- CN108149909A CN108149909A CN201810037937.4A CN201810037937A CN108149909A CN 108149909 A CN108149909 A CN 108149909A CN 201810037937 A CN201810037937 A CN 201810037937A CN 108149909 A CN108149909 A CN 108149909A
- Authority
- CN
- China
- Prior art keywords
- bar
- side pole
- linkage section
- cross
- bar unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 31
- 239000010959 steel Substances 0.000 title claims abstract description 31
- 238000009434 installation Methods 0.000 claims abstract description 13
- 238000003780 insertion Methods 0.000 claims description 9
- 230000037431 insertion Effects 0.000 claims description 9
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 239000004744 fabric Substances 0.000 claims 1
- -1 first side pole (21) Substances 0.000 claims 1
- 230000032258 transport Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000007935 neutral effect Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/02—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
- E04G1/04—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
- E04G1/06—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section comprising members with rod-like or tubular portions fitting together end to end, with or without separate connecting pieces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/02—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
- E04G1/04—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
- E04G1/08—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section secured together by bolts or the like penetrating the members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/20—Stiff scaffolding clamps for connecting scaffold members of common shape for ends of members only, e.g. for connecting members in end-to-end relation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/22—Stiff scaffolding clamps for connecting scaffold members of common shape for scaffold members in end-to-side relation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The present invention relates to a kind of adjustable steel tube scaffolds,Including upright bar and cross bar,The upright bar is made of several upright bar unit pieces,The cross bar is made of several cross-bar unit parts,Each upright bar unit piece includes upper half bar and lower half bar,The lower half bar can just be seated in upper half bar,The upper and lower ends of the upper half bar are respectively arranged a disk and buckle,The disk is buckled equipped with equally distributed multiple mounting holes,Each cross-bar unit part includes the first side pole of grafting successively,Intermediate bar and the second side pole,The intermediate bar includes at least a connecting rod,The connecting rod includes the first linkage section and the second linkage section,One end of first side pole is fixedly connected with screw rod,First linkage section is just seated in the first side pole,Second side pole includes inserting paragraph and fixed section,Fixed section is fixedly connected with screw rod,Inserting paragraph is just seated in the second linkage section.The present invention is easy for installation, easy to disassemble and transports, and use scope is wide.
Description
Technical field
The present invention relates to scaffolds, and in particular to a kind of adjustable steel tube scaffold.
Background technology
Scaffold is indispensable important construction tool in construction industry, mainly for construction personnel makees up and down
Industry, perimeter security net is gone along with sb. to guard him and high-altitude installation component etc.;In the early period after the foundation of New China, China's scaffold is based on bamboo and wood material, and 70
Before and after age, China introduces steel pipe scaffold, and the development of Construction Formwork & Scaffold Technology is made to enter a new stage;As China is built
The development in an all-round way of industry, various template support frame bodies are popularized in construction, wherein fastener type steel pipe scaffold, gate-type foot hand
Frame and a collection of disk button emerged in recent years and bowl formula scaffold are applied the most extensive.
Fastener type steel pipe scaffold is the foot that vertically and horizontally steel pipe is stitched together using the snapping connector of bolt fastening
Hand cradle;Fastener type steel pipe scaffold embody in the construction process be convenient to mount and dismount, strong applicability the advantages that, be widely used engineering
In practice;But still have that fastener is easy to be lost, the quality of connection fastener sole mass of fastener node and the influence of operation are shown
The defects of work;Meanwhile the safety of such scaffold is relatively low, the accident frequency that related fastener type steel pipe scaffold collapses has generation.
Door-type scaffold is to form base with door frame, cross support, pitman, hung and buckled scaffold board or level frame, hammerlock etc.
This structure, then horizontal reinforcing bar, bridging, bar of sweeping the floor, sealing bar, bracket and pedestal are set, and use wall-connecting piece and building
A kind of standardization steel pipe scaffold that agent structure is connected;Door-type scaffold is rational in infrastructure, and stress performance is good, can make full use of steel
Material intensity, bearing capacity are high;But frame size is without any flexibility, and expensive, economy is not high.
Disk buckle type scaffold and total sub-semigroup have been widely applied to reality in recent years as novel scaffold
In engineering, compared to traditional design of coupler scaffold and door-type scaffold, connection mode is novel reliable, and it is fast that speed is torn in spelling open, also
Can the scaffold of plurality of specifications be built according to different actual needs;But it is faced with architectural industrialization and high artificial
Take, for such scaffold there are still scantling standardization level is relatively low, it is larger that scantling is limited serious and component quality
The problems such as.
Invention content
In order to overcome drawbacks described above, the present invention provides a kind of adjustable steel tube scaffold, which can be according to reality
Use demand changes size, greatly improves the applicability of scaffold.
The present invention in order to solve its technical problem used by technical solution be:
A kind of adjustable steel tube scaffold, including several upright bars and several cross bars, the upright bar is by several upright bars
Unit piece forms, and the cross bar is made of several cross-bar unit parts, and each upright bar unit piece includes upper half bar and and upper half
The lower half bar that bar is fixedly connected, the lower half bar can just be seated in upper half bar, and the upper and lower ends of the upper half bar respectively cover
If a disk is buckled, the disk is buckled equipped with equally distributed multiple mounting holes, and each cross-bar unit part includes the first of grafting successively
Side pole, intermediate bar and the second side pole, the intermediate bar include at least a connecting rod, the connecting rod include the first linkage section with
And the second linkage section being fixedly connected with the first linkage section, one end of first side pole are fixedly connected with screw rod, the other end is for the
One linkage section is inserted into, and first linkage section is just seated in the first side pole, second side pole include inserting paragraph and with
The fixed section that inserting paragraph is fixedly connected, end of the fixed section far from inserting paragraph are fixedly connected with screw rod, and the inserting paragraph is just
It being seated when the second linkage section, installation, the screw rod at cross-bar unit part both ends is inserted into after the mounting hole that disk is buckled through nut check, from
And cross-bar unit part is fixedly connected with upright bar unit piece.
Preferably, the mounting hole includes the first mounting hole, and the disk is buckled to be buckled for annular disk, along peripheral direction equably
If there are four the first mounting hole, first mounting hole is circular through hole.
Preferably, the mounting hole further includes the second mounting hole, and one second peace is equipped between two neighboring first mounting hole
Hole is filled, second mounting hole is arc-shaped through-hole.
Preferably, the upright bar unit piece is round steel pipe, and the upper half bar and lower half bar in the upright bar unit piece are one
The length of body formed part and the two is identical, and the internal diameter of upper half bar is slightly larger than the outer diameter of lower half bar.
Preferably, the length of the upper half bar and lower half bar is 300mm.
Preferably, the first side pole, connecting rod and the second side pole in the cross-bar unit part be all for round steel pipe, and described the
The inside of one side pole is equipped with internal thread, and the screw rod is fitted vertically in one end of the first side pole, and the connecting rod is integrated into
Type part and the equal length of the first linkage section and the second linkage section, the outside of the first linkage section are equipped with external screw thread, the second linkage section
Inside is equipped with internal thread, is equipped with external screw thread on the outside of the insertion end of second side pole, first side pole is led to the first linkage section
It crosses internal and external screw thread to be spirally connected fixation, the second linkage section of the insertion end or a connecting rod of second linkage section and the second side pole
It is spirally connected fixation by internal and external screw thread with the first linkage section of another connecting rod.
Preferably, the inserting paragraph of second side pole and fixed section are integrally formed the equal length of part and the two, described
The outer diameter of insertion end is slightly less than the internal diameter of fixed section, and the screw rod is fitted vertically one end far from inserting paragraph in fixed section, institute
The outer diameter for stating inserting paragraph and the first linkage section is equal, and the internal diameter of the fixed section and the second linkage section is equal.
Preferably, the length that the length of first side pole is 300mm, the length of connecting rod is 600mm and the second side pole
For 600mm.
Preferably, counterbracing is further included, each fixed screw rod in both ends of the counterbracing, during installation, both ends
Screw rod is inserted into after the mounting hole that disk is buckled respectively through nut check, so as to which counterbracing be fixedly connected with upright bar unit piece.
Preferably, the counterbracing there are two arranged crosswise is set between two neighboring upright bar.
The beneficial effects of the invention are as follows:The upright bar that the present invention is mutually parallel by several and the cross bar that several are mutually parallel
Composition, upright bar are mutually inserted by several upright bar unit pieces, and cross bar is mutually overlapped by several cross-bar unit parts, are stood
It is fixedly connected between bar unit part and cross-bar unit part by screw rod with nut, it when mounted, can according to actual needs arbitrarily
Ground increase or decrease upright bar unit piece, connecting rod in cross-bar unit part quantity, and arbitrarily adjust entire scaffold length,
The size of width and short transverse, so as to improve the practicability of scaffold;The size of cross-bar unit part and upright bar unit piece compared with
It is small, lighter weight, and also the size of minimum component is satisfied by the requirement of building module, while in use by directly inserting
It connects and carries out assisting installation can be completed, therefore alleviate the working strength of worker assembles without external any attachment, carry
The high working efficiency of assembling.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the enlarged drawing at A in Fig. 1;
Fig. 3 is the structure diagram of the neutral bar unit part of the present invention;
Fig. 4 is the structure diagram that the neutral bar unit part disk of the present invention is buckled;
Fig. 5 is the structure diagram of cross-bar unit part in the present invention;
Fig. 6 is the explosive view of cross-bar unit part in the present invention;
Fig. 7 is upright bar in the present invention and the structure diagram before cross bar assembling;
Fig. 8 is upright bar in the present invention and the structure diagram after cross bar assembling;
In figure:10- upright bar unit pieces, 11- upper half bars, 12- lower half bars, 13- disks are buckled, the first mounting holes of 14-, 15- second
Mounting hole, 20- cross-bar unit parts, the first side poles of 21-, 22- connecting rods, the second side poles of 23-, 24- screw rods, 25- nuts, 30- are handed over
Pitch diagonal brace.
Specific embodiment
Below in conjunction with the embodiment of the present invention, the technical solution in the embodiment of the present invention is clearly and completely described,
Obviously, described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.Based in the present invention
Embodiment, those of ordinary skill in the art's all other embodiments obtained without making creative work, all
Belong to the scope of protection of the invention.
Embodiment:As shown in figures 1-8, a kind of adjustable steel tube scaffold, including several upright bars and several cross bars, institute
It states upright bar to be made of several upright bar unit pieces 10, the cross bar is made of several cross-bar unit parts 20, each upright bar unit
Part 10, which includes upper half bar 11 and the lower half bar 12 being fixedly connected with upper half bar, the lower half bar 12, can just be seated in upper half
In bar 11, the upper and lower ends of the upper half bar 11 are respectively arranged a disk and buckle 13, and the disk buckles 13 and is equipped with equally distributed multiple peaces
Hole is filled, each cross-bar unit part 20 includes the first side pole 21 of grafting, intermediate bar and the second side pole 23 successively, and the intermediate bar is extremely
Include a connecting rod 22, the second company that the connecting rod 22 includes the first linkage section and is fixedly connected with the first linkage section less
Section is connect, one end of first side pole 21 is fixedly connected with screw rod 24, and the other end is inserted into for the first linkage section, first linkage section
It is just seated in the first side pole, second side pole 23 includes inserting paragraph and the fixed section being fixedly connected with inserting paragraph, institute
It states end of the fixed section far from inserting paragraph and is fixedly connected with screw rod 24, the inserting paragraph is just seated when the second linkage section, installation,
The screw rod 24 at 20 both ends of cross-bar unit part is inserted into after disk buckles 13 mounting hole and is locked by nut 25, thus by cross-bar unit part 20
It is fixedly connected with upright bar unit piece 10.The upright bar that the present invention is mutually parallel by several and the cross bar group that several are mutually parallel
Into upright bar is buckled equipped with disk, in the mounting hole that cross bar is buckled by being fixedly arranged on the insertion disk of screw rod 24 at its both ends, and by nut lock
Tightly, being fixedly connected for cross bar and upright bar is realized, the upright bar is mutually inserted by several upright bar unit pieces 10, the horizontal stroke
Bar is mutually inserted by several cross-bar unit parts 20, can optionally increase or decrease upright bar unit piece, horizontal stroke as needed
The quantity of connecting rod 22 in bar unit part, therefore the size of entire scaffold can be adjusted arbitrarily, so as to improve scaffold
Practicability;The size of cross-bar unit part and upright bar unit piece is smaller, lighter weight, and the size of minimum component is satisfied by building
The requirement of modulus is built, while direct grafting carries out assisting that peace can be completed without external any attachment in installation process
Dress, therefore convenient for the assembling of worker, alleviate the working strength of worker assembles, improve the working efficiency of assembling.
As shown in Figure 1, counterbracing 30 is further included in the present invention, each fixed screw rod in both ends of the counterbracing 30
24, during installation, the screw rod 24 at both ends is inserted into respectively after disk buckles 13 mounting hole is locked by nut 25, so as to by counterbracing
30 are fixedly connected with upright bar unit piece 10, and the counterbracing 30 there are two arranged crosswise is set between two neighboring upright bar.It will intersect
Diagonal brace is obliquely connected between two upright bars, and both ends are equipped with terminal pad, and terminal pad forms about 135 ° of folder with counterbracing
Angle, two terminal pads are mutually parallel, and a screw rod 24 is vertically fixed in terminal pad, and counterbracing can not only play lateral support work
With, while the effect of going along with sb. to guard him is also acted as, improve the security performance of scaffold.
As shown in Figure 3 and Figure 4, the upright bar unit piece 10 is round steel pipe, the upper half bar 11 in the upright bar unit piece
With lower half bar 12 be integrally formed part and the two length it is identical, the internal diameter of upper half bar 11 is slightly larger than the outer diameter of lower half bar 12, this
Sample, when the upper half bar that the lower half bar of a upright bar unit piece is inserted into another upright bar unit piece, lower half bar is fully inserted to
Installation can be completed using its gravity, between very convenient and upright bar unit piece in the inside of half bar, and the two is seated cooperation
Bond strength it is high.The length of the upper half bar 11 and lower half bar 12 is 300mm.The total length of upright bar unit piece 10 is 600mm,
When two upright bar unit pieces are mutually inserted, the lower half bar of a upright bar unit piece is fully inserted into the upper half of another upright bar unit piece
Bar, that is, often increase a upright bar unit piece, the length of upright bar is increased by 300mm, meets the modulus requirement in building height direction,
The radical of suitable upright bar unit piece can be selected as needed.The mounting hole includes the first mounting hole 14, and the disk buckles 13
For annular disk button, four the first mounting holes 14 are evenly provided with along peripheral direction, first mounting hole 14 is circular through hole,
The mounting hole further includes the second mounting hole 15, is equipped with one second mounting hole 15 between two neighboring first mounting hole, and described the
Two mounting holes 15 are arc-shaped through-hole.Under normal conditions, the screw rod 24 at 20 both ends of cross-bar unit part is inserted into the first mounting hole 14
, if building is odd-shaped cross section, screw rod 24 can be inserted into the second mounting hole i.e. arc-shaped through-hole, utilize the arc of through-hole
Structure adjusts the setting angle between cross bar and upright bar, so as to adjust the angle of scaffold to meet the need of special-shaped building
It asks.
As shown in Figure 5 and Figure 6, the first side pole 21 in the cross-bar unit part 20,22 and second side pole 23 of connecting rod be all
For round steel pipe, the inside of first side pole 21 is equipped with internal thread, and the screw rod 24 is fitted vertically in the first side pole 21
One end, the connecting rod 22 are integrally formed part and the equal length of the first linkage section and the second linkage section, the first linkage section
Outside is equipped with external screw thread, and internal thread is equipped on the inside of the second linkage section, external screw thread is equipped on the outside of the insertion end of second side pole 23,
First side pole, 21 and first linkage section is spirally connected fixation by internal and external screw thread, and second linkage section and the second side pole are inserted
Enter end or the second linkage section of a connecting rod and the first linkage section of another connecting rod to be spirally connected fixation by internal and external screw thread.It is horizontal
The minimum length of bar unit part 20 for successively by 21, connecting rods 22 of first side pole and 23 grafting of the second side pole and
Into, will be first by multiple 22 phase interfix of connecting rod by increasing the number of connecting rod when the length of cross-bar unit part to be increased
Intermediate bar is formed after connecing, then assembles to form cross-bar unit part by the first side pole, intermediate bar and the second side pole.The second end
The inserting paragraph and fixed section of bar 23 are integrally formed the equal length of part and the two, and the outer diameter of the insertion end is slightly less than fixed section
Internal diameter, the screw rod 24 is fitted vertically one end far from inserting paragraph in fixed section, the inserting paragraph and the first linkage section
Outer diameter is equal, and the internal diameter of the fixed section and the second linkage section is equal.The length of first side pole 21 is 300mm, connecting rod
22 length is 600mm and the length of the second side pole 23 is 600mm.Cross-bar unit part 20 divides for lateral cross-bar unit part and longitudinal direction
Cross-bar unit part, longitudinal cross-bar unit part are mutually inserted by first side pole, two connecting rods and second side pole,
Lateral cross-bar unit part forms intermediate bar and a second side pole phase by the connecting rod of first side pole, three or three or more
Mutual grafting forms, and can select the radical of connecting rod as needed so as to form the different lateral cross-bar unit part of length, often increase
Add a connecting rod, the length of cross bar is increased by 300mm, meets the modulus requirement of building width direction.
The installation process of the present invention:An as shown in Figure 1, part (in scaffold frame body of the present embodiment for scaffold frame body
Interbed), in the structure of cuboid:A height of 3m, width 1.2m, a length of 3.6m combine shape by upright bar, counterbracing 30 and cross bar
Into by being mutually inserted to form upright bar by multiple upright bar unit pieces 10, lower half bar 12 is directly inserted into upper half bar 11 during grafting
In both can, the height of each layer of scaffold is 3m in the present embodiment, i.e. each layer of scaffold is mutual by 10 upright bar unit pieces 10
Grafting forms;Cross bar is made of cross-bar unit part 20, and cross-bar unit part 20 divides for lateral cross-bar unit part and longitudinal cross-bar unit
Part, longitudinal cross-bar unit part are mutually spirally connected by 21, two connecting rods 22 of first side pole and second side pole 23, i.e.,
The width of this scaffold is 1.2m, and lateral cross-bar unit part is by 21, four connecting rods 22 of first side pole and a second end
Bar 23 is mutually spirally connected, i.e., each lateral cross-bar unit part length is 1.8m, and the length of this scaffold is the multiple of 1.8m;Often
One layer of cross-bar unit part is equipped with every the height of 1.5m, during installation, the both ends screw rod 24 of cross-bar unit part 20 is inserted into upright bar respectively
(when building is polymorphic structure, screw rod can be inserted into the second mounting hole 15, led in the first mounting hole 14 that unit piece disk is buckled
The arcuate structure of the second mounting hole is crossed to adjust the setting angle between cross-bar unit part and upright bar unit piece so that entire foot hand
The angle of frame meets the demand of special-shaped building), then locked by nut 25, and cross-bar unit part and upright bar unit piece are consolidated
Fixed connection, and counterbracing 30 is installed between upper and lower two lateral cross-bar unit parts, by the both ends screw rod 24 of counterbracing 30
It is inserted into the first mounting hole 14 for buckleing of upright bar unit piece disk respectively, then by nut check, and by counterbracing 30 and upright bar
Unit piece is fixedly connected, and two counterbracings are arranged in a crossed manner, forms " X " font, so as to play lateral support to scaffold and enclose
The effect of shield improves the security performance of scaffold, and the present invention is easy for installation, easy to disassemble and transports, and use scope is wide.
It should be pointed out that for those of ordinary skill in the art, without departing from the inventive concept of the premise, may be used also
To make several modifications and improvements, these belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with
Subject to appended claims.
Claims (10)
1. a kind of adjustable steel tube scaffold, it is characterised in that:Including several upright bars and several cross bars, if the upright bar by
Dry upright bar unit piece (10) composition, the cross bar are made of several cross-bar unit parts (20), each upright bar unit piece (10)
Including upper half bar (11) and the lower half bar (12) being fixedly connected with upper half bar, the lower half bar (12) can just be seated in upper
In half bar (11), the upper and lower ends of the upper half bar (11) are respectively arranged a disk and buckle (13), and the disk, which is buckled (13) and is equipped with, uniformly to be divided
Multiple mounting holes of cloth, first side pole (21), intermediate bar and second side pole of each cross-bar unit part (20) including grafting successively
(23), the intermediate bar includes at least a connecting rod (22), and the connecting rod (22) is including the first linkage section and with first
The second linkage section that linkage section is fixedly connected, one end of first side pole (21) are fixedly connected with screw rod (24), and the other end is for the
One linkage section is inserted into, and first linkage section is just seated in the first side pole, second side pole (23) including inserting paragraph with
And the fixed section being fixedly connected with inserting paragraph, end of the fixed section far from inserting paragraph is fixedly connected with screw rod (24), described to insert
Enter section to be just seated when the second linkage section, installation, the screw rod (24) at cross-bar unit part (20) both ends is inserted into the peace that disk buckles (13)
It is locked after filling hole by nut (25), so as to which cross-bar unit part (20) be fixedly connected with upright bar unit piece (10).
2. adjustable steel tube scaffold according to claim 1, it is characterised in that:The mounting hole includes the first mounting hole
(14), the disk is buckled (13) and is buckled for annular disk, and four the first mounting holes (14) are evenly provided with along peripheral direction, and described first
Mounting hole (14) is circular through hole.
3. adjustable steel tube scaffold according to claim 2, it is characterised in that:The mounting hole further includes the second installation
Hole (15), one second mounting hole (15) is equipped between two neighboring first mounting hole, and second mounting hole (15) is led to for arc
Hole.
4. adjustable steel tube scaffold according to claim 1, it is characterised in that:The upright bar unit piece (10) is circle
Steel pipe, upper half bar (11) in the upright bar unit piece and lower half bar (12) be integrally formed part and the two length it is identical, on
The internal diameter of half bar (11) is slightly larger than the outer diameter of lower half bar (12).
5. adjustable steel tube scaffold according to claim 4, it is characterised in that:The upper half bar (11) and lower half bar
(12) length is 300mm.
6. adjustable steel tube scaffold according to claim 1, it is characterised in that:In the cross-bar unit part (20)
One side pole (21), connecting rod (22) and the second side pole (23) are all round steel pipe, and the inside of first side pole (21) is equipped with interior
Screw thread, the screw rod (24) are fitted vertically in one end of the first side pole (21), the connecting rod (22) be integrally formed part and
The equal length of first linkage section and the second linkage section, the outside of the first linkage section are equipped with external screw thread, are set on the inside of the second linkage section
There is internal thread, external screw thread, first side pole (21) and the first linkage section are equipped on the outside of the insertion end of second side pole (23)
It is spirally connected fixation by internal and external screw thread, second linkage section is connect with the insertion end of the second side pole or the second of a connecting rod
Section and the first linkage section of another connecting rod are spirally connected fixation by internal and external screw thread.
7. adjustable steel tube scaffold according to claim 6, it is characterised in that:The inserting paragraph of second side pole (23)
The equal length of part and the two of being integrally formed with fixed section, the outer diameter of the insertion end is slightly less than the internal diameter of fixed section, described
Screw rod (24) is fitted vertically one end far from inserting paragraph in fixed section, and the outer diameter of the inserting paragraph and the first linkage section is equal,
The internal diameter of the fixed section and the second linkage section is equal.
8. adjustable steel tube scaffold according to claim 7, it is characterised in that:The length of first side pole (21) is
300mm, connecting rod (22) length be 600mm and the length of the second side pole (23) is 600mm.
9. adjustable steel tube scaffold according to claim 1, it is characterised in that:Counterbracing (30) is further included, it is described
Each fixed screw rod (24) in both ends of counterbracing (30), during installation, the screw rod (24) at both ends is inserted into disk and buckles (13) respectively
It is locked after mounting hole by nut (25), so as to which counterbracing (30) be fixedly connected with upright bar unit piece (10).
10. adjustable steel tube scaffold according to claim 9, it is characterised in that:Two are equipped between two neighboring upright bar
The counterbracing (30) of a arranged crosswise.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810037937.4A CN108149909A (en) | 2018-01-16 | 2018-01-16 | Adjustable steel tube scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810037937.4A CN108149909A (en) | 2018-01-16 | 2018-01-16 | Adjustable steel tube scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108149909A true CN108149909A (en) | 2018-06-12 |
Family
ID=62461436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810037937.4A Pending CN108149909A (en) | 2018-01-16 | 2018-01-16 | Adjustable steel tube scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108149909A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152867A (en) * | 2021-04-16 | 2021-07-23 | 浙江维安建筑支护科技有限公司 | Assembled scaffold |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2095358A (en) * | 1981-03-25 | 1982-09-29 | Duggan John Joseph | Scaffolding joints |
EP2390439A2 (en) * | 2010-05-26 | 2011-11-30 | Johannes Weiss | Module frame with rigid adjoining tubular cross bar connections |
CN105317208A (en) * | 2014-07-18 | 2016-02-10 | 湖南金峰金属构件有限公司 | Angle-adjustable socket and spigot type key groove type scaffold steel pipe |
CN205476424U (en) * | 2016-02-05 | 2016-08-17 | 肖佳 | Cordwood system scaffold |
CN207863419U (en) * | 2018-01-16 | 2018-09-14 | 苏州中材建设有限公司 | Adjustable steel tube scaffold |
-
2018
- 2018-01-16 CN CN201810037937.4A patent/CN108149909A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2095358A (en) * | 1981-03-25 | 1982-09-29 | Duggan John Joseph | Scaffolding joints |
EP2390439A2 (en) * | 2010-05-26 | 2011-11-30 | Johannes Weiss | Module frame with rigid adjoining tubular cross bar connections |
CN105317208A (en) * | 2014-07-18 | 2016-02-10 | 湖南金峰金属构件有限公司 | Angle-adjustable socket and spigot type key groove type scaffold steel pipe |
CN205476424U (en) * | 2016-02-05 | 2016-08-17 | 肖佳 | Cordwood system scaffold |
CN207863419U (en) * | 2018-01-16 | 2018-09-14 | 苏州中材建设有限公司 | Adjustable steel tube scaffold |
Non-Patent Citations (1)
Title |
---|
刘希月;杨建军;王元清;: "门式钢管脚手架稳定承载力影响因素分析", 建筑科学, no. 05 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152867A (en) * | 2021-04-16 | 2021-07-23 | 浙江维安建筑支护科技有限公司 | Assembled scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207863419U (en) | Adjustable steel tube scaffold | |
CN108149909A (en) | Adjustable steel tube scaffold | |
CN105649213B (en) | A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting | |
CN208242365U (en) | A kind of vegetable cultivation auxiliary stand | |
CN207513125U (en) | Self assembling type steel pipe scaffold | |
CN206621772U (en) | A kind of dance training barre | |
CN206440447U (en) | A kind of universal shake table battery fixing tool | |
CN110397317A (en) | Frame thin wall-type concrete cooling tower shell and its method of construction | |
CN210636781U (en) | Hanging flower basket of safety support for building | |
CN209509454U (en) | The outer protective frame of out-hung panel | |
CN208168147U (en) | A kind of prefabrication type building structure column | |
CN207620433U (en) | A kind of suspension type riding track mounting structure based on central tube | |
CN108575544A (en) | A kind of Anti-Typhoon tree fixed mount | |
CN211273322U (en) | Diving platform springboard supporting steel frame structure | |
CN216042477U (en) | Scaffold | |
CN110306689A (en) | A kind of light steel room window skeleton | |
CN217925216U (en) | Novel enclosure net for sports ground | |
CN219138554U (en) | Reinforced iron tower structure | |
CN210217103U (en) | Climb frame and use protection network connection structure | |
CN111114972A (en) | Raw materials rack for feed processing convenient to get material and have function of weighing | |
CN211114943U (en) | A high outer wall protector of security for construction | |
CN210767928U (en) | Protection mechanism of safety protection platform | |
CN207988476U (en) | A kind of scaffold hanging ladder | |
CN217602028U (en) | Reinforced connection structure of overhanging scaffold | |
CN217232909U (en) | Dustproof shed of construction site outdoor construction raise dust treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |