CN108152128A - A kind of anti-rubble splashing collection device being arranged on pressure testing machine - Google Patents
A kind of anti-rubble splashing collection device being arranged on pressure testing machine Download PDFInfo
- Publication number
- CN108152128A CN108152128A CN201711085439.9A CN201711085439A CN108152128A CN 108152128 A CN108152128 A CN 108152128A CN 201711085439 A CN201711085439 A CN 201711085439A CN 108152128 A CN108152128 A CN 108152128A
- Authority
- CN
- China
- Prior art keywords
- column
- protective fence
- edge
- rubble
- protective
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/02—Details
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0014—Type of force applied
- G01N2203/0016—Tensile or compressive
- G01N2203/0019—Compressive
Landscapes
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Revetment (AREA)
Abstract
The present invention provides a kind of anti-rubble splashing collection device being arranged on pressure testing machine, including:Protective fence outer layer is porous protective jube, internal layer is elastic rubber bed course, and protective fence lower end is provided with collection frame, and collection frame is made with horizontal line in certain inclination angle and using integrally formed plastics;More jack side columns are vertically arranged in the middle part of protective fence, high-speed camera instrument box for putting can be moved up and down along more jack side columns.Technical scheme of the present invention not only reduces the own wt of protective fence, also it is avoided that rubble penetrates porous protective jube and weakens rubble impact capacity, the rubble for being also conducive to splash to protection face simultaneously is slid to collection frame, and rubble flocks together by own wt and then convenient for the removing work after experiment.Technical scheme of the present invention is avoided that the personal safety of rubble hazard test personnel generated during concrete sample flash disruption, while can the gem-pure crack growth situation for observing high-strength concrete uniaxial compressive test each stage.
Description
Technical field
The present invention relates to pressure testing protective devices, and in particular to a kind of anti-rubble being arranged on pressure testing machine splashes
Collection device.
Background technology
With the rapid development of concrete technology, high-strength concrete is as a kind of new construction material, in particular to resistance to compression
Intensity meets or exceeds the concrete of 60MPa, superior with its compression strength is high, non-deformability is strong, density is big, porosity is low
Property, it is widely applied in fields such as science of bridge building, skyscraper, ocean engineering and mine constructions.
The characteristics of high-strength concrete is maximum is compression strength height, generally the 4~6 of regular tenacity concrete times, with coal mine
For borehole wall concrete, as New Built Mine passes through table soil alluvium and rock section more and more deeper, it is desirable that the borehole wall can sustain
The complicated external load effect such as powerful ground pressure, hydraulic pressure, therefore the borehole wall strength grade of concrete made at this stage is higher and higher,
Highest has case of the C100 concrete applications of result in engineering practice.
But concrete is as a kind of fragile material, with strength grade, to improve Brittleness all the more apparent.Usually in reality
When testing progress high-strength concrete uniaxial compressive strength test on indoor pressure testing machine, test specimen destruction shows sudden, anxious
The characteristics of rush property, be embodied in and send out suddenly " bang " loud noise, destroy immediately, and destroy preceding without any apparent sex character
Million.Since concrete sample is flash disruption, the most of energy moment saved bit by bit in loading procedure is released so that comes off
Rubble splashes, and rubble has corner angle mostly, if certain journey can inevitably be caused by being splashed to human body face or skin exposed section
The injury of degree, therefore be very unsafe for testing crew.Secondly, just because of Brittleness of Concrete feature it is apparent, destroy
The characteristics of rapid, testing crew be in security consideration can not close-ups to the entire full mistake of high-strength concrete uniaxial compressive test
The situation of change of crackle during the Initiation And Propagation perforation situation, especially critical slope langth of journey crackle, therefore high-strength concrete single shaft is resisted
Press each stage stress of overall process and the grasp of the correspondence of crack growth situation not thorough.
Accordingly, it is desirable to provide a kind of improved technology scheme insufficient for the above-mentioned prior art.
Invention content
The purpose of the present invention is the rubble generated when overcoming the above-mentioned flash disruption of concrete sample in the prior art endangers examination
It tests the personal safety of personnel and is being not easy to observe each stage crack growth situation of high-strength concrete uniaxial compressive test overall process etc.
Problem provides a kind of anti-rubble splashing collection device being arranged on pressure testing machine.
To achieve these goals, the present invention provides following technical solution:
A kind of anti-rubble splashing collection device being arranged on pressure testing machine, the pressure testing machine include more root posts
With the pressure testing machine chassis among the more columns, test test specimen is positioned on the pressure testing machine chassis, institute
It states anti-rubble splashing collection device to connect with the more columns, the anti-rubble splashing collection device includes:Protective fence, it is described
Protective fence is centered around the periphery of the more columns, and the test test specimen placed on pressure testing machine chassis is stated for hood guard residence,
The rubble during test test specimen flash disruption is avoided to be splashed to the outside of the protective fence;The vertically arranged side of the protective fence
Formula is in there is certain inclination angle with the longitudinal axis;Collection frame, the collection frame are connect with the protective fence, and the collection frame is separately positioned on
The lower end of the protective fence, for collect it is described test test specimen flash disruption when splashes rubble;Multiple supporting racks are more
A support frame as described above is located at the lower part of the anti-rubble splashing collection device, and support frame as described above is fixedly connected with the column, institute
The lower end for stating protective fence is overlapped on support frame as described above, is used to support the protective fence.
In anti-rubble splashing collection device as described above, it is preferable that the protective fence includes front side protective column, right side is prevented
Guardrail, protecting back face column and left side protective fence are sequentially connected around composition;The front side protective column, right side protective fence, the back side are prevented
The setting of guardrail and left side protective fence has certain inclination angle with the longitudinal axis.
In anti-rubble splashing collection device as described above, it is preferable that the front side protective column, right side protective fence, the back side
The setting of protective fence and left side protective fence has 2 °~3 ° of inclination angle with the longitudinal axis.
In anti-rubble splashing collection device as described above, it is preferable that the front side protective column and the right side protective fence
It is linked and fixed by magnetic edge strip, convenient for the front side protective column with the closure of the right side protective fence with detaching;The right side
Protective fence is connect with the protecting back face column by fixed hinge;The protecting back face column passes through fixation with the left side protective fence
Hinge connection;The left side protective fence is connect with the front side protective column by leaf hinge;Under the protecting back face column
The middle position in portion is additionally provided with loose-leaf protection face column, convenient for can will be on the loose-leaf protection face column at the end of to be tested
It turns over, and then the rubble in the back side collection frame of the lower end setting on the cleaning protecting back face column.
In anti-rubble splashing collection device as described above, it is preferable that be arranged on the lower end on the front side protective column
Positive collection frame is arranged in parallel along horizontal line;It is arranged on right side collection frame, the protecting back face of the lower end of the right side protective fence
The back side collection frame of the lower end on column and the left side collection frame of the lower end of left side protective fence are in 5 °~6 ° with horizontal line
What inclination angle was arranged;Preferably, the back side collection frame of the lower end on the protecting back face column be using center line as it is symmetrical,
It is low between the senior middle school of both ends, and both ends are respectively facing intermediate, inclined setting, both ends are and horizontal line towards the angle of intermediate, inclined
In 5 °~6 ° of inclination angle.
In anti-rubble splashing collection device as described above, it is preferable that in the front side protective column, right side protective fence, the back of the body
It is vertical on the inner surface of face protective fence and left side protective fence to be fixedly installed more jack side columns;On more jack side columns
High-speed camera instrument box for putting is provided with, and the high-speed camera instrument box for putting can be moved up and down along more jack side columns;It is described
For placing high-speed camera instrument in high-speed camera instrument box for putting, convenient for recording the test test specimen loading complete process deformation failure feelings
Condition.
In anti-rubble splashing collection device as described above, it is preferable that the front side protective column further includes front side protective face
Column is provided with reinforcing edge strip at the left side edge on front side protective face column, and multiple loose-leaves is set to cut with scissors on the reinforcing edge strip
Chain jack, for installing leaf hinge;The edge strip that is magnetic is set at the right side edge on front side protective face column;The right side
Protective fence further includes right side protection face column, equal at the left side edge, upper edge and right side edge on the right side protection face column
It is provided with reinforcing edge strip, multiple fixed hinge jacks is set on the reinforcing edge strip in left side edge, for installing fixed hinge;Institute
It states left side protective fence and further includes left side protection face column, left side edge, upper edge and right edge on the left side protection face column
It is both provided with reinforcing edge strip at edge, is respectively provided with multiple leaf hinge jacks on the reinforcing edge strip in left side edge, in right side edge
Reinforcing edge strip on be respectively provided with multiple fixed hinge jacks, for installing fixed hinge;The protecting back face column further includes the back side
Protection face column is both provided with reinforcing edge strip at the left side edge, upper edge and right side edge on protecting back face face column, left
Multiple fixed hinge jacks are respectively provided on reinforcing edge strip on lateral edges and right side edge, for installing fixed hinge.It is described just
The right side edge on face protection face column is connect with the right side edge on the right side protection face column, the left side on the right side protection face column
Edge is connect with the right side edge on protecting back face face column, the left side edge on protecting back face face column and the left side protection face
The right side edge connection on column, the left side edge on the left side protection face column are connect with the left side edge on front side protective face column.
In anti-rubble splashing collection device as described above, it is preferable that further include:Screens fixator, the screens are fixed
Device is located at the top of the anti-rubble splashing collection device, for being fixedly connected with the protective fence and the column;The right side
Multiple screens are respectively provided on reinforcing edge strip in the upper edge of protective fence, the protecting back face column and the left side protective fence to consolidate
Determine device jack, for installing the screens fixator, the column and the protective fence are fixed with this;Preferably, the card
The position U-shaped structure of fixator, the opening of the screens fixator of the U-shaped structure far from the test test specimen, the U-shaped structure
The U-shaped angle of screens fixator is arranged at the periphery of the every column, two edges of a wing of the screens fixator of the U-shaped structure
Across the screens retainer insertion hole reinforced on edge strip of the upper edge of each protective fence, and with nut driving in the U
The end on two edges of a wing of the screens fixator of type structure is prevented the column with each by the screens fixator with this
Guardrail is fixedly connected.
In anti-rubble splashing collection device as described above, it is preferable that be provided with multiple jacks on more jack side columns;
It is arranged at intervals at the side wall surface of the high-speed camera instrument box for putting there are two fixed edge strip, on two fixed edge strips
It is provided with multiple pin holes;The width of more jack side columns is less than or equal to the spacing distance between two fixed edge strips,
Between snapping onto two fixed edge strips convenient for more jack side columns, and according to the height size of test test specimen, described
The position to adjust the high-speed camera instrument box for putting is moved up and down in the short transverse of more jack side columns, then passes through positioning
Bolt fixes more jack side columns and high-speed camera instrument box for putting positioning;Preferably, the high-speed camera instrument is put
The side wall surface of case is equipped with protective cover, which tests the one side of test specimen for face, and is installed at the middle part of the protective cover
There is a round implosion guard, the diameter of the implosion guard is more than the diameter of the pick-up lens of the high-speed camera instrument.
In anti-rubble splashing collection device as described above, it is preferable that the protective fence include the porous protective of outer layer every
The elastic rubber bed course on column and internal layer;Preferably, the plastics that being integrated of the collection frame cast forms are prepared.
Compared with the immediate prior art, technical solution provided by the invention has following excellent effect:
1st, technical solution provided by the invention is avoided that the rubble splashes danger generated during concrete sample flash disruption
The personal safety of evil testing crew, while gem-pure can observe each rank in high-strength concrete uniaxial compressive test overall process
Section test piece deformation destroys development, especially surface of test piece crack initiation, extension, connection, perforation situation.
2nd, the protective fence in technical scheme of the present invention is arranged to porous protective jube using outer layer, internal layer is arranged to elasticity
Rubber spacer, the vertically arranged mode of protective fence, in certain inclination angle, not only reduce the own wt of protective fence, also with the longitudinal axis
It is avoided that rubble penetrates porous protective jube and weakens rubble impact capacity, while the rubble for being also conducive to splash to protection face slides
To collection frame.
3rd, the collection frame in technical scheme of the present invention is arranged to horizontal line in certain inclination angle and using integrated molding
Plastics be made, not only reduce the weight of device, be also convenient for sliding the rubble to collection frame and be gathered in by own wt
Together, convenient for the removing work after experiment.
4th, the technical scheme is that being vertically arranged with more jack side columns in the middle part of protective fence, and make high-speed camera instrument
Box for putting can be moved up and down along more jack side columns, convenient for laboratory technician according to the height up and down adjustment of test test specimen, fixed high speed
The specific location of video camera box for putting.
Description of the drawings
Anti- rubble splashes and collection device during Fig. 1 high-strength concrete uniaxial compressive strength tests provided in an embodiment of the present invention
Overall structure diagram;
Fig. 2 is the structure diagram on front side protective column in Fig. 1;
Fig. 3 is the structure diagram of right side protective fence in Fig. 1;
Fig. 4 is the structure diagram of left side protective fence in Fig. 1;
Fig. 5 is the structure diagram on protecting back face column in Fig. 1;
Fig. 6 is the amplified structure diagram in protection face column provided in an embodiment of the present invention;
Fig. 7 is the structure diagram of supporting rack provided in an embodiment of the present invention;
Fig. 8 be it is provided in an embodiment of the present invention for install supporting rack accessory structure diagram (left side be trumpet bolt,
Centre is oversize reamer bolt and right side is nut);
Fig. 9 is the structure diagram of high-speed camera instrument box for putting provided in an embodiment of the present invention;
Figure 10 is the structure diagram of fastening screw provided in an embodiment of the present invention;
For the structure diagram of leaf hinge provided in an embodiment of the present invention and fixed hinge, (left side is loose-leaf hinge to Figure 11
Chain, right side are fixed hinge);
Figure 12 is the structure diagram of more jack side columns provided in an embodiment of the present invention;
Figure 13 is that (left side is fixed for screens for the structure diagram of screens fixator provided in an embodiment of the present invention and nut
Device, right side are nut);
In figure:1- front side protectives column;Protective fence on the right side of 2-;Protective fence on the left of 3-;4- protecting back faces column;5- supporting racks;6-
Small size bolt;7- oversize reamer bolts;8- nuts;9- bolts hole;10- screens fixators;11- fixed hinges;12- leaf hinges;13-
Reinforce edge strip;14- magnetism edge strips;15- fronts collection frame;16- high-speed camera instrument box for putting;17- fastening screws;The more jacks of 18-
Side column;19- implosion guards;20- protective covers;21- high-speed camera instrument;22- fixes edge strip;23- pin holes;24- fixed hinges are inserted
Hole;Collection frame on the right side of 25-;26- screens retainer insertion holes;27- protection faces column;28- porous protective jubes;29- resilient rubbber cushions
Layer;Collection frame on the left of 30-;31- back sides collection frame;32- loose-leaf protection faces column;33- columns;34- tests test specimen;35- pressure is tried
Test machine chassis.
Specific embodiment
The technical solution in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation
Example is only the part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general
Logical technical staff's all other embodiments obtained, shall fall within the protection scope of the present invention.
The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.It should be noted that in the feelings not conflicted
Under condition, the feature in embodiment and embodiment in the present invention can be combined with each other.
In the description of the present invention, term " longitudinal direction ", " transverse direction ", " on ", " under ", "front", "rear", "left", "right", " perpendicular
Directly ", the orientation of the instructions such as " level ", " top ", " bottom " or position relationship are based on orientation shown in the drawings or position relationship, are only
The present invention rather than require the present invention therefore it is not intended that right with specific azimuth configuration and operation for ease of description
The limitation of the present invention.The term " connected " that is used in the present invention, " connection " should be interpreted broadly, for example, it may be fixedly connected,
Can also be detachably connected;It can be directly connected, can also be indirectly connected by intermediate member, for the common of this field
For technical staff, the concrete meaning of above-mentioned term can be understood as the case may be.
As shown in Fig. 1~Figure 13, specific embodiments of the present invention provide a kind of anti-rubble being arranged on pressure testing machine
Anti- rubble splashing and collection device when splashing collection device, in particular to a kind of high-strength concrete uniaxial compressive strength test.
In the present invention, pressure testing machine includes more root posts 33 and the pressure testing machine bottom among more root posts 33
Disk 35, test test specimen 34 are positioned on pressure testing machine chassis 35.The column 33 of common pressure testing machine has 4 or 2, this
The specific embodiment of invention carrys out the specific anti-rubble splashing for introducing the present invention by taking the pressure testing machine of 2 root posts 33 as an example and collects dress
It puts, the present invention does not limit 33 radical of column of pressure testing machine, the equal energy on the pressure testing machine of different 33 numbers of column
Using the anti-rubble splashing collection device of the present invention.
In the present invention, anti-rubble splashing collection device is connect with 2 root posts 33, and anti-rubble splashing collection device includes:
Protective fence is centered around the periphery of 2 root posts 33, and the test test specimen 34 placed on pressure testing machine chassis 35 is lived for hood guard, is avoided
Rubble when testing 34 flash disruption of test specimen is splashed to the outside of protective fence, and the vertically arranged mode of protective fence is in having with the longitudinal axis
One inclination angle;Collection frame is connect with protective fence, and collection frame is separately positioned on the lower end of protective fence, and 34 wink of test specimen is tested for collecting
Between destroy when splashes rubble;Multiple supporting racks 5 are located at the lower part of anti-rubble splashing collection device, and supporting rack is consolidated with column
Fixed connection, the lower end of protective fence are overlapped on supporting rack, are used to support protective fence.
Preferably, the V-shaped structure of multiple supporting racks 5, supporting rack 5 is laterally disposed, the opening of the supporting rack 5 of V-structure
Far from test test specimen 34, the tip (V-type corner) of supporting rack 5 is close to test test specimen 34, the V-type angle card of the supporting rack 5 of V-structure
At the periphery of each column 33, in particular to column 33 passes through the receiving of centre that two edges of a wing of V-type supporting rack 5 form
Portion;The lower end of protective fence is overlapped on supporting rack 5, is correspondingly arranged on respectively on two edges of a wing of the supporting rack 5 of V-structure multiple
Bolt hole 9, bolt pass through threaded hole and the both ends of bolt be screwed in nut 8, supporting rack 5 is made to be fixed with column 33 with this
Connection.
It is further preferred that as shown in fig. 7, supporting rack 5 by two pieces of width 5cm~8cm the weldering in a certain angle of steel short column
The supporting rack 5 into V-structure is connect, is respectively stayed before and after steel short column and sets a bolt hole 9, short column angle can just clamp experiment with length
Machine cylinder long column, and deepening part can allow for protective fence lower end to be placed on supporting rack 5, front and rear bolt hole 9 is inserted into respectively
Corresponding trumpet bolt 6 and oversize reamer bolt 7, and tightened at bolt both ends with nut 8, its supporting rack 5 is made to be stable in testing machine
On cylindrical long column.As shown in figure 8, small size bolt 6 is identical with 7 diameter of oversize reamer bolt, only length is different, and oversize reamer bolt 7 is longer than
Small size bolt 6, therefore identical nut 8 can be used.
In a specific embodiment of the present invention, protective fence includes front side protective column 1, right side protective fence 2, protecting back face column 4
It is sequentially connected with left side protective fence 3 around composition.In order to which the rubble after rupture is made to be splashed on protective fence and is glided to drop into
In the collection frame of protective fence lower end setting, now front side protective column 1, right side protective fence 2, protecting back face column 4 and left side are protected
The 3 vertically arranged Cheng Junyu longitudinal axis of column is installed in a manner of certain inclination angle.Preferably, front side protective column 1, right side protection
Column 2, protecting back face column 4 and left side protective fence 3 are identical with longitudinal axis degree of tilt.More preferably, front side protective column 1, right side protective fence
2nd, the setting of protecting back face column 4 and left side protective fence 3 has 2 °~3 ° of inclination angle with the longitudinal axis.
As shown in fig. 6, to mitigate front side protective column 1, right side protective fence 2, left side protective fence 3, itself matter of protecting back face column 4
Protection face is made hollow out cellular, referred to as porous protective jube 28, while for rubble is avoided to penetrate porous protective jube by amount
28 and weaken rubble impact capacity, in one layer of 28 upper berth of porous protective jube elastic rubber bed course 29, rubble collides elastic rubber
By cushioning effect on rubber cushion layer 29;Simultaneously as protective fence is in certain inclination angle with the longitudinal axis, falling into bottom convenient for rubble downslide receives
Collect frame.
In a specific embodiment of the present invention, front side protective column 1 is linked solid with right side protective fence 2 by magnetic edge strip 14
It is fixed, convenient for front side protective column 1 with the closure of right side protective fence 2 with detaching;Right side protective fence 2 passes through fixation with protecting back face column 4
Hinge 11 connects;Protecting back face column 4 is connect with left side protective fence 3 by fixed hinge 11;Left side protective fence 3 and front side protective column
1 is connected by leaf hinge 12;Overleaf the middle position of the lower part of protective fence 4 is additionally provided with loose-leaf protection face column 32, just
Loose-leaf protection face column 32 can be turned at the end of to be tested, and then clean the back side of the lower end setting on protecting back face column 4
Rubble in collection frame 31.
Front side protective column 1 further includes front side protective face column 27, the left side edge on front side protective face column 27, upper edge,
It is both provided at lower edge and reinforces edge strip 13, multiple leaf hinges 12 is set to insert on the reinforcing edge strip 13 at left side edge
Hole, for installing leaf hinge 12;The edge strip 14 that is magnetic is set at the right side edge on front side protective face column 27.Since front is anti-
Guardrail 1 links fixation with right side protective fence 2 by magnetic edge strip 14, and convenient for opening front side protective column 1, therefore right side protective fence 2 leans on
It is no longer stayed in reinforcing edge strip 13 at nearly front side protective column 1 and sets fixed hinge jack 24, another side, which is normally stayed, to be set fixed hinge and insert
Hole 24.
Right side protective fence 2 further includes right side protection face column 27, the left side edge on right side protection face column 27, upper edge,
It is both provided at lower edge and right side edge and reinforces edge strip 13, multiple fixed hinges are set on the reinforcing edge strip 13 in left side edge
Chain jack 24, for installing fixed hinge 11.
Left side protective fence 3 further includes left side protection face column 27, the left side edge on left side protection face column 27, upper edge,
It is both provided at lower edge and right side edge and reinforces edge strip 13, multiple loose-leaves are respectively provided on the reinforcing edge strip 13 in left side edge
12 jack of hinge is respectively provided with multiple fixed hinge jacks 24 on the reinforcing edge strip 13 in right side edge, for installing fixed hinge
11。
Protecting back face column 4 further includes protecting back face face column 27, overleaf the left side edge on protection face column 27, upper edge,
It is both provided at lower edge and right side edge and reinforces edge strip 13, be all provided on the reinforcing edge strip 13 in left side edge and right side edge
Multiple fixed hinge jacks 24 are put, for installing fixed hinge 11.
Shown in specific schematic diagram Fig. 2 to Fig. 5 in the present invention, right side edge and the right side protection face on front side protective face column 27
The right side edge connection on column 27, the left side edge on right side protection face column 27 connect with the right side edge on protecting back face face column 27, carry on the back
The left side edge on face protection face column 27 is connect with the right side edge on left side protection face column 27, the left side edge on left side protection face column 27
It is connect with the left side edge on front side protective face column 27.Chain is fixed in front side protective column 1 with left side protective fence 3 by leaf hinge 12
It connects, with protecting back face column 4 by 11 fixed-link of fixed hinge, protecting back face column 4 leads to left side protective fence 3 with right side protective fence 2
Cross 11 fixed-link of fixed hinge.
Preferably, reinforcing edge strip 13 is formed by the cast iron process of certain thickness (1.5cm~2cm is thick), rectangular shape,
Middle reinforcing width about 3cm~4cm, strengthening length to protective fence lower end and bottom collection frame junction.More preferably, magnetic edge strip
14 by having the magnetic stripe of strong adsorption effect to be process, which is only limitted to front side protective column 1, and reinforcing scope, which combines, to be shown
It is intended to 2 along the rectangular shape in 1 edge of front side protective column, wherein width 2cm~3cm, length to protective fence lower end and bottom collection frame
Junction.
It is further preferred that the left side edge on front side protective face column 27, which is reinforced on edge strip 13, is provided with 6 leaf hinges
12 jacks, two 12 jacks of leaf hinge are one group, totally 3 groups, are separately positioned on upper end, middle part and lower end.In right side protection face
The left side edge on column 27, which is reinforced on edge strip 13, is provided with 8 fixed hinge jacks 24, and two fixed hinge jacks 24 are one group, altogether
4 groups, it is separately positioned on upper end, middle and upper part, middle and lower part and lower end.Left side edge on left side protection face column 27 is reinforced on edge strip 13
Be provided with 6 12 jacks of leaf hinge, two 12 jacks of leaf hinge are one group, totally 3 groups, be separately positioned on upper end, middle part and
Lower end.Right side edge on left side protection face column 27, which is reinforced on edge strip 13, is provided with 8 fixed hinge jacks 24, two fixed hinges
Chain jack 24 is one group, totally 4 groups, is separately positioned on upper end, middle and upper part, middle and lower part and lower end.The overleaf left side on protection face column 27
8 fixed hinge jacks 24, two fixed hinge jacks 24 are respectively arranged on lateral edges and the reinforcing edge strip 13 of right side edge
It is one group, totally 4 groups, is separately positioned on upper end, middle and upper part, middle and lower part and lower end.
In the present invention, it further includes:Screens fixator 10, screens fixator 10 are located at the upper of anti-rubble splashing collection device
Portion, for being fixedly connected with protective fence and column 33;The upper edge of right side protective fence 2, protecting back face column 4 and left side protective fence 3
On reinforcing edge strip 13 on be respectively provided with multiple screens retainer insertion holes 26, it is vertical to fix with this for installing screens fixator 10
Column 33 and protective fence.
Preferably, 2 screens retainer insertion holes are respectively provided on the reinforcing edge strip 13 in the upper edge of right side protective fence 2
26.4 screens retainer insertion holes 26 are respectively provided on reinforcing edge strip 13 in the upper edge on protecting back face column 4.Left side protective fence 3
Upper edge on reinforcing edge strip 13 on be respectively provided with 2 screens retainer insertion holes 26.
More preferably, as shown in figs 2-4, in front side protective face column, right side protection face column, protecting back face face column and left side
It is both provided at the lower edge on protection face column and reinforces edge strip 13.It is further preferred that it is by certain thickness to reinforce edge strip 13
The cast iron process of (1.5cm~2cm is thick) forms, rectangular shape, wherein reinforcing width 2cm~3cm.
Preferably, as shown in Figure 1,10 U-shaped structure of screens fixator, the opening of the screens fixator 10 of U-shaped structure are remote
From test test specimen 34, the U-shaped angle of the screens fixator 10 of U-shaped structure is arranged at the periphery of each column 33, the card of U-shaped structure
Two edges of a wing of position fixator 10 pass through the screens retainer insertion hole 26 reinforced on edge strip 13 of the upper edge of each protective fence,
And the end on two edges of a wing of the screens fixator 10 of U-shaped structure is screwed in nut 8, being come with this will by screens fixator 10
Column 33 is fixedly connected with each protective fence.More preferably, as shown in figure 13, the U-shaped angle of the screens fixator 10 of U-shaped structure is
Arc crotch, two edges of a wing are bolt column, and the diameter of arc crotch is consistent with testing machine cylindrical column 33, can be close to
Bolt column after screens fixator 10 blocks testing machine cylindrical column 33, is being inserted into protective fence by testing machine cylindrical column 33
On screens retainer insertion hole 26 after, then upper two nuts 8 tighten fixation.
In a specific embodiment of the present invention, the positive collection frame 15 of the lower end on front side protective column 1 is arranged on along level
Line is arranged in parallel;Be arranged on the right side collection frame 25 of lower end of right side protective fence 2, the lower end on protecting back face column 4 the back side
The left side collection frame 30 of the lower end of collection frame 31 and left side protective fence 3 is to be arranged with horizontal line in 5 °~6 ° of inclination angle
's.Preferably, the back side collection frame 31 of the lower end on protecting back face column 4 is low between symmetrical, both ends senior middle school using center line,
And both ends are respectively facing intermediate, inclined setting, both ends are to incline with horizontal line in 5 °~6 ° towards the angle of intermediate, inclined
Angle.
For the ease of cleaning the rubble in each collection frame, the right side collection frame 25 and water of the lower end of right side protective fence 2
Horizontal line, towards front side protective column 1, splashes to after collection frame conducive to rubble in the inclined direction at 5 °~6 ° of inclination angle and relies on itself again
Weight slides to the right end of right side collection frame 25, can very easily be collected in the collection frame 25 of right side after opening front side protective column 1 in this way
Rubble.The left side collection frame 30 of the lower end of left side protective fence 3 is with horizontal line in the inclined direction direction at 5 °~6 ° of inclination angle
Front side protective column 1 splashes to after collection frame the left end for sliding to left side collection frame 30 by own wt again conducive to rubble, beats in this way
Open the rubble that can very easily collect behind front side protective column 1 in the collection frame 30 of left side.
The both ends of the back side collection frame 31 of the lower end on protecting back face column 4 towards it is intermediate be in incline with 5 °~6 ° of horizontal line
Oblique, in particular to back side collection frame 31 both ends are high, centre bottom, set splashed to after collection frame again by certainly conducive to rubble in this way
Body weight slides to the middle position of back side collection frame 31, opens the loose-leaf at 4 lower middle position of protecting back face column in this way and prevents
The rubble in back side collection frame 31 can be very easily collected after guardrail.
Preferably, being integrated of collection frame is poured into a mould the good plastics of the impact resistant plasticity formed and is prepared, and can mitigate
The quality of protective fence, while can also reach collection storage lithotrity effect.
On the inner surface of front side protective column 1, right side protective fence 2, protecting back face column 4 and left side protective fence 3 vertically
It is fixedly installed more jack side columns 18;High-speed camera instrument box for putting 16, and high-speed camera instrument are provided on more jack side columns 18
Box for putting 16 can be moved up and down along more jack side columns 18;For placing high-speed camera instrument 21 in high-speed camera instrument box for putting 16, just
In the loading complete process deformation failure situation for recording test test specimen 34, especially surface of test piece crack initiation, extension, connect, pass through
Understanding and considerate condition.
Preferably, more jack side columns 18 be weldingly fixed on vertically on the inner surface of each protective fence, in particular to:It inserts more
The both ends of hole edge column 18 are welded with the reinforcing edge strip 13 at upper and lower end parts on the inside of protective fence, and then more 18 middle parts of jack side column are adopted
Protection face column is fixed on steel wire lashing;More preferably, more jack side columns 18 are fixed on front side protective column 1 and protecting back face vertically
More jack side columns 18 on the medial surface of the middle position of the medial surface on column 4, right side protective fence 2 and left side protective fence 3 are put
Position is put in principle not influence 21 photographic effect of high-speed camera instrument, can look at concrete sample left and right sides straight.
As shown in figs. 9 and 12, multiple jacks are provided on more jack side columns 18;The side of high-speed camera instrument box for putting 16
(back side, the one side far from test test specimen 34) is arranged at intervals there are two fixed edge strip 22 at wall surface, on two fixed edge strips 22
It is both provided with multiple pin holes 23.The width of more jack side columns 18 is less than or equal to the spacing distance between two fixed edge strips 22,
Between snapping onto two fixed edge strips 22 convenient for more jack side columns 18, and according to the height size of test test specimen 34, in more jacks
The position to adjust high-speed camera instrument box for putting 16 is moved up and down in the short transverse of side column 18, then passes through fastening screw 17
More jack side columns 18 and high-speed camera instrument box for putting 16 are positioned into fixation.Specifically referring to more 18 width of jack side column can just insert
Enter in fixed edge strip 22.More 18 internal plug seats of jack side column are flushed with pin hole 23 after determining good position, then by fastening screw 17
Insertion can be fixed.Due in more jack side columns 18 reserve multiple jacks, can according to test test specimen 34 height up and down adjustment,
Fixed high-speed camera instrument box for putting 16.Preferably, two fixed edge strips 22 are made of two groups of identical edge strips, each correspondence in edge strip
It stays and sets 3 pin holes 23, the spacing between two edges can just meet the insertion of more jack side columns 18.More preferably, fixed edge
Item 22 is by being fixedly welded on 16 back side centre position of high-speed camera instrument box for putting.
Preferably, 16 side wall surface of high-speed camera instrument box for putting (front, the one side of positive corresponding test test specimen 34) is equipped with anti-
Shield 20, the side wall surface test the one side of test specimen 34 for face, and a round implosion guard is equipped at the middle part of protective cover 20
19, the diameter of implosion guard 19 is more than the diameter of the pick-up lens of high-speed camera instrument 21.Preferably, implosion guard 19 is a diameter of
1.1 times of the pick-up lens diameter of high-speed camera instrument 21.
In order to be further understood from technical solution provided by the invention, the anti-rubble that is now arranged on pressure testing machine
The specifically used method of splashing collection device is further elaborated, and is as follows:
1st, supporting rack 5 is located and fixed on testing machine cylindrical column 33 first, then above-mentioned protective fence is placed it
On, and the upper end of protective fence is fixed with screens fixator 10, while by each protective fence by leaf hinge 12 or admittedly
Determine hinge 11 to surround together.
2nd, the position of high-speed camera instrument box for putting 16 is adjusted according to the height size of test test specimen 34 in advance, it is ensured that can
The change procedure of entire experiment process test specimen four sides crackle is recorded.
3rd, front side protective column 1 is opened, high-strength concrete test specimen is put on pressure testing machine chassis 35, checks four sides protective fence
Whether (front side protective column 1, right side protective fence 2, protecting back face column 4 and left side protective fence 3) bottom is surrounded, it is ensured that imporosity,
Check whether 21 camera lens of high-speed camera instrument has been directed at test specimen, it is ensured that zero deflection closes front side protective column 1 after all going well.
4th, start high-strength concrete uniaxial compressive test, high-speed camera instrument 21 records test specimen overall process deformation failure feelings automatically
Condition, especially surface of test piece crack initiation, extension, connection, perforation situation, while during test specimen flash disruption splashes rubble
After colliding the elastic rubber bed course 29 on protective fence face, impact force weaken, and due to protective fence have certain inclination angle, rubble with
It protective fence face and rolls down to each protective fence bottom collection frame, and since bottom collection frame has certain inclination angle, rubble can be slided
Bottom is fallen on, is comparatively concentrated.
5th, after treating with a collection of high-strength concrete uniaxial compressive test, open front side protective column 1, by front side protective column 1,
Rubble residue in right side protective fence 2,3 bottom collection frame of left side protective fence is cleaned out, and protecting back face column 4 is then by opening it
The rubble residue in bottom collection frame is cleaned out on loose-leaf protection face column 32.
6th, from computer from 21 self registering high definition pictorial information of high-speed camera instrument, cooperation high-strength concrete single shaft resist
Pressure experiment overall process ess-strain result is analyzed.
In conclusion the present invention has following advantageous effects:
1st, technical solution provided by the invention is avoided that the rubble splashes danger generated during concrete sample flash disruption
The personal safety of evil testing crew, while gem-pure can observe each rank in high-strength concrete uniaxial compressive test overall process
The test piece deformation of section destroys development, especially surface of test piece crack initiation, extension, connection, perforation situation.
2nd, the protective fence in technical scheme of the present invention is arranged to porous protective jube 28 using outer layer, internal layer is arranged to bullet
Property rubber spacer 29, the vertically arranged mode of protective fence in certain inclination angle, not only reduces itself weight of protective fence with the longitudinal axis
Amount, moreover it is possible to rubble be avoided to penetrate porous protective jube 28 and weaken rubble impact capacity, while be also conducive to splash to protection face
Rubble is slid to collection frame.
3rd, the collection frame in technical scheme of the present invention is arranged to horizontal line in certain inclination angle and using integrated molding
Plastics be made, not only reduce the weight of device, be also convenient for sliding the rubble to collection frame and be gathered in by own wt
Together, convenient for the removing work after experiment.
4th, the technical scheme is that being vertically arranged with more jack side columns 18 in the middle part of protective fence, and make high-speed camera
Instrument box for putting 16 can be moved up and down along more jack side columns 18, convenient for laboratory technician according to test test specimen 34 height up and down adjustment,
The specific location of fixed high-speed camera instrument box for putting 16.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
God and principle within, any modification, equivalent replacement, improvement and so on, accompanying claims protection domain of the present invention it
It is interior.
Claims (10)
- A kind of 1. anti-rubble splashing collection device being arranged on pressure testing machine, which is characterized in that the pressure testing machine packet More root posts and the pressure testing machine chassis among the more columns are included, test test specimen is positioned over the pressure testing machine On chassis, the anti-rubble splashing collection device is connect with the more columns, and the anti-rubble splashing collection device includes:Protective fence, the protective fence are centered around the periphery of the more columns, and pressure testing machine chassis is stated for hood guard residence The test test specimen of placement avoids the rubble during test test specimen flash disruption from being splashed to the outside of the protective fence;It is described anti- The vertically arranged mode of guardrail is in there is certain inclination angle with the longitudinal axis;Collection frame, the collection frame are connect with the protective fence, and the collection frame is separately positioned on the lower end of the protective fence, The rubble of splashes during for collecting the test test specimen flash disruption;Multiple supporting racks, multiple support frames as described above are located at the lower part of the anti-rubble splashing collection device, support frame as described above and institute It states column to be fixedly connected, the lower end of the protective fence is overlapped on support frame as described above, is used to support the protective fence.
- 2. anti-rubble splashing collection device as described in claim 1, which is characterized in that the protective fence includes front side protective Column, right side protective fence, protecting back face column and left side protective fence are sequentially connected around composition;The front side protective column, right side protection The setting on column, protecting back face column and left side protective fence has certain inclination angle with the longitudinal axis.
- 3. anti-rubble splashing collection device as claimed in claim 2, which is characterized in that the front side protective column, right side protection The setting on column, protecting back face column and left side protective fence has 2 °~3 ° of inclination angle with the longitudinal axis.
- 4. anti-rubble splashing collection device as claimed in claim 2, which is characterized in thatThe front side protective column links fixation with the right side protective fence by magnetic edge strip, convenient for the front side protective column and institute The closure of right side protective fence is stated with detaching;The right side protective fence is connect with the protecting back face column by fixed hinge;The protecting back face column is connect with the left side protective fence by fixed hinge;The left side protective fence is connect with the front side protective column by leaf hinge;Middle position in the lower part on the protecting back face column is additionally provided with loose-leaf protection face column, convenient for energy at the end of to be tested It is enough to turn over the loose-leaf protection face column and then broken in the back side collection frame of the lower end setting on the cleaning protecting back face column Stone.
- 5. anti-rubble splashing collection device as claimed in claim 4, which is characterized in thatThe positive collection frame for being arranged on the lower end on the front side protective column is arranged in parallel along horizontal line;Be arranged on the right side collection frame of the lower end of the right side protective fence, the back side collection frame of the lower end on protecting back face column and The left side collection frame of the lower end of left side protective fence is to be arranged with horizontal line in 5 °~6 ° of inclination angle;Preferably, the back side collection frame of the lower end on the protecting back face column be using center line between symmetrical, both ends senior middle school It is low, and both ends are respectively facing intermediate, inclined setting, both ends are in 5 °~6 ° with horizontal line towards the angle of intermediate, inclined Inclination angle.
- 6. the anti-rubble splashing collection device as described in claim 2 or 4, which is characterized in that on the front side protective column, right side It is vertical on the inner surface of protective fence, protecting back face column and left side protective fence to be fixedly installed more jack side columns;It is provided with high-speed camera instrument box for putting on more jack side columns, and the high-speed camera instrument box for putting can be along described more Jack side column moves up and down;For placing high-speed camera instrument in the high-speed camera instrument box for putting, convenient for recording the test examination Part loading complete process deformation failure situation.
- 7. anti-rubble splashing collection device as claimed in claim 6, which is characterized in thatThe front side protective column further includes front side protective face column, and reinforcing is provided at the left side edge on front side protective face column Edge strip sets multiple leaf hinge jacks, for installing leaf hinge on the reinforcing edge strip;On front side protective face column The edge strip that is magnetic is set at right side edge;The right side protective fence further includes right side protection face column, the left side edge, upper edge on the right side protection face column with It is both provided with reinforcing edge strip at right side edge, multiple fixed hinge jacks is set on the reinforcing edge strip in left side edge, for pacifying Fill fixed hinge;The left side protective fence further includes left side protection face column, the left side edge, upper edge on the left side protection face column with It is both provided with reinforcing edge strip at right side edge, multiple leaf hinge jacks, right side is respectively provided on the reinforcing edge strip in left side edge Multiple fixed hinge jacks are respectively provided on reinforcing edge strip on edge, for installing fixed hinge;The protecting back face column further includes protecting back face face column, the left side edge, upper edge on protecting back face face column with It is both provided with reinforcing edge strip at right side edge, multiple fixed hinges is respectively provided on the reinforcing edge strip in left side edge and right side edge Jack, for installing fixed hinge.The right side edge on front side protective face column is connect with the right side edge on the right side protection face column, the right side protection face The left side edge on column is connect with the right side edge on protecting back face face column, the left side edge on protecting back face face column with it is described The right side edge connection on left side protection face column, the left side edge on the left side protection face column and the left side on front side protective face column Edge connects.
- 8. anti-rubble splashing collection device as claimed in claim 7, which is characterized in that further include:Screens fixator, the card Position fixator is located at the top of the anti-rubble splashing collection device, for being fixedly connected with the protective fence and the column;It is all provided on reinforcing edge strip in the upper edge of the right side protective fence, the protecting back face column and the left side protective fence Multiple screens retainer insertion holes are put, for installing the screens fixator, the column and the protective fence are fixed with this;Preferably, the U-shaped structure of screens fixator, the opening of the screens fixator of the U-shaped structure is far from the test Test specimen, the U-shaped angle of the screens fixator of the U-shaped structure are arranged at the periphery of the every column, the card of the U-shaped structure Two edges of a wing of position fixator pass through the screens retainer insertion hole reinforced on edge strip of the upper edge of each protective fence, and With nut driving in the end on two edges of a wing of the screens fixator of the U-shaped structure, come with this through the screens fixator The column is fixedly connected with each protective fence.
- 9. anti-rubble splashing collection device as claimed in claim 6, which is characterized in that be provided on more jack side columns more A jack;Fixed edge strip, two fixed edge strips there are two being arranged at intervals at the side wall surface of the high-speed camera instrument box for putting On be both provided with multiple pin holes;The width of more jack side columns is less than or equal to the spacing distance between two fixed edge strips, convenient for more jacks Between side column snaps onto two fixed edge strips, and according to the height size of test test specimen, in the height of more jack side columns The position to adjust the high-speed camera instrument box for putting is moved up and down on degree direction, then is inserted described by fastening screw more Hole edge column is fixed with high-speed camera instrument box for putting positioning;Preferably, the side wall surface of the high-speed camera instrument box for putting is equipped with protective cover, which tests test specimen for face On one side, and in the middle part of the protective cover one round implosion guard is installed, the diameter of the implosion guard is more than the high speed The diameter of the pick-up lens of video camera.
- 10. anti-rubble splashing collection device as described in claim 1, which is characterized in that the protective fence includes the more of outer layer The elastic rubber bed course of jube and internal layer is protected in hole;Preferably, the plastics that being integrated of the collection frame cast forms are prepared.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711085439.9A CN108152128A (en) | 2017-11-07 | 2017-11-07 | A kind of anti-rubble splashing collection device being arranged on pressure testing machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711085439.9A CN108152128A (en) | 2017-11-07 | 2017-11-07 | A kind of anti-rubble splashing collection device being arranged on pressure testing machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108152128A true CN108152128A (en) | 2018-06-12 |
Family
ID=62468926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711085439.9A Pending CN108152128A (en) | 2017-11-07 | 2017-11-07 | A kind of anti-rubble splashing collection device being arranged on pressure testing machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108152128A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112595576A (en) * | 2020-11-12 | 2021-04-02 | 广东韶钢工程技术有限公司 | Safety device of testing machine |
CN116067761A (en) * | 2023-04-06 | 2023-05-05 | 甘肃建投商品混凝土有限公司 | Machine-made sand concrete bending resistance performance detection device |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201819842U (en) * | 2010-08-30 | 2011-05-04 | 中冶天工集团有限公司 | Cracking prevention device for high-strength concrete compression strength testing |
CN202661328U (en) * | 2012-06-07 | 2013-01-09 | 中国核工业华兴建设有限公司 | Test block explosion protective cover for concrete compression testing machine |
CN204154569U (en) * | 2014-10-14 | 2015-02-11 | 中交第二航务工程局有限公司 | Portable pressure testing machine safty shield |
CN205244811U (en) * | 2015-11-26 | 2016-05-18 | 北京汽车研究总院有限公司 | Safety protective cover |
CN205404136U (en) * | 2016-03-09 | 2016-07-27 | 汕头市浩大轮胎测试装备有限公司 | Protection device for high -speed endurance test machine of tire |
CN205607756U (en) * | 2016-04-26 | 2016-09-28 | 安徽理工大学 | Rotation type metal mesh hydraulic pressure universal tester protector |
CN205719830U (en) * | 2016-04-19 | 2016-11-23 | 云南省建筑科学研究院 | A kind of highway coarse aggregate auto impact testing machine |
CN206114416U (en) * | 2016-10-12 | 2017-04-19 | 任崇阁 | Concrete test block detects uses protector |
CN206504934U (en) * | 2017-01-04 | 2017-09-19 | 深圳市鸿力健混凝土有限公司 | A kind of anti-folding and anti-pressing testing machine protector |
CN206593952U (en) * | 2017-03-24 | 2017-10-27 | 深圳市建工质量检测鉴定中心有限公司 | A kind of protector of universal testing machine |
-
2017
- 2017-11-07 CN CN201711085439.9A patent/CN108152128A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201819842U (en) * | 2010-08-30 | 2011-05-04 | 中冶天工集团有限公司 | Cracking prevention device for high-strength concrete compression strength testing |
CN202661328U (en) * | 2012-06-07 | 2013-01-09 | 中国核工业华兴建设有限公司 | Test block explosion protective cover for concrete compression testing machine |
CN204154569U (en) * | 2014-10-14 | 2015-02-11 | 中交第二航务工程局有限公司 | Portable pressure testing machine safty shield |
CN205244811U (en) * | 2015-11-26 | 2016-05-18 | 北京汽车研究总院有限公司 | Safety protective cover |
CN205404136U (en) * | 2016-03-09 | 2016-07-27 | 汕头市浩大轮胎测试装备有限公司 | Protection device for high -speed endurance test machine of tire |
CN205719830U (en) * | 2016-04-19 | 2016-11-23 | 云南省建筑科学研究院 | A kind of highway coarse aggregate auto impact testing machine |
CN205607756U (en) * | 2016-04-26 | 2016-09-28 | 安徽理工大学 | Rotation type metal mesh hydraulic pressure universal tester protector |
CN206114416U (en) * | 2016-10-12 | 2017-04-19 | 任崇阁 | Concrete test block detects uses protector |
CN206504934U (en) * | 2017-01-04 | 2017-09-19 | 深圳市鸿力健混凝土有限公司 | A kind of anti-folding and anti-pressing testing machine protector |
CN206593952U (en) * | 2017-03-24 | 2017-10-27 | 深圳市建工质量检测鉴定中心有限公司 | A kind of protector of universal testing machine |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112595576A (en) * | 2020-11-12 | 2021-04-02 | 广东韶钢工程技术有限公司 | Safety device of testing machine |
CN116067761A (en) * | 2023-04-06 | 2023-05-05 | 甘肃建投商品混凝土有限公司 | Machine-made sand concrete bending resistance performance detection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108152128A (en) | A kind of anti-rubble splashing collection device being arranged on pressure testing machine | |
CN104652911B (en) | A kind of anti-reversing device | |
CN206114416U (en) | Concrete test block detects uses protector | |
CN215758861U (en) | Supporting and protecting device for dam construction | |
CN214661747U (en) | Large-scale spherical storage tank inspection maintenance auxiliary device | |
CN209625403U (en) | Debris flow alarm | |
CN209011168U (en) | A kind of building pile foundation dead-load detection device | |
Thuvander et al. | Influence of repetitive stiffness variation on crack growth behaviour in wood | |
CN217331937U (en) | Concrete pressure experiment machine | |
CN213275192U (en) | Concrete sample bending resistance testing machine | |
Mindess et al. | Impact resistance of polyolefin fibre reinforced precast units | |
CN212534157U (en) | Composite slope management protection device | |
CN211577157U (en) | Geological exploration collapse prevention device | |
KR101000376B1 (en) | Jig for multy-use door | |
CN216238194U (en) | A protective structure for among earth and stone excavation construction | |
CN109827485A (en) | Pin-connected panel flyrock protection device and its application method for cofferdam demolition explosion | |
US9222240B2 (en) | Apparatus for protecting components of an excavator | |
CN109686055A (en) | Debris flow alarm and use method | |
CN216485004U (en) | Anticollision type geotechnical engineering landslide monitoring devices | |
CN221223582U (en) | Protection device for mine blasting | |
CN112943859A (en) | Large-scale spherical storage tank inspection maintenance auxiliary device | |
CN217204162U (en) | Firm strenghthened type massif protection wire net | |
Perera et al. | Large Scale Experimental Investigation of a Reinforced Concrete Rockfall Protection Wall with a Gabion Cushion Cover | |
CN221029347U (en) | Road subgrade protection structure | |
CN219434515U (en) | Compressive clamp for building engineering detection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180612 |