CN108145379A - A kind of preparation method of high-stability large torque differential casing - Google Patents

A kind of preparation method of high-stability large torque differential casing Download PDF

Info

Publication number
CN108145379A
CN108145379A CN201711260222.7A CN201711260222A CN108145379A CN 108145379 A CN108145379 A CN 108145379A CN 201711260222 A CN201711260222 A CN 201711260222A CN 108145379 A CN108145379 A CN 108145379A
Authority
CN
China
Prior art keywords
product
hole
casting
workpiece
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711260222.7A
Other languages
Chinese (zh)
Other versions
CN108145379B (en
Inventor
俞飞翔
许志祥
马强
赖友羲
夏早春
夏冬明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Mingyuan Orion Hydrogen Energy Technology Co.,Ltd.
Original Assignee
HANGZHOU SITONG TRANSMISSION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU SITONG TRANSMISSION CO Ltd filed Critical HANGZHOU SITONG TRANSMISSION CO Ltd
Priority to CN201711260222.7A priority Critical patent/CN108145379B/en
Publication of CN108145379A publication Critical patent/CN108145379A/en
Application granted granted Critical
Publication of CN108145379B publication Critical patent/CN108145379B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16HGEARING
    • F16H48/00Differential gearings
    • F16H48/38Constructional details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat Treatment Of Articles (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

Preparation method more particularly to a kind of preparation method of high-stability large torque differential casing the present invention relates to a kind of differential casing.It carries out according to the following steps:Product structure → blank making → semi-finished product making → assembling → planet hole making → final inspection → purged and packed → storage.A kind of preparation method of high-stability large torque differential casing further promotes the quality of product, reduces enterprise's production cost.

Description

A kind of preparation method of high-stability large torque differential casing
Technical field
Preparation method more particularly to a kind of high-stability large torque differential carrier the present invention relates to a kind of differential casing The preparation method of body.
Background technology
Differential casing is auto parts machinery, and conventional preparation method can not meet the rigidity of product, deposit in use In certain safe mass.
Chinese patent 201410041273.0 discloses a kind of processing unit (plant) of the differential casing of field of automobile And its technique, risen vehicle clamper and setting by the rotary jig being set on machining center, the Inner being set on centre numerically controlled lathe In the vehicle spherical surface fixture composition on centre numerically controlled lathe, wherein:The rotary jig includes:Both ends are set by runner assembly In the operation part on machining center, wherein:The operation part includes:It is fixedly installed on clamping fixture seat positive and negative respectively Several hydraulic corner cylinders, operation console and the dowelled spanner being rotatably dispose on clamping fixture seat, wherein:It is positive every positioned at clamping fixture seat A operation console extension is evenly distributed with three hydraulic corner cylinders used for positioning, and the clamping fixture seat reverse side of corresponding each operation console sets that there are one use In the hydraulic corner cylinder of the material returned;The dowelled spanner face operation console;The Inner vehicle clampers that rise include:Axial force distribution part and Radial direction force-applying piece, wherein:The front end of radial direction force-applying piece is connected with being set to the mandrel to be fixed of numerically controlled lathe, and rear end is applied with axial One end of power part is connected, and the other end of axial force distribution part is connected with numerically controlled lathe fixed frame.This structure is filled by a processing It puts and adds a processing technology, this processing step is relative complex, and the cost is relatively high for manufacture, and properties of product are not relatively strong.
Invention content
The present invention mainly solves the deficiencies in the prior art, and it is scientific and reasonable to provide a kind of step operation, further Reduce a kind of preparation method of high-stability large torque differential casing of manufacture cost.
The above-mentioned technical problem of the present invention is mainly what is be addressed by following technical proposals:
A kind of preparation method of high-stability large torque differential casing, carries out according to the following steps:
(1), product structure:
This product is nodular iron casting, is divided into left and right two parts, respectively by sand casting one-pass molding, respectively will first be machined The two-part spherical in left and right and connecting portion process, and are then fixed two parts by bolt, time processing goes out planet Hole ensures the relative position degree between each hole and bearing guard;
(2), blank makes:
The blank of product is by casting and forming, and the material of selection is QT500-7, first by mold flow analysis, to casting Riser in journey, runner carry out simulation casting, so as to find that the possibility of casting flaw is also easy to produce in casting cycle, are adjusted and keep away Exempt from;
According to mold flow analysis come out as a result, design mould structure, increase Feeding channel, machine-shaping;It then will be by The molten iron of the proportioned 1300 ° of high temperature of QT500-7 elements is molded into mold cavity, is come out of the stove by the heat preservation of 3 hours, then carried out Every Metallographic Analysis and performance test, to confirm material qualification;
(3), semi-finished product make:
1st, left poor shell:
Temper is first carried out, statenchyma structure reduces material hardness, eliminates internal stress, and hardness is controlled in HB190 Between~HB210;Then upper numerically controlled lathe, clamps both ends, with 120m/min linear velocities, 280mm/min feed speeds make product Shape and inner cavity spherical surface preliminarily forming, for finish reserved margin 0.5mm;
Completion of processing, workpiece, which is placed in storing basket, to be retained 24 hours or more, to eliminate the plasticity that big surplus cutting is brought Deformation;
Digital control lathe chuck oil pressure pressure is adjusted to 6bar, reduces clamping deformation, smart car 1/2 is justified, and circularity is kept to exist Within 0.01mm, concentricity Φ 0.03mm, roughness Ra 1.6, while step seam allowance to the cooperation requirement of 0.02mm, is protected in smart car Demonstrate,prove flatness 0.03mm;
Then work in-process in the heart, with compound step drill with the rotating speed of 1800r/min, once will by the feeding of 420mm/min Thread Pilot hole and step machine-shaping, have not only been saved process time, but also ensure that the concentricity of holes simultaneously;Burr is cleared up, etc. It is to be assembled;
2nd, right poor shell:
Temper is first carried out, statenchyma structure reduces material hardness, eliminates internal stress, and hardness is controlled in HB190 Between~HB210;Then upper numerically controlled lathe, clamps both ends, with 120m/min linear velocities, 280mm/min feed speeds make product Shape and inner cavity spherical surface preliminarily forming, for finish reserved margin 0.5mm;
Completion of processing, workpiece, which is placed in storing basket, to be retained 24 hours or more, to eliminate the plasticity that big surplus cutting is brought Deformation;
Digital control lathe chuck oil pressure pressure is adjusted to 6bar, reduces clamping deformation, smart car 1/2 is justified, and circularity is kept to exist Within 0.01mm, concentricity Φ 0.03mm, roughness Ra 1.6, while the cooperation of smart car outer lug boss to 0.02mm require;Then exist On machining center, bored with high speed deep hole U with the rotating speed of 2400r/min, the feeding of 350mm/min, it, will by deep hole cyclic process Chip discharge in bolt hole comes, and ensure that the straightness and position degree in hole;Burr is cleared up, is waited to be assembled.
(4), it assembles:
Grinding process is carried out to semi-finished product, removes burrs on edges, flange clears up both sides faying face;Using 0.02mm clearance gauges It checks whether binding face is bonded closely, then with 12.9 grade high-strength bolt M8 × 100 of GB/T70.1 standards, penetrates screw hole, It is screwed in the torque of 42N.m, develops the fastening of bolt plane, on left and right difference shell designated position with laser marking machine by drawing Pairing identification code is stamped, in order to be used in dismounting pairing from now on;
(5), planet hole makes:
Product is cross axle construction, and product is placed on four revolving platforms, entire production is supported with dedicated tailstock centre Product prevent from dropping;Turntable with 90 ° of directions is rotated, processes planet hole successively, to ensure the straightness in planet hole 0.02mm and position degree, are detected using special gauge, and since the axial line in planet hole is just on the faying face of left and right difference shell, easily Drill bit deviation phenomenon is generated, influences straightness and position degree, therefore is bored with U with the cutting speed of 135m/min in processing, The amount of feeding of 300mm/min carries out drilling processing, is modified finishing with boring cutter later, to ensure the geometric tolerance needed;
(6), final inspection:
It is required according to product drawing, tested to the geometric dimension of product;
(7), purged and packed:
Assembly is disassembled, is put into special-purpose ultrasonic cleaning machine, passes through ultrasonic cleaning, cleaning rinsing, dried, oiled The cleannes standard of workpiece is controlled within 10 grades, workpiece then is packed cartonning by packing instructions by journey;
(8), it is put in storage:
The qualified products accompanying quality certification handles storage formality.
This product is conventional products, using scientific and reasonable operating procedure, promotes the quality of product, while reduces enterprise's life Produce cost.By the linkage of equipment and equipment technical parameters, effective Control platform.
Therefore, the preparation method of a kind of high-stability large torque differential casing of the invention further promotes product Quality reduces enterprise's production cost.
Specific embodiment
Below by embodiment, the technical solutions of the present invention will be further described.
Embodiment 1:A kind of preparation method of high-stability large torque differential casing, carries out according to the following steps:
(1), product structure:
This product is nodular iron casting, is divided into left and right two parts, respectively by sand casting one-pass molding, respectively will first be machined The two-part spherical in left and right and connecting portion process, and are then fixed two parts by bolt, time processing goes out planet Hole ensures the relative position degree between each hole and bearing guard;
(2), blank makes:
The blank of product is by casting and forming, and the material of selection is QT500-7, first by mold flow analysis, to casting Riser in journey, runner carry out simulation casting, so as to find that the possibility of casting flaw is also easy to produce in casting cycle, are adjusted and keep away Exempt from;
According to mold flow analysis come out as a result, design mould structure, increase Feeding channel, machine-shaping;It then will be by The molten iron of the proportioned 1300 ° of high temperature of QT500-7 elements is molded into mold cavity, is come out of the stove by the heat preservation of 3 hours, then carried out Every Metallographic Analysis and performance test, to confirm material qualification;
(3), semi-finished product make:
1st, left poor shell:
Temper is first carried out, statenchyma structure reduces material hardness, eliminates internal stress, and hardness is controlled in HB190 Between~HB210;Then upper numerically controlled lathe, clamps both ends, with 120m/min linear velocities, 280mm/min feed speeds make product Shape and inner cavity spherical surface preliminarily forming, for finish reserved margin 0.5mm;
Completion of processing, workpiece, which is placed in storing basket, to be retained 24 hours or more, to eliminate the plasticity that big surplus cutting is brought Deformation;
Digital control lathe chuck oil pressure pressure is adjusted to 6bar, reduces clamping deformation, smart car 1/2 is justified, and circularity is kept to exist Within 0.01mm, concentricity Φ 0.03mm, roughness Ra 1.6, while step seam allowance to the cooperation requirement of 0.02mm, is protected in smart car Demonstrate,prove flatness 0.03mm;
Then work in-process in the heart, with compound step drill with the rotating speed of 1800r/min, once will by the feeding of 420mm/min Thread Pilot hole and step machine-shaping, have not only been saved process time, but also ensure that the concentricity of holes simultaneously;Burr is cleared up, etc. It is to be assembled;
2nd, right poor shell:
Temper is first carried out, statenchyma structure reduces material hardness, eliminates internal stress, and hardness is controlled in HB190 Between~HB210;Then upper numerically controlled lathe, clamps both ends, with 120m/min linear velocities, 280mm/min feed speeds make product Shape and inner cavity spherical surface preliminarily forming, for finish reserved margin 0.5mm;
Completion of processing, workpiece, which is placed in storing basket, to be retained 24 hours or more, to eliminate the plasticity that big surplus cutting is brought Deformation;
Digital control lathe chuck oil pressure pressure is adjusted to 6bar, reduces clamping deformation, smart car 1/2 is justified, and circularity is kept to exist Within 0.01mm, concentricity Φ 0.03mm, roughness Ra 1.6, while the cooperation of smart car outer lug boss to 0.02mm require;Then exist On machining center, bored with high speed deep hole U with the rotating speed of 2400r/min, the feeding of 350mm/min, it, will by deep hole cyclic process Chip discharge in bolt hole comes, and ensure that the straightness and position degree in hole;Burr is cleared up, is waited to be assembled.
(4), it assembles:
Grinding process is carried out to semi-finished product, removes burrs on edges, flange clears up both sides faying face;Using 0.02mm clearance gauges It checks whether binding face is bonded closely, then with 12.9 grade high-strength bolt M8 × 100 of GB/T70.1 standards, penetrates screw hole, It is screwed in the torque of 42N.m, develops the fastening of bolt plane, on left and right difference shell designated position with laser marking machine by drawing Pairing identification code is stamped, in order to be used in dismounting pairing from now on;
(5), planet hole makes:
Product is cross axle construction, and product is placed on four revolving platforms, entire production is supported with dedicated tailstock centre Product prevent from dropping;Turntable with 90 ° of directions is rotated, processes planet hole successively, to ensure the straightness in planet hole 0.02mm and position degree, are detected using special gauge, and since the axial line in planet hole is just on the faying face of left and right difference shell, easily Drill bit deviation phenomenon is generated, influences straightness and position degree, therefore is bored with U with the cutting speed of 135m/min in processing, The amount of feeding of 300mm/min carries out drilling processing, is modified finishing with boring cutter later, to ensure the geometric tolerance needed;
(6), final inspection:
It is required according to product drawing, tested to the geometric dimension of product;
(7), purged and packed:
Assembly is disassembled, is put into special-purpose ultrasonic cleaning machine, passes through ultrasonic cleaning, cleaning rinsing, dried, oiled The cleannes standard of workpiece is controlled within 10 grades, workpiece then is packed cartonning by packing instructions by journey;
(8), it is put in storage:
The qualified products accompanying quality certification handles storage formality.

Claims (1)

1. a kind of preparation method of high-stability large torque differential casing, it is characterised in that carry out according to the following steps:
(1), product structure:
This product is nodular iron casting, is divided into left and right two parts, and respectively by sand casting one-pass molding, first machining respectively will left and right Two-part spherical and connecting portion process, and are then fixed two parts by bolt, and time processing goes out planet hole, protect Demonstrate,prove the relative position degree between each hole and bearing guard;
(2), blank makes:
The blank of product is by casting and forming, and the material of selection is QT500-7, first by mold flow analysis, in casting cycle Riser, runner carries out simulation casting, so as to find that the possibility of casting flaw is also easy to produce in casting cycle, is adjusted and avoids;
According to mold flow analysis come out as a result, design mould structure, increase Feeding channel, machine-shaping;It then will be by QT500-7 The molten iron of the proportioned 1300 ° of high temperature of element is molded into mold cavity, is come out of the stove by the heat preservation of 3 hours, then carries out every gold Facies analysis and performance test, to confirm material qualification;
(3), semi-finished product make:
1st, left poor shell:
First carry out temper, statenchyma structure reduces material hardness, eliminates internal stress, by hardness control HB190~ Between HB210;Then upper numerically controlled lathe, clamps both ends, with 120m/min linear velocities, 280mm/min feed speeds make product Shape and inner cavity spherical surface preliminarily forming, to finish reserved margin 0.5mm;
Completion of processing, workpiece, which is placed in storing basket, to be retained 24 hours or more, to eliminate the plastic deformation that big surplus cutting is brought;
Digital control lathe chuck oil pressure pressure is adjusted to 6bar, reduces clamping deformation, smart car 1/2 is justified, and keeps circularity in 0.01mm Within, concentricity Φ 0.03mm, roughness Ra 1.6, while step seam allowance to the cooperation requirement of 0.02mm, ensures plane in smart car Spend 0.03mm;
Then work in-process in the heart, with compound step drill with the rotating speed of 1800r/min, the feeding of 420mm/min, once by screw thread Bottom outlet and step machine-shaping, have not only been saved process time, but also ensure that the concentricity of holes simultaneously;Burr is cleared up, is waited to be installed Match;
2nd, right poor shell:
First carry out temper, statenchyma structure reduces material hardness, eliminates internal stress, by hardness control HB190~ Between HB210;Then upper numerically controlled lathe, clamps both ends, with 120m/min linear velocities, 280mm/min feed speeds make product Shape and inner cavity spherical surface preliminarily forming, to finish reserved margin 0.5mm;
Completion of processing, workpiece, which is placed in storing basket, to be retained 24 hours or more, to eliminate the plastic deformation that big surplus cutting is brought;
Digital control lathe chuck oil pressure pressure is adjusted to 6bar, reduces clamping deformation, smart car 1/2 is justified, and keeps circularity in 0.01mm Within, concentricity Φ 0.03mm, roughness Ra 1.6, while the cooperation of smart car outer lug boss to 0.02mm require;Then work in-process In the heart, it is bored with high speed deep hole U with the rotating speed of 2400r/min, by deep hole cyclic process, bolt is led to for the feeding of 350mm/min Chip discharge in hole comes, and ensure that the straightness and position degree in hole;Burr is cleared up, is waited to be assembled.
(4), it assembles:
Grinding process is carried out to semi-finished product, removes burrs on edges, flange clears up both sides faying face;Using 0.02mm clearance gauge inspections Whether binding face is bonded closely, then with 12.9 grade high-strength bolt M8 × 100 of GB/T70.1 standards, penetrates screw hole, with The torque of 42N.m screws in, and develops the fastening of bolt plane, is beaten by drawing with laser marking machine on left and right difference shell designated position Upper pairing identification code, in order to be used in dismounting pairing from now on;
(5), planet hole makes:
Product is cross axle construction, and product is placed on four revolving platforms, entire product is supported with dedicated tailstock centre, is prevented Only drop;Turntable with 90 ° of directions is rotated, processes planet hole successively, to ensure the straightness 0.02mm in planet hole And position degree, it is detected using special gauge, and since the axial line in planet hole is just on the faying face of left and right difference shell, be also easy to produce brill Head deviation phenomenon is influenced straightness and position degree, therefore to be bored in processing with U with the cutting speed of 135m/min, 300mm/min The amount of feeding, carry out drilling processing, be modified finishing with boring cutter later, with ensure needs geometric tolerance;
(6), final inspection:
It is required according to product drawing, tested to the geometric dimension of product;
(7), purged and packed:
Assembly is disassembled, is put into special-purpose ultrasonic cleaning machine, by ultrasonic cleaning, cleaning process rinsing, dried, oiled, The cleannes standard of workpiece is controlled within 10 grades, workpiece is then packed into cartonning by packing instructions;
(8), it is put in storage:
The qualified products accompanying quality certification handles storage formality.
CN201711260222.7A 2017-12-04 2017-12-04 A kind of preparation method of high-stability large torque differential casing Active CN108145379B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711260222.7A CN108145379B (en) 2017-12-04 2017-12-04 A kind of preparation method of high-stability large torque differential casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711260222.7A CN108145379B (en) 2017-12-04 2017-12-04 A kind of preparation method of high-stability large torque differential casing

Publications (2)

Publication Number Publication Date
CN108145379A true CN108145379A (en) 2018-06-12
CN108145379B CN108145379B (en) 2019-09-17

Family

ID=62466396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711260222.7A Active CN108145379B (en) 2017-12-04 2017-12-04 A kind of preparation method of high-stability large torque differential casing

Country Status (1)

Country Link
CN (1) CN108145379B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3783483A (en) * 1970-09-18 1974-01-08 Borg Warner Ltd Method of making a fluid coupling member
US20090105031A1 (en) * 2007-10-17 2009-04-23 Michael Sefcik Differential assembly and method for manufacturing same
CN101633091A (en) * 2008-07-21 2010-01-27 鞠小平 Method for processing differential case assembly
CN103639666A (en) * 2013-12-04 2014-03-19 鞠小平 Method for machining front shell of differential mechanism
CN105479117A (en) * 2015-12-30 2016-04-13 山东汇金股份有限公司 Machining method of special-shaped differential mechanism shell
CN105583586A (en) * 2016-03-22 2016-05-18 衡阳风顺车桥有限公司 Machining technology of automobile differential shell

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3783483A (en) * 1970-09-18 1974-01-08 Borg Warner Ltd Method of making a fluid coupling member
US20090105031A1 (en) * 2007-10-17 2009-04-23 Michael Sefcik Differential assembly and method for manufacturing same
CN101633091A (en) * 2008-07-21 2010-01-27 鞠小平 Method for processing differential case assembly
CN103639666A (en) * 2013-12-04 2014-03-19 鞠小平 Method for machining front shell of differential mechanism
CN105479117A (en) * 2015-12-30 2016-04-13 山东汇金股份有限公司 Machining method of special-shaped differential mechanism shell
CN105583586A (en) * 2016-03-22 2016-05-18 衡阳风顺车桥有限公司 Machining technology of automobile differential shell

Also Published As

Publication number Publication date
CN108145379B (en) 2019-09-17

Similar Documents

Publication Publication Date Title
CN103009021B (en) Segmented crankshaft machining process
CN102069346B (en) Process for processing spindle sleeve of built-in motorized spindle unit
CN103639666B (en) A kind of processing method of front shell of differential
CN205996581U (en) Engine compressor disk anti-deformation machining tool fixture
CN103551856B (en) Prevent the processing method that high precision large-sized titanium alloy thin wall foundry goods mounting edge is out of shape
CN106425290A (en) Preparation method for table press
CN103111814A (en) Numerical control machining method of aero-engine disc-shaft integrated structure part
CN110587246B (en) Manufacturing process of external tooth cylinder type broach finish cutting gear cutter head
CN105290738A (en) Method for precision machining of nozzle type parts
CN108067841B (en) A kind of preparation method of the high intensity support of bearing
CN110026751A (en) A kind of manufacturing method of bevel planet gear oil groove
CN111015107A (en) Hydraulic cylinder body and cylinder sleeve boring and rolling combined machining method
CN109531078B (en) Processing method of phenolic aldehyde rubberized fabric separated entity retainer
CN102059509A (en) Processing method of double-section drive axle space ring
CN108145379B (en) A kind of preparation method of high-stability large torque differential casing
CN105522356A (en) Crankshaft machining method
CN115213641B (en) Method for machining transmission input shaft
CN106392485A (en) Processing method of circular pocket cage
CN115229439B (en) Manufacturing method of light steering knuckle for automobile and steering knuckle for automobile
CN102896473B (en) A kind of processing technique of motor speed measuring tooth ring type thin wall members loading
CN104907775A (en) Manufacturing technology for disc brake upper pump
CN113070641B (en) Turning tool and process for single-cylinder crankshaft of general gasoline engine
US8336208B1 (en) Process for producing a cast, coated vehicle wheel
CN107470872A (en) A kind of processing method of bent axle
CN107859688A (en) A kind of screw rod drilling tool journal bearing and its production technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190808

Address after: Room 708-23, 1816 Harbour Avenue, Xitangqiao Street Economic Development Zone, Haiyan County, Jiaxing City, Zhejiang Province

Applicant after: Zhejiang Mingyuan Machinery Co.,Ltd.

Address before: 311254 No. 1 Xinguang Road, Suoqian Town, Xiaoshan District, Hangzhou City, Zhejiang Province

Applicant before: HANGZHOU SITONG TRANSMISSION Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A kind of preparation method of high stability and high torque differential case

Effective date of registration: 20220816

Granted publication date: 20190917

Pledgee: Xitangqiao sub branch of Zhejiang Haiyan Rural Commercial Bank Co.,Ltd.

Pledgor: Zhejiang Mingyuan Machinery Co.,Ltd.

Registration number: Y2022330001760

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 677 Hangzhou Bay Avenue, Xitangqiao Street, Haiyan County, Jiaxing City, Zhejiang Province, 314300

Patentee after: Zhejiang Mingyuan Orion Hydrogen Energy Technology Co.,Ltd.

Address before: Room 708-23, No. 1816 Haigang Avenue, Xitangqiao Street Economic Development Zone (Xitangqiao Street), Haiyan County, Jiaxing City, Zhejiang Province, 314300

Patentee before: Zhejiang Mingyuan Machinery Co.,Ltd.