CN108149651B - 一种旋流阻塞与扩散复合消能工的设计方法 - Google Patents
一种旋流阻塞与扩散复合消能工的设计方法 Download PDFInfo
- Publication number
- CN108149651B CN108149651B CN201711390476.0A CN201711390476A CN108149651B CN 108149651 B CN108149651 B CN 108149651B CN 201711390476 A CN201711390476 A CN 201711390476A CN 108149651 B CN108149651 B CN 108149651B
- Authority
- CN
- China
- Prior art keywords
- blocking
- orifice
- rotational flow
- flow
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/06—Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Hydraulic Turbines (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
本发明公开了一种旋流阻塞与扩散复合消能工的设计方法,旋流阻塞设置在水平旋流泄洪洞内的旋流洞末端,为旋流洞与下游退水洞的连接段,由阻塞收缩段、均匀段和扩散段组成,进入旋流洞的起旋器喉口平均流速应不大于35m/s,旋流阻塞孔口水流空化数应大于0.3,阻塞收缩段与均匀段连接形式为渐缩式,渐缩段与水平所成倾斜角的取值范围为:0°<α<20°,扩散段与下游退水洞连接方式为渐扩式,扩散段与水平所成倾斜角的取值范围为:0°<β<15°,本发明解决了现有技术中存在的常规的水平旋流泄洪洞极易发生空化空蚀破坏的问题。
Description
技术领域
本发明属于水利水电工程泄洪消能技术领域,具体涉及一种旋流阻塞与扩散复合消能工的设计方法。
背景技术
水平旋流泄洪洞作为一种常规的消能工,具有进口布置设计灵活、消能率高、出口流速低,出口雾化和下游河道冲刷轻等特点,应用于国外前苏联罗贡水电站和印度特立水电站,并在国内首次成功应用于公伯峡水电站。但通过大量研究表明,当作用水头超过100m时,旋流洞内流速可能将超过40m/s,极易引发旋流洞内的空化空蚀,严重威胁旋流泄洪洞的运行安全。为解决上述问题,发明者提出了在旋流洞段末端设置旋流阻塞与扩散复合消能工的设计方法的水平旋流复合内消能方式。设置阻塞可显著增大旋流洞内壁面压强,对竖井与起旋器喉口的有压出流形成顶托,减小洞内流速,从而有效改善水流空化空蚀条件。阻塞可增大水流旋转角,增加水流旋转流程,增加旋流洞的沿程水头损失,因而可大幅提高消能率,使其在高水头泄洪时具有广阔的应用前景。
但是目前在公开的文献和现行规范中尚没有这种旋流阻塞与扩散复合消能工的设计方法的设计方法。
发明内容
本发明的目的是提供一种旋流阻塞与扩散复合消能工的设计方法,解决了现有技术中存在的常规的水平旋流泄洪洞极易发生空化空蚀破坏的问题。
本发明所采用的技术方案是,一种旋流阻塞与扩散复合消能工的设计方法,旋流阻塞设置在水平旋流泄洪洞内的旋流洞末端,为旋流洞与下游退水洞的连接段,由阻塞收缩段、均匀段和扩散段组成。
本发明的特点还在于,
进入旋流洞的起旋器喉口平均流速应不大于35m/s,旋流阻塞孔口水流空化数应大于0.3,计算公式如下:
σ=(p3+pa-pv)/0.5ρv2>0.3 (2)
阻塞收缩段与均匀段连接形式为渐缩式,渐缩段与水平所成倾斜角的取值范围为:0°<α<20°,扩散段与下游退水洞连接方式为渐扩式,扩散段与水平所成倾斜角的取值范围为:0°<β<15°。
起旋器喉口压强系数Cp1与旋流阻塞孔口前壁面压强系数Cp2之间的关系Cp1=0.41Cp2 3/2+1.25、旋流阻塞孔口空腔半径比值r03/r02与旋流阻塞孔口压强比值p2/p3之间的关系p2/p3=-1.12r03 2/r02 2+2.08、旋流阻塞孔口空腔半径相对比值(r02/R2)/(r03/R3)与旋流阻塞孔口傅汝德数Fr03之间的关系为(r02/R2)/(r03/R3)=0.0001Fr03,共同确定进而得到阻塞孔口半径的。
阻塞收缩段的长度的取值范围为旋流洞径的1.5~2倍,即:1.5D<L1<2D,均匀段长度为阻塞洞径的2~2.5倍,即:2R3<L2<2.5R3,扩散段的长度为阻塞洞径的3.5~4.5倍,即:3.5R3<L3<4.5R3。
本发明的有益效果是,一种旋流阻塞与扩散复合消能工的设计方法,为保证水平旋流洞内不发生空蚀空化、不出现高速水流问题等运行安全的前提条件下,通过建立的旋流阻塞几何尺寸与起旋器喉口压强、旋流阻塞孔口压强以及旋流阻塞孔口空腔半径之间的关系,进而确定旋流阻塞的体型与几何尺寸,进入旋流洞的起旋器喉口平均流速应不大于35m/s,旋流阻塞孔口水流空化数应大于0.3。
附图说明
图1是本发明一种旋流阻塞与扩散复合消能工的设计方法水平旋流泄洪洞体型布置示意图;
图2是本发明一种旋流阻塞与扩散复合消能工的设计方法中Cp1与Cp2 1.5的关系图;
图3是本发明一种旋流阻塞与扩散复合消能工的设计方法中r03/r02与p2/p3的关系图;
图4是本发明一种旋流阻塞与扩散复合消能工的设计方法中Fr03与(r02/R2)/(r03/R3)的关系图。
具体实施方式
下面结合附图和具体实施方式对本发明进行详细说明。
本发明一种旋流阻塞与扩散复合消能工的设计方法,如图1所示,旋流阻塞设置在水平旋流泄洪洞内的旋流洞末端,为旋流洞与下游退水洞的连接段,由阻塞收缩段、均匀段和扩散段组成。
进入旋流洞的起旋器喉口平均流速应不大于35m/s,旋流阻塞孔口水流空化数应大于0.3,计算公式如下:
σ=(p3+pa-pv)/0.5ρv2>0.3 (2)
阻塞收缩段与均匀段连接形式为渐缩式,渐缩段与水平所成倾斜角的取值范围为:0°<α<20°,扩散段与下游退水洞连接方式为渐扩式,扩散段与水平所成倾斜角的取值范围为:0°<β<15°。
起旋器喉口压强系数Cp1与旋流阻塞孔口前壁面压强系数Cp2之间的关系Cp1=0.41Cp2 3/2+1.25、旋流阻塞孔口空腔半径比值r03/r02与旋流阻塞孔口压强比值p2/p3之间的关系p2/p3=-1.12r03 2/r02 2+2.08、旋流阻塞孔口空腔半径相对比值(r02/R2)/(r03/R3)与旋流阻塞孔口傅汝德数Fr03之间的关系(r02/R2)/(r03/R3)=0.0001Fr03,共同确定进而得到阻塞孔口半径的。
阻塞收缩段的长度的取值范围为旋流洞径的1.5~2倍,即:1.5D<L1<2D,均匀段长度为阻塞洞径的2~2.5倍,即:2R3<L2<2.5R3,扩散段的长度为阻塞洞径的3.5~4.5倍,即:3.5R3<L3<4.5R3。
具体设计过程如下:
设计条件:作用水头为H=137.07m,设计流量为Q=1470m3/s,水平旋流洞洞径D=14m。假定一个旋流阻塞孔口的净过流面积A03=π(R3 2-r03 2)=22m2,由公式(1)用于确定起旋器孔口壁面压强值p1:
p1=0.747ρgH=1003.47kpa
依据试验资料得到起旋器喉口压强系数Cp1与旋流阻塞孔口前壁面压强系数Cp2的关系曲线如图2所示,拟合公式如公式(3),此关系用于确定旋流阻塞孔口前壁面压强值p2:
Cp1=0.41Cp2 3/2+1.25 (3)
其中,Cp1=1.64,Cp2=0.096,p2=592.41kpa;
Cp1=p1/0.5ρv1 2,Cp2=p2/0.5ρv2 2,v1为起旋器喉口的平均流速,v2为旋流阻塞孔口的平均流速;
公式(2)用于确定旋流阻塞孔口的壁面压强p3:
选取值温度为15度,一个大气压时值为pv=1.71kpa
p3=0.3*0.5ρv2+pv-pa=574kpa
旋流阻塞孔口空腔半径比值r03/r02与旋流阻塞孔口壁面压强比值p2/p3的关系如图3所示,拟合公式如公式(4),此关系用于确定旋流阻塞孔口空腔半径的比值r03/r02:
p2/p3=-1.12r03 2/r02 2+2.08 (4)
r03/r02=0.96
旋流阻塞孔口空腔半径相对比值r03/r02与旋流阻塞孔口傅汝德数Fr03的关系如图4所示,拟合公式见公式(5),此关系用于确定旋流阻塞孔口半径R3和旋流阻塞净过流面积A03:
r02/R2=r03/R3=0.92 (5)
其中,r02=0.91*R2=6.44m,r03=0.96*r02=6.18m,R3=r02/0.92=6.71m,
A03设=π(R3 2-r03 2)=21.76m2
旋流阻塞孔口的净过流面积设计值与假定值进行对比:
A03=22m2=A03设=21.76m2
通过试算法直至旋流阻塞净过流面积的设计值与假定值一致,即确定旋流阻塞的半径为6.7m,旋流阻塞渐缩段的长度为旋流洞径的2倍左右,即为28m,阻塞均匀段长度取阻塞洞径的2.5倍,即为16.75m,扩散段的长度取阻塞洞径的4.5倍,即为30.15m。
Claims (4)
2.根据权利要求1所述的一种旋流阻塞与扩散复合消能工的设计方法,其特征在于,所述阻塞收缩段与均匀段连接形式为渐缩式,渐缩段与水平所成倾斜角的取值范围为:0°<α<20°,扩散段与下游退水洞连接方式为渐扩式,扩散段与水平所成倾斜角的取值范围为:0°<β<15°。
3.根据权利要求1所述的一种旋流阻塞与扩散复合消能工的设计方法,其特征在于,起旋器喉口压强系数Cp1与旋流阻塞孔口前壁面压强系数Cp2之间的关系为Cp1=0.41Cp2 3/2+1.25、旋流阻塞孔口空腔半径比值r03/r02与旋流阻塞孔口压强比值p2/p3之间的关系p2/p3=-1.12r03 2/r02 2+2.08、旋流阻塞孔口空腔半径相对比值(r02/R2)/(r03/R3)与旋流阻塞孔口傅汝德数Fr03之间的关系为(r02/R2)/(r03/R3)=0.0001Fr03,共同确定进而得到阻塞孔口半径,具体设计过程如下:
设计条件:作用水头为H=137.07m,设计流量为Q=1470m3/s,水平旋流洞洞径D=14m,假定一个旋流阻塞孔口的净过流面积A03=π(R3 2-r03 2)=22m2,由公式(1)用于确定起旋器孔口壁面压强值p1:
p1=0.747ρgH=1003.47kpa
依据试验资料得到起旋器喉口压强系数Cp1与旋流阻塞孔口前壁面压强系数Cp2的关系曲线,拟合公式如公式(3),此关系用于确定旋流阻塞孔口前壁面压强值p2:
Cp1=0.41Cp2 3/2+1.25 (3)
其中,Cp1=1.64,Cp2=0.096,p2=592.41kpa;
Cp1=p1/0.5ρv1 2,Cp2=p2/0.5ρv2 2,v1为起旋器喉口的平均流速,v2为旋流阻塞孔口的平均流速;
公式(2)用于确定旋流阻塞孔口的壁面压强p3:
选取值温度为15度,一个大气压时值为pv=1.71kpa
p3=0.3*0.5ρv2+pv-pa=574kpa
旋流阻塞孔口空腔半径比值r03/r02与旋流阻塞孔口壁面压强比值p2/p3的关系拟合公式如公式(4),此关系用于确定旋流阻塞孔口空腔半径的比值r03/r02:
p2/p3=-1.12r03 2/r02 2+2.08 (4)
r03/r02=0.96
旋流阻塞孔口空腔半径相对比值r03/r02与旋流阻塞孔口傅汝德数Fr03的关系拟合公式见公式(5),此关系用于确定旋流阻塞孔口半径R3和旋流阻塞净过流面积A03:
r02/R2=r03/R3=0.92 (5)
其中,r02=0.91*R2=6.44m,r03=0.96*r02=6.18m,R3=r02/0.92=6.71m,
A03设=π(R3 2-r03 2)=21.76m2
旋流阻塞孔口的净过流面积设计值与假定值进行对比:
A03=22m2=A03设=21.76m2
通过试算法直至旋流阻塞净过流面积的设计值与假定值一致,即确定旋流阻塞的半径为6.7m。
4.根据权利要求1所述的一种旋流阻塞与扩散复合消能工的设计方法,其特征在于,所述阻塞收缩段的长度的取值范围为旋流洞径的1.5~2倍,即:1.5D<L1<2D,均匀段长度为阻塞洞径的2~2.5倍,即:2R3<L2<2.5R3,扩散段的长度为阻塞洞径的3.5~4.5倍,即:3.5R3<L3<4.5R3。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711390476.0A CN108149651B (zh) | 2017-12-21 | 2017-12-21 | 一种旋流阻塞与扩散复合消能工的设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711390476.0A CN108149651B (zh) | 2017-12-21 | 2017-12-21 | 一种旋流阻塞与扩散复合消能工的设计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108149651A CN108149651A (zh) | 2018-06-12 |
CN108149651B true CN108149651B (zh) | 2020-03-31 |
Family
ID=62464078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711390476.0A Expired - Fee Related CN108149651B (zh) | 2017-12-21 | 2017-12-21 | 一种旋流阻塞与扩散复合消能工的设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108149651B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149651B (zh) * | 2017-12-21 | 2020-03-31 | 西安理工大学 | 一种旋流阻塞与扩散复合消能工的设计方法 |
CN111809580B (zh) * | 2020-07-31 | 2022-02-11 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种泄洪洞闸门后掺气防空蚀结构 |
CN113174911A (zh) * | 2021-05-07 | 2021-07-27 | 中国电建集团西北勘测设计研究院有限公司 | 一种提高水平旋流消能率的旋流洞结构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101148867A (zh) * | 2007-10-19 | 2008-03-26 | 中国水利水电科学研究院 | 一种采用旋流及强水气掺混消能的泄洪方法和泄洪洞 |
CN201214781Y (zh) * | 2008-06-06 | 2009-04-01 | 中国水电顾问集团西北勘测设计研究院 | 水平旋流消能泄洪洞 |
CN104762934A (zh) * | 2015-04-08 | 2015-07-08 | 中国水利水电科学研究院 | 导流洞改建水平旋流洞的起旋室与旋流洞过渡连接装置 |
CN108149651A (zh) * | 2017-12-21 | 2018-06-12 | 西安理工大学 | 一种旋流阻塞与扩散复合消能工的设计方法 |
-
2017
- 2017-12-21 CN CN201711390476.0A patent/CN108149651B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101148867A (zh) * | 2007-10-19 | 2008-03-26 | 中国水利水电科学研究院 | 一种采用旋流及强水气掺混消能的泄洪方法和泄洪洞 |
CN201214781Y (zh) * | 2008-06-06 | 2009-04-01 | 中国水电顾问集团西北勘测设计研究院 | 水平旋流消能泄洪洞 |
CN104762934A (zh) * | 2015-04-08 | 2015-07-08 | 中国水利水电科学研究院 | 导流洞改建水平旋流洞的起旋室与旋流洞过渡连接装置 |
CN108149651A (zh) * | 2017-12-21 | 2018-06-12 | 西安理工大学 | 一种旋流阻塞与扩散复合消能工的设计方法 |
Non-Patent Citations (1)
Title |
---|
泄洪洞内具有阻塞与扩散段的水平旋_省略_式水力特性的试验与数值模拟_1;李奇龙等;《水力发电学报》;20141031;第33卷(第5期);145-151 * |
Also Published As
Publication number | Publication date |
---|---|
CN108149651A (zh) | 2018-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108149651B (zh) | 一种旋流阻塞与扩散复合消能工的设计方法 | |
CN104309791B (zh) | 提高能量效率的船舶驱动系统的前喷嘴 | |
CN102704448B (zh) | 一种深孔旋流竖井泄洪洞和设计方法 | |
CN105155484B (zh) | 将临时导流洞改建为永久泄洪设施的方法 | |
CN109529738A (zh) | 一种旋流空化装置 | |
CN100392193C (zh) | 导流洞改建为有压突扩掺气泄洪洞的方法 | |
CN102619200B (zh) | 斜井式泄洪洞的侧壁掺气坎和出口潜水挑流坎的消能方法 | |
CN107237718A (zh) | 一种吸收潮汐能的多级叶轮转动装置 | |
CN101349047A (zh) | 泄洪洞内掺气型曲线阶梯消能工 | |
CN102767164A (zh) | 一种坝内双向进流旋流式竖井泄流消能设施 | |
CN202610774U (zh) | 一种深孔旋流竖井泄洪洞 | |
CN204418136U (zh) | 有压突扩突跌圆形射流消能工 | |
CN107964928A (zh) | 一种利用通水孔减免空蚀破坏的消力墩结构 | |
CN102369352A (zh) | 水电式涡轮机喷嘴和它们的关系 | |
CN111119139A (zh) | 一种旋流竖井式消能结构 | |
CN215758814U (zh) | 一种单边扩散与斜切挑坎结合的消能设施 | |
CN104762934A (zh) | 导流洞改建水平旋流洞的起旋室与旋流洞过渡连接装置 | |
CN113089603A (zh) | 一种竖井旋流泄洪洞 | |
CN106089546B (zh) | 一种用于潮流发电的导流和自动沉浮装置 | |
CN105714746B (zh) | 用于高水头泄洪洞中闸室的压坡式通风井 | |
CN205977512U (zh) | 一种用于潮流发电的导流和自动沉浮装置 | |
CN111577508A (zh) | 一种带有双进口式蜗壳的高比转速轴流式水轮机 | |
CN104594308B (zh) | 有压突扩突跌圆形射流消能工 | |
CN108035322B (zh) | 一种水平旋流泄洪洞起旋器体型设计方法 | |
CN112922764B (zh) | 一种高射流直径比冲击式水轮机及确定方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200331 Termination date: 20211221 |