rejection of invention patent application after publication