CN108151266A - Tuyere structure installation method and air port mounting structure - Google Patents

Tuyere structure installation method and air port mounting structure Download PDF

Info

Publication number
CN108151266A
CN108151266A CN201711401439.5A CN201711401439A CN108151266A CN 108151266 A CN108151266 A CN 108151266A CN 201711401439 A CN201711401439 A CN 201711401439A CN 108151266 A CN108151266 A CN 108151266A
Authority
CN
China
Prior art keywords
tuyere structure
connector
tuyere
air port
guide frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711401439.5A
Other languages
Chinese (zh)
Inventor
池晓龙
朱江程
邓勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Publication of CN108151266A publication Critical patent/CN108151266A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/32Supports for air-conditioning, air-humidification or ventilation units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/06Outlets for directing or distributing air into rooms or spaces, e.g. ceiling air diffuser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/0007Indoor units, e.g. fan coil units
    • F24F1/0043Indoor units, e.g. fan coil units characterised by mounting arrangements
    • F24F1/0047Indoor units, e.g. fan coil units characterised by mounting arrangements mounted in the ceiling or at the ceiling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/14Details or features not otherwise provided for mounted on the ceiling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
  • Duct Arrangements (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The embodiment of the invention discloses a kind of tuyere structure installation method and air port mounting structures, are related to apparatus of air conditioning field, to simplify the installation procedure of tuyere structure, reduce the complexity of installation.The tuyere structure installation method, includes the following steps:Suspending assembly is installed on to the installing matrix of the unit;The suspending assembly will be installed on across the connector of the guide frame of the tuyere structure, so that the tuyere structure is installed on the installing matrix of unit.Above-mentioned installation method, due to tuyere structure have guide frame, even if therefore in the case where tuyere structure thickness is larger, guide frame also can play guiding role to connector, easily and accurately to realize the installation of tuyere structure and installing matrix;And simple installation after the completion of furred ceiling is open, can be installed immediately, and installation is efficient.

Description

Tuyere structure installation method and air port mounting structure
Technical field
The present invention relates to apparatus of air conditioning fields, and in particular to a kind of tuyere structure installation method and air port installation knot Structure.
Background technology
The air outlet structure of air conditioner of existing ceiling type air conditioner is embedded into inside furred ceiling, and the installation of air outlet structure of air conditioner needs It will following ten steps:Step 1: furred ceiling is open;Step 2: in furred ceiling edge heavy platform;It is Step 3: nested for air port Inward flange pastes U.S. line paper;Step 4: bonding glue is brushed in the heavy platform joint place at air port nesting Yu furred ceiling edge;Step 5: it adopts Air port nesting is fixed at furred ceiling with nailing gun;Step 6: mend high-strength putty for the periphery of air port nesting and furred ceiling heavy platform; Step 7: paste paper of squeegeeing in air port nesting and furred ceiling edge;Step 8: brush putty is polished, mopping filling-in;Step 9: it removes The U.S. line paper and equating edge of air port nesting inward flange;Step 10: air port component is fixed in the nesting of air port with screw.
Inventor has found that at least there are following problems in the prior art:Outlet air mouthpiece uses above-mentioned peace in the prior art Dress mode, installation process are complicated, are related to that process is more, and installation period is long, and emergency works project can not meet;The constructor of each step Member may be different, and the cooperation personnel being related to are more, it is difficult to ensure the reliability of installation.
Invention content
One of purpose of the present invention is to propose a kind of tuyere structure installation method and air port mounting structure, to simplification The installation procedure of tuyere structure reduces the complexity of installation.
To achieve the above object, the present invention provides following technical schemes:
The present invention provides a kind of tuyere structure installation methods, include the following steps:
Suspending assembly is installed on to the installing matrix of the unit;
The suspending assembly will be installed on across the connector of the guide frame of the tuyere structure, so that the air port Structure is installed on the installing matrix of unit;Wherein, the guide frame is used to guide the installation direction of the connector.
In one or more embodiments, it is described suspending assembly is installed on to the unit installing matrix the step of wrap It includes:
Suspending assembly is installed on to the opposite both sides of installing matrix of the unit.
In one or more embodiments, the connector of the guide frame across the tuyere structure is installed on described The step of suspending assembly, includes:
The head that the connector is pre-installed on the suspending assembly and causes the connector is located under the bottom surface of furred ceiling Side;
The tuyere structure is pushed up upwards, until the head of the connector passes through the guide frame of the tuyere structure and position In the lower section of the tuyere structure;
The tuyere structure is continued up into top to the bottom surface of the tuyere structure position concordant with the bottom surface of furred ceiling;
The guide frame is fixed on after fixinig plate is passed through the head of the connector;
The connector and the suspending assembly are tightened.
Another embodiment of the present invention provides a kind of air port mounting structure, including installing matrix and tuyere structure, the installation Matrix is fixed with suspending assembly, and the tuyere structure is equipped with the guide frame for guiding connector installation direction, the air port Structure is by passing through the connector of the guide frame to be fixed with the suspending assembly.
In one or more embodiments, the opposite both sides of the tuyere structure pass through the suspending assembly and the installation Matrix is fixedly connected.
In one or more embodiments, the suspending assembly includes connecting plate and nut, the connecting plate and the peace Dress matrix is detachably connected, and the tuyere structure is connect by the connector and the nut with the connecting plate.
In one or more embodiments, air port mounting structure further includes locating part, and the locating part is set on the air port Structure, the locating part have the plane that can block the furred ceiling bottom end.
In one or more embodiments, air port mounting structure further includes panel, and the panel is set on the tuyere structure Away from the side of the installing matrix.
In one or more embodiments, air port mounting structure further includes fixinig plate, the fixinig plate be equipped with notch and The through-hole connected with the notch;The fixinig plate is set between the connector and the end face of the guide frame to prevent The head for stating connector is entered inside the guide frame.
In one or more embodiments, the through-hole is oblong.
In one or more embodiments, the fixinig plate is detachably connected with the guide frame.
In one or more embodiments, the end face of the guide frame is equipped with groove, and the fixinig plate is installed on described In groove.
Another embodiment of the present invention provides a kind of air port mounting structure, and including interior machine and tuyere structure, the interior machine is fixed There is suspending assembly, the tuyere structure is fixed with the suspending assembly.
In one or more embodiments, the tuyere structure is equipped with the guiding knot for guiding connector installation direction Structure, the tuyere structure is by passing through the connector of the guide frame to be fixed with the suspending assembly.
In one or more embodiments, the opposite both sides of the tuyere structure pass through the suspending assembly and the interior machine It is fixedly connected.
In one or more embodiments, the suspending assembly include connecting plate and nut, the connecting plate with it is described interior Machine is detachably connected, and the tuyere structure is connect by the connector and the nut with the connecting plate.
In one or more embodiments, air port mounting structure further includes locating part, and the locating part is set on the air port Structure, the locating part have the plane that can block furred ceiling bottom end.
In one or more embodiments, air port mounting structure further includes panel, and the panel is set on the tuyere structure Away from the side of the interior machine.
In one or more embodiments, air port mounting structure further includes fixinig plate, the fixinig plate be equipped with notch and The through-hole connected with the notch;The fixinig plate is set between the connector and the end face of the guide frame to prevent The head for stating connector is entered inside the guide frame.
In one or more embodiments, the through-hole is oblong.
In one or more embodiments, the fixinig plate is detachably connected with the guide frame.
In one or more embodiments, the end face of the guide frame is equipped with groove, and the fixinig plate is installed on described In groove.
Based on above-mentioned technical proposal, the embodiment of the present invention can at least generate following technique effect:
The guide frame of tuyere structure will be installed on by tuyere structure installation method provided by the invention using connector Fill matrix suspending assembly, due to tuyere structure have guide frame, even if therefore in the case where tuyere structure thickness is larger, lead Can also guiding role be played to connector, to structure easily and accurately to realize the installation of tuyere structure and installing matrix;And Simple installation after the completion of furred ceiling is open, can be installed immediately, and installation is efficient.
Description of the drawings
Attached drawing described herein is used to provide further understanding of the present invention, and forms the part of the application, this hair Bright illustrative embodiments and their description do not constitute improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is tuyere structure installation method flow diagram provided in an embodiment of the present invention;
Fig. 2 is tuyere structure provided in an embodiment of the present invention and the fixed schematic diagram of installing matrix;
Fig. 3 is the structure diagram of tuyere structure in Fig. 2;
Fig. 4 is the diagrammatic side-view cross-sectional schematic diagram at locating part in Fig. 3;
Fig. 5 is the diagrammatic side-view cross-sectional schematic diagram at fixing piece in Fig. 3;
Fig. 6 is the scheme of installation of tuyere structure and guide frame in Fig. 2;
Fig. 7 is the schematic cross-sectional view of guide frame in Fig. 6;
Fig. 8 is the scheme of installation of guide frame and fixinig plate in Fig. 7;
Fig. 9 is adjustable direction schematic diagram of fixinig plate in Fig. 8;
Figure 10 is the structure diagram of fixinig plate in Fig. 8;
Figure 11 is the structure diagram one of fixing piece in Fig. 3;
Figure 12 is the structure diagram two of fixing piece in Fig. 3;
Figure 13 is the structure diagram three of fixing piece in Fig. 3;
Figure 14 is tuyere structure provided in an embodiment of the present invention and the fixed schematic diagram of interior machine.
Reference numeral:
1st, interior machine;2nd, tuyere structure;3rd, fixing piece;4th, suspending assembly;5th, connector;6th, guide frame;7th, locating part;8、 Panel;9th, fixinig plate;10th, furred ceiling;11st, installing matrix;31st, the first trepanning;32nd, the second trepanning;33rd, the first plate;34th, second Plate;35th, fastener;41st, connecting plate;42nd, nut;61st, guiding surface;62nd, groove;91st, notch;92nd, through-hole.
Specific embodiment
Technical solution provided by the invention is illustrated in more detail with reference to Fig. 1~Figure 14.
The embodiment of the present invention provides a kind of tuyere structure installation method, includes the following steps:
Step 1: suspending assembly 4 is installed on to the installing matrix 11 of unit.
Above-mentioned step one can specifically include:Suspending assembly is installed on the opposite both sides of installing matrix.To install base Body 11 can install suspending assembly 4, and every using for structure shown in Fig. 2 at the both ends of 11 length direction of installing matrix Hold two suspending assemblies 4 of dispersible installation.The structure can cause 11 both ends stress equalization of installing matrix, tuyere structure after installation 2 is solid and reliable.Installing matrix 11 can specifically include interior machine.Installing matrix 11 is specifically as follows interior machine.
Step 2: the connector 5 of the guide frame 6 across tuyere structure 2 is installed on suspending assembly 4, so that air port Structure 2 is installed on the installing matrix 11 of unit.Wherein, guide frame 6 is used to guide the installation direction of connector 5.
Above-mentioned step two specifically may include:
First, the pre- stubborn several threads of connector 5 are pre-installed on suspending assembly 4, the head of the connector 5 after prepackage, which is located at, hangs The subjacent on top 10.
Secondly, mouth structure 2 against the wind upwards, until the head of connector 5 passes through the guide frame 6 of tuyere structure 2 and is located at The subjacent of tuyere structure 2.
Again, tuyere structure 2 is continued up into top to the bottom surface of tuyere structure 2 position concordant with the bottom surface of furred ceiling 10.
Guide frame 6 is fixed on again, fixinig plate 9 to be passed through to the head of connector 5 after;
Finally, connector 5 and suspending assembly 4 are tightened.
A specific embodiment is described below.
Referring to Fig. 2 and Fig. 3, suspending assembly (suspending assembly 4 is equipped with screw hole) 4 is installed in advance in installing matrix 11, Hanging nut 42 in pre-welding on suspending assembly 4.Tuyere structure 2 can set guide frame 6, the fixation of guide frame 6 There are many mode, for example are buckled, and screw is fixed, glue bond.Certainly, also directly can be inherently designed in tuyere structure 2 can play The feature of similar guiding role.Finite place piece 7 is fixed on tuyere structure, tuyere structure 2 is fixed with the fixation of adjustable installation site Piece 9, fixinig plate 9 are equipped with notch 91, can be snapped on connector 5 by 91 fixinig plate 9 of notch, referring to Fig. 3, Fig. 9 and Figure 10.
Specific installation steps are as follows:
1) before installing, the fixing screws (see Fig. 8) on the fixinig plate 9 of position adjustable are first unloaded, by the fixation of position adjustable It is spare that piece 9 is placed on the installation of erector's pocket.
2) along 11 length direction of installing matrix, two suspending assemblies 4 are fixed by screw in 11 both sides of installing matrix, are joined See Fig. 2.
3) connector 5 (being specially long spiro nail) pre- stubborn several threads are fixed on suspending assembly 4, hang head of screw at this time Expose in 10 bottom surface of furred ceiling, tuyere structure 2 enables the head of screw of connector 5 smoothly to lead to by the guiding surface 61 of guide frame 6 6 medial surface of guide frame is crossed, sees Fig. 6 to Fig. 8.
4) after the head of connector 5 is by guide frame 6, tuyere structure 2 is up resisted, so that locating part 7 can be with hanging Push up the fitting of 10 lower faces.
5) erector can take out the fixinig plate 9 of position adjustable that step 1 is removed inside pocket at this time, see Fig. 8, Fig. 9 And Figure 10, the fixinig plate 9 are designed with the notch 91 of card screw, by 91 snap-fit connection members 5 of notch, fixinig plate 9 is caught in direction ginseng As shown in arrow in Fig. 8.Adjustable position long waist shaped through-hole is designed on the fixinig plate 9, ensures that 5 head of connector will not be by this Through-hole, and the body of rod of connector 5 can be in long waist shaped through-hole slide inside, to ensure that tuyere structure 2 can be in length direction Upper offset.In addition the width direction of the fixinig plate 9 can also set adjustment long waist shaped hole, ensure tuyere structure 2 on the width It can also slightly adjust.The arrow of length direction, width direction meaning shown in Figure 10.
6) connector 5 is finally tightened, tuyere structure 2 is made to be bonded with furred ceiling 10.
It is surely filled since in project installation actual application, the opening of furred ceiling 10 often differs with 11 air outlet of installing matrix Divide alignment, the design of more than clever structure, ensure that lifting is fixed can be adapted to major part requirement of engineering.
Described in detail above is to hang mounting means, and in actual application, this hanging method is suitble to tuyere structure 2 itself Compare thick situation.If tuyere structure 2 is relatively thin, can also be installed using following mode:
1) suspending assembly 4 is fixed in installing matrix 11.
2) installation of tuyere structure 2 is resisted in 10 bottom surface of furred ceiling, i.e., locating part 7 is touched 10 bottom surface of furred ceiling.
3) nut of the directly alignment suspending assembly 4 of connector (specifically including long screw) 5, then tightens, makes tuyere structure 2 Effectively fitting furred ceiling 10, and be fixed in installing matrix 11.
It should be noted that above-mentioned lifting fixed form only sets connector 5 in the longitudinal direction, if tuyere structure 2 Longer, tuyere structure 2 may deform, and intermediate place deformation be caused to expose gap, then can also be in 2 centre position of tuyere structure It is fixed and is assisted by side cartridge screw mode.
Referring to Fig. 2 and Fig. 8, another embodiment of the present invention provides a kind of air port mounting structure and includes installing matrix 11 and air port Structure 2.Installing matrix 11 is fixed with suspending assembly 4, and tuyere structure 2 is equipped with the guiding knot for guiding 5 installation direction of connector Structure 6, tuyere structure 2 is by passing through the connector 5 of guide frame 6 to be fixed with suspending assembly 4.
Above-mentioned technical proposal is provided with guide frame 6 on tuyere structure 2, during actual installation, if first by tuyere structure 2 It is contacted with installing matrix 11, then guide frame 6 provides guiding role, guide frame 6 for the installation of connector in subsequent operation 5 Can be inclined-plane or other structures, connector 5 to be helped to find threaded hole accurately.If connector 5 is first mounted in installing matrix 11 in advance On, then guide frame 6 provides guiding role for tuyere structure 2 across connector 5.Above-mentioned guiding role is mutual, is depended on In referring in particular to object.
Referring to Fig. 2 and Fig. 7, in the present embodiment, guide frame 6 can set guiding surface 61, and connection is found accurately for connector 5 Plate 41 and nut 42 provide guiding.This is simple and compact for structure, manufacture easy to process.
Referring to Fig. 2, the opposite both sides of tuyere structure 2 are fixedly connected by suspending assembly 4 with installing matrix 11.The present embodiment In, the widthwise edge of tuyere structure 2 is lifted on installing matrix 11.
Referring to Fig. 2, suspending assembly 4 includes connecting plate 41 and nut 42, and connecting plate 41 is detachably connected with installing matrix 11, Tuyere structure 2 is connect by connector 5 and nut 42 with connecting plate 41.The suspending assembly 4 of above structure, compact-sized, installation It is convenient.
Referring to Fig. 2 and Fig. 8, air port mounting structure further includes fixinig plate 9, fixinig plate 9 be equipped with notch 91 and with notch 91 The through-hole 92 of connection.Fixinig plate 9 is set between connector 5 and the end face of guide frame 6 to prevent the head of connector 5 from entering Inside guide frame 6.Setting fixinig plate 9 can conveniently realize connector 5 and the relative position of tuyere structure 2 is fixed, and drops Low connector 5 installs fixed difficulty with installing matrix 11.
Referring to Fig. 8, through-hole 92 is oblong, so that the relative position of fixinig plate 9 and connector 5 can be in through-hole 92 Length range in adjust.
Referring to Fig. 8, fixinig plate 9 is detachably connected with guide frame 6, is specifically as follows and is bolted.
Referring to Fig. 8, the end face of guide frame 6 is equipped with groove 62, and fixinig plate 9 is installed in groove 62.Fixinig plate 9 is installed Afterwards, surface is not provided with what the part of groove 62 was generally flush in the end face of guide frame 6, to prevent from interfering.
Referring to Fig. 3, air port mounting structure further includes locating part 7, and locating part 7 is set on tuyere structure 2, and locating part 7 has energy Enough block the plane of 10 bottom end of furred ceiling.Locating part 7 can be plate, and side and the tuyere structure 2 of locating part 7 are installed, opposite side Expose tuyere structure 2, which is used to support in furred ceiling 10 when tuyere structure 2 is installed, to the peace of 2 upper and lower directions of tuyere structure Load position-limiting action so that tuyere structure 2 is not retracted in excessively inside furred ceiling 10.
Referring to Fig. 3, air port mounting structure further includes panel 8, and panel 8 is set on one that tuyere structure 2 deviates from installing matrix 11 Side.The size of panel 8 can be greater than or equal to the size that furred ceiling 10 is open, and such panel 8 can block the installation of tuyere structure 2 Position so that lower to the precision requirement of installation site.
Referring to Fig. 1 to Figure 11, another embodiment of the present invention provides a kind of tuyere structure installation method again, and this method can be real Now independent side fills, individually lifts and be lifted on a variety of situations such as side dress combination.This method includes the following steps:
Step S10, judge whether the support strength of furred ceiling 10 meets the lifting requirements of tuyere structure 2.
Can furred ceiling 10 meet lifting requirements, depending on the material of furred ceiling 10, thickness, shape, structure etc..Actual use In, using tuyere structure 2 be installed on furred ceiling 10 after total be it is safe, can normal use as standard.
If step S20, meeting the requirements, the side of tuyere structure 2 is mounted on furred ceiling 10, wind is mainly carried by furred ceiling 10 Mouth structure 2.Tuyere structure 2 is mounted in the installing matrix 11 of unit, carrying tuyere structure 2 is assisted by installing matrix 11.Its In, by the side of tuyere structure 2 be mounted on furred ceiling 10 on operation and by tuyere structure 2 be mounted on unit installing matrix 11 on Operation can successively carry out, can also be carried out at the same time.Being carried out at the same time needs more operating personnel.Operation needed for successively carrying out Personnel amount is then less.
In above-mentioned step S20, the support strength of furred ceiling 10 is met the requirements, and there are two types of mounting means for tuyere structure 2:Directly It connects side and is loaded on furred ceiling 10, the installing matrix 11 for being directly mounted at unit.Both modes can be used alone, and can also combine other peaces Dress mode to carry the weight of tuyere structure 2 jointly.
The side mounting means of tuyere structure 2 refers to that the side of tuyere structure 2 is directly installed on furred ceiling 10, does not need to It is nested.Specifically, screw and plate may be used directly to fix the side of tuyere structure 2 and furred ceiling 10.It can also be used herein The mounting means described in the mounting structure embodiment of air port provided hereinafter.
If step S30, being unsatisfactory for requiring, tuyere structure 2 is mounted in the installing matrix 11 of unit, by installing matrix 11 main carrying tuyere structures 2;The side of tuyere structure 2 is mounted on furred ceiling 10, carrying tuyere structure is assisted by furred ceiling 10 2。
Whether the tuyere structure installation method that above-mentioned technical proposal provides the bearing capacity of itself can be expired based on furred ceiling 10 Foot requires the mounting means to determine tuyere structure 2;If 10 bearing capacity of furred ceiling is met the requirements, tuyere structure 2 mainly uses Side dress (i.e. side is installed) carrying, the position of installation point is more, can disperse the weight of tuyere structure 2, even and if 2 foot of tuyere structure It is enough long, the problems such as deformation will not occur.If the bearing capacity of furred ceiling 10 is unsatisfactory for the lifting requirements of tuyere structure 2, by wind Mouth structure 2 is mainly carried by installing matrix 11.Above two mounting means can save nesting, and then save nested installation process In required complicated procedures of forming, simplify tuyere structure 2 installation procedure, improve installation effectiveness.
Tuyere structure 2 is carried simultaneously by furred ceiling 10 and installing matrix 11, installation point when above-mentioned mounting means can reduce side dress Quantity.
Step S20 is described below and specifically includes following steps:
Step 1: in the side mounting fixing parts 3 of tuyere structure 2.Referring to Fig. 3 and Figure 11, wherein, fixing piece 3 has the One trepanning 31 and the second trepanning 32, the first trepanning 31 and the second trepanning 32 at least one be slotted hole.Fixing piece 3 passes through One trepanning 31 and the side of tuyere structure 2 are fixed.If the first trepanning 31 and the second trepanning 32 are slotted hole, the first trepanning 31 Length direction along tuyere structure 2 first direction, the length direction of the second trepanning 32 along tuyere structure 2 second direction. The longitudinal direction of one of first direction and second direction for tuyere structure 2, another transverse direction for tuyere structure 2.First trepanning 31 It can be slotted hole with the second trepanning 32, fixing piece 3 and furred ceiling 10, tuyere structure 2 can be adjusted by two slotted holes Installation site.
Step 2: the side of tuyere structure 2 and furred ceiling 10 are fixed across the second trepanning 32 using fastener 35.Referring to figure 5, fastener is such as bolt etc..
Above-mentioned step S30 specifically may include following steps:
Step 1: suspending assembly 4 is installed on to the installing matrix 11 of unit.The structure of suspending assembly 4 can there are many, can Think plate or frame class formation, specific structure type will be provided hereinafter.
Step 2: tuyere structure 2 and suspending assembly 4 are fixed.Referring to Fig. 2, such as:Using connector 5 from tuyere structure 2 Bottom wear to top and fix tuyere structure 2 and suspending assembly 4.Referring to Fig. 2, connector 5 is specifically as follows long spiro nail.
The specific embodiment of above-mentioned tuyere structure installation method is described below.
Side dress mode is introduced first.It introduces tuyere structure 2 and furred ceiling 10 is fixed on by side cartridge screw.Tuyere structure is from lower past On install furred ceiling 10, locating part (design is relatively thin, there is sufficient intensity) 7 is resisted in 10 lower face of furred ceiling (see Fig. 4), ties air port Structure and 10 bottom surface of furred ceiling are straight.At this time fastener (being specially side cartridge screw) 35 passes through the 32 (figure of the second trepanning on fixing piece 3 11) it is fixed on furred ceiling 10.Further, fixinig plate 3 can also be equipped with the first trepanning 31 of long waist shaped, it is therefore an objective to can be according to hanging 10 opening actual size of top, 3 position of adjustment fixinig plate so that side cartridge screw will not lead to 2 deformation of tuyere structure when fastening, and ensure Appearance is unaffected.
Next introduces lifting mode.Suspending assembly is installed in installing matrix 11 in advance (suspending assembly 4 is equipped with screw hole) 4, hanging nut 42 in pre-welding on suspending assembly 4.Tuyere structure 2 can set guide frame 6, and guide frame 6 is consolidated It is many to determine mode, for example is buckled, screw is fixed, glue bond.Certainly, also directly can be inherently designed in tuyere structure 2 can rise To the feature of similar guiding role.Finite place piece 7 is fixed on tuyere structure, tuyere structure 2 is fixed with consolidating for adjustable installation site Stator 9, fixinig plate 9 are equipped with notch 91, can be snapped on connector 5 by 91 fixinig plate 9 of notch, referring to Fig. 3, Fig. 9 and figure 10。
Specific installation steps are as follows:
1) before installing, the fixing screws (see Fig. 8) on the fixinig plate 9 of position adjustable are first unloaded, by the fixation of position adjustable It is spare that piece 9 is placed on the installation of erector's pocket.
2) along 11 length direction of installing matrix, two suspending assemblies 4 are fixed by screw in 11 both sides of installing matrix, are joined See Fig. 2.
3) connector 5 (being specially long spiro nail) pre- stubborn several threads are fixed on suspending assembly 4, hang head of screw at this time Expose in 10 bottom surface of furred ceiling, tuyere structure 2 enables hanging head of screw to pass through guiding by the guiding surface 61 of guide frame 6 6 medial surface of structure, is shown in Fig. 6 to Fig. 8.
4) after the head of connector 5 is by guide frame 6, tuyere structure 2 is up resisted with hand enables locating part 7 and furred ceiling 10 lower faces are bonded.
5) erector can take out the fixinig plate 9 of position adjustable that step 1 is removed inside pocket at this time, see Fig. 8, Fig. 9 And Figure 10, the fixinig plate 9 are designed with the notch 91 of card screw, by 91 snap-fit connection members 5 of notch, fixinig plate 9 is caught in direction ginseng As shown in arrow in Fig. 8.Adjustable position long waist shaped through-hole is designed on the fixinig plate 9, ensures that 5 head of connector will not be by this Through-hole, and the body of rod of connector 5 can be in long waist shaped through-hole slide inside, to ensure that tuyere structure 2 can be in length direction Upper offset.In addition the width direction of the fixinig plate 9 can also set adjustment long waist shaped hole, ensure tuyere structure 2 on the width It can also slightly adjust.The arrow of length direction, width direction meaning shown in Figure 10.
6) connector 5 is finally tightened, tuyere structure 2 is made to be bonded with furred ceiling 10.
It is surely filled since in project installation actual application, the opening of furred ceiling 10 often differs with 11 air outlet of installing matrix Divide alignment, the design of more than clever structure, ensure that lifting is fixed can be adapted to major part requirement of engineering.
Described in detail above is to hang mounting means, and in actual application, this hanging method is suitble to tuyere structure 2 itself Compare thick situation.If tuyere structure 2 is relatively thin, can also be installed using following mode:
1) suspending assembly 4 is fixed in installing matrix 11.
2) installation of tuyere structure 2 is resisted in 10 bottom surface of furred ceiling, i.e., locating part 7 is touched 10 bottom surface of furred ceiling.
3) nut of the directly alignment suspending assembly 4 of connector (specifically including long screw) 5, then tightens, makes tuyere structure 2 Effectively fitting furred ceiling 10, and be fixed in installing matrix 11.
It should be noted that above-mentioned lifting fixed form only sets connector 5 in the longitudinal direction, if tuyere structure 2 Longer, tuyere structure 2 may deform, and intermediate place deformation be caused to expose gap, then can also be in 2 centre position of tuyere structure It is fixed and is assisted by side cartridge screw mode.
The tuyere structure installation method that the above embodiment of the present invention provides, according to actual needs, can only use wherein one Kind mounting means or two kinds of mounting means use simultaneously.Above-mentioned installation method, installation are versatile;The opening of furred ceiling 10 has certain Still it can meet installation during deviation, do over again without furred ceiling 10, be open again again.Hanging is reliable, energy after tuyere structure 2 is installed Fully fitting furred ceiling 10;Simple installation after the completion of furred ceiling 10 is open, can be installed immediately, convenience and high-efficiency.
Referring to Fig. 2 to Figure 11, another embodiment of the present invention provides a kind of air port mounting structure, available for implementing above-mentioned implementation The tuyere structure installation method that example provides.The air port mounting structure include installing matrix 11 and tuyere structure 2, tuyere structure 2 by Installing matrix 11 and furred ceiling carry jointly.
Installing matrix 11 is lifted on roof (or being ceiling).According to the difference of actual conditions, tuyere structure 2 can be with Using following bearing modes of one of them:By furred ceiling 10, mainly carrying and installing matrix 11 assist carrying, by installing matrix 11 Main carrying and the auxiliary carrying of furred ceiling 10.
Tuyere structure 2 is carried by installing matrix 11, can be fixed to avoid that in the prior art must be mounted on tuyere structure 2 In the complex procedures brought in the nesting of furred ceiling 10, required personnel are more the problems such as.
Further, the side of tuyere structure 2 is equipped with the fixing piece 3 for being connect with furred ceiling 10, fixing piece 3 and furred ceiling 10 link position is adjustable.
Fixing piece 3 can be selected one according to actual needs and installed with furred ceiling 10 by setting multiple mounting structures.It is alternatively, solid Determine part 3 and the adjustable holes of installation sites such as slotted hole are set, to realize may be selected for installation site.
Referring to Figure 11, in the present embodiment, fixing piece 3 has the first trepanning 31 and the second trepanning 32.First trepanning 31 and At least one is slotted hole for two trepannings 32, this is sentenced be slotted hole for.Fixing piece 3 passes through the first trepanning 31 and air port The side of structure 2 is fixed;The length direction of first trepanning 31 is along the first direction of tuyere structure 2, the length of the second trepanning 32 Direction is along the second direction of tuyere structure 2, and one of first direction and second direction are the longitudinal direction of tuyere structure 2, separately One is the transverse direction of tuyere structure 2.
It, can be in the lateral, vertical of tuyere structure 2 by the first trepanning 31 and the second trepanning 32 for setting length direction different The adjustment of installation site is carried out to both direction, installation is more convenient.
Referring to Figure 11, fixing piece 3 includes the first plate 33 and the second plate 34 that are fixed to each other, the first plate 33 and tuyere structure 2 Fixed, the second plate 34 is fixed with furred ceiling 10.In the present embodiment, fixing piece 3 can cause by using above structure using normal Fastener 35 across the second opening 32 can just cause furred ceiling 10 to provide the second plate 34 active force obliquely, active force tool Some vertical components can coordinate with locating part 7, so that the ground of tuyere structure 2 is concordant with the bottom surface of furred ceiling 10.It is so-called normal The fastener 35 of installation refers to that, by fastener 35 using for screw, the length direction of fastener 35 is perpendicular to the second plate 34.
Referring to Figure 12, the angle of the first plate 33 and the second plate 34 is 95 degree to 140 degree, for example, for 95 degree, 100 degree, 105 It spends, 110 degree, 120 degree, 130 degree, 140 degree etc..When the angle to install fastener 35, the fixed force F of fastener 35 is oblique On, there are one upward component F1, while in the case where locating part 7 limits, bottom surface and the furred ceiling of tuyere structure 2 can be made 10 bottom surface is concordant.
Referring to Figure 12, the total height B of fixing piece 3 is 7mm to 12mm.Above-mentioned height can meet the general thickness of furred ceiling, protect It demonstrate,proves it and will not be excessively high or escapes to the lower section of furred ceiling 10.
Referring to Figure 13, the length C of the second trepanning 32 is 8mm to 20mm.Above-mentioned length can ensure original after the dismounting of air port Bearing is destroyed when can not install, and can aside reinstall fastener 35.
Referring to Figure 13, the diameter R of the second trepanning 32 is 2.5mm to 4mm.Diameter R can meet can in existing project installation The screw sizes that can be used, while ensure that the installation of screw will not relax.
Referring to Figure 13, distance D of second trepanning 32 apart from bottom is 2mm to 5mm, which carries for the installation of fastener 35 Space has been supplied without interfering with tuyere structure 2.
Further, installing matrix 11 is fixed with suspending assembly 4, and tuyere structure 2 is solid by connector 5 and suspending assembly 4 It is fixed.Connector 5 can be stay bolt.
Referring to Fig. 2, optionally, the transverse end surface of installing matrix 11 is fixedly connected with tuyere structure 2 by suspending assembly 4. Suspending assembly 4 is set, convenient for connection installing matrix 11 and tuyere structure 2.The transverse end surface setting suspending assembly of installing matrix 11 4, fully consider the design feature of installing matrix 11 and the convenience of installation.
Referring to Fig. 2, in the present embodiment, the opposite both sides of tuyere structure 2 are installed on furred ceiling 10, opposite another of tuyere structure 2 Outer both sides are fixedly connected by suspending assembly 4 with installing matrix 11.In the present embodiment, two longitudinal edge sides of tuyere structure 2, which are loaded on, hangs Top 10, widthwise edge is lifted on installing matrix 11.
Referring to Fig. 2, in the present embodiment, suspending assembly 4 includes connecting plate 41 and nut 42, connecting plate 41 and installing matrix 11 It is detachably connected, tuyere structure 2 is connect by connector 5 and nut 42 with connecting plate 41.The suspending assembly 4 of above structure, knot Structure is compact, easy for installation.
Referring to Fig. 2, for the ease of installation connecting element 5, tuyere structure 2 is equipped with to guide leading for 5 installation direction of connector To structure 6.Guide frame 6 can be inclined-plane or other structures, connector 5 to be helped to find threaded hole accurately.
Referring to Fig. 7, in the present embodiment, guide frame 6 can set guiding surface 61, and connecting plate 41 is found accurately for connector 5 Guiding is provided with nut 42.This is simple and compact for structure, manufacture easy to process.
Referring to Fig. 4, further, air port mounting structure further includes locating part 7, and locating part 7 is set on tuyere structure 2, limiting Part 7 has the plane that can block 10 bottom end of furred ceiling.Locating part 7 can be plate, and side and the tuyere structure 2 of locating part 7 are pacified Dress, opposite side expose tuyere structure 2, which is used to support in furred ceiling 10 when tuyere structure 2 is installed, on tuyere structure 2 Position-limiting action is played in the installation in lower direction so that tuyere structure 2 is not retracted in excessively inside furred ceiling 10.
Referring to Fig. 4 or Fig. 5, optionally, air port mounting structure further includes panel 8, and panel 8 is set on tuyere structure 2 away from peace Fill the side of matrix 11.
The size of panel 8 can be greater than or equal to the size that furred ceiling 10 is open, and such panel 8 can block tuyere structure 2 Installation site so that it is lower to the requirement of the precision of installation site.
Another embodiment is described below.Referring to Figure 14 and Fig. 3 to Figure 13, the present embodiment provides a kind of installations of air port to tie Structure, including interior machine 1 and tuyere structure 2, interior machine 1 is fixed with suspending assembly 4, and tuyere structure 2 is fixed with suspending assembly 4.
Above-mentioned technical proposal, secures suspending assembly 4 on interior machine 1, and tuyere structure 2 can be mounted on one with suspending assembly 4 It rises, tuyere structure 2 is carried by interior machine 1 to realize.
Optionally, tuyere structure 2 is equipped with the guide frame 6 for guiding 5 installation direction of connector, and tuyere structure 2 passes through Connector 5 across guide frame 6 is fixed with suspending assembly 4.
Above-mentioned technical proposal is provided with guide frame 6 on tuyere structure 2, during actual installation, if first by tuyere structure 2 It is contacted with interior machine 1, then guide frame 6 provides guiding role for the installation of connector in subsequent operation 5, and guide frame 6 can be with For inclined-plane or other structures, connector 5 to be helped to find threaded hole accurately.If first pre-installing connector 5 on interior machine 1, it is oriented to Structure 6 provides guiding role for tuyere structure 2 across connector 5.Above-mentioned guiding role be it is mutual, depending on referring in particular to Object.
Referring to Figure 14 and Fig. 7, in the present embodiment, guide frame 6 can set guiding surface 61, be 5 company of finding accurately of connector Fishplate bar 41 and nut 42 provide guiding.This is simple and compact for structure, manufacture easy to process.
The opposite both sides of tuyere structure 2 are fixedly connected by suspending assembly 4 with interior machine 1.In the present embodiment, tuyere structure 2 Substantially rectangular parallelepiped structure, long side, the i.e. widthwise edge of tuyere structure 2 are lifted on interior machine 1.
Referring to Figure 14, in the present embodiment, suspending assembly 4 includes connecting plate 41 and nut 42, and connecting plate 41 and interior machine 1 are removable Connection is unloaded, tuyere structure 2 is connect by connector 5 and nut 42 with connecting plate 41.The suspending assembly 4 of above structure, structure is tight It gathers, it is easy for installation.
In the present embodiment, air port mounting structure further includes fixinig plate 9, and fixinig plate 9 is equipped with notch 91 and connects with notch 91 Logical through-hole 92.Fixinig plate 9 is set on and is led between connector 5 and the end face of guide frame 6 with preventing the head of connector 5 from entering To the inside of structure 6.Setting fixinig plate 9 can conveniently realize connector 5 and the relative position of tuyere structure 2 is fixed, and reduces Connector 5 installs fixed difficulty with interior machine 1.
Referring to Fig. 8, in the present embodiment, through-hole 92 is oblong, so that the relative position of fixinig plate 9 and connector 5 It can be adjusted in the length range of through-hole 92.
Referring to Fig. 4, optionally, air port mounting structure further includes locating part 7, and locating part 7 is set on tuyere structure 2, locating part 7 With the plane that can block 10 bottom end of furred ceiling.Locating part 7 can be plate, and side and the tuyere structure 2 of locating part 7 are installed, Opposite side exposes tuyere structure 2, which is used to support in furred ceiling 10 when tuyere structure 2 is installed, to 2 upper and lower of tuyere structure To installation play position-limiting action so that tuyere structure 2 is not retracted in excessively inside furred ceiling 10.
In the present embodiment, fixinig plate 9 is detachably connected with guide frame 6, is specifically as follows and is bolted.
Referring to Fig. 8, in the present embodiment, the end face of guide frame 6 is equipped with groove 62, and fixinig plate 9 is installed in groove 62.Gu After stator 9 is installed, surface is not provided with what the part of groove 62 was generally flush in the end face of guide frame 6, to prevent from interfering.
Referring to Fig. 5, in the present embodiment, air port mounting structure further includes panel 8, and panel 8 is set on tuyere structure 2 and deviates from interior machine 1 side.The size of panel 8 can be greater than or equal to the size that furred ceiling 10 is open, and such panel 8 can block tuyere structure 2 Installation site so that it is lower to the requirement of the precision of installation site.
The present embodiment unaccomplished matter refers to the description of above-described embodiment.
In the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear", The orientation or position relationship of the instructions such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on attached drawing institutes The orientation or position relationship shown is only the present invention and simplified description rather than instruction for ease of description or implies signified device Or element must have specific orientation, be specific azimuth configuration and operation, thus it is not intended that in present invention protection The limitation of appearance.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution recorded in foregoing embodiments or carry out equivalent replacement to which part technical characteristic, But these modification or replace, various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (22)

1. a kind of tuyere structure installation method, which is characterized in that include the following steps:
Suspending assembly is installed on to the installing matrix of the unit;
The suspending assembly will be installed on across the connector of the guide frame of the tuyere structure, so that the tuyere structure It is installed on the installing matrix of unit;Wherein, the guide frame is used to guide the installation direction of the connector.
2. tuyere structure installation method according to claim 1, which is characterized in that it is described suspending assembly is installed on it is described The step of installing matrix of unit, includes:
Suspending assembly is installed on to the opposite both sides of installing matrix of the unit.
3. tuyere structure installation method according to claim 1, which is characterized in that the leading across the tuyere structure The step of being installed on the suspending assembly to the connector of structure includes:
The connector is pre-installed on the suspending assembly, the head of the connector after prepackage is located under the bottom surface of furred ceiling Side;
The tuyere structure is pushed up upwards, until the head of the connector passes through the guide frame of the tuyere structure and positioned at institute State the lower section of tuyere structure;
The tuyere structure is continued up into top to the bottom surface of the tuyere structure position concordant with the bottom surface of furred ceiling;
The guide frame is fixed on after fixinig plate is passed through the head of the connector;
The connector and the suspending assembly are tightened.
4. a kind of air port mounting structure, which is characterized in that including installing matrix (11) and tuyere structure (2), the installing matrix (11) suspending assembly (4) is fixed with, the tuyere structure (2) is equipped with the guide frame for guiding connector (5) installation direction (6), the tuyere structure (2) is solid by the connector (5) and the suspending assembly (4) for passing through the guide frame (6) It is fixed.
5. air port mounting structure according to claim 4, which is characterized in that the opposite both sides of the tuyere structure (2) lead to The suspending assembly (4) is crossed to be fixedly connected with the installing matrix (11).
6. air port mounting structure according to claim 4, which is characterized in that the suspending assembly (4) is including connecting plate (41) it is detachably connected with nut (42), the connecting plate (41) with the installing matrix (11), the tuyere structure (2) passes through The connector (5) and the nut (42) are connect with the connecting plate (41).
7. air port mounting structure according to claim 4, which is characterized in that further include locating part (7), the locating part (7) set on the tuyere structure (2), the locating part (7) has the plane that can block furred ceiling (10) bottom end.
8. air port mounting structure according to claim 4, which is characterized in that further include panel (8), the panel (8) sets In the tuyere structure (2) away from the side of the installing matrix (11).
9. air port mounting structure according to claim 4, which is characterized in that further include fixinig plate (9), the fixinig plate (9) through-hole (92) connected equipped with notch (91) and with the notch (91);The fixinig plate (9) is set on the connector (5) between the end face of the guide frame (6) to prevent the head of the connector (5) from entering the guide frame (6) It is internal.
10. air port mounting structure according to claim 9, which is characterized in that the through-hole (92) is oblong.
11. air port mounting structure according to claim 9, which is characterized in that the fixinig plate (9) and the guide frame (6) it is detachably connected.
12. air port mounting structure according to claim 9, which is characterized in that the end face of the guide frame (6) is equipped with recessed Slot (62), the fixinig plate (9) are installed in the groove (62).
13. a kind of air port mounting structure, which is characterized in that including interior machine (1) and tuyere structure (2), the interior machine (1) is fixed with Suspending assembly (4), the tuyere structure (2) are fixed with the suspending assembly (4).
14. air port mounting structure according to claim 13, which is characterized in that the tuyere structure (2) is equipped with for drawing The guide frame (6) of connector (5) installation direction is led, the tuyere structure (2) is by passing through the described of the guide frame (6) Connector (5) is fixed with the suspending assembly (4).
15. air port mounting structure according to claim 14, which is characterized in that the opposite both sides of the tuyere structure (2) It is fixedly connected by the suspending assembly (4) with the interior machine (1).
16. air port mounting structure according to claim 14, which is characterized in that the suspending assembly (4) is including connecting plate (41) it is detachably connected with nut (42), the connecting plate (41) with the interior machine (1), the tuyere structure (2) is by described Connector (5) and the nut (42) are connect with the connecting plate (41).
17. air port mounting structure according to claim 13, which is characterized in that further include locating part (7), the locating part (7) set on the tuyere structure (2), the locating part (7) has the plane that can block furred ceiling (10) bottom end.
18. air port mounting structure according to claim 13, which is characterized in that further include panel (8), the panel (8) Set on the tuyere structure (2) away from the side of the interior machine (1).
19. air port mounting structure according to claim 14, which is characterized in that further include fixinig plate (9), the fixinig plate (9) through-hole (92) connected equipped with notch (91) and with the notch (91);The fixinig plate (9) is set on the connector (5) between the end face of the guide frame (6) to prevent the head of the connector (5) from entering the guide frame (6) It is internal.
20. air port mounting structure according to claim 19, which is characterized in that the through-hole (92) is oblong.
21. air port mounting structure according to claim 19, which is characterized in that the fixinig plate (9) is tied with described be oriented to Structure (6) is detachably connected.
22. air port mounting structure according to claim 19, which is characterized in that the end face of the guide frame (6) is equipped with Groove (62), the fixinig plate (9) are installed in the groove (62).
CN201711401439.5A 2017-08-25 2017-12-22 Tuyere structure installation method and air port mounting structure Pending CN108151266A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710742959 2017-08-25
CN2017107429596 2017-08-25

Publications (1)

Publication Number Publication Date
CN108151266A true CN108151266A (en) 2018-06-12

Family

ID=61942238

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201711401437.6A Pending CN107940712A (en) 2017-08-25 2017-12-22 Tuyere structure installation method and air port mounting structure
CN201721812269.5U Active CN207815646U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401534.5A Pending CN109425089A (en) 2017-08-25 2017-12-22 Air port mounting structure, indoor unit and air-conditioner set
CN201721812002.6U Active CN207815645U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201721812367.9U Active CN208042459U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401546.8A Pending CN108050680A (en) 2017-08-25 2017-12-22 Tuyere structure installation method and air port mounting structure
CN201711401439.5A Pending CN108151266A (en) 2017-08-25 2017-12-22 Tuyere structure installation method and air port mounting structure

Family Applications Before (6)

Application Number Title Priority Date Filing Date
CN201711401437.6A Pending CN107940712A (en) 2017-08-25 2017-12-22 Tuyere structure installation method and air port mounting structure
CN201721812269.5U Active CN207815646U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401534.5A Pending CN109425089A (en) 2017-08-25 2017-12-22 Air port mounting structure, indoor unit and air-conditioner set
CN201721812002.6U Active CN207815645U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201721812367.9U Active CN208042459U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401546.8A Pending CN108050680A (en) 2017-08-25 2017-12-22 Tuyere structure installation method and air port mounting structure

Country Status (5)

Country Link
US (1) US20210071906A1 (en)
EP (1) EP3640559B1 (en)
CN (7) CN107940712A (en)
ES (1) ES2967707T3 (en)
WO (1) WO2019119873A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107940712A (en) * 2017-08-25 2018-04-20 珠海格力电器股份有限公司 Tuyere structure installation method and air port mounting structure
CN109297165A (en) * 2018-11-20 2019-02-01 宁波奥克斯电气股份有限公司 A kind of hanger rod component and air conditioner
CN114484839B (en) * 2021-12-10 2023-05-23 惠瑞净化科技(江苏)有限公司 Install high-efficient supply-air outlet of sealed on lithium cell toilet roof

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030054754A1 (en) * 2001-09-20 2003-03-20 Canplas Industries Ltd. Passive venting device
KR20050113319A (en) * 2004-05-27 2005-12-02 삼성전자주식회사 Ceiling flush type air conditioner
JP2007327703A (en) * 2006-06-08 2007-12-20 Daikin Ind Ltd Indoor unit for air conditioner
KR20090082731A (en) * 2008-01-28 2009-07-31 엘지전자 주식회사 Ceiling type air conditioner
CN204100439U (en) * 2014-07-08 2015-01-14 广东松下环境系统有限公司 Ion generating device
CN104330086A (en) * 2014-10-16 2015-02-04 重庆金宏汽车电子有限公司 Vehicle navigator rapid assembling structure
CN204134190U (en) * 2014-10-14 2015-02-04 王彬 A kind of elevating mechanism of Novel mahjong machine
CN204648631U (en) * 2015-05-28 2015-09-16 广东美的制冷设备有限公司 Lifting fixtures and ceiling-mounted air conditioner
CN205448203U (en) * 2015-12-23 2016-08-10 宁波威霖住宅设施有限公司 Central air conditioning wind gap shell fragment mounting structure
CN205726795U (en) * 2016-06-30 2016-11-23 浙江光大通信设备有限公司 The mounting structure of light current module
CN205939596U (en) * 2016-07-04 2017-02-08 珠海格力电器股份有限公司 Wind gap fixing device , wind gap structure and suspension type air conditioner
CN106642329A (en) * 2016-11-29 2017-05-10 青岛海尔空调器有限总公司 Air conditioner indoor unit
CN207815646U (en) * 2017-08-25 2018-09-04 珠海格力电器股份有限公司 Air port mounting structure

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1604111A1 (en) * 1965-11-20 1970-04-30 Air Devices Inc Ceiling diffuser
JP2575949Y2 (en) * 1992-07-28 1998-07-02 ダイキン工業株式会社 Installation device for ceiling-mounted air conditioners
JP3445428B2 (en) * 1996-01-12 2003-09-08 東芝キヤリア株式会社 Duct ventilation fan
JPH10213345A (en) * 1997-01-28 1998-08-11 Nissei Kinzoku Kk Room air conditioner mounting implement
WO1999024761A2 (en) * 1997-11-06 1999-05-20 Nerling Gmbh Systemräume Air-conditioning device for technical premises such as measuring rooms
JP4359955B2 (en) * 1999-03-26 2009-11-11 ダイキン工業株式会社 Embedded ceiling air conditioner
US6587642B1 (en) * 2000-11-14 2003-07-01 Daniel King Ceiling fan cooling system
JP2005049074A (en) * 2003-07-31 2005-02-24 Fuji Industrial Co Ltd Ceiling suspension type range hood fan
CN202401705U (en) * 2011-10-17 2012-08-29 北京优尼法制药技术有限公司 Integrated structure of suspended ceiling and air inlet
CN203231490U (en) * 2013-02-28 2013-10-09 大金工业株式会社 Panel installation auxiliary device and indoor set of air conditioner
JP6270645B2 (en) * 2013-12-26 2018-01-31 三菱電機株式会社 Equipment mounting device and indoor unit
DE102014001543B4 (en) * 2014-02-07 2017-08-31 Octanorm-Vertriebs-GmbH für Bauelemente System for creating suspended ceiling constructions
CN104019536A (en) * 2014-06-17 2014-09-03 珠海格力电器股份有限公司 Ceiling type air conditioner indoor unit installation method and ceiling type air conditioner
CN204165215U (en) * 2014-06-17 2015-02-18 珠海格力电器股份有限公司 Ceiling type air conditioner
CN204084765U (en) * 2014-07-18 2015-01-07 中国建筑第七工程局有限公司 A kind of device for fixing air port system
CN205174759U (en) * 2015-11-19 2016-04-20 宁波威霖住宅设施有限公司 Vent panel switch structure
CN106123263B (en) * 2016-06-20 2019-06-11 珠海格力电器股份有限公司 Ceiling type air conditioner and its exhaust apparatus
CN106152449A (en) * 2016-09-19 2016-11-23 珠海格力电器股份有限公司 Air outlet structure and there is its central air conditioner system
CN207831611U (en) * 2017-12-22 2018-09-07 珠海格力电器股份有限公司 Tuyere structure component and ceiling type air conditioner

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030054754A1 (en) * 2001-09-20 2003-03-20 Canplas Industries Ltd. Passive venting device
KR20050113319A (en) * 2004-05-27 2005-12-02 삼성전자주식회사 Ceiling flush type air conditioner
JP2007327703A (en) * 2006-06-08 2007-12-20 Daikin Ind Ltd Indoor unit for air conditioner
KR20090082731A (en) * 2008-01-28 2009-07-31 엘지전자 주식회사 Ceiling type air conditioner
CN204100439U (en) * 2014-07-08 2015-01-14 广东松下环境系统有限公司 Ion generating device
CN204134190U (en) * 2014-10-14 2015-02-04 王彬 A kind of elevating mechanism of Novel mahjong machine
CN104330086A (en) * 2014-10-16 2015-02-04 重庆金宏汽车电子有限公司 Vehicle navigator rapid assembling structure
CN204648631U (en) * 2015-05-28 2015-09-16 广东美的制冷设备有限公司 Lifting fixtures and ceiling-mounted air conditioner
CN205448203U (en) * 2015-12-23 2016-08-10 宁波威霖住宅设施有限公司 Central air conditioning wind gap shell fragment mounting structure
CN205726795U (en) * 2016-06-30 2016-11-23 浙江光大通信设备有限公司 The mounting structure of light current module
CN205939596U (en) * 2016-07-04 2017-02-08 珠海格力电器股份有限公司 Wind gap fixing device , wind gap structure and suspension type air conditioner
CN106642329A (en) * 2016-11-29 2017-05-10 青岛海尔空调器有限总公司 Air conditioner indoor unit
CN207815646U (en) * 2017-08-25 2018-09-04 珠海格力电器股份有限公司 Air port mounting structure

Also Published As

Publication number Publication date
EP3640559A1 (en) 2020-04-22
US20210071906A1 (en) 2021-03-11
CN207815646U (en) 2018-09-04
CN207815645U (en) 2018-09-04
EP3640559A4 (en) 2020-11-04
EP3640559B1 (en) 2023-10-04
ES2967707T3 (en) 2024-05-03
CN109425089A (en) 2019-03-05
CN208042459U (en) 2018-11-02
CN108050680A (en) 2018-05-18
CN107940712A (en) 2018-04-20
WO2019119873A1 (en) 2019-06-27

Similar Documents

Publication Publication Date Title
CN108151266A (en) Tuyere structure installation method and air port mounting structure
CN107499326A (en) Railcar and its Undercarriage structure
CN105667634B (en) A kind of application method of rear shock absorber installation positioning accessory
CN104466828B (en) Cable bridge convenient to install
CN208913952U (en) Frame assembly leading portion general assembly tooling
CN206564747U (en) The attachment structure of module and base
CN208363292U (en) A kind of steel structure connecting member
CN207191174U (en) Semitrailer and its column
CN207525955U (en) For the connection component of curtain wall panel installation
CN206811812U (en) A kind of hatch door installs auxiliary mould
CN208470065U (en) Siding is built in one kind reinforces tooling
CN101941531A (en) Micro-satellite assembly and disassembly method based on large-span hanging
CN206664695U (en) A kind of half load car is flexibly connected girder construction
CN207481492U (en) A kind of encircling type chapter body fastener of the compatible a variety of chapter bodies of energy
CN206287798U (en) The mounting bracket of glass-frame riser
CN206344771U (en) A kind of automotive air outlet panel for being easy to assemble
CN209290536U (en) Vehicle and its carriage chassis
CN205976240U (en) Fast -assembling support
CN208164931U (en) A kind of wire bundle fixing structure of dotted line positioning
CN108105495A (en) A kind of antidetonation tube bundle devices being easily installed
CN207029497U (en) A kind of horizontal position pin hand code and the scaffold using this kind of pin hand code
CN207790927U (en) One kind attaching together guider
CN217631163U (en) High-rise building elevator shaft safety construction platform
CN219519388U (en) Glue coating gun nozzle
CN209240855U (en) Battery mounting device suitable for new-energy automobile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination