gil
pipe mother
gas chamber
mother
gis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810081769.9A
Other languages
Chinese (zh)
Other versions
CN108152693B (en
Inventor
黎卫国
邓军
张长虹
陈伟民
杨旭
楚金伟
王奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Original Assignee
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance and Test Center of Extra High Voltage Power Transmission Co filed Critical Maintenance and Test Center of Extra High Voltage Power Transmission Co
Priority to CN201810081769.9A priority Critical patent/CN108152693B/en
Publication of CN108152693A publication Critical patent/CN108152693A/en
Application granted granted Critical
Publication of CN108152693B publication Critical patent/CN108152693B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • G01R31/1245Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of line insulators or spacers, e.g. ceramic overhead line cap insulators; of insulators in HV bushings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • G01R31/1254Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of gas-insulated power appliances or vacuum gaps

Abstract

The invention discloses three support insulator fault simulating test platform of GIL equipment and simulation experiment method, which includes outlet casing tube, and bottom is provided with independent the second gas chamber of the first gas chamber of GIS busbares and GIS busbares adjacent to each other;GIL pipes are female, and one end is sealed and is connected with the outer wall of the second gas chamber of GIS busbares, and the other end opens wide;There is air bound insulating basin in GIL main pipe end sets, contact base is provided in air bound insulating basin;It is provided with to observe the observation window for sliding three post insulator sub-component discharge processes in GIL pipe mothers;It is provided with that GIL pipe mother's hand holes that temperature rises terminal board are installed in GIL pipe mothers;Pipe is female, is removably installed in the openend of GIL pipes mother.The three post insulator sub-component of slip of the conveniently replaced a variety of different insulative operating modes of this platform in insulation faults such as its surface simulation burr, filth, metallic particles, metal suspensions, measures ultrahigh-frequency signal using air bound insulator, discharge process is recorded by observation window.

Description

Three support insulator fault simulating test platform of GIL equipment and simulation experiment method
Technical field
The present invention relates to technical field of electric power, and in particular to a kind of three support insulator fault simulating test of GIL equipment is put down Platform and simulation experiment method.
Background technology
The apparatus insulated failures of 550kV GIL and heating accident take place frequently, and have occurred 2 three in company administrative area in recent years Column insulator is burst, 2 three support insulator partial discharge abnormal failures, a lot of three support insulators external flashover failures, due to GIL Equipment is mainly used in alternating current filter inlet wire and converter power transformer feeder zone, and GIL device fails will cause exchange to be filtered The big group of stoppage in transit of wave device or converter power transformer are stopped transport, and direct current transportation power will substantially reduce, and endanger electric power netting safe running.GIL equipment Three support insulators mainly by electric field and thermal field comprehensive function, at present, lack carry out tri- pillars of GIL both at home and abroad in the process of running Insulator bears electric field and the test platform of thermal field comprehensive function.Occur to find out three support insulator of GIL operational process The basic reason of insulation fault and heating accident researches and develops a set of three support insulator insulation fault of GIL equipment and heating accident mould It is particularly important to intend test platform.
Invention content
It is an object of the invention to overcome above-mentioned the deficiencies in the prior art, a kind of three support insulator of GIL equipment event is provided Hinder analogue test platform
To achieve the above object, the technical scheme is that:
Three support insulator fault simulating test platform of GIL equipment, including
Outlet casing tube, bottom are provided with independent the second gas chamber of the first gas chamber of GIS busbares and GIS busbares adjacent to each other, The first gas chamber of GIS busbares and the second gas chamber of GIS busbares are both provided with charge and discharge gas port;
GIL pipes are female, and one end is sealed and is connected with the outer wall of the second gas chamber of GIS busbares, and the other end opens wide;In GIL mothers Tube end is provided with air bound insulating basin, and contact base is provided in air bound insulating basin;It is provided with to see in GIL pipe mothers Examine the observation window for sliding three post insulator sub-component discharge processes;It is provided in GIL pipe mothers and rises terminal board for installing temperature GIL pipe mother's hand holes;
Pipe is female, is removably installed in the openend of GIL pipes mother, and pipe is female to form GIL pipe mother-qis between GIL pipe mothers Room, GIL pipe mother-qis room are provided with charge and discharge gas port;Pipe mother's hand hole is provided in pipe mother, the inner wall and outer wall of pipe mother's hand hole are equal It is provided with temperature and rises terminal plate, pipe mother's hand hole cover board is detachably installed on the open end of pipe mother's hand hole;
Three post insulator sub-components are slided, are set in GIL pipe mothers, for simulating three support insulator different faults works Condition.
It is described go out the first gas chamber of GIS busbares, the second gas chamber of GIS busbares and GIL pipe mother-qis room using fixing bracket into Row support, sets insulation spacer, absolutely between the first gas chamber of GIS busbares, the second gas chamber of GIS busbares, GIL pipe mother-qi rooms and fixing bracket When edge is tested, by grounding copper bar reliable ground, during temperature rise test, grounding copper bar is dismantled.
The pipe mother is detachable by the way of flanged joint, is hermetically installed in the openend of GIL pipes mother.
Three post insulator sub-components of the slip include particle trapping device, slide three support insulators and conducting rod, institute It states and slides three support insulator supporting legs, two nylon rollers of setting, top setting copper bead electrode, copper bead electrode is by little spring pressure It connects and is reliably contacted with GIL pipe mother's inner walls;Described conducting rod one end is directly plugged on air bound insulator contact base, and the other end carries Fastening bolt and removably shielding case is pressed to surround.
When carrying out simulation test, the dimension of the first gas chamber of GIS busbares, the second gas chamber of GIS busbares and GIL pipe mother-qis room It holds in 0.5Mpa.
The outlet casing tube is the composite sheath outlet casing tube of 500KV.
Another object of the present invention is to provide a kind of three support insulator insulation fault analogy method of GIL equipment, the party Method is carried out using above-mentioned three support insulator fault simulating test platform of GIL equipment, is included the following steps:
Under the conditions of step 1, deenergization, the first gas chamber of GIS busbares, the second gas chamber of GIS busbares, GIL pipe mother-qis room are checked Air pressure whether maintain 0.5Mpa;
Step 2 utilizes SF6 retracting devices, recycling GIS busbar the second gas chamber gases so that GIS busbares the second gas chamber air pressure It is reduced to 0.25MPa stoppings;
Step 3 utilizes SF6 retracting devices, recycling GIL pipe mother-qis room gas so that zero-pressure is down in GIL pipe mother-qi room air pressures Stop;
Step 4 dismantles pipe mother;
Step 5, will slide three support insulator modular connectors to the exhausted basin of air bound in contact base on;
Step 6 checks and slides whether copper bead electrode at the top of three support insulators reliably connects with GIL pipe mother inner walls, it is ensured that Detachable copper bar reliable ground.
Step 7 utilizes scouring pad and alcohol wipe GIL pipe mother's inner walls;
Pipe mother is returned dress by step 8;
Step 9 vacuumizes GIL pipe mother-qis room, until 100Pa maintains 0.5h;
Step 10 recharges the second gas chamber of GIL pipe mother-qi rooms and GIS using qualified SF6, when air chamber pressure stops for 0.5Mpa Inflation;
Step 11 picks out high-voltage connection in the grading ring of thread casing;
Step 12, by high-speed camera horizontal aligument observation window;
Step 13 uniformly improves test voltage, studies the various insulation fault mechanism of three support insulators.
It is still another object of the present invention to provide a kind of three support insulator heating accident analogy method of GIL equipment, the party Method is carried out using above-mentioned three support insulator fault simulating test platform of GIL equipment, is included the following steps:
Under the conditions of step 1, deenergization, the first gas chamber of GIS busbares, the second gas chamber of GIS busbares, GIL pipe mother-qis room are checked Air pressure whether maintain 0.5Mpa;
Step 2 utilizes SF6 retracting devices, recycling GIS busbar the second gas chamber gases so that GIS busbares the second gas chamber air pressure It is reduced to 0.25MPa stoppings;
Step 3 utilizes SF6 retracting devices, recycling GIL pipe mother-qis room gas so that zero-pressure is down in GIL pipe mother-qi room air pressures Stop;
Step 4 dismantles pipe mother;
Step 5, will slide three support insulator modular connectors to the exhausted basin of air bound in contact base on;
Step 6, by temperature rise thermocouple be arranged in need monitor Wen Sheng position, thermocouple wire by GIL pipe mother's hand holes at Terminal board is drawn;
Step 7, dismounting shielding case fasten soft copper band using the bolt of three post insulator sub-component conducting rod ends, return dress Pipe is female, dismantles pipe mother's hand hole cover board, and soft copper is connected with the other end with the inner wall terminal plate of pipe mother's hand hole;
Step 8 returns tubulature mother's hand hole cover board, dismantles grounding copper bar;
Step 9 vacuumizes GIL pipe mother-qis room, until 100Pa maintains 0.5h;
Step 10 recharges the second gas chamber of GIL pipe mother-qi rooms and GIS using qualified SF6, when air chamber pressure stops for 0.5Mpa Inflation;
Strong current generator output terminal is coupled with outlet casing tube terminal plate and demountable tube mother's hand hole outer wall by step 11 At terminal plate;
Step 12 changes strong current generator transmission current, three support insulator heating accident of research GIL equipment.
Compared with prior art, the present invention advantage is:
The three post insulator sub-component of slip of the conveniently replaced a variety of different insulative operating modes of the present invention, in its surface simulation hair The insulation faults such as thorn, filth, metallic particles, metal suspension measure ultrahigh-frequency signal using air bound insulator, are remembered by observation window Recording playback electric process.It in addition, will be in three post insulator sub-component conducting rods and demountable tube mother's hand hole by detachable soft copper band Wall terminal plate is connected, and removes grounding copper bar, strong current generator output terminal is connected to outlet casing tube terminal plate and demountable tube The outer wall terminal plate of female hand hole, three support insulator heating accident when simulating different running currents.It can be goed deep into using test platform The various insulation faults of three support insulator of GIL equipment and heating accident are analyzed, specific aim measures to rectify and reform is proposed, effectively prevent three The generation of column insulator dielectric failure and heating accident.
Description of the drawings
Fig. 1 is analog insulation failure schematic diagram of the embodiment of the present invention;
Fig. 2 simulates heating accident schematic diagram for the embodiment of the present invention;
In figure:1st, outlet casing tube;2nd, GIS busbares gas chamber;3rd, GIL pipes are female;4th, pipe is female;5th, three post insulator subgroups are slided Part;6th, air bound insulating basin;7th, contact base;8th, shielding case;9th, observation window;10th, GIL pipes mother hand hole;11st, pipe mother hand hole;12nd, it is soft Copper strips;13rd, grounding copper bar;14th, fixing bracket;15th, three support insulators are slided;16th, particle trapping device;17th, conducting rod;18、 Insulation spacer;19th, charge and discharge gas port;20th, flange.
Specific embodiment
Present disclosure is described in further details with reference to the accompanying drawings and detailed description.
Embodiment:
Refering to shown in Fig. 1-2, three support insulator fault simulating test platform of GIL equipment provided in this embodiment includes 500kV outlet casing tubes 1, GIL pipes mother 3, pipe mother 4, slide three post insulator sub-components 5, air bound insulating basin at GIS busbares gas chamber 2 6th, contact base 7, shielding case 8, observation window 9, GIL pipe mothers hand hole 10, pipe mother hand hole 11, soft copper band 12, grounding copper bar 13 and solid Fixed rack 14.
Test platform two GIS busbares gas chambers of setting and a GIL pipe mother-qis room, each gas chamber setting charge and discharge gas port, 3 Gas chamber is independent air chamber, which is 0.5MPa, and the first independent air chamber of GIS busbares is located at 1 bottom of outlet casing tube, The second independent air chamber of GIS busbares is adjacent with the first independent air chamber, and GIS busbares second are independent when replacing three post insulator sub-components 5 Gas chamber can be used as transition gas chamber, and GIL pipe mother-qi chamber enclosures are formed by connecting by GIL pipes mother 3 and pipe mother 4 by flange 20, flange 20 Place ensures air-tightness using dual sealing technique, in the pipe mother hand hole 11 of the female 4 surface faces setting φ 40cm of pipe, pipe mother hand hole 11 Wall is equipped with temperature liter terminal plate, outer wall also is provided with temperature and rises terminal plate, and pipe mother is detachably equipped on the open end of pipe mother's hand hole Hand hole cover board.
GIL pipe mother's hands of setting φ 40cm immediately below 3 front setting φ 40cm observation windows 9 of GIL pipes mother, GIL pipes mother 4 Hole 10, discharge process is tested using 9 monitor log of observation window, three support insulator, and Wen Shengduan is installed using GIL pipe mothers hand hole 10 Daughter board.
The three post insulator sub-component 5 of slip includes particle trapping device 16, slides three support insulators 15, conducting rod 17. The three support insulator supporting leg of slip sets two nylon rollers, and top setting copper bead electrode, copper bead electrode is by little spring pressure It connects and is reliably contacted with female 3 inner walls of GIL pipes;17 one end of conducting rod is directly plugged on the contact base 7 of air bound insulating basin 6, another 4 fastening bolts of band are held, and removably shielding case 8 are pressed to surround.
The outlet casing tube 1 of test platform, GIS busbares gas chamber 2, GIL pipes mother are supported using fixing bracket 14, and GIS is female Insulation spacer 18 is set between line gas chamber and GIL pipe mother-qi rooms and fixing bracket 14, it, can by grounding copper bar 13 during Insulation Test By ground connection, during temperature rise test, grounding copper bar 13 is dismantled.
Pipe mother 4 is dismantled, three strut assemblies of slip of replaceable a variety of different operating modes are sliding three support insulator surface modes Intend the insulation faults such as burr, filth, metallic particles, metal suspension, measure ultrahigh-frequency signal using air bound insulator, pass through observation Window records discharge process.
Shielding case 8 is dismantled, by soft copper band 12 by the inner wall of three post insulator sub-component conducting rods 17 and pipe mother hand hole 11 Terminal plate is connected, and removes grounding copper bar 13, strong current generator output terminal is connected to 1 terminal plate of outlet casing tube and pipe mother's hand hole 11 outer wall terminal plate, three support insulator heating accident when simulating different running currents.
In addition, the present embodiment additionally provides a kind of three support insulator insulation fault analogy method of GIL equipment, this method is adopted It is carried out, specifically comprised the following steps with above-mentioned three support insulator fault simulating test platform of GIL equipment:
Under the conditions of step 1, deenergization, the first gas chamber of GIS busbares, the second gas chamber of GIS busbares, GIL pipe mother-qis room are checked Air pressure whether maintain 0.5Mpa;
Step 2 utilizes SF6 retracting devices, recycling GIS busbar the second gas chamber gases so that GIS busbares the second gas chamber air pressure It is reduced to 0.25MPa stoppings;
Step 3 utilizes SF6 retracting devices, recycling GIL pipe mother-qis room gas so that zero-pressure is down in GIL pipe mother-qi room air pressures Stop;
Step 4 dismantles pipe mother;
Step 5, will slide three support insulator modular connectors to the exhausted basin of air bound in contact base on;
Step 6 checks and slides whether copper bead electrode at the top of three support insulators reliably connects with GIL pipe mother inner walls, it is ensured that Detachable copper bar reliable ground.
Step 7 utilizes scouring pad and alcohol wipe GIL pipe mother's inner walls;
Pipe mother is returned dress by step 8;
Step 9 vacuumizes GIL pipe mother-qis room, until 100Pa maintains 0.5h;
Step 10 recharges the second gas chamber of GIL pipe mother-qi rooms and GIS using qualified SF6, when air chamber pressure stops for 0.5Mpa Inflation;
Step 11 picks out high-voltage connection in the grading ring of thread casing;
Step 12, by high-speed camera horizontal aligument observation window;
Step 13 uniformly improves test voltage, studies the various insulation fault mechanism of three support insulators.
Meanwhile the present embodiment additionally provides a kind of three support insulator heating accident analogy method of GIL equipment, this method It is carried out, specifically comprised the following steps using above-mentioned three support insulator fault simulating test platform of GIL equipment:
Under the conditions of step 1, deenergization, the first gas chamber of GIS busbares, the second gas chamber of GIS busbares, GIL pipe mother-qis room are checked Air pressure whether maintain 0.5Mpa;
Step 2 utilizes SF6 retracting devices, recycling GIS busbar the second gas chamber gases so that GIS busbares the second gas chamber air pressure It is reduced to 0.25MPa stoppings;
Step 3 utilizes SF6 retracting devices, recycling GIL pipe mother-qis room gas so that zero-pressure is down in GIL pipe mother-qi room air pressures Stop;
Step 4 dismantles pipe mother;
Step 5, will slide three support insulator modular connectors to the exhausted basin of air bound in contact base on;
Step 6, by temperature rise thermocouple be arranged in need monitor Wen Sheng position, thermocouple wire by GIL pipe mother's hand holes at Terminal board is drawn;
Step 7, dismounting shielding case fasten soft copper band using the bolt of three post insulator sub-component conducting rod ends, return dress Pipe is female, dismantles pipe mother's hand hole cover board, and soft copper is connected with the other end with the inner wall terminal plate of pipe mother's hand hole;
Step 8 returns tubulature mother's hand hole cover board, dismantles grounding copper bar;
Step 9 vacuumizes GIL pipe mother-qis room, until 100Pa maintains 0.5h;
Step 10 recharges the second gas chamber of GIL pipe mother-qi rooms and GIS using qualified SF6, when air chamber pressure stops for 0.5Mpa Inflation;
Strong current generator output terminal is coupled with outlet casing tube terminal plate and demountable tube mother's hand hole outer wall by step 11 At terminal plate;
Step 12 changes strong current generator transmission current, three support insulator heating accident of research GIL equipment.
Above-described embodiment is in the art the purpose is to be to allow simply to illustrate that the technical concepts and features of the present invention Those of ordinary skill can understand present disclosure and implement according to this, and it is not intended to limit the scope of the present invention.It is all It is the equivalent variation or modification made according to the essence of the content of present invention, should all covers within the scope of the present invention.

Claims (8)

  1. Three support insulator fault simulating test platform of 1.GIL equipment, which is characterized in that including
    Outlet casing tube, bottom are provided with independent the second gas chamber of the first gas chamber of GIS busbares and GIS busbares adjacent to each other, and GIS is female The first gas chamber of line and the second gas chamber of GIS busbares are both provided with charge and discharge gas port;
    GIL pipes are female, and one end is sealed and is connected with the outer wall of the second gas chamber of GIS busbares, and the other end opens wide;At GIL main pipes end Portion is provided with air bound insulating basin, and contact base is provided in air bound insulating basin;It is provided with to observe cunning in GIL pipe mothers The observation window of dynamic three post insulator sub-component discharge processes;It is provided with that the GIL pipes that temperature rises terminal board are installed in GIL pipe mothers Female hand hole;
    Pipe is female, is removably installed in the openend of GIL pipes mother, and pipe is female to form GIL pipe mother-qis room between GIL pipe mothers, GIL pipe mother-qis room is provided with charge and discharge gas port;Pipe mother's hand hole is provided in pipe mother, the inner wall and outer wall of pipe mother's hand hole are respectively provided with There is temperature to rise terminal plate, pipe mother's hand hole cover board is detachably installed on the open end of pipe mother's hand hole;
    Three post insulator sub-components are slided, are set in GIL pipe mothers, for simulating the different faults work of three support insulators Condition.
  2. 2. three support insulator fault simulating test platform of GIL equipment as described in claim 1, which is characterized in that it is described go out The first gas chamber of GIS busbares, the second gas chamber of GIS busbares and GIL pipe mother-qis room are supported using fixing bracket;GIS busbares Insulation spacer between the first gas chamber, the second gas chamber of GIS busbares, GIL pipe mother-qi rooms and fixing bracket is set, during Insulation Test, is passed through Grounding copper bar reliable ground during temperature rise test, dismantles grounding copper bar.
  3. 3. three support insulator fault simulating test platform of GIL equipment as described in claim 1, which is characterized in that the pipe Mother is detachable by the way of flanged joint, is hermetically installed in the openend of GIL pipes mother.
  4. 4. three support insulator fault simulating test platform of GIL equipment as described in claim 1, which is characterized in that the cunning Dynamic three post insulator sub-components include particle trapping device, slide three support insulators and conducting rod, and three pillars of the slip are exhausted Edge supporting leg sets two nylon rollers, top setting copper bead electrode, and copper bead electrode is crimped reliably female with GIL pipes by little spring Inner wall contacts;Described conducting rod one end is directly plugged on air bound insulator contact base, and the other end is with fastening bolt and by can The pressure shielding case of dismounting surrounds.
  5. 5. three support insulator fault simulating test platform of GIL equipment as described in claim 1, which is characterized in that carrying out During simulation test, the first gas chamber of GIS busbares, the second gas chamber of GIS busbares and GIL pipe mother-qis room are kept at 0.5Mpa.
  6. 6. three support insulator fault simulating test platform of GIL equipment as described in claim 1, which is characterized in that it is described go out Thread casing is the composite sheath outlet casing tube of 500KV.
  7. Three support insulator insulation fault analogy method of 7.GIL equipment, which is characterized in that the method uses claim 4 institute The three support insulator fault simulating test platform of GIL equipment stated carries out, and includes the following steps:
    Under the conditions of step 1, deenergization, check GIS busbares the first gas chambers, the second gas chamber of GIS busbares, GIL pipe mother-qis room gas Whether pressure maintains 0.5Mpa;
    Step 2 utilizes SF6 retracting devices, recycling GIS busbar the second gas chamber gases so that the air pressure of the second gas chamber of GIS busbares reduces Stop to 0.25MPa;
    Step 3 utilizes SF6 retracting devices, recycling GIL pipe mother-qis room gas so that GIL pipe mother-qi room air pressures are down to zero-pressure and are stopped Only;
    Step 4 dismantles pipe mother;
    Step 5, will slide three support insulator modular connectors to the exhausted basin of air bound in contact base on;
    Step 6 checks and slides whether copper bead electrode at the top of three support insulators reliably connects with GIL pipe mother inner walls, it is ensured that removable Unload copper bar reliable ground;
    Step 7 utilizes scouring pad and alcohol wipe GIL pipe mother's inner walls;
    Pipe mother is returned dress by step 8;
    Step 9 vacuumizes GIL pipe mother-qis room, until 100Pa maintains 0.5h;
    Step 10 recharges the second gas chamber of GIL pipe mother-qi rooms and GIS using qualified SF6, when air chamber pressure is filled for 0.5Mpa stoppings Gas;
    Step 11 picks out high-voltage connection in the grading ring of thread casing;
    Step 12, by high-speed camera horizontal aligument observation window;
    Step 13 uniformly improves test voltage, studies the various insulation fault mechanism of three support insulators.
  8. Three support insulator heating accident analogy method of 8.GIL equipment, which is characterized in that the method uses claim 4 institute The three support insulator fault simulating test platform of GIL equipment stated carries out, and includes the following steps:
    Under the conditions of step 1, deenergization, check GIS busbares the first gas chambers, the second gas chamber of GIS busbares, GIL pipe mother-qis room gas Whether pressure maintains 0.5Mpa;
    Step 2 utilizes SF6 retracting devices, recycling GIS busbar the second gas chamber gases so that the air pressure of the second gas chamber of GIS busbares reduces Stop to 0.25MPa;
    Step 3 utilizes SF6 retracting devices, recycling GIL pipe mother-qis room gas so that GIL pipe mother-qi room air pressures are down to zero-pressure and are stopped Only;
    Step 4 dismantles pipe mother;
    Step 5, will slide three support insulator modular connectors to the exhausted basin of air bound in contact base on;
    Temperature liter thermocouple is arranged in the position for needing to monitor Wen Sheng by step 6, and thermocouple wire passes through terminal at GIL pipe mother's hand holes Plate is drawn;
    Step 7, dismounting shielding case fasten soft copper band using the bolt of three post insulator sub-component conducting rod ends, return tubulature mother, Pipe mother's hand hole cover board is dismantled, soft copper is connected with the other end with the inner wall terminal plate of pipe mother's hand hole;
    Step 8 returns tubulature mother's hand hole cover board, dismantles grounding copper bar;
    Step 9 vacuumizes GIL pipe mother-qis room, until 100Pa maintains 0.5h;
    Step 10 recharges the second gas chamber of GIL pipe mother-qi rooms and GIS using qualified SF6, when air chamber pressure is filled for 0.5Mpa stoppings Gas;
    Strong current generator output terminal is coupled with outlet casing tube terminal plate and demountable tube mother's hand hole outer wall wiring by step 11 At plate;
    Step 12 changes strong current generator transmission current, three support insulator heating accident of research GIL equipment.
CN201810081769.9A 2018-01-29 2018-01-29 GIL equipment three-post insulator fault simulation test platform and simulation test method Active CN108152693B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810081769.9A CN108152693B (en) 2018-01-29 2018-01-29 GIL equipment three-post insulator fault simulation test platform and simulation test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810081769.9A CN108152693B (en) 2018-01-29 2018-01-29 GIL equipment three-post insulator fault simulation test platform and simulation test method

Publications (2)

Publication Number Publication Date
CN108152693A true CN108152693A (en) 2018-06-12
CN108152693B CN108152693B (en) 2024-04-02

Family

ID=62459075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810081769.9A Active CN108152693B (en) 2018-01-29 2018-01-29 GIL equipment three-post insulator fault simulation test platform and simulation test method

Country Status (1)

Country Link
CN (1) CN108152693B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963928A (en) * 2018-07-20 2018-12-07 西安交通大学 A kind of base unit and piping lane transmission of electricity GIL in ultra-high/extra-high voltage piping lane transmission of electricity GIL
CN109683071A (en) * 2018-12-24 2019-04-26 中国南方电网有限责任公司超高压输电公司检修试验中心 Fast-positioning device and method after a kind of three support insulator discharge fault of GIL equipment
CN109816192A (en) * 2018-09-18 2019-05-28 国网江苏省电力有限公司盐城供电分公司 GIL piping lane Engineering Simulation control system
WO2019237920A1 (en) * 2019-03-18 2019-12-19 中国南方电网有限责任公司超高压输电公司检修试验中心 Gil device three-post insulator mechanical reliability test platform and test method
CN110687406A (en) * 2019-09-26 2020-01-14 中国南方电网有限责任公司超高压输电公司检修试验中心 GIL equipment unit ultrahigh frequency signal attenuation amount test platform and test method thereof
CN110729684A (en) * 2019-10-31 2020-01-24 西安交通大学 Ultra/extra-high voltage SF6Gas insulation wall bushing and insulation supporting structure thereof
CN111509658A (en) * 2020-03-20 2020-08-07 中国南方电网有限责任公司超高压输电公司检修试验中心 GI L equipment standard unit based on novel internal structure and realization method
CN111610412A (en) * 2020-04-20 2020-09-01 国网山东省电力公司青岛供电公司 Sleeve electric test strutting arrangement
CN112130041A (en) * 2020-09-25 2020-12-25 华北电力大学 GIL post insulator cracking fault simulation test platform and measurement method
CN113109062A (en) * 2020-01-10 2021-07-13 平高集团有限公司 Metal particle trap trapping test device and method
CN113567264A (en) * 2021-08-24 2021-10-29 国家电网公司华中分部 Experimental device and experimental method capable of simultaneously simulating high voltage and high temperature of GIL inner conductor
CN113933009A (en) * 2021-11-09 2022-01-14 广东电网有限责任公司电力科学研究院 Variable-temperature three-post insulator vibration simulation testing device
CN116593845A (en) * 2023-07-06 2023-08-15 江苏安靠智能输电工程科技股份有限公司 Transformer and GIS equipment test device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446617A (en) * 2008-05-27 2009-06-03 中国电力科学研究院 Test apparatus of DC gas insulated metal enclosed transmission line (GIL)
CN101718824A (en) * 2009-12-07 2010-06-02 中国电力科学研究院 Experiment device used for extra-high voltage alternating current-direct current gas insulated metal enclosed transmission line
CN202421414U (en) * 2011-11-15 2012-09-05 国网电力科学研究院 Super and extra high pressure oil-SF6 sleeve testing apparatus
CN105467282A (en) * 2015-11-23 2016-04-06 国网重庆市电力公司电力科学研究院 GIS true-type fault simulation test system
CN106226669A (en) * 2016-09-18 2016-12-14 国网江苏省电力公司电力科学研究院 A kind of GIS combined-voltage Combined Trials System and method for
CN207992375U (en) * 2018-01-29 2018-10-19 中国南方电网有限责任公司超高压输电公司检修试验中心 Three support insulator fault simulating test platform of GIL equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446617A (en) * 2008-05-27 2009-06-03 中国电力科学研究院 Test apparatus of DC gas insulated metal enclosed transmission line (GIL)
CN101718824A (en) * 2009-12-07 2010-06-02 中国电力科学研究院 Experiment device used for extra-high voltage alternating current-direct current gas insulated metal enclosed transmission line
CN202421414U (en) * 2011-11-15 2012-09-05 国网电力科学研究院 Super and extra high pressure oil-SF6 sleeve testing apparatus
CN105467282A (en) * 2015-11-23 2016-04-06 国网重庆市电力公司电力科学研究院 GIS true-type fault simulation test system
CN106226669A (en) * 2016-09-18 2016-12-14 国网江苏省电力公司电力科学研究院 A kind of GIS combined-voltage Combined Trials System and method for
CN207992375U (en) * 2018-01-29 2018-10-19 中国南方电网有限责任公司超高压输电公司检修试验中心 Three support insulator fault simulating test platform of GIL equipment

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963928A (en) * 2018-07-20 2018-12-07 西安交通大学 A kind of base unit and piping lane transmission of electricity GIL in ultra-high/extra-high voltage piping lane transmission of electricity GIL
CN109816192A (en) * 2018-09-18 2019-05-28 国网江苏省电力有限公司盐城供电分公司 GIL piping lane Engineering Simulation control system
CN109683071A (en) * 2018-12-24 2019-04-26 中国南方电网有限责任公司超高压输电公司检修试验中心 Fast-positioning device and method after a kind of three support insulator discharge fault of GIL equipment
WO2019237920A1 (en) * 2019-03-18 2019-12-19 中国南方电网有限责任公司超高压输电公司检修试验中心 Gil device three-post insulator mechanical reliability test platform and test method
US11428613B2 (en) 2019-03-18 2022-08-30 Maintenance & Test Centre, Csg Ehv Power Transmission Company Mechanical reliability testing platform and testing method for tri-post insulators in GIL device
CN110687406A (en) * 2019-09-26 2020-01-14 中国南方电网有限责任公司超高压输电公司检修试验中心 GIL equipment unit ultrahigh frequency signal attenuation amount test platform and test method thereof
CN110729684B (en) * 2019-10-31 2020-10-27 西安交通大学 Ultra/extra-high voltage SF6Gas insulation wall bushing and insulation supporting structure thereof
CN110729684A (en) * 2019-10-31 2020-01-24 西安交通大学 Ultra/extra-high voltage SF6Gas insulation wall bushing and insulation supporting structure thereof
CN113109062A (en) * 2020-01-10 2021-07-13 平高集团有限公司 Metal particle trap trapping test device and method
CN111509658B (en) * 2020-03-20 2022-05-17 中国南方电网有限责任公司超高压输电公司检修试验中心 GIL equipment standard unit based on novel internal structure and implementation method
CN111509658A (en) * 2020-03-20 2020-08-07 中国南方电网有限责任公司超高压输电公司检修试验中心 GI L equipment standard unit based on novel internal structure and realization method
CN111610412A (en) * 2020-04-20 2020-09-01 国网山东省电力公司青岛供电公司 Sleeve electric test strutting arrangement
CN111610412B (en) * 2020-04-20 2023-03-28 国网山东省电力公司青岛供电公司 Sleeve electric test strutting arrangement
CN112130041A (en) * 2020-09-25 2020-12-25 华北电力大学 GIL post insulator cracking fault simulation test platform and measurement method
CN112130041B (en) * 2020-09-25 2023-06-16 华北电力大学 GIL post insulator burst fault simulation test platform and measurement method
CN113567264A (en) * 2021-08-24 2021-10-29 国家电网公司华中分部 Experimental device and experimental method capable of simultaneously simulating high voltage and high temperature of GIL inner conductor
CN113567264B (en) * 2021-08-24 2024-04-26 国家电网公司华中分部 Experimental device and experimental method capable of simultaneously simulating high voltage and high temperature of GIL inner conductor
CN113933009A (en) * 2021-11-09 2022-01-14 广东电网有限责任公司电力科学研究院 Variable-temperature three-post insulator vibration simulation testing device
CN116593845A (en) * 2023-07-06 2023-08-15 江苏安靠智能输电工程科技股份有限公司 Transformer and GIS equipment test device
CN116593845B (en) * 2023-07-06 2023-12-05 江苏安靠智能输电工程科技股份有限公司 Transformer and GIS equipment test device

Also Published As

Publication number Publication date
CN108152693B (en) 2024-04-02

Similar Documents

Publication Publication Date Title
CN108152693A (en) Three support insulator fault simulating test platform of GIL equipment and simulation experiment method
CN207992375U (en) Three support insulator fault simulating test platform of GIL equipment
CN106848964A (en) A kind of 35kv all insulations enclosed busbar
CN105445629A (en) AC voltage withstand test method for 500kV GIS
CN103105568A (en) Transformer paper oil insulation experiment device integrated with electric heating combination ageing and partial discharge
CN104849630B (en) A kind of device for being used to measure gas-insulated stacked switch disc insulator defect
CN204347192U (en) Disc insulator Withstand test device
CN202383236U (en) Withstand voltage test fixture for insulation stands
CN205753131U (en) A kind of outdoor compact type intelligent substation
CN102253319A (en) Solid insulation voltage resistance performance test system under high voltage and low temperature Paschen condition
CN201897021U (en) Connector device for SF6 (sulfur hexafluoride) switch moisture test
CN106556745B (en) Direct current voltage divider and capacitance and dielectric loss detection method thereof
CN113567264B (en) Experimental device and experimental method capable of simultaneously simulating high voltage and high temperature of GIL inner conductor
CN106054044A (en) Insulation test device for gas filled tank
CN205374640U (en) Make super special high voltage electricity transformer test device of oil expenses - SF6 sheathed tube
CN211014556U (en) GIS equipment defect simulation system and platform
CN209690453U (en) A kind of 220kV cable run field test device
CN205543941U (en) Connector of transformer high -tension bushing and GIS equipment room
CN205960554U (en) 550kVGIS is with business turn over line porcelain bushing
Watanabe et al. Construction of first gas insulated transmission line in Japan
CN206193164U (en) Experimental frock of generating line gum cover
CN219799657U (en) GIS is with insulating pull rod high-voltage test device
CN217846525U (en) High-voltage cable accessory test detection device
CN103941165A (en) GIS equipment testing device and method
CN212303525U (en) GIS is with keeping apart and withstand voltage equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant