CN108167324A - A kind of release bearing and its production technology with flower pattern spring - Google Patents

A kind of release bearing and its production technology with flower pattern spring Download PDF

Info

Publication number
CN108167324A
CN108167324A CN201810068761.9A CN201810068761A CN108167324A CN 108167324 A CN108167324 A CN 108167324A CN 201810068761 A CN201810068761 A CN 201810068761A CN 108167324 A CN108167324 A CN 108167324A
Authority
CN
China
Prior art keywords
flower pattern
product
outer ring
punching machine
grease
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810068761.9A
Other languages
Chinese (zh)
Inventor
黄东勋
党利娜
何万里
王立波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy-Conservation Science And Technology Co Ltd Of Hangzhou Lei Dike
Original Assignee
Energy-Conservation Science And Technology Co Ltd Of Hangzhou Lei Dike
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Energy-Conservation Science And Technology Co Ltd Of Hangzhou Lei Dike filed Critical Energy-Conservation Science And Technology Co Ltd Of Hangzhou Lei Dike
Priority to CN201810068761.9A priority Critical patent/CN108167324A/en
Publication of CN108167324A publication Critical patent/CN108167324A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C23/00Bearings for exclusively rotary movement adjustable for aligning or positioning
    • F16C23/06Ball or roller bearings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D35/00Combined processes according to or processes combined with methods covered by groups B21D1/00 - B21D31/00
    • B21D35/002Processes combined with methods covered by groups B21D1/00 - B21D31/00
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/40Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for rings; for bearing races
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/30Parts of ball or roller bearings
    • F16C33/58Raceways; Race rings
    • F16C33/581Raceways; Race rings integral with other parts, e.g. with housings or machine elements such as shafts or gear wheels

Abstract

The present invention relates to a kind of release bearing more particularly to a kind of release bearings and its production technology with flower pattern spring.Including center, the left end of the center is cased with inner ring, outer ring is set with outside the inner ring, retainer is equipped between the inner ring and outer ring, steel ball is equipped in the retainer, flower pattern spring is equipped between the center and inner ring, the inner wall of the flower pattern spring and outer ring is resilient supporting, retainer raceway is formed between the outer ring and inner ring, the grease baffle with outer ring inner wall elastic connection is equipped in the retainer raceway.It is compact-sized, product quality is promoted, is prolonged the service life.

Description

A kind of release bearing and its production technology with flower pattern spring
Technical field
The present invention relates to a kind of release bearing more particularly to a kind of release bearings and its production technology with flower pattern spring.
Background technology
Vehicle clutch disengaging bearing is unfixed in use, in order to eliminate the position due to being formed after each part entrucking Deviation is put, being now designed to the rotating part of release bearing can be with the structure of automatic aligning.Before the shortcomings that product:
1st, without aligning structure, without aligning function, product is unable to aligning, quick abrasion during use, short life;
2nd, it using the aligning structure of waveform spring, but to be used in combination with shell, complicated, technique is cumbersome;
3rd, using the aligning structure of rubber sleeve, product can automatically reset when pre-tightening insufficient, and aligning performance is bad, uses the later stage Quick abrasion, service life reduction.
Invention content
The present invention mainly solves the deficiencies in the prior art, provides a kind of simple in structure, raising release bearing tune A kind of release bearing and its production technology with flower pattern spring that mental and physical efforts are stablized.
The above-mentioned technical problem of the present invention is mainly what is be addressed by following technical proposals:
A kind of release bearing with flower pattern spring, including center, the left end of the center is cased with inner ring, described Outer ring is set with outside inner ring, retainer is equipped between the inner ring and outer ring, steel ball is equipped in the retainer, in described The heart is covered being equipped with flower pattern spring between inner ring, and the inner wall of the flower pattern spring and outer ring is resilient supporting, the outer ring with it is interior Retainer raceway is formed between circle, the grease baffle with outer ring inner wall elastic connection is equipped in the retainer raceway;
The flower pattern spring is distributed in round, and the flower pattern spring with center phase empty set is equipped in the flower pattern spring Mounting hole, the inner wall of the flower pattern spring are equipped with equally distributed elastic support sheet, elasticity are equipped between adjacent spring support chip Notch, the elastic support sheet are distributed in shape is folded upward at.
Preferably, the trapezoidal shape distribution in the longitudinal section of the elastic support sheet, the interior dog-ear of the elastic notch In arc transition;The bottom end of the elastic support sheet is bearing diagonal piece, and the outer end of the elastic support sheet is supported for bending Piece, the inclination angle of the bearing diagonal piece is 21 degree, and the junction of the bending support chip and bearing diagonal piece is in arc transition, The inclination angle of the bending support chip is 15 degree.
Preferably, the elastic support sheet is distributed with flower pattern spring in integrated, the bearing diagonal piece and bending Support chip is distributed in integration, and the thickness of the flower pattern spring is 0.25mm, the elastic support sheet and elastic notch Quantity is respectively 12.
Preferably, it is sealed between the inner ring and outer ring by sealing ring.
By the punching and bending and molding to sheet metal, it is allowed to certain bending and angle, global shape can be appropriate The inside for being installed on release bearing;Quenching treatment is carried out, allows sheet metal that can possess good elasticity;By flower pattern spring assembly Inside release bearing, make it to generate appropriate pressure, pressure generates required after acting on the contact surface of two parts One of main performance of frictional force, i.e. release bearing --- aligning force.
The aligning force of release bearing is one of its main performance, but its internal structure is generally compact, it is impossible to be placed Conventional spring element is designed by our flower pattern spring, makes product interior our needs of can generating in a limited space Suitable aligning force.Flower pattern spring is of less demanding to fitted position, and the active force that can be generated is more stable, different by changing Angle, it may be convenient to increase or decrease active force, release bearing aligning force equipped with flower pattern spring is stablized;In addition, assembling Frock clamp it is fairly simple, it is easy to assembly.
A kind of release bearing with flower pattern spring, carries out according to the following steps:
(1) confirm material:
Production schedule list is formulated according to the demand of client, 65Mn materials are got according to technological requirement, are confirmed using micrometer The thickness of material, it is ensured that thickness reaches 0.25 ± 0.01mm, and checks whether material has crackle corrosion defect, and material is pulled to punching Bed feed zone;
(2), punch die is adjusted:
Corresponding with model blanking die is taken out, selects the common punch press of 5-10T, using high pressure gas by work bench of punch press The foreign matter in face is blown clean;Upper mold is fixed on to the centre in the upper table face of punching machine using bolt;Lower die is placed under punching machine On work top, slider of punch is adjusted, completely attaches to upper and lower mould;Lower die is fixed on to the lower table of punching machine using pressing plate Face;Punching machine big belt wheel is pulled by hand, slides up and down punching machine upper table face, observes the whether smooth cooperation of upper and lower mould;
A strip material is taken out, is transported to examination punching between mold;Punching machine top shoe is adjusted, upper mold is allow to pour lower die More than 0.5mm;Check that slug appearance confirms that mold installation is correct, blanking edge does not have burr, then locks punching machine using screw Sliding block;Workbench and die surface are blown clean using high pressure gas;A small amount of lubricating oil is smeared on mold side edge with hairbrush, is being rushed Splicing basket is placed in bed discharging area, powers on, and adjusts step height, foot position is made to meet ergonomics, is produced;
(3), shaping:
Shaping mould corresponding with model is taken out, the shaping angle of mold is 1-2 ° bigger than angles of product respectively, selects 5-10T Common punch press, the foreign matter of work surface of punching machine is blown clean using high pressure gas;Upper mold is fixed on punching machine using bolt The centre in upper table face;Lower die is placed on punching machine lower table face, slider of punch is adjusted, upper and lower mould is made to be bonded completely; Lower die is fixed on to the lower table face of punching machine using pressing plate;Punching machine big belt wheel is pulled by hand, is made above and below punching machine upper table face It slides, upper and lower mould is allowed smoothly to slide;
Lower charging basket is removed to material waiting section, blanking material is taken out, puts it into lower mould, edge of materials and lower mould are recessed Area is completely the same, it is impossible to exceed;Punching machine top shoe is adjusted, upper mold is allow to pour more than lower die 0.5mm;Check examination slug appearance Confirm that mold installation is correct, product edge does not have burr, then locks slider of punch using screw;It is blown clean using high pressure gas Workbench and die surface;A small amount of lubricating oil is smeared in die surface with hairbrush, is placed splicing basket in punching machine blanking area, is connected Power supply adjusts step height, foot position is made to meet ergonomics;
(4), it quenches:
Product is only stacked per 4-5 into heating furnace, salt bath quenching;Product hardness 450-500HV is examined after quenching;Surface is not There can be decarburization, product there cannot be apparent deformation;
(5), it assembles:
From warehouse, neck goes out each part, and after removing outer packing to steel ball, flower pattern spring and grease baffle, uses 120# gasoline Or cleaning agent is cleaned;Paying attention to the steel ball of different size will be cleaned separately, it is impossible to mix;Cleaning needs 2 before use It is used in working day, otherwise needs to do antirust again and be cleaned again using preceding;
A, the steel ball of different size is packed into pulping apparatus, the steel ball specification inside pulping apparatus is if it is different, need to clear up before It could be used after complete;Retainer is put into charge bar to be installed, openend is upward, and adjusting device is into luggage ball;It is needed after dress ball red The detection of outside line 100% is lost, and encounters the retainer lost, equipment can automatic rejection to NonConforming Parts Area, treat a batch or After shift is finished, operator needs to take out the neglected loading retainer in unqualified area, by hand fills steel ball, is put into charging basket;It removes There cannot be big-movement during fortune, and otherwise have steel ball and fall from retainer;In addition, it is singly fallen using having in middle discovery charging basket Steel ball when retainer is then needed in full inspection basket to find out miss steel ball part, fill by hand;
B, flower pattern spring, grease baffle and outer ring are removed to oil pressure area, adjusts hydraulic station to operating pressure 4-6MPa;By flower pattern Spring and each 1 of grease baffle are sequentially placed into 1 outer ring inner wall, and the material put well is put to hydraulic area, using corresponding Grease baffle is pressed into outer ring inner wall by mold, and oil pressure is maintained at 4-6MPa, checks that grease baffle cannot have deformation, flower pattern spring after press-in It cannot be pushed down by grease baffle, allow the freely activity between grease baffle and outer ring of flower pattern spring, but cannot come off;
C, steel ball and retainer are placed in outer ring raceway position, the openend for paying attention to making retainer is upward;
D, sealing ring is pressed into the seal groove of outer ring, the full glue surface of sealing ring upward, and there cannot be deformation;
E, product component is removed to stuffing area, chooses oil head corresponding with product, notice that the grease trade mark inside oil head will It is consistent with the grease trade mark in grease pump, if inconsistent need the grease in oil head to remove totally.Then grease pump is adjusted Air pressure, air pressure is made to continuously adjust the location nut of grease pump, injection test fat reaches a film output amount in 0.2-0.4MPa 2.5-3.0g, last locking positioning nut.If the grease trade mark in oil head in the grease trade mark and grease pump is inconsistent, in oil head Grease cannot produce before not removing;Press foot pedal once can greasing it is primary;Product is fully inserted into oil head during greasing, so Rear pedal is pressed once, after the stopping of air pressure sound, is rotated by hand more than the circle of bearing 0.5, then extract bearing, such greasing It just calculates and completes;
F, selection and outer ring and the corresponding inner ring of steel ball stepping size;Outer ring assembl and inner ring are moved into baric area;It will Atmospheric pressure value is adjusted to 0.3-0.5MPa;Inner ring is put into outer ring assembl, is then put into togerther under the press-loading head of air pressure, is pressed Dynamic foot pedal, press-loading head downlink push down inner ring end face, inner ring are completely forced into outer ring;When Internal and external cycle can not be pressed by air pressure When, it is that inner ring fore shaft is excessive, it is impossible to be pressed by force, otherwise can destroy steel ball and inner ring raceway;Bearing portions is carried out after press-in Radial internal clearance examine, clearance is in 0.015-0.045mm;
G, the internal diameter size inspection that the center that high-ranking military officer enters carries out 100% using drift is stopped, underproof product will reject, Certified products are then transferred to next procedure;
H, qualified center and bearing portions will be examined to move in hydraulic region;Hydraulic press is adjusted, operating pressure is adjusted to 2-5MPa;Corresponding flower pattern floating die is taken out, first combines bearing and center by hand, bearing outer ring internal diameter 4 positioning grooves and 4 salient points of center positioning match, it is impossible to misplace, otherwise, subsequent press fitting can be by center casing pressure It bursts;The power switch of hydraulic press is opened, operating switch is pressed using foot pedal;Check whether operating pressure is setting pressure;It will The product combined by hand is positioned over hydraulic area, and the head of pressing mold is put into the bending part of flower pattern spring, grasps pressure The central region of mould, by pressing mold righting;Press floor push, pressure testing product;Pressing mold is taken out, brings the product after press fitting into aligning Force inspecting area;
I, the test mandrel of aligning tension gauge is replaced with mandrel corresponding with product;The endoporus of product to be measured is put into Mandrel;The dynamometer on detector is adjusted, is zeroed;The measuring wrench of detector is pulled, makes the gauge head top of dynamometer to axis Outer diameter is held, slowly pulls spanner, the pointer of dynamometer is allowed to change, continues to pull spanner, until the pointer of dynamometer is no longer Increase, the reading for writing down dynamometer pointer are the aligning force of this product surveyed, and then pull spanner and retract;By product in core 120 ° or so are rotated on axis;Action more than repeating measures the aligning force of product again;It is finally equidirectional again to rotate product twice 120 ° or so, repeat above action, 4 aligning forces of survey;Including the aligning force value of usual 1st survey is disregarded, rear 3 surveys are taken Average value is the aligning force of test product.
Therefore, a kind of release bearing and its production technology with flower pattern spring of the invention, it is compact-sized, promote product product Matter prolongs the service life.
Description of the drawings
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the structure diagram of flower pattern spring in the present invention;
Fig. 3 is the schematic cross-sectional view of flower pattern spring in the present invention.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
Embodiment 1:As shown in Figure 1, Figure 2 and Figure 3, a kind of release bearing with flower pattern spring, it is described including center 1 The left end of center 1 be cased with inner ring 2, be set with outer ring 3 outside the inner ring 2, be equipped with and protect between the inner ring 2 and outer ring 3 Frame 4 is held, steel ball 5 is equipped in the retainer 4, flower pattern spring 6, the flower pattern is equipped between the center 1 and inner ring 2 Spring 6 and the inner wall of outer ring 3 are resilient supporting, and retainer raceway 7, the retainer are formed between the outer ring 3 and inner ring 2 The grease baffle 8 with 3 inner wall elastic connection of outer ring is equipped in raceway 7;
The flower pattern spring 6 is distributed in round, and the flower pattern with 1 phase empty set of center is equipped in the flower pattern spring 6 Spring mounting hole 9, the inner wall of the flower pattern spring 6 are equipped with equally distributed elastic support sheet 10, adjacent spring support chip 10 Between be equipped with elastic notch 11, the elastic support sheet 10 is in being folded upward at shape distribution.
The trapezoidal shape distribution in longitudinal section of the elastic support sheet 10, the interior dog-ear of the elastic notch 11 is in circular arc Transition;The bottom end of the elastic support sheet 10 is bearing diagonal piece 12, and the outer end of the elastic support sheet 10 is supported for bending Piece 13, the inclination angle of the bearing diagonal piece 12 is 21 degree, and the bending support chip 13 and the junction of bearing diagonal piece 12 are in Arc transition, the inclination angle of the bending support chip 13 is 15 degree.
With flower pattern spring 6 in integrated distribution, the bearing diagonal piece 12 supports the elastic support sheet 10 with bending Piece 13 is distributed in integration, and the thickness of the flower pattern spring 6 is 0.25mm, the elastic support sheet 10 and elastic notch 11 Quantity be respectively 12.
It is sealed between the inner ring 2 and outer ring 3 by sealing ring 14.
Release bearing with flower pattern spring, it is characterised in that carry out according to the following steps:
(1) confirm material:
Production schedule list is formulated according to the demand of client, 65Mn materials are got according to technological requirement, are confirmed using micrometer The thickness of material, it is ensured that thickness reaches 0.25 ± 0.01mm, and checks whether material has crackle corrosion defect, and material is pulled to punching Bed feed zone;
(2), punch die is adjusted:
Corresponding with model blanking die is taken out, selects the common punch press of 5-10T, using high pressure gas by work bench of punch press The foreign matter in face is blown clean;Upper mold is fixed on to the centre in the upper table face of punching machine using bolt;Lower die is placed under punching machine On work top, slider of punch is adjusted, completely attaches to upper and lower mould;Lower die is fixed on to the lower table of punching machine using pressing plate Face;Punching machine big belt wheel is pulled by hand, slides up and down punching machine upper table face, observes the whether smooth cooperation of upper and lower mould;
A strip material is taken out, is transported to examination punching between mold;Punching machine top shoe is adjusted, upper mold is allow to pour lower die More than 0.5mm;Check that slug appearance confirms that mold installation is correct, blanking edge does not have burr, then locks punching machine using screw Sliding block;Workbench and die surface are blown clean using high pressure gas;A small amount of lubricating oil is smeared on mold side edge with hairbrush, is being rushed Splicing basket is placed in bed discharging area, powers on, and adjusts step height, foot position is made to meet ergonomics, is produced;
(3), shaping:
Shaping mould corresponding with model is taken out, the shaping angle of mold is 1-2 ° bigger than angles of product respectively, selects 5-10T Common punch press, the foreign matter of work surface of punching machine is blown clean using high pressure gas;Upper mold is fixed on punching machine using bolt The centre in upper table face;Lower die is placed on punching machine lower table face, slider of punch is adjusted, upper and lower mould is made to be bonded completely; Lower die is fixed on to the lower table face of punching machine using pressing plate;Punching machine big belt wheel is pulled by hand, is made above and below punching machine upper table face It slides, upper and lower mould is allowed smoothly to slide;
Lower charging basket is removed to material waiting section, blanking material is taken out, puts it into lower mould, edge of materials and lower mould are recessed Area is completely the same, it is impossible to exceed;Punching machine top shoe is adjusted, upper mold is allow to pour more than lower die 0.5mm;Check examination slug appearance Confirm that mold installation is correct, product edge does not have burr, then locks slider of punch using screw;It is blown clean using high pressure gas Workbench and die surface;A small amount of lubricating oil is smeared in die surface with hairbrush, is placed splicing basket in punching machine blanking area, is connected Power supply adjusts step height, foot position is made to meet ergonomics;
(4), it quenches:
Product is only stacked per 4-5 into heating furnace, salt bath quenching;Product hardness 450-500HV is examined after quenching;Surface is not There can be decarburization, product there cannot be apparent deformation;
(5), it assembles:
From warehouse, neck goes out each part, and after removing outer packing to steel ball, flower pattern spring and grease baffle, uses 120# gasoline Or cleaning agent is cleaned;Paying attention to the steel ball of different size will be cleaned separately, it is impossible to mix;Cleaning needs 2 before use It is used in working day, otherwise needs to do antirust again and be cleaned again using preceding;
J, the steel ball of different size is packed into pulping apparatus, the steel ball specification inside pulping apparatus is if it is different, need to clear up before It could be used after complete;Retainer is put into charge bar to be installed, openend is upward, and adjusting device is into luggage ball;It is needed after dress ball red The detection of outside line 100% is lost, and encounters the retainer lost, equipment can automatic rejection to NonConforming Parts Area, treat a batch or After shift is finished, operator needs to take out the neglected loading retainer in unqualified area, by hand fills steel ball, is put into charging basket;It removes There cannot be big-movement during fortune, and otherwise have steel ball and fall from retainer;In addition, it is singly fallen using having in middle discovery charging basket Steel ball when retainer is then needed in full inspection basket to find out miss steel ball part, fill by hand;
K, flower pattern spring, grease baffle and outer ring are removed to oil pressure area, adjusts hydraulic station to operating pressure 4-6MPa;By flower pattern Spring and each 1 of grease baffle are sequentially placed into 1 outer ring inner wall, and the material put well is put to hydraulic area, using corresponding Grease baffle is pressed into outer ring inner wall by mold, and oil pressure is maintained at 4-6MPa, checks that grease baffle cannot have deformation, flower pattern spring after press-in It cannot be pushed down by grease baffle, allow the freely activity between grease baffle and outer ring of flower pattern spring, but cannot come off;
L, steel ball and retainer are placed in outer ring raceway position, the openend for paying attention to making retainer is upward;
M, sealing ring is pressed into the seal groove of outer ring, the full glue surface of sealing ring upward, and there cannot be deformation;
N, product component is removed to stuffing area, chooses oil head corresponding with product, notice that the grease trade mark inside oil head will It is consistent with the grease trade mark in grease pump, if inconsistent need the grease in oil head to remove totally.Then grease pump is adjusted Air pressure, air pressure is made to continuously adjust the location nut of grease pump, injection test fat reaches a film output amount in 0.2-0.4MPa 2.5-3.0g, last locking positioning nut.If the grease trade mark in oil head in the grease trade mark and grease pump is inconsistent, in oil head Grease cannot produce before not removing;Press foot pedal once can greasing it is primary;Product is fully inserted into oil head during greasing, so Rear pedal is pressed once, after the stopping of air pressure sound, is rotated by hand more than the circle of bearing 0.5, then extract bearing, such greasing It just calculates and completes;
O, selection and outer ring and the corresponding inner ring of steel ball stepping size;Outer ring assembl and inner ring are moved into baric area;It will Atmospheric pressure value is adjusted to 0.3-0.5MPa;Inner ring is put into outer ring assembl, is then put into togerther under the press-loading head of air pressure, is pressed Dynamic foot pedal, press-loading head downlink push down inner ring end face, inner ring are completely forced into outer ring;When Internal and external cycle can not be pressed by air pressure When, it is that inner ring fore shaft is excessive, it is impossible to be pressed by force, otherwise can destroy steel ball and inner ring raceway;Bearing portions is carried out after press-in Radial internal clearance examine, clearance is in 0.015-0.045mm;
P, the internal diameter size inspection that the center that high-ranking military officer enters carries out 100% using drift is stopped, underproof product will reject, Certified products are then transferred to next procedure;
Q, qualified center and bearing portions will be examined to move in hydraulic region;Hydraulic press is adjusted, operating pressure is adjusted to 2-5MPa;Corresponding flower pattern floating die is taken out, first combines bearing and center by hand, bearing outer ring internal diameter 4 positioning grooves and 4 salient points of center positioning match, it is impossible to misplace, otherwise, subsequent press fitting can be by center casing pressure It bursts;The power switch of hydraulic press is opened, operating switch is pressed using foot pedal;Check whether operating pressure is setting pressure;It will The product combined by hand is positioned over hydraulic area, and the head of pressing mold is put into the bending part of flower pattern spring, grasps pressure The central region of mould, by pressing mold righting;Press floor push, pressure testing product;Pressing mold is taken out, brings the product after press fitting into aligning Force inspecting area;
R, the test mandrel of aligning tension gauge is replaced with mandrel corresponding with product;The endoporus of product to be measured is put into Mandrel;The dynamometer on detector is adjusted, is zeroed;The measuring wrench of detector is pulled, makes the gauge head top of dynamometer to axis Outer diameter is held, slowly pulls spanner, the pointer of dynamometer is allowed to change, continues to pull spanner, until the pointer of dynamometer is no longer Increase, the reading for writing down dynamometer pointer are the aligning force of this product surveyed, and then pull spanner and retract;By product in core 120 ° or so are rotated on axis;Action more than repeating measures the aligning force of product again;It is finally equidirectional again to rotate product twice 120 ° or so, repeat above action, 4 aligning forces of survey;Including the aligning force value of usual 1st survey is disregarded, rear 3 surveys are taken Average value is the aligning force of test product.

Claims (5)

1. a kind of release bearing with flower pattern spring, it is characterised in that:Including center (1), the left end of the center (1) Inner ring (2) is cased with, outer ring (3) is set with outside the inner ring (2), retainer is equipped between the inner ring (2) and outer ring (3) (4), steel ball (5) is equipped in the retainer (4), flower pattern spring (6), institute are equipped between the center (1) and inner ring (2) The flower pattern spring (6) and the inner wall of outer ring (3) stated are resilient supporting, and retainer rolling is formed between the outer ring (3) and inner ring (2) Road (7) is equipped with the grease baffle (8) with outer ring (3) inner wall elastic connection in the retainer raceway (7);
The flower pattern spring (6) is distributed in round, and the flower with center (1) phase empty set is equipped in the flower pattern spring (6) Type spring mounting hole (9), the inner wall of the flower pattern spring (6) is equipped with equally distributed elastic support sheet (10), adjacent spring Elastic notch (11) is equipped between support chip (10), the elastic support sheet (10) is distributed in shape is folded upward at.
2. a kind of release bearing with flower pattern spring according to claim 1, it is characterised in that:The elastic support sheet (10) the trapezoidal shape distribution in longitudinal section, the interior dog-ear of the elastic notch (11) is in arc transition;The resilient support The bottom end of piece (10) is bearing diagonal piece (12), and the outer end of the elastic support sheet (10) is bending support chip (13), described The inclination angle of bearing diagonal piece (12) is 21 degree, and the junction of the bending support chip (13) and bearing diagonal piece (12) is in circular arc mistake It crosses, the inclination angle of the bending support chip (13) is 15 degree.
3. a kind of release bearing with flower pattern spring according to claim 3, it is characterised in that:The elastic support sheet (10) with flower pattern spring (6) in integrated distribution, the bearing diagonal piece (12) is distributed with bending support chip (13) in integrated, The thickness of the flower pattern spring (6) is 0.25mm, and the elastic support sheet (10) and the quantity of elastic notch (11) are distinguished It is 12.
4. a kind of release bearing with flower pattern spring according to claim 1, it is characterised in that:The inner ring (2) with It is sealed between outer ring (3) by sealing ring (14).
5. the release bearing with flower pattern spring according to claims 1 or 2 or 3 or 4, it is characterised in that according to the following steps into Row:
(1) confirm material:
Production schedule list is formulated according to the demand of client, 65Mn materials are got according to technological requirement, confirms material using micrometer Thickness, it is ensured that thickness reaches 0.25 ± 0.01mm, and checks whether material has crackle corrosion defect, and material is pulled to punching machine send Expect area;
(2), punch die is adjusted:
Corresponding with model blanking die is taken out, selects the common punch press of 5-10T, using high pressure gas by work surface of punching machine Foreign matter is blown clean;Upper mold is fixed on to the centre in the upper table face of punching machine using bolt;Lower die is placed under punching machine and is worked On table top, slider of punch is adjusted, completely attaches to upper and lower mould;Lower die is fixed on to the lower table face of punching machine using pressing plate;Hand Work pulls punching machine big belt wheel, slides up and down punching machine upper table face, observes the whether smooth cooperation of upper and lower mould;
A strip material is taken out, is transported to examination punching between mold;Punching machine top shoe is adjusted, upper mold is allow to pour lower die More than 0.5mm;Check that slug appearance confirms that mold installation is correct, blanking edge does not have burr, then locks punching machine using screw Sliding block;Workbench and die surface are blown clean using high pressure gas;A small amount of lubricating oil is smeared on mold side edge with hairbrush, is being rushed Splicing basket is placed in bed discharging area, powers on, and adjusts step height, foot position is made to meet ergonomics, is produced;
(3), shaping:
Corresponding with model shaping mould is taken out, the shaping angle of mold is 1-2 ° bigger than angles of product respectively, selects that 5-10T's is general Logical punching machine, is blown clean the foreign matter of work surface of punching machine using high pressure gas;Upper mold is fixed on to the upper work of punching machine using bolt Make the centre of table top;Lower die is placed on punching machine lower table face, slider of punch is adjusted, upper and lower mould is made to be bonded completely;It uses Lower die is fixed on the lower table face of punching machine by pressing plate;Punching machine big belt wheel is pulled by hand, slides up and down punching machine upper table face, Upper and lower mould is allowed smoothly to slide;
Lower charging basket is removed to material waiting section, blanking material is taken out, puts it into lower mould, edge of materials and lower mould recessed area are complete It is complete consistent, it is impossible to exceed;Punching machine top shoe is adjusted, upper mold is allow to pour more than lower die 0.5mm;Check that examination slug appearance confirms Mold installation is correct, and product edge does not have burr, then locks slider of punch using screw;Work is blown clean using high pressure gas Platform and die surface;A small amount of lubricating oil is smeared in die surface with hairbrush, is placed splicing basket in punching machine blanking area, is connected electricity Source adjusts step height, foot position is made to meet ergonomics;
(4), it quenches:
Product is only stacked per 4-5 into heating furnace, salt bath quenching;Product hardness 450-500HV is examined after quenching;Surface cannot have Decarburization, product cannot have apparent deformation;
(5), it assembles:
From warehouse, neck goes out each part, and after removing outer packing to steel ball, flower pattern spring and grease baffle, uses 120# gasoline or clear Lotion is cleaned;Paying attention to the steel ball of different size will be cleaned separately, it is impossible to mix;Cleaning needs 2 work before use It in a few days uses, otherwise need to do antirust again and is cleaned again using preceding;
A, the steel ball of different size is packed into pulping apparatus, the steel ball specification inside pulping apparatus is if it is different, need after having cleared up before It could use;Retainer is put into charge bar to be installed, openend is upward, and adjusting device is into luggage ball;Infrared ray is needed after dress ball 100% detection is lost, and encounters the retainer lost, and equipment meeting automatic rejection treats a batch or shift to NonConforming Parts Area After finishing, operator needs to take out the neglected loading retainer in unqualified area, by hand fills steel ball, is put into charging basket;It carried There cannot be big-movement in journey, and otherwise have steel ball and fall from retainer;In addition, using there is the steel singly fallen in middle discovery charging basket Retainer is then needed in full inspection basket to find out during ball and misses steel ball part, is filled by hand;
B, flower pattern spring, grease baffle and outer ring are removed to oil pressure area, adjusts hydraulic station to operating pressure 4-6MPa;By flower pattern spring 1 each with grease baffle is sequentially placed into 1 outer ring inner wall, and the material put well is put to hydraulic area, uses corresponding mold Grease baffle is pressed into outer ring inner wall, oil pressure is maintained at 4-6MPa, checks that grease baffle there cannot be deformation after press-in, flower pattern spring cannot It is pushed down by grease baffle, allows the freely activity between grease baffle and outer ring of flower pattern spring, but cannot come off;
C, steel ball and retainer are placed in outer ring raceway position, the openend for paying attention to making retainer is upward;
D, sealing ring is pressed into the seal groove of outer ring, the full glue surface of sealing ring upward, and there cannot be deformation;
E, product component is removed to stuffing area, chooses oil head corresponding with product, pays attention to that the grease trade mark inside oil head is wanted and oily The grease trade mark in fat pump is consistent, if inconsistent needs are clean the grease removal in oil head.Then the gas of grease pump is adjusted Pressure makes air pressure continuously adjust the location nut of grease pump, injection test fat makes a film output amount reach 2.5- in 0.2-0.4MPa 3.0g, last locking positioning nut.If the grease trade mark in oil head in the grease trade mark and grease pump is inconsistent, grease in oil head It cannot be produced before not removing;Press foot pedal once can greasing it is primary;Product is fully inserted into oil head during greasing, then foot Pedal is pressed once, after the stopping of air pressure sound, is rotated by hand more than the circle of bearing 0.5, then extract bearing, such greasing is just calculated It completes;
F, selection and outer ring and the corresponding inner ring of steel ball stepping size;Outer ring assembl and inner ring are moved into baric area;By air pressure Value is adjusted to 0.3-0.5MPa;Inner ring is put into outer ring assembl, is then put into togerther under the press-loading head of air pressure, presses foot Pedal, press-loading head downlink push down inner ring end face, inner ring are completely forced into outer ring;When Internal and external cycle can not be pressed by air pressure, it is Inner ring fore shaft is excessive, it is impossible to be pressed by force, otherwise can destroy steel ball and inner ring raceway;The radial direction of bearing portions is carried out after press-in Clearance is examined, and clearance is in 0.015-0.045mm;
G, the internal diameter size inspection that the center that high-ranking military officer enters carries out 100% using drift is stopped, underproof product will reject, qualified Product are then transferred to next procedure;
H, qualified center and bearing portions will be examined to move in hydraulic region;Hydraulic press is adjusted, operating pressure is adjusted to 2- 5MPa;Corresponding flower pattern floating die is taken out, first combines bearing and center by hand, the 4 of bearing outer ring internal diameter A positioning groove and 4 salient points of center positioning match, it is impossible to misplace, otherwise, subsequent press fitting can be by center casing pressure It bursts;The power switch of hydraulic press is opened, operating switch is pressed using foot pedal;Check whether operating pressure is setting pressure;It will The product combined by hand is positioned over hydraulic area, and the head of pressing mold is put into the bending part of flower pattern spring, grasps pressure The central region of mould, by pressing mold righting;Press floor push, pressure testing product;Pressing mold is taken out, brings the product after press fitting into aligning Force inspecting area;
I, the test mandrel of aligning tension gauge is replaced with mandrel corresponding with product;The endoporus of product to be measured is put into core Axis;The dynamometer on detector is adjusted, is zeroed;The measuring wrench of detector is pulled, makes the gauge head top of dynamometer to bearing Outer diameter slowly pulls spanner, and the pointer of dynamometer is allowed to change, and continues to pull spanner, until the pointer of dynamometer no longer increases Greatly, the reading for writing down dynamometer pointer is the aligning force of this product surveyed, and then pulls spanner and retracts;By product in mandrel Upper 120 ° or so of rotation;Action more than repeating measures the aligning force of product again;It is finally equidirectional again to rotate product twice 120 ° or so, repeat above action, 4 aligning forces of survey;Including the aligning force value of usual 1st survey is disregarded, rear 3 surveys are taken Average value is the aligning force of test product.
CN201810068761.9A 2018-01-24 2018-01-24 A kind of release bearing and its production technology with flower pattern spring Pending CN108167324A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810068761.9A CN108167324A (en) 2018-01-24 2018-01-24 A kind of release bearing and its production technology with flower pattern spring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810068761.9A CN108167324A (en) 2018-01-24 2018-01-24 A kind of release bearing and its production technology with flower pattern spring

Publications (1)

Publication Number Publication Date
CN108167324A true CN108167324A (en) 2018-06-15

Family

ID=62515362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810068761.9A Pending CN108167324A (en) 2018-01-24 2018-01-24 A kind of release bearing and its production technology with flower pattern spring

Country Status (1)

Country Link
CN (1) CN108167324A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108869533A (en) * 2018-08-15 2018-11-23 江苏联动轴承股份有限公司 A kind of elastic slice bearing
CN113210177A (en) * 2021-04-08 2021-08-06 王月瑞 Insulating bearing sleeve normal position spraying insulating varnish and winding weftless tape device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11270586A (en) * 1998-03-20 1999-10-05 Ntn Corp Clutch release mechanism for automobile, and self-alignment type clutch release bearing device
JP2000145815A (en) * 1998-11-09 2000-05-26 Ntn Corp Automatic aligning type clutch release bearing device
JP2001355652A (en) * 2000-04-11 2001-12-26 Nachi Fujikoshi Corp Self-aligning type clutch release bearing
CN2672358Y (en) * 2004-02-06 2005-01-19 无锡民联轴承制造有限公司 Separable bearing of automobile clutch
CN201810675U (en) * 2010-09-30 2011-04-27 浙江优联汽车轴承有限公司 Automatic aligning clutch release bearing
CN202597540U (en) * 2012-04-11 2012-12-12 南京轴承有限公司 Tooth spring type clutch release bearing unit
CN202707796U (en) * 2012-08-29 2013-01-30 浙江优联汽车轴承有限公司 Automobile clutch bearing
CN104121286A (en) * 2013-04-25 2014-10-29 宁波市鄞州金鑫轴承五金有限公司 Self-aligning ball bearing
CN204164171U (en) * 2014-10-17 2015-02-18 无锡民联轴承制造有限公司 Self-aligning push type clutch release bearing
CN208010770U (en) * 2018-01-24 2018-10-26 杭州雷迪克节能科技股份有限公司 A kind of release bearing with flower pattern spring

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11270586A (en) * 1998-03-20 1999-10-05 Ntn Corp Clutch release mechanism for automobile, and self-alignment type clutch release bearing device
JP2000145815A (en) * 1998-11-09 2000-05-26 Ntn Corp Automatic aligning type clutch release bearing device
JP2001355652A (en) * 2000-04-11 2001-12-26 Nachi Fujikoshi Corp Self-aligning type clutch release bearing
CN2672358Y (en) * 2004-02-06 2005-01-19 无锡民联轴承制造有限公司 Separable bearing of automobile clutch
CN201810675U (en) * 2010-09-30 2011-04-27 浙江优联汽车轴承有限公司 Automatic aligning clutch release bearing
CN202597540U (en) * 2012-04-11 2012-12-12 南京轴承有限公司 Tooth spring type clutch release bearing unit
CN202707796U (en) * 2012-08-29 2013-01-30 浙江优联汽车轴承有限公司 Automobile clutch bearing
CN104121286A (en) * 2013-04-25 2014-10-29 宁波市鄞州金鑫轴承五金有限公司 Self-aligning ball bearing
CN204164171U (en) * 2014-10-17 2015-02-18 无锡民联轴承制造有限公司 Self-aligning push type clutch release bearing
CN208010770U (en) * 2018-01-24 2018-10-26 杭州雷迪克节能科技股份有限公司 A kind of release bearing with flower pattern spring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108869533A (en) * 2018-08-15 2018-11-23 江苏联动轴承股份有限公司 A kind of elastic slice bearing
CN113210177A (en) * 2021-04-08 2021-08-06 王月瑞 Insulating bearing sleeve normal position spraying insulating varnish and winding weftless tape device

Similar Documents

Publication Publication Date Title
CN108167324A (en) A kind of release bearing and its production technology with flower pattern spring
US7997111B2 (en) Apparatus for rotating a container body
US20130081439A1 (en) Manufacturing method and manufacturing apparatus for cup-shaped member
US20130181375A1 (en) Method of forming a frontal toothing on an inner ring of a wheel hub
CN103899661B (en) A kind of secondary series ball loading mechanism of two-row ball bearing
CN112642953A (en) Automobile hub stamping equipment
CN108716511A (en) A kind of applanation bearing assembly equipment and its assembly method
CN114918350A (en) Forging production line and forging method for electric automobile motor spindle
CN108080543A (en) Multiple roll pendulum rolles over the manufacturing process of rosette and metal ring
JPS5852733B2 (en) Outer lace processing method and equipment
CN103899662B (en) A kind of first row ball loading mechanism of two-row ball bearing
CN204852040U (en) Biserial thin wall angular contact ball bearing assembly quality
CN206951790U (en) A kind of deflector roll and deflector roll assembly tooling
JP2900819B2 (en) Expansion dies for steel pipe expansion machines
CN214242941U (en) Quantitative steel ball conveying device
CN215722411U (en) Automatic oil feeding lubricating device of machining center
CN107127568A (en) The intelligent flexible assembly system fed back based on mechanics
CN214171155U (en) Device for pressing retainer on outer ring of hub bearing
CN214162011U (en) Bolt press-fitting structure of hub bearing
US5058415A (en) Rolling bearing seal ring crimp tooling
CN108714836B (en) Flexible positioning structure for grinding outer surface channels of slender shaft workpieces
CN111940994A (en) Inner hole rolling tool
CN107150071B (en) A kind of deflector roll and deflector roll assembly tooling
CN211071393U (en) Elbow pushing machine
US2880495A (en) Method for making tapered roller bearing cones

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination