CN108165700A CN201810174518.5A CN201810174518A CN108165700A CN 108165700 A CN108165700 A CN 108165700A CN 201810174518 A CN201810174518 A CN 201810174518A CN 108165700 A CN108165700 A CN 108165700A
Authority
CN
China
Prior art keywords
thermometric
channel
spray gun
gas
converter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810174518.5A
Other languages
Chinese (zh)
Other versions
CN108165700B (en
Inventor
朱荣
胡绍岩
董凯
刘润藻
李伟峰
姚柳洁
李志辉
周赟
王云
魏光升
朱长富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201810174518.5A priority Critical patent/CN108165700B/en
Publication of CN108165700A publication Critical patent/CN108165700A/en
Application granted granted Critical
Publication of CN108165700B publication Critical patent/CN108165700B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/46Details or accessories
    • C21C5/4673Measuring and sampling devices

Abstract

The present invention relates to converter steeling technology fields, provide a kind of continuous temperature measurement spray gun for being installed on converter bottom and its application method;Thermometric spray gun is installed on converter bottom, and module is installed including thermometric channel, anti-blocking channel, cooling duct and sensor, contains O by injection2Thermometric gas, temperature profile signal transmission passage is directly established between molten steel and temperature transducer, without arranging flue gas and slag blanket, can stablize in converter steelmaking process, accurately, continuously measure molten steel temperature;While gas composition and supply gas pressure by adjusting each channel of thermometric spray gun stage by stage, control the coverage area and cladding thickness of mushroom head and slag blanket, under the premise of maintenance thermometric channel is persistently unobstructed, thermometric spray gun end and its periphery is made well to be covered, realizes the safety long-life of thermometric spray gun.The present invention is suitable for conventional top and bottom combined blown converter and pushes up BOTTOM OXYGEN converter, and within ranging from ± 15 DEG C of temperature measurement accuracy, the service life of thermometric spray gun is synchronous with furnace life.

Description

A kind of thermometric spray gun for being installed on converter bottom and application method
Technical field
The present invention relates to converter steeling technology field, more particularly to a kind of thermometric spray gun for being installed on converter bottom and use Method.
Background technology
At present, the requirement to steel and iron industry intelligence manufacture, green production is increasingly urgent, and converter " key steel-making " is as main Research and development direction.However, in order to realize converter " key steel-making ", the key index progress to converter steelmaking process is needed It monitors in real time or predicts, such as molten steel temperature, molten steel component etc., wherein, the continuous molten steel temperature that monitors is to optimizing converter slag-making, taking off Phosphorus and terminal point control are respectively provided with significance.Current convertor steelmaking process there is no method to realize the continuous monitoring to molten steel temperature, Molten steel temperature can only be measured or by the artificial thermometric of grate by sublance smelting the later stage, instruct to smelt latter stage with this temperature Blowing, this method increase production cost and labor intensity, due to being to survey rather than continuously measure molten steel temperature, the party Method also can not accurately instruct terminal point control, and the hit rate for often resulting in the double hits of molten steel temperature, carbon content is not high.
In recent years, developing into for infrared temperature-test technology realized that the continuous temperature measurement of convertor steelmaking process provided technical support. Patent(ZL 201510958681.7)Disclose temp measuring system and the thermometric side of a kind of electric-arc furnace steelmaking on-line measurement molten steel temperature Infrared temperature probe is integrated in electric arc furnaces wall lance by method, this method, and the supersonic airstream generated using oxygen rifle is blown open Foam slag blanket sets up stable molten steel temperature characteristic signal transmission channel between molten steel and sensor, realizes electric arc furnaces refining The continuously or discontinuously on-line measurement of steel process molten steel in the stove temperature.However, for converter, due to the type of furnace and offering oxygen way Greatest differences do not have the condition of installation wall lance, and top blow oxygen lance length used in converter is more than 10 meters, and the spray of end Hole is tilted with certain angle, can not also provide the channel and window of temperature signal transmission;Patent(ZL 201510958681.7) Disclosed in wall lance for water-cooling structure, and water-cooling structure spray gun can be only installed at position more than molten steel face, can not install Furnace wall or furnace bottom below molten steel face;Meanwhile the patent(ZL 201510958681.7)In disclose thermometric gas as N2、 CO2Or Ar, but N2、CO2Or Ar is blown to causing cooling effect to molten steel surface during molten steel surface so that temperature transducers The temperature that device measures is less than molten steel actual temperature.Therefore, the patent(ZL 201510958681.7)Disclosed temp measuring system and survey Warm method is not particularly suited for the continuous temperature measurement of convertor steelmaking process.
The mode of current converter generally use top bottom blowing, i.e. the top high-strength oxygen into stove by oxygen rifle, Bottom blowing element agitation molten pool is installed in bottom, by rational furnace bottom maintenance service and slag splashing, can keep bottom blowing element Full stove labour is unobstructed.With reference to converter profile, injection method and smelting requirements, in converter bottom, installation thermometric spray gun is feasible, nothing Flue gas and slag blanket need to be arranged, temperature signal transmission channel can be directly established between molten steel and temperature transducer, but there are following Problem:(1)Installation site can not use water-cooling structure, how ensure that thermometric spray gun is not burnt by high-temperature molten steel below molten steel face Damage;(2)If simply carrying out cooling protection to thermometric spray gun using cooling gas, mushroom head can be formed in lance outlet, by Gradually block thermometric channel;(3)Due to N2、CO2Or Ar has molten steel cooling effect, how to select suitable thermometric gas, measures standard True molten steel temperature.(4)Since thermometric spray gun is mounted on converter bottom, there is high-temperature molten steel covering in top, once gas supply interrupts, steel Liquid will pour in down a chimney to spray gun, block even scaling loss thermometric spray gun.
Invention content
The purpose of the present invention is exactly to have overcome the deficiencies of the prior art and provide a kind of thermometric spray gun for being installed on converter bottom And application method, on the basis of temperature signal transmission channel is provided, solve furnace bottom to be caused to corrode, because of bottom blowing shape because of bottom blown gas Thermometric channel blockage and N are caused into mushroom head2、CO2Or Ar leads to the critical issue that thermometric is not allowed as thermometric gas.
The present invention contains O by injection2Thermometric gas, temperature profile is directly established between molten steel and temperature transducer Signal transmission passage without arranging flue gas and slag blanket, is formed and is supplied by the gas for adjusting each channel of thermometric spray gun stage by stage Pressure controls the coverage area and cladding thickness of mushroom head and slag blanket, under the premise of maintenance thermometric channel is persistently unobstructed, realizes The safety long-life of thermometric spray gun, by setting contingency gas sources, cooperation grate operation avoids molten steel being caused to pour in down a chimney due to gas supply is unstable To spray gun.
The specific technical solution of the present invention is as follows:
A kind of thermometric spray gun for being installed on converter bottom installs mould including thermometric channel, anti-blocking channel, cooling duct and sensor Block;The side wall of the thermometric spray gun is equipped with thermometric gas access, anti-blocking gas access and cooling gas inlet;The sensor peace The die-filling piece of lower end for being arranged on the thermometric channel, the sensor installation module and the thermometric channel are saturating by high temperature resistant Optical element sealing isolation.
Further, the sensor is installed and infrared temperature probe is provided in module, in the infrared temperature probe Heart line and the center line of the thermometric channel are coaxial.
Further, the sensor installation module is process by refractory metal material, inside filling bradyseism material, High-temperaure coating is smeared in outer surface, avoids probe-shift or damage caused by furnace body fascinates with high temperature under stove.
Further, the thermometric channel of the thermometric spray gun, anti-blocking channel and cooling duct are coaxially arranged, the survey Warm channel, anti-blocking channel, the port of export of cooling duct are concordant with furnace bottom.
Further, the air supply system of the thermometric spray gun includes air supply system and air regulating device, the air source system System includes conventional air source and contingency gas sources, and the pressure of the contingency gas sources is maintained at more than 1.5MPa, and the contingency gas sources can be solely It is vertical to meet thermometric spray gun gas supply more than 3min.
Further, in order to which under the premise of stabilization signal transmission channel is provided, the gas flow of reduction thermometric spray gun subtracts Gently to the erosion of furnace bottom, the latus rectum of the thermometric channel is 10 ~ 30mm.
Further, since converter bottom dust is big, temperature is high, and converter needs to realize 360 ° of rotations, temperature transducer It can not be communicated by cable and optical fiber with host computer, therefore the temperature transducer of sensor installation module is using wireless transmission Mode and host computer communicate.
Further, top and bottom combined blown converter and top BOTTOM OXYGEN converter of the thermometric spray gun suitable for 50 ~ 350 tons.
A kind of application method of above-mentioned thermometric spray gun, the thermometric spray gun thermometric channel, anti-blocking channel, cooling duct Gas forms and supply gas pressure is using control by stages, is as follows:
In the stage of bessemerizing:Thermometric channel is blown thermometric gas, and the thermometric gas is O2-CO2Gaseous mixture or O2-N2- Ar is mixed Gas is closed, supply gas pressure is 0.3 ~ 0.8MPa, the O2-CO2O in gaseous mixture2Ratio is 30% ~ 50%, the O2-N2- Ar gaseous mixtures Middle O2Ratio is 20% ~ 40%, utilizes O2The exothermic effects reacted with molten steel offset N2、CO2, cooling effects of the Ar to molten steel, make The practical molten steel temperature obtained in molten steel temperature and molten bath right over thermometric channel is consistent, and molten steel temperature characteristic signal is continuous Ground is by thermometric channel transfer, and the translucent element across thermometric channel and sensor installation module, into temperature probe, Molten steel temperature is obtained, realizes continuous, accurate molten steel thermometric;Anti-blocking channel is blown O2, supply gas pressure is 0.4 ~ 1.0MPa, is utilized O2The exothermic effects reacted with molten steel avoid thermometric channel end from generating mushroom head, and thermometric channel is caused to reduce and is even blocked;It is cold But channel injection CH4、N2, Ar or its mixed air, supply gas pressure is 0.5 ~ 1.2MPa, passes through the cracking heat absorption of cooling gas or object Reason heat absorption forms mushroom head covering in cooling duct end and its outside, high-temperature molten steel is inhibited to rush furnace bottom and thermometric spray gun Brush corrodes and scaling loss;
In the splashing slag in converter stage:Thermometric channel blows air, supply gas pressure (contain on a small quantity for 0.5 ~ 1.0MPa in air Oxygen), using high-voltage high-speed air draught, clinker is avoided to enter thermometric channel or is covered in thermometric channel end;Anti-blocking channel Blows air, supply gas pressure are 0.5 ~ 1.0MPa (containing a small amount of oxygen in air), using high-voltage high-speed air draught, are avoided Clinker enters anti-blocking channel or is covered in anti-blocking channel end;Cooling duct is blown N2, supply gas pressure is 0.6 ~ 1.2MPa, cold But slag blanket covering is formed on the basis of channel end and its covering of outside mushroom head, protects thermometric spray gun, meanwhile, pass through high pressure height Fast air-flow avoids the coating of cooling duct end is too thick cooling duct is caused to block;
In other stages of converter smelting:Both without liquid slag in stove, also without molten steel, therefore thermometric channel, anti-blocking channel N is blown with cooling duct2, the supply gas pressure of thermometric channel and anti-blocking channel is 0.3 ~ 0.5MPa, and cooling duct is due to end It is covered by mushroom head and slag blanket, supply gas pressure is 0.4 ~ 0.8MPa.
Further, the air supply system of the thermometric spray gun includes air supply system and air regulating device, the air source system System includes conventional air source and contingency gas sources, and the pressure of the contingency gas sources is maintained at more than 1.5MPa, and the contingency gas sources can be solely It is vertical to meet thermometric spray gun gas supply more than 3min;When the pressure of the conventional air source is less than 1.2MPa, control system provides report Alert signal is immediately switched to contingency gas sources gas supply, top blow oxygen lance is proposed converter, and tilting converter is exposed to thermometric spray gun, prevents Only molten steel is caused to pour in down a chimney to thermometric channel due to bleed pressure deficiency.
Beneficial effects of the present invention are:
(1)A kind of continuous temperature measurement spray gun for being installed on converter bottom using the present invention and its application method, solve by converter The problem of continuous molten steel thermometric can not be realized caused by the type of furnace, offering oxygen way limitation in steel ullage;
(2)A kind of continuous temperature measurement spray gun for being installed on converter bottom using the present invention and its application method, converter bottom aneroid State clinker by bottom blowing thermometric gas, can directly establish temperature profile signal transmission passage between molten steel and temperature transducer, Flue gas and clinker need not be arranged, without the interference of flue gas and clinker, more stable and more accurately temperature measurement data can be obtained;
(3)A kind of continuous temperature measurement spray gun for being installed on converter bottom using the present invention and its application method, pass through thermometric spray gun The gas of injection can provide temperature signal transmission channel, also can agitation molten pool, improve the dynamic conditions of converter;
(4)The present invention has obtained the composition of thermometric gas, has offset CO by a large amount of creative Experimental Researchs2、N2, Ar is to steel The cooling effect of liquid obtains more accurate molten steel temperature measurement result;Within ranging from ± 15 DEG C of temperature measurement accuracy;
(5)A kind of continuous temperature measurement spray gun for being installed on converter bottom using the present invention and its application method, by converter smelting Each stage of refining, dynamic regulation thermometric channel, anti-blocking channel and the gas of cooling duct composition, control mushroom head and slag blanket cover Lid range and cladding thickness, under the premise of thermometric channel is uncovered so that cooling duct end and its periphery are well covered Lid, that realizes thermometric channel continues unobstructed and thermometric spray gun safety long-life.
(6)A kind of continuous temperature measurement spray gun for being installed on converter bottom using the present invention and its application method, pass through setting Contingency gas sources, cooperation grate operation avoid molten steel being caused to pour in down a chimney to spray gun due to gas supply is unstable, protect thermometric spray gun and thermometric Probe.
Description of the drawings
Fig. 1 show a kind of thermometric spray gun structure schematic diagram for being installed on converter bottom of the embodiment of the present invention.
In figure:1st, converter;2nd, molten steel;3rd, clinker;4th, top blow oxygen lance;5th, thermometric spray gun;5-1, thermometric channel;It is 5-2, anti-blocking Channel;5-3, cooling duct;5-4, sensor installation module;5-5, thermometric gas access;5-6, anti-blocking gas access;It is 5-7, cold But gas access;5-8, translucent element;5-9, infrared temperature probe.
Specific embodiment
The specific embodiment of the invention is described in detail below in conjunction with specific attached drawing.It should be noted that in following embodiments The combination of the technical characteristic or technical characteristic of description is not construed as isolated, they can be combined with each other to reach To superior technique effect.In the attached drawing of following embodiments, identical label that each attached drawing occurs represent identical feature or Person's component can be applied in different embodiments.
As shown in Figure 1, a kind of thermometric spray gun for being installed on converter bottom of the embodiment of the present invention, including thermometric channel 5-1, prevents Stifled channel 5-2, cooling duct 5-3 and sensor installation module 5-4;The side wall of the thermometric spray gun is equipped with thermometric gas access 5- 5th, anti-blocking gas access 5-6 and cooling gas inlet 5-7;The sensor installation module 5-4 is arranged on the thermometric channel 5-1 Lower end, the sensor installation module 5-4 and thermometric channel 5-1 passes through high temperature resistant translucent element 5-8 sealings and completely cuts off. Infrared temperature probe 5-9, the center line of the infrared temperature probe 5-9 and institute are provided in the sensor installation module 5-4 The center line for stating thermometric channel 5-1 is coaxial.Preferably, sensor installation module 5-4 processed by refractory metal material and Into inside filling bradyseism material, outer surface smears high-temperaure coating, avoids the probe-shift caused by furnace body fascinates with high temperature under stove Or damage.Thermometric channel 5-1, the anti-blocking channel 5-2 and cooling duct 5-3 of the thermometric spray gun are coaxially arranged outward from center, The thermometric channel 5-1, anti-blocking channel 5-2, the port of export of cooling duct 5-3 are concordant with furnace bottom.
Embodiment 1
The embodiment of the present invention is applied on 120 tons of top and bottom combined blown converters, and the furnace bottom of the converter installs 1 thermometric spray gun of the invention With the capillary type bottom blowing element of 4 routines, the thermometric channel 5-1 latus rectums of thermometric spray gun are 15mm, the slit width of anti-blocking channel 5-2 For 2mm, the slit width of cooling duct 5-3 is 1mm.
In the stage of bessemerizing, thermometric channel 5-1 injection thermometric gases, thermometric gas is O2-N2- Ar gaseous mixtures, in order to keep away It is exceeded to exempt from terminal nitrogen content in liquid steel, it is O to bessemerize early period and mid-term2-N2Gaseous mixture, blowing later stage are O2- Ar gaseous mixtures supply Atmospheric pressure is 0.3 ~ 0.5MPa, O in thermometric gas2Ratio is 30%;Anti-blocking channel 5-2 is blown O2, supply gas pressure for 0.4 ~ 0.6MPa utilizes O2The very exothermic effect reacted with molten steel, avoids thermometric channel 5-1 ends from generating mushroom head;Cooling duct 5-3 is blown CH4, supply gas pressure is 0.5 ~ 0.7MPa, passes through CH4Cracking heat absorption, in cooling duct 5-3 ends and its outside shape It is covered into mushroom head, high-temperature molten steel is inhibited to wash away erosion and scaling loss to furnace bottom and thermometric spray gun.
In the splashing slag in converter stage, thermometric channel 5-1 blows airs, supply gas pressure is 0.5 ~ 0.6MPa, is contained in air There is a small amount of oxygen, using high-voltage high-speed air draught, clinker is avoided to enter thermometric channel 5-1 or is covered in thermometric channel 5-1 End;Anti-blocking channel 5-2 blows airs, supply gas pressure are 0.5 ~ 0.6MPa, contain a small amount of oxygen in air, utilize high pressure height Fast air draught avoids clinker from entering anti-blocking channel 5-2 or is covered in anti-blocking channel 5-2 ends;Cooling duct 5-3 is blown N2, Supply gas pressure is 0.6 ~ 0.8MPa, and slag blanket covering is formed on the basis of cooling duct 5-3 ends and its covering of outside mushroom head, Thermometric spray gun is protected, meanwhile, by high-voltage high-speed airflow, avoid the coating of cooling duct 5-3 ends is too thick from causing cooling logical Road 5-3 is blocked.
In other stages of converter smelting, both without liquid slag in stove, also without molten steel, therefore it is thermometric channel 5-1, anti- Stifled channel 5-2 and cooling duct 5-3 be blown the supply gas pressure of N2, thermometric channel 5-1 and anti-blocking channel 5-2 for 0.3 ~ Since end is by mushroom head and slag blanket covering, supply gas pressure is 0.5 ~ 0.6MPa by 0.4MPa, cooling duct 5-3.
After converter thermometric spray gun using the present invention and method, continuous measurement of the smelting process to molten steel temperature is realized, The temperature measurement accuracy of thermometric spray gun is ± 13 DEG C;Thermometric spray gun realizes that full stove labour is unimpeded, and furnace life is without significant change.
Embodiment 2
The present invention, which is applied, to be pushed up at 300 tons in BOTTOM OXYGEN converter, and the furnace bottom of the converter installs 1 thermometric spray gun of the invention and 7 Double-layer sleeve-type spray gun, the thermometric channel latus rectum of thermometric spray gun are 25mm, and the slit width of anti-blocking channel is 2mm, the seam of cooling duct Width is 1mm, the central tube injecting oxygen and pulvis of Double-layer sleeve-type spray gun, circumferential weld injection cooling gas.
In the stage of bessemerizing, thermometric channel 5-1 injection thermometric gases, thermometric gas is O2-CO2Gaseous mixture, supply gas pressure For 0.5 ~ 0.6MPa, O in thermometric gas2Ratio is 40%;Anti-blocking channel 5-2 is blown O2, supply gas pressure is 0.6 ~ 0.8MPa, is utilized O2The very exothermic effect reacted with molten steel, avoids thermometric channel 5-1 ends from generating mushroom head;Cooling duct 5-3 is blown CH4, supply Atmospheric pressure is 0.7 ~ 1.0MPa, passes through CH4Cracking heat absorption, mushroom head covering is formed in cooling duct 5-3 ends and its outside, High-temperature molten steel is inhibited to wash away erosion and scaling loss to furnace bottom and thermometric spray gun.
In the splashing slag in converter stage, thermometric channel 5-1 blows airs, supply gas pressure is 0.5 ~ 0.6MPa, is contained in air There is a small amount of oxygen, using high-voltage high-speed air draught, clinker is avoided to enter thermometric channel 5-1 or is covered in thermometric channel 5-1 End;Anti-blocking channel 5-2 blows airs, supply gas pressure are 0.5 ~ 0.6MPa, contain a small amount of oxygen in air, utilize high pressure height Fast air draught avoids clinker from entering anti-blocking channel 5-2 or is covered in anti-blocking channel 5-2 ends;Cooling duct 5-3 is blown N2, Supply gas pressure is 0.7 ~ 1.0MPa, and slag blanket covering is formed on the basis of cooling duct 5-3 ends and its covering of outside mushroom head, Thermometric spray gun is protected, meanwhile, by high-voltage high-speed airflow, avoid the coating of cooling duct 5-3 ends is too thick from causing cooling logical Road 5-3 is blocked.
In other stages of converter smelting, both without liquid slag in stove, also without molten steel, therefore it is thermometric channel 5-1, anti- Stifled channel 5-2 and cooling duct 5-3 is blown N2, the supply gas pressure of thermometric channel 5-1 and anti-blocking channel 5-2 for 0.3 ~ Since end is by mushroom head and slag blanket covering, supply gas pressure is 0.5 ~ 0.6MPa by 0.4MPa, cooling duct 5-3.
After converter thermometric spray gun using the present invention and method, continuous measurement of the smelting process to molten steel temperature is realized, The temperature measurement accuracy of thermometric spray gun is ± 15 DEG C;Thermometric spray gun realizes that full stove labour is unimpeded, and furnace life is without significant change.
Although having been presented for several embodiments of the present invention herein, it will be appreciated by those of skill in the art that Without departing from the spirit of the invention, the embodiments herein can be changed.Above-described embodiment is only exemplary, no It should be using the embodiments herein as the restriction of interest field of the present invention.

Claims (10)

1. a kind of thermometric spray gun for being installed on converter bottom, which is characterized in that including thermometric channel, anti-blocking channel, cooling duct Module is installed with sensor;The side wall of the thermometric spray gun enters equipped with thermometric gas access, anti-blocking gas access and cooling gas Mouthful;The sensor installation module is arranged on the lower end of the thermometric channel, the sensor installation module and the thermometric Channel is sealed by high temperature resistant translucent element to be completely cut off.
2. thermometric spray gun as described in claim 1, which is characterized in that be provided with infrared measurement of temperature in the sensor installation module Probe, the center line of the infrared temperature probe and the center line of the thermometric channel are coaxial.
3. thermometric spray gun as described in claim 1, which is characterized in that the sensor installs module by refractory metal material It is process, inside filling bradyseism material, outer surface smears high-temperaure coating, avoids visiting caused by furnace body fascinates with high temperature under stove Head displacement or damage.
4. thermometric spray gun as described in claim 1, which is characterized in that the thermometric channel of the thermometric spray gun, anti-blocking channel and Cooling duct is coaxially arranged, and the thermometric channel, anti-blocking channel, the port of export of cooling duct are concordant with furnace bottom.
5. thermometric spray gun as described in claim 1, which is characterized in that the air supply system of the thermometric spray gun includes air supply system And air regulating device, the air supply system includes conventional air source and contingency gas sources, the pressure of the contingency gas sources are maintained at More than 1.5MPa, the contingency gas sources can independently meet thermometric spray gun gas supply more than 3min.
6. thermometric spray gun as described in claim 1, which is characterized in that the latus rectum of the thermometric channel is 10 ~ 30mm.
7. thermometric spray gun as described in claim 1, which is characterized in that the temperature transducer of the sensor installation module uses The mode of wireless transmission is communicated with host computer.
8. such as claim 1-7 any one of them thermometric spray guns, which is characterized in that the thermometric spray gun is suitable for 50 ~ 350 tons Top and bottom combined blown converter and top BOTTOM OXYGEN converter.
It is 9. a kind of such as the application method of claim 1-8 any one of them thermometric spray guns, which is characterized in that the thermometric spray gun Thermometric channel, anti-blocking channel, the gas composition of cooling duct and supply gas pressure are as follows using control by stages:
In the stage of bessemerizing:Thermometric channel is blown thermometric gas, and the thermometric gas is O2-CO2Gaseous mixture or O2-N2- Ar is mixed Gas is closed, supply gas pressure is 0.3 ~ 0.8MPa, the O2-CO2O in gaseous mixture2Ratio is 30% ~ 50%, the O2-N2- Ar gaseous mixtures Middle O2Ratio is 20% ~ 40%, utilizes O2The exothermic effects reacted with molten steel offset N2、CO2, cooling effects of the Ar to molten steel, make The practical molten steel temperature obtained in molten steel temperature and molten bath right over thermometric channel is consistent, and molten steel temperature characteristic signal is continuous Ground is by thermometric channel transfer, and the translucent element across thermometric channel and sensor installation module, into temperature probe, Molten steel temperature is obtained, realizes continuous, accurate molten steel thermometric;Anti-blocking channel is blown O2, supply gas pressure is 0.4 ~ 1.0MPa, is utilized O2The exothermic effects reacted with molten steel avoid thermometric channel end from generating mushroom head, and thermometric channel is caused to reduce and is even blocked;It is cold But channel injection CH4、N2, Ar or its mixed air, supply gas pressure is 0.5 ~ 1.2MPa, passes through the cracking heat absorption of cooling gas or object Reason heat absorption forms mushroom head covering in cooling duct end and its outside, high-temperature molten steel is inhibited to rush furnace bottom and thermometric spray gun Brush corrodes and scaling loss;
In the splashing slag in converter stage:Thermometric channel blows air, supply gas pressure are 0.5 ~ 1.0MPa, utilize high-voltage high-speed air Air-flow avoids clinker from entering thermometric channel or is covered in thermometric channel end;Anti-blocking channel blows air, supply gas pressure for 0.5 ~ 1.0MPa using high-voltage high-speed air draught, avoids clinker from entering anti-blocking channel or is covered in anti-blocking channel end;Cooling duct It is blown N2, supply gas pressure is 0.6 ~ 1.2MPa, and slag blanket is formed on the basis of cooling duct end and its covering of outside mushroom head Thermometric spray gun is protected in covering, meanwhile, by high-voltage high-speed airflow, avoid the coating of cooling duct end is too thick from causing to cool down Channel blockage;
In other stages of converter smelting:Both without liquid slag in stove, also without molten steel, therefore thermometric channel, anti-blocking channel N is blown with cooling duct2, the supply gas pressure of thermometric channel and anti-blocking channel is 0.3 ~ 0.5MPa, and cooling duct is due to end It is covered by mushroom head and slag blanket, supply gas pressure is 0.4 ~ 0.8MPa.
10. application method as claimed in claim 9, which is characterized in that the air supply system of the thermometric spray gun includes air source system System and air regulating device, the air supply system includes conventional air source and contingency gas sources, the pressure of the contingency gas sources are maintained at More than 1.5MPa, the contingency gas sources can independently meet thermometric spray gun gas supply more than 3min;When the pressure of the conventional air source During less than 1.2MPa, control system provides alarm signal, is immediately switched to contingency gas sources gas supply, top blow oxygen lance is proposed converter, And tilting converter is exposed to thermometric spray gun, prevents from molten steel being caused to pour in down a chimney to thermometric channel due to bleed pressure deficiency.
CN201810174518.5A 2018-03-02 2018-03-02 Temperature measuring spray gun installed at bottom of converter and application method Active CN108165700B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810174518.5A CN108165700B (en) 2018-03-02 2018-03-02 Temperature measuring spray gun installed at bottom of converter and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810174518.5A CN108165700B (en) 2018-03-02 2018-03-02 Temperature measuring spray gun installed at bottom of converter and application method

Publications (2)

Publication Number Publication Date
CN108165700A true CN108165700A (en) 2018-06-15
CN108165700B CN108165700B (en) 2023-06-02

Family

ID=62510715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810174518.5A Active CN108165700B (en) 2018-03-02 2018-03-02 Temperature measuring spray gun installed at bottom of converter and application method

Country Status (1)

Country Link
CN (1) CN108165700B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109897936A (en) * 2019-04-29 2019-06-18 连铸 A kind of detection system continuously detecting liquid steel temperature and composition for pneumatic steelmaking
CN110628983A (en) * 2019-10-10 2019-12-31 北京科技大学 Converter smelting fire point area temperature continuous monitoring oxygen lance system and monitoring method
CN111088414A (en) * 2019-12-17 2020-05-01 湖北理工学院 Oxygen lance with online continuous temperature measurement function and use method thereof
WO2021073015A1 (en) * 2019-10-16 2021-04-22 北京科技大学 Converter co2-o2 mixed injection smelting method and dynamic temperature control method in fire-point region
CN115232911A (en) * 2022-06-17 2022-10-25 中钢集团鞍山热能研究院有限公司 Hot air spray gun for steelmaking and blowing process thereof
US11808635B2 (en) 2019-04-29 2023-11-07 Chu LIEN System for continuously detecting temperature and composition of molten steel during converter steelmaking

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH085464A (en) * 1994-06-17 1996-01-12 Nkk Corp Temperature measuring device using optical fiber for high temperature liquid
JPH11246907A (en) * 1998-03-02 1999-09-14 Nippon Steel Corp Method for controlling blowing in converter
JP2002146426A (en) * 2000-11-02 2002-05-22 Nippon Steel Corp Method for measuring temperature of molten metal by radiation
JP2003013131A (en) * 2001-07-06 2003-01-15 Nippon Steel Corp Method for blowing gas through tuyere for measuring temperature
JP2007322382A (en) * 2006-06-05 2007-12-13 Nippon Steel Corp Temperature measuring method of molten steel in convertor
CN102796841A (en) * 2012-08-21 2012-11-28 东北大学 Method for slagging steelmaking by side blowing of powder particle limestone in top-bottom combined blown converter
CN105369009A (en) * 2015-12-18 2016-03-02 北京科技大学 Temperature measuring system and method for on-line measurement of molten steel temperature in steelmaking process of electric-arc furnace
CN105910716A (en) * 2016-06-06 2016-08-31 中冶赛迪工程技术股份有限公司 Non-contact electric-arc-furnace continuous temperature measuring gun structure
CN208071732U (en) * 2018-03-02 2018-11-09 北京科技大学 A kind of thermometric spray gun being installed on converter bottom

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH085464A (en) * 1994-06-17 1996-01-12 Nkk Corp Temperature measuring device using optical fiber for high temperature liquid
JPH11246907A (en) * 1998-03-02 1999-09-14 Nippon Steel Corp Method for controlling blowing in converter
JP2002146426A (en) * 2000-11-02 2002-05-22 Nippon Steel Corp Method for measuring temperature of molten metal by radiation
JP2003013131A (en) * 2001-07-06 2003-01-15 Nippon Steel Corp Method for blowing gas through tuyere for measuring temperature
JP2007322382A (en) * 2006-06-05 2007-12-13 Nippon Steel Corp Temperature measuring method of molten steel in convertor
CN102796841A (en) * 2012-08-21 2012-11-28 东北大学 Method for slagging steelmaking by side blowing of powder particle limestone in top-bottom combined blown converter
CN105369009A (en) * 2015-12-18 2016-03-02 北京科技大学 Temperature measuring system and method for on-line measurement of molten steel temperature in steelmaking process of electric-arc furnace
CN105910716A (en) * 2016-06-06 2016-08-31 中冶赛迪工程技术股份有限公司 Non-contact electric-arc-furnace continuous temperature measuring gun structure
CN208071732U (en) * 2018-03-02 2018-11-09 北京科技大学 A kind of thermometric spray gun being installed on converter bottom

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109897936A (en) * 2019-04-29 2019-06-18 连铸 A kind of detection system continuously detecting liquid steel temperature and composition for pneumatic steelmaking
CN109897936B (en) * 2019-04-29 2020-11-20 连铸 Detection system for continuously detecting temperature and components of molten steel in converter steelmaking
US11808635B2 (en) 2019-04-29 2023-11-07 Chu LIEN System for continuously detecting temperature and composition of molten steel during converter steelmaking
CN110628983A (en) * 2019-10-10 2019-12-31 北京科技大学 Converter smelting fire point area temperature continuous monitoring oxygen lance system and monitoring method
WO2021073015A1 (en) * 2019-10-16 2021-04-22 北京科技大学 Converter co2-o2 mixed injection smelting method and dynamic temperature control method in fire-point region
US11788160B2 (en) 2019-10-16 2023-10-17 University Of Science And Technology Beijing Converter CO2—O2 mixed injection smelting method and method of dynamically controlling fire point area temperature
CN111088414A (en) * 2019-12-17 2020-05-01 湖北理工学院 Oxygen lance with online continuous temperature measurement function and use method thereof
CN115232911A (en) * 2022-06-17 2022-10-25 中钢集团鞍山热能研究院有限公司 Hot air spray gun for steelmaking and blowing process thereof
CN115232911B (en) * 2022-06-17 2023-11-07 中钢集团鞍山热能研究院有限公司 Hot air spray gun for steelmaking and converting process thereof

Also Published As

Publication number Publication date
CN108165700B (en) 2023-06-02

Similar Documents

Publication Publication Date Title
CN108165700A (en) A kind of thermometric spray gun for being installed on converter bottom and application method
CN110804684B (en) CO converter2-O2Dynamic control method for temperature of mixed blowing smelting fire point area
CN105369009B (en) A kind of temp measuring system and temp measuring method of electric-arc furnace steelmaking on-line measurement molten steel temperature
CN102288740B (en) Measuring probes for measuring and sampling with a metal melt
CN108424988B (en) Liquid slag buffer device with concurrent heating and preheating functions
CN208071732U (en) A kind of thermometric spray gun being installed on converter bottom
CN111575443B (en) Gas supply device and method for smelting low-carbon alloy in AOD furnace
CN109269646A (en) A kind of continuous temperature measuring device for molten and system
CN106065426B (en) A kind of bottom blowing element that oxygen spray powder is supplied for converter bottom
CN104513880A (en) Converter sublance body
CN207379274U (en) A kind of metallurgical furnace
CN111088414A (en) Oxygen lance with online continuous temperature measurement function and use method thereof
CN212253637U (en) Chamber type gas heating furnace
CN204138734U (en) Blow side plumbous melting reduction device
CN206207998U (en) Oxygen enriched molten bath smelting furnace
CN106382817A (en) Oxygen-enriched molten pool melting furnace
CN113843330B (en) Hot stamping steel plate emissivity calibration experiment platform
CN204251643U (en) A kind of revolving furnace sublance rifle body
CN213113394U (en) Process monitoring device for front-mounted tapping furnace of smelting reduction furnace
CN107655332A (en) A kind of metallurgical furnace
CN213388757U (en) Coal-oxygen lance for baking steel scrap in converter
CN220317862U (en) Alloy material baking device for converter steelmaking
CN108947281A (en) A kind of modifying combustion-compensating device for dry granulation high-temperature liquid state slag
CN210937036U (en) Continuous temperature measuring device for steelmaking continuous casting tundish
CN209623352U (en) A kind of fireproofing prefabricated member or precast concrete roasting kiln

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant