CN108140219A - Server unit - Google Patents

Server unit Download PDF

Info

Publication number
CN108140219A
CN108140219A CN201680049427.8A CN201680049427A CN108140219A CN 108140219 A CN108140219 A CN 108140219A CN 201680049427 A CN201680049427 A CN 201680049427A CN 108140219 A CN108140219 A CN 108140219A
Authority
CN
China
Prior art keywords
accumulator group
integration
server unit
formality
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201680049427.8A
Other languages
Chinese (zh)
Inventor
远矢正
远矢正一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Publication of CN108140219A publication Critical patent/CN108140219A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services

Landscapes

  • Business, Economics & Management (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Accounting & Taxation (AREA)
  • General Physics & Mathematics (AREA)
  • Finance (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

Server unit has:Communicator communicates with information terminal;And controller, when its utilization obstacle in accumulator group meets using condition, communicator is controlled, information used in the formality carried out via communication network is sent to information terminal, the formality is for paying the formality that accumulator group is enable to continue the usage charges utilized.

Description

Server unit
Technical field
This disclosure relates to the server unit to communicate with information terminal.
Background technology
In the past, it is proposed that for lending the system of accumulator group (pack) and device etc..Electricity described in patent document 1 Usage charges setting device described in the server of pond rental system and patent document 2 is its example.
Existing technical literature
Patent document 1:Japanese Unexamined Patent Publication 2011-118638 bulletins
Patent document 2:Japanese Unexamined Patent Publication 2013-232129 bulletins
Invention content
In above-mentioned existing technology, accumulator group is not necessarily suitably utilized always, is existed and is inadequately utilized Possibility.
In view of the foregoing, provide can be to the appropriate using being assisted (propping up of accumulator group for illustrative embodiment Help) server unit.
The server unit that one technical solution of the disclosure is related to, has:Communicator is led to information terminal Letter;And controller, when the utilization obstacle of accumulator group meets using condition, the formality institute that will be carried out via communication network The information used is sent to described information terminal via the communicator, and the formality is to make the accumulator group for paying It can continue the formality of the usage charges utilized.
In addition, these master or specific technical solutions can pass through system, device, method, integrated circuit, meter The recording mediums of the non-transients such as calculation machine program or computer-readable CD-ROM is realized, can also pass through system, dress It puts, method, integrated circuit, computer program and the arbitrary of recording medium combine to realize.
According to the server unit that the disclosure technical solution is related to, appropriate utilize of accumulator group is assisted.
Description of the drawings
Fig. 1 is the block diagram for representing the composition for lending system in embodiment.
Fig. 2 is the block diagram for the composition for representing the server unit in embodiment.
Fig. 3 is the flow chart for representing the work for lending system in embodiment.
Fig. 4 is the flow chart for the work for representing the server unit in embodiment.
Fig. 5 is the flow chart for representing the formality continued in embodiment.
Fig. 6 is the concept map for representing the input picture for being used to input password (password) in embodiment.
Fig. 7 is the concept map for representing the input picture for being used to buy usage amount integration (point) in embodiment.
Fig. 8 is the concept map for the input picture of integration during buying represented in embodiment.
Specific embodiment
(opinion for becoming the basis of the disclosure)
About the utilization of accumulator group, the present inventor is found that problem by research.Hereinafter, it is concretely demonstrated.
In recent years, it is being popularized using the electric equipment of accumulator group.Electrically assisted bicycle is its an example.Example Such as, the user of electric equipment buys the accumulator group used in electric equipment, makes electric equipment work using the accumulator group bought Make.Recently, for making it possible that the system of lending of accumulator group of following situation also begins to be studied:The utilization of electric equipment Person borrows the accumulator group used in electric equipment, electric equipment is made to work using the accumulator group borrowed.
For example, being lent in system such, the user of the borrower as accumulator group can be in predetermined usage amount Or utilize the accumulator group lent in the range of making a reservation for during use.On the other hand, forbid be more than predetermined usage amount or Predetermined range during use utilizes accumulator group.Then, for example, user is according to predetermined usage amount or makes a reservation for make With the range of period, accumulator group is returned.Moreover, user is to make electric equipment work, again to the accumulator group of return or The other accumulator group of person is borrowed.
Specifically, it is carried out for borrowing the formality of accumulator group again in the service centre for lending accumulator group.Therefore, Substantially, it may occur that user goes to this operation of service centre according to predetermined usage amount or predetermined range during use. In order to omit this operation, can also carry out lending the accumulator group of user for using and continuing with into via communication network For possible formality.The operation for going to service centre is omitted as a result,.
However, the accumulator group that there is a possibility that lend inadequately is utilized.Moreover, because being carried out via communication network For making it possible the formality continued with of the accumulator group lent, therefore there is the accumulator group lent by inadequately The possibility continued with.
Then, the server unit that a technical solution of the disclosure is related to, has:Communicator, with information terminal into Row communication;And controller, when the utilization obstacle of accumulator group meets using condition, the hand that will be carried out via communication network Information used in continuous is sent to described information terminal via the communicator, and the formality is to make the electric power storage for paying Pond group can continue the formality of the usage charges utilized.
Server unit can make accumulator group when the utilization obstacle of accumulator group is appropriate utilization obstacle as a result, It can continue to utilize.Therefore, server unit can be to the appropriate using assisting of accumulator group.
For example, it is also possible to be, it is described to include the condition for managing the state of the accumulator group using condition.
Server unit can enable accumulator group under the utilization obstacle that accumulator group is suitably managed as a result, It continues to utilize.
In addition, for example or, described using condition is that the accumulator group lends inequality in utilizing condition, including The user of the accumulator group is the user in accordance with return time deadline.
As a result, server unit can lending in service in accumulator group, for the return time deadline in accordance with accumulator group User, accumulator group is enable to continue to utilize.
In addition, for example or, described using condition is that the accumulator group lends inequality in utilizing condition, including The state for being not above the update time limit of the accumulator group or representing the accumulator group before the update time limit Information be sent to the server unit.
Server unit can make when representing that the information of situation of accumulator group is appropriately update as a result, Accumulator group can continue to utilize.
In addition, for example may be the condition utilized included using condition for promoting the accumulator group.
Server unit can meet to promote utilizing for accumulator group in the utilization obstacle of accumulator group as a result, During condition, accumulator group is enable to continue to utilize.Therefore, server unit can promote the utilization of accumulator group.It takes as a result, Business device device can be to the appropriate using assisting of accumulator group.
In addition, for example or, described using condition is that the accumulator group lends inequality in utilizing condition, including It is more than the amount of recommending for reaching the accumulator group using the accumulator group within the scheduled period.
Server unit can make accumulator under the utilization obstacle that accumulator group has been sufficiently carried out utilizing as a result, Group can continue to utilize.Therefore, server unit can promote the utilization of accumulator group.
In addition, for example or, the communicator obtains from the accumulator group via described information terminal and represents institute State the information of utilization obstacle.
Even if server unit can not can also be obtained with accumulator group direct communication according to via information terminal as a result, Utilization obstacle, accumulator group is enable to continue to utilize.
In addition, it for example or, is achieved in the communicator from the accumulator group and represents the utilization obstacle During information, the controller judges whether the utilization obstacle meets and described utilizes condition.
Whether the controller of server unit, which can be met by judging the utilization obstacle of accumulator group, as a result, utilizes item Part enables accumulator group to continue to utilize when utilization obstacle meets using condition.That is, the controller without accumulator group comes Whether judgement utilization obstacle, which meets, utilizes condition.
In addition, for example or, information used in the formality, which is used in buy, can be used as the usage charges The integration used.
Server unit can be sent and used when the utilization obstacle of accumulator group is appropriate utilization obstacle as a result, In buying information that accumulator group is enable to continue the integration utilized.Therefore, server unit can fit accumulator group When using being assisted.
In addition, for example or, having memory, which stores the institute that the user of the accumulator group possesses Integration is stated, is accepted in the communicator from described information terminal to during the formality, the controller controls the memory to make The integration that the user possesses increases.
As a result, when server unit has the memory of storage integration, server unit can be according to via communication network The formality that network carries out is used in accumulator group and continues the integration utilized increase.Server unit can be according to as a result, Via the formality that communication network carries out, accumulator group is enable to continue to utilize.
In addition, it for example or, is accepted in the communicator from described information terminal to during the formality, the control Device controls the communicator, and the increased information of the integration that the memory for making the accumulator group is stored is via described information Terminal is sent to the accumulator group.
As a result, when accumulator group has the memory of storage integration, server unit can be according to via communication network The formality of progress is used in accumulator group and continues the integration utilized increase.Server unit can be according to warp as a result, The formality carried out by communication network, enables accumulator group to continue to utilize.
In addition, for example or, the information for the utilization obstacle for representing accumulator group is sent to server unit, in institute When stating utilization obstacle satisfaction using condition, letter used in the formality carried out via communication network is received from the server unit Breath, the formality are for paying the formality that the accumulator group is enable to continue the usage charges utilized, the institute that will be received It states information used in formality and is sent to the server unit via the communication network.
As a result, the user of accumulator group can accumulator group utilization obstacle where appropriate, continuing with accumulator group. Therefore, the appropriate utilization of accumulator group is promoted.
In addition, for example or, server unit has:1st receiver, from accumulator group and information terminal At least one party obtains the utilization obstacle of the accumulator group;1st memory stores the utilization condition of the accumulator group;1st Judging device judges whether the utilization obstacle meets and described utilizes condition;Follower, described in utilization obstacle satisfaction During using condition, password used in formality is exported, the formality is the accumulator group to be enable to continue profit in order to pay Usage charges and via communication network carry out formality;The password is sent to described information terminal by transmitter;2nd Memory stores the integration that the user of the accumulator group possesses;2nd receiver receives institute from described information terminal State the information of formality;2nd judging device judges whether the described information that the 2nd receiver receives is consistent with the password; And controller, when described information is consistent with the password, the 2nd memory is controlled to increase the integration.
Thereby, it is possible in the utilization obstacle of accumulator group where appropriate, accumulator group is enable to continue to utilize.At this point, only The user appropriate to the utilization obstacle of accumulator group sends password.Moreover, only in the formality received from user Formality is accepted under information and password unanimous circumstances, thereby, it is possible to more effectively appropriate only for the utilization obstacle of accumulator group User, accumulator group is enable to continue to utilize.
In addition, for example may be, the controlling party in the system including accumulator group, information terminal and server unit Method, including:The information for the utilization obstacle for representing the accumulator group is sent to the server unit, institute by the accumulator group Server unit is stated in the case where the utilization obstacle for being judged as receiving meets the utilization condition that storage part is stored, it will It buys password used in the formality of integration and is sent to described information terminal, the integration, which can be used as, enables the accumulator group The usage charges utilized are enough continued to use, described information terminal sends the password received from the server unit The institute stored to the server unit, the server unit in the password for being judged as receiving with the storage part It states under password unanimous circumstances, perform the integration buys formality, increases the integration that the storage part is stored.
As a result, the user of accumulator group can accumulator group utilization obstacle where appropriate, continuing with accumulator group. Therefore, the appropriate utilization of accumulator group is promoted.
In addition, these master or specific technical solutions can pass through system, device, method, integrated circuit, meter The recording mediums of the non-transients such as calculation machine program or computer-readable CD-ROM is realized, can also pass through system, dress It puts, method, integrated circuit, computer program and the arbitrary of recording medium combine to realize.
Hereinafter, with reference to attached drawing, specifically embodiment is illustrated.In addition, embodiments described below represents Master or specific example.The numerical value that represents in the following embodiments, shape, material, inscape, form will As an example of the allocation position of element and connection mode, step, the sequence of step etc., it is not intended that limit the disclosure.In addition, for Under embodiment in inscape in, be not documented in represent upper concept independent claims in composition will Element is illustrated as arbitrary inscape.
In addition, in the following description, charge and discharge mean at least one party in being charged and discharged.In addition, accumulator group Use either the charging of accumulator group or the electric discharge of accumulator group.In addition, the utilization of accumulator group can also It is the use of accumulator group.In addition, whether can utilizing for accumulator group may correspond to allow to utilize accumulator group.Example Such as, it can utilize and may correspond to allow to utilize, it is impossible to using may correspond to forbid utilizing.
(embodiment)
Fig. 1 is the block diagram for representing the composition for lending system in present embodiment.Specifically, in Fig. 1, illustrate storage Battery pack 200, information terminal 300, router (router) 400, communication network 500 and server unit 600.For example, go out Have accumulator group 200, information terminal 300 and the server unit 600 in these inscapes by means of system 100.
Accumulator group 200 is to be carried out the device of charge and discharge, is the device for putting aside electric energy.For example, accumulator group 200 Lent by lending businessman to user, with electrically assisted bicycle etc. as electric equipment connect.Moreover, 200 institute of accumulator group The electric power that the electric equipment of connection is obtained using the electric discharge by accumulator group 200 works.In addition, accumulator group 200 connects Charger is connected to charge.
In addition, accumulator group 200 can communicate via 500 grade of communication network with server unit 600.Accumulator group 200 both can be that can communicate via information terminal 300 and communication network 500 with server unit 600, or can It communicates via router 400 and communication network 500 with server unit 600.In their communication, can both it apply wired Communication, can also employing wireless communication.
For example, in communication between accumulator group 200 and information terminal 300, can also apply as with Bluetooth The IEEE802.15.1 standards of (registered trademark) for the international standard of the wireless near field communication of representative.In addition, in accumulator group In communication between 200 and router 400, it can also apply as with WLAN (LAN:Local Area Network) Or the IEEE802.11 standards of the international standard for the wireless communication that Wi-Fi (registered trademark) is representative.
In addition, accumulator group 200 has accumulator 201, working controller 202, communicator 210, power terminal 211,213 And communication terminal 212.
Accumulator 201 is the inscape for putting aside electric energy, also referred to as secondary cell or TunePower.Electric power storage Pond 201 can be monocell or modular battery or battery block, can also be battery pack.
Working controller 202 is the inscape of the work for controlling accumulator group 200 whole.For example, job control Device 202 can also control the charge and discharge of accumulator 201 and could utilizing for accumulator group 200.In addition, working controller 202 can also control the information related with accumulator 201.Specifically, working controller 202 have switch (switch) 203, Detector 204, judging device 205, information controller 206, integration counter (counter) 207 and electric current counter 209.
Switch 203 is connect with for carrying out the circuit of charge and discharge to accumulator 201, according to conducting (ON) and is ended (OFF) switching, to could charge and discharge switch over.Could utilizing for accumulator group 200 is switched over as a result,.It is specific and Speech, switch 203 conducting and cut-off according to by could the judgement result that is obtained of the judging device 205 that is judged of charge and discharge To switch.
Detector 204 is the inscape for detecting the state of accumulator 201.Such as detector 204 detects accumulator 201 voltage and temperature etc..Specifically, detector 204 can be made up of potentiometer and thermometer etc..
Judging device 205 is the inscape for determining whether charge and discharge.Judging device 205 by processor and can be deposited Reservoir etc. is formed.In addition, judging device 205 can also be contained in information controller 206.
For example, judging device 205 is according to the information obtained from detector 204 and the information obtained from integration counter 207 Deng determining whether charge and discharge, and come the conducting and cut-off of switching switch 203 according to judgement result.Specifically, judging device 205 be determined as can charge and discharge when, switch 203 is set as being connected.It on the other hand, will when being judged to being unable to charge and discharge Switch 203 is set as ending.If at this point, switch 203 is set as being connected, accumulator 201 is enable to be electrically connected with external equipment It connects.If in addition, switch 203 is set as ending, being electrically connected for accumulator 201 and external equipment is cut off.
More specifically, such as in charging, if the voltage of accumulator 201 rises to more than predetermined voltage, judging device 205 are judged to charge.That is, switch 203 is ended, stop charging, so that accumulator 201 will not become overcharge. On the contrary, judging device 205 when the voltage of accumulator 201 is less than predetermined voltage, is judged to charge, switch 203 is connected.
In addition, judging device 205 can also be 0 in the integration managed by integration counter 207, i.e. without being used to utilize storage During the integration of battery pack 200, it is judged to being unable to charge and discharge, ends switch 203.On the contrary, judging device 205 can also be by accumulating When the integration that minute counter 207 manages is more than 0, is useful for the integration using accumulator group 200, being determined as being capable of charge and discharge Switch 203 is connected in electricity.
In addition, judging device 205 can also via 210 grade of communicator from server unit 600 obtain represent could charge and discharge Information.At this time it is also possible to the information based on acquirement determines whether charge and discharge, the conducting and cut-off of switching switch 203.
Information controller 206 is the inscape for carrying out information processing.Information controller 206 can pass through processor And memory etc. is formed.The processor is either MPU or CPU.In addition, the memory is either volatile Property memory or nonvolatile memory.Information controller 206 both can be by carrying out central controlled individual control Device is formed, and multiple controllers that decentralised control can also be carried out by cooperating are formed.
Specifically, information controller 206 controls the work of working controller 202, and control by carrying out information processing The work of accumulator group 200.For example, information controller 206 can also be sent via 210 grade of communicator to server unit 600 The information obtained from detector 204 and the identification information of accumulator group 200 etc..
In addition, such as information controller 206 can also from detector 204 acquirement represent the state of accumulator group 200 Information keeps acquired information as historical record, at the time of can be sent (timing), via communication 210 grade of device sends the information kept as historical record to server unit 600.In addition, for example information controller 206 also may be used According to the magnitude of current measured by electric current counter 209, to make to be reduced by the integration that integration counter 207 manages.
Integration counter 207 is for managing the inscape of integration that accumulator group 200 is enable to be utilized.It is such as long-pending Minute counter 207 is made up of processor and memory etc..In addition, integration counter 207 can also be contained in information control Device 206 processed.
Specifically, integration counter 207 has the memory 208 of storage integration.Integration counter 207 is with the time By or accumulator group 200 use, reduce the integration that memory 208 stored.In addition, integration counter 207 is being purchased When having entered integration, the information of integration is obtained from server unit 600 via communicator 210, increases integration.
Memory 208 is for storing the inscape of integration that accumulator group 200 is enable to be utilized.Such as memory 208 be nonvolatile memory.Integration is suitably maintained as a result,.
In Fig. 1, memory 208 is contained in integration counter 207, but memory 208 can not also be contained in integrating meter Number device 207.In addition, the information different from integrating can also be stored in memory 208.Moreover, memory 208 can also not only By integration counter 207, but utilized by the entirety of accumulator group 200.
Electric current counter 209 is the inscape for measuring the magnitude of current.Such as electric current counter 209 is ammeter.Electricity Flow counter 209 measures the discharge and recharge of accumulator 201 by measuring the magnitude of current of power line being connect with accumulator 201. That is, electric current counter 209 measures the usage amount of accumulator group 200 by measuring the magnitude of current.
Communicator 210 is for the inscape with 600 grade communications of server unit.Communicator 210 can also be included The processing circuit of communication interface.Both it can include the communication terminal 212 for wire communication in communicator 210, can also include For the communication antenna of wireless communication.
For example, communicator 210 communicates via 500 grade of communication network with server unit 600.Communicator 210 both may be used To communicate via information terminal 300 and communication network 500 with server unit 600, via router 400 and can also lead to Communication network 500 communicates with server unit 600.In their communication, wire communication can be both applied, it can also employing wireless Communication.
For example, communicator 210 can also be in the communication with information terminal 300, used as with Bluetooth (registrations Trade mark) for representative wireless near field communication international standard IEEE802.15.1 standards.In addition, communicator 210 can also In the communication with router 400, used as the wireless communication with WLAN or Wi-Fi (registered trademark) for representative International standard IEEE802.11 standards.
For example, communicator 210 sends the profit for representing accumulator group 200 via 500 grade of communication network to server unit 600 With the information of situation.The utilization obstacle of accumulator group 200 can also be the state of accumulator group 200, more specifically be electric power storage The state in pond 201.The information for representing the utilization obstacle of accumulator group 200 can also be the utilization for judging accumulator group 200 Whether situation meets the information using condition of accumulator group 200.
For example, the utilization obstacle in accumulator group 200 can be according to the identification information of accumulator group 200 come when identifying, table The information for showing the utilization obstacle of accumulator group 200 can also be the identification information of accumulator group 200.Specifically, according to electric power storage The identification information of pond group 200 can both determine utilization obstacle of the state of accumulator group 200 as accumulator group 200, can also Determine utilization obstacle of the user of accumulator group 200 as accumulator group 200.
Power terminal 211,213 is the power terminal being connect with the charger to charge to accumulator group 200.Power end Son 211,213 can also be connect with consuming the electric equipment of electric power discharged from accumulator group 200.For example, power terminal 211, 213 are connected in the state of charger or electric equipment, carry out the charge or discharge of accumulator group 200.
Specifically, the side in power terminal 211,213 is positive power terminal, the opposing party is negative power terminal. Such as can be that power terminal 211 is positive power terminal, power terminal 213 is negative power terminal.
Communication terminal 212 is the communication terminal being connect with the charger to charge to accumulator group 200.Communication terminal 212 can also connect with consuming the electric equipment of electric power discharged from accumulator group 200.It is filled for example, being connected in communication terminal 212 Electric appliance either in the state of electric equipment between accumulator group 200 and charger or between accumulator group 200 and electric equipment into Row communication.
Accumulator group 200 can also be also equipped with the loader for inputting information and the follower for output information.
Information terminal 300 is can be with the device of 600 grade communications of server unit.Specifically, information terminal 300 is to store The information terminal that the user of battery pack 200 is possessed.Information terminal 300 can be information processing apparatus as computer etc. It puts.More specifically, information terminal 300 is either portable terminal or mobile phone, can also be smart mobile phone. In addition, information terminal 300 can also can communicate with accumulator group 200.In their communication, cable modem can be both applied Letter, can also employing wireless communication.
For example, in communication between information terminal 300 and server unit 600, can also apply as the movement of the 3rd generation is logical It is utilized in mobile communication system as letter system (3G), fourth generation mobile communication systems (4G) or LTE (registered trademark) etc. Communication standard.More specifically, can also apply IMT (International Mobile Telecommunications, Ternational Mobile Telecommunications) -2000 or IMT-Advanced etc..
In addition, for example, in communication between information terminal 300 and accumulator group 200, can also apply as with Bluetooth (registered trademark) is the IEEE802.15.1 standards of the international standard of the wireless near field communication of representative.Information is whole End 300 can also communicate by communicating with accumulator group 200, and via communication network 500 with server unit 600, so as to right Communication between accumulator group 200 and server unit 600 is relayed.
Information terminal 300 can also have the loader for inputting information and the follower for output information.
Router 400 is the device for being relayed to communication.For example, router 400 can be logical with accumulator group 200 Letter, can communicate via the communication networks such as internet 500 with server unit 600.Moreover, router 400 by with accumulator 200 communication of group, and communicate via communication network 500 with server unit 600, so as to accumulator group 200 and server unit Communication between 600 is relayed.In their communication, wire communication can be both applied, it can also employing wireless communication.
For example, router 400 can also wirelessly communicate with accumulator group 200, filled in a wired fashion with server Put 600 communications.In communication between router 400 and accumulator group 200, can also apply as with WLAN or Wi-Fi (registered trademark) is the IEEE802.11 standards of the international standard of the wireless communication of representative.In router 400 and server In a part for communication between device 600, it can also apply as the world using cable LAN as the wire communication of representative The IEEE802.3 standards of standard.
Communication network 500 is that information terminal 300, router 400 and server unit 600 etc. are logical for what is be in communication with each other Communication network.Communication network 500 is either network general as internet or lend the dedicated of system 100 Network.
Server unit 600 is an example of the server unit of the disclosure, is for the appropriate utilization to accumulator group 200 The server unit assisted.Server unit 600 can be information processing unit as computer etc..In addition, service Device device 600 can also be made up of multiple devices.For example, server unit 600 can be via communication networks such as internets 500 communicate with information terminal 300.Server unit 600 may be can be directly whole with information not via communication network 500 300 communication of end.
In addition, server unit 600 may be that can communicate via the communication networks such as internet 500 with router 400. Moreover, server unit 600 may be that can communicate via 400 grade of router with accumulator group 200.Alternatively, server fills It puts 600 or can directly communicate not via router 400 etc. with accumulator group 200.In their communication, both may be used It, can also employing wireless communication to apply wire communication.
For example, in communication between server unit 600 and information terminal 300, can also apply as the movement of the 3rd generation is logical It is utilized in mobile communication system as letter system (3G), fourth generation mobile communication systems (4G) or LTE (registered trademark) etc. Communication standard.More specifically, IMT-2000 or IMT-Advanced etc. can also be applied.In addition, in server unit In a part for communication between 600 and router 400, it can also apply as the wire communication using cable LAN as representative International standard IEEE802.3 standards.
Fig. 2 is the block diagram for the composition for representing server unit 600 shown in FIG. 1.As shown in Fig. 2, server unit 600 has Preparation controller 601, communicator 602, integration counter 603 and memory 605.In addition, server unit 600 can also have Their part.For example, server unit 600 can also have controller 601 and communicator 602, do not have integrating meter Number device 603 and memory 605.
Controller 601 is an example of the controller of the disclosure, is the inscape for the work for controlling server unit 600. For example, controller 601 is when the utilization obstacle of accumulator group 200 meets the utilization condition of accumulator group 200, via communicator 602 pairs of information terminals 300 send information used in the formality carried out via communication network 500.The formality is specifically used The accumulator group 200 is enable to continue the formalities of the usage charges utilized in payment.
Information used in formality is either represent the letter of password used in the formality carried out via communication network 500 The information of access (access, access) destination of formality that breath or expression are carried out via communication network 500.In addition, Information used in formality can also be reception and registration or notice can go through the formalities this case information.
In addition, information used in formality can also buy as used in the integration that usage charges use to believe Breath.Moreover, controller 601 can also accept formality via communication network 500 and communicator 602, make the profit of accumulator group 200 The integration that user possesses increases.
In addition, controller 601 can also obtain expression via communication network 500 and communicator 602 from accumulator group 200 The information used of accumulator group 200, according to the use of accumulator group 200, the integration for possessing the user of accumulator group 200 It reduces.
At this moment, it specifically, controller 601 can also update the integration managed by integration counter 603, thus updates The integration that the user of accumulator group 200 possesses.In addition, controller 601 can also be via communicator 602 and communication network 500, the integration managed by the integration counter 207 of accumulator group 200 is updated, thus the more user of new accumulator group 200 The integration possessed.
In addition, the utilization obstacle using condition specifically accumulator group 200 of accumulator group 200 is appropriate utilization Situation.Specifically, can also be that accumulator group 200 is used within the scope of predetermined temperature using condition.In addition, utilize condition It can also be the impact not imposed to accumulator group 200 more than predetermined benchmark.
In addition, accumulator group 200 can also be for the condition of the state of management of battery group 200 using condition.Example Such as, the user that using condition can also be accumulator group 200 is the user in accordance with return time deadline.Here, in accordance with the return phase The user of limit for example refer to over (in the past) the accumulator group 200 lent is returned before its return time deadline User also.That is, it is to pass by the above user that accumulator group 200 has been returned before return time deadline at least once.
In addition, can also send the information for the state for representing accumulator group 200 before the time limit is updated using condition To server unit 600.For example, represent that the information of the state of accumulator group 200 is sent at each moment that can be sent To server unit 600, it is updated, monitors in server unit 600.Information by the state for representing accumulator group 200 Server unit 600 is sent to before the time limit is updated, accumulator group 200 can suitably be monitored.Update time limit example Such as can be in the past once after updated 1 month.
In addition, can also be for promoting the condition utilized of accumulator group 200 using condition.Such as in order to promote electric power storage The utilization of pond group 200 can also reach pushing away for accumulator group 200 using accumulator group 200 within the scheduled period using condition It recommends more than usage amount.Specifically, can also be the charge and discharge cycles of the progress 1 or more within 1 month using condition (cycle)。
Can also be the combination of above-mentioned multiple conditions using condition.Moreover, it is multiple to be combined in utilization obstacle satisfaction Condition it is some or all when, controller 601 can also be sent via communication information terminal 300 via communicator 602 Information used in the formality that network 500 carries out.In addition, controller 601 can also have follower, which exports the hand Information used in continuous.
For example, controller 601 obtains the utilization obstacle for representing accumulator group 200 via communicator 602 from accumulator group 200 Information.Specifically, controller 601 can also be obtained via information terminal 300 and communicator 602 from accumulator group 200 Represent the information of the utilization obstacle of accumulator group 200.Moreover, controller 601 judges the information institute by being obtained from accumulator group 200 Whether the utilization obstacle of expression, which meets, utilizes condition.That is, controller 601 can also have judging device, the judging device is to accumulator The utilization obstacle of group 200 is compared with the utilization condition stored in advance by 605 grade of memory, and whether judgement utilization obstacle is full Foot utilizes condition.
In addition, controller 601 can also accept formality via communication network 500 from information terminal 300.That is, control Device 601 processed can also obtain to promote and (continue) via communication network 500 and communicator 602 from information terminal 300 The information of formality.Moreover, controller 601 can also carry out the information processing for promoting formality.Moreover, controller 601 also may be used With via information of the communicator 602 to the result of the transmission formality of information terminal 300 or for being pushed further into formality.
In addition, controller 601 can also be according to formality as a result, accumulator group 200 is enable to continue to utilize.It is specific and Speech, controller 601 can also make to be increased by the integration that integration counter 603 manages.In addition, controller 601 can also pass through The information of integration is sent via communicator 602 and communication network 500, increases the integration managed in accumulator group 200.
In addition, controller 601 can be made up of processor and memory etc..The processor of controller 601 can be with It is MPU or CPU.The memory of controller 601 is either volatile memory or nonvolatile memory.Control Device 601 processed can both be formed by carrying out central controlled individual controller, can also carry out decentralised control by cooperating Multiple controllers are formed.
Communicator 602 is an example of the communicator of the disclosure, is the inscape to communicate with information terminal 300.It is logical Believe that device 602 can also be the processing circuit for including communication interface.For example, the control that communicator 602 is carried out according to controller 601, It receives and sends messages.Both it can include the communication terminal for wire communication in communicator 602, can also include for wireless communication Communication antenna.
For example, communicator 602 can communicate via the communication networks such as internet 500 with information terminal 300.Communicator 602 may be that can directly communicate not via communication network 500 with information terminal 300.In addition, communicator 602 can both be used Wire communication communicates with information terminal 300, can also be communicated with wireless communication with information terminal 300.
In addition, communicator 602 may be that can communicate via the communication networks such as internet 500 with router 400.And And communicator 602 may be that can communicate via 400 grade of router with accumulator group 200.Alternatively, communicator 602 can also Can directly to communicate not via router 400 etc. with accumulator group 200.In their communication, cable modem can be both applied Letter, can also employing wireless communication.
For example, in communication between communicator 602 and information terminal 300, such as third generation mobile communications system can also be applied What is utilized in mobile communication system as system (3G), fourth generation mobile communication systems (4G) or LTE (registered trademark) etc. is logical Beacon is accurate.More specifically, IMT-2000 or IMT-Advanced etc. can also be applied.In addition, in communicator 602 and routing In a part for communication between device 400, it can also apply and be marked as the world using cable LAN as the wire communication of representative Accurate IEEE802.3 standards.
In addition, such as communicator 602 is when the utilization obstacle of accumulator group 200 meets the utilization condition of accumulator group 200, Information used in the formality carried out via communication network 500 is sent to information terminal 300.In addition, such as communicator 602 is from storage Battery pack 200 receives the information for the utilization obstacle for representing accumulator group 200.
Communicator 602 can also receive the utilization for representing accumulator group 200 via communication network 500 from accumulator group 200 The information of situation.Specifically, communicator 602 both can be via information terminal 300 and communication network 500, it can also be via Router 400 and communication network 500 receive the information for the utilization obstacle for representing accumulator group 200 from accumulator group 200.
In addition, communicator 602 can also receive and dispatch the information related with the formality carried out via communication network 500.It is specific and Speech, communicator 602 can also receive via communication network 500 from information terminal 300 information for promoting formality.It is moreover, logical Believe that device 602 can also send the result of formality or for being pushed further into formality via communication network 500 to information terminal 300 Information.In addition, communicator 602 can also be according to formality as a result, sending to continue to accumulator group 200 The information utilized.
Integration counter 603 is for managing the inscape of integration that accumulator group 200 is enable to be utilized.It is such as long-pending Minute counter 603 is made up of processor and memory etc..In addition, integration counter 603 can also be contained in controller 601。
Specifically, integration counter 603 has the memory 604 of storage integration.Integration counter 603 is according to controller 601 controls carried out, with time going by or the use of accumulator group 200, subtract the integration that memory 604 is stored It is few.In addition, integration counter 603 when having bought integration, according to the control that controller 601 carries out, increases integration.
Memory 604 is for storing the inscape of integration that accumulator group 200 is enable to be utilized.Such as memory 604 be nonvolatile memory.Integration is suitably maintained as a result,.In fig. 2, memory 604 is contained in integration counter 603, but memory 604 can not also be contained in integration counter 603.Moreover, memory 604 can also be closed with memory 605 And.
Memory 605 is the inscape for storing information.Such as memory 605 is nonvolatile memory.It is depositing In reservoir 605, such as storage represents the information of the state of accumulator group 200 and represents the utilization obstacle of accumulator group 200 Information etc..These information can also be stored as historical record.
Server unit 600 can also be also equipped with the loader for inputting information and the output for output information Device.
In addition it is also possible to the integral counting of integration counter 603 and accumulator group 200 without server unit 600 A side in device 207.For example, in the integration counter 207 without accumulator group 200, according to by server unit 600 The integration that integration counter 603 is managed controls the utilization of accumulator group 200 via communication.In addition, without server During the integration counter 603 of device 600, server unit 600 can also be via communication, to the integrating meter by accumulator group 200 The integration that number device 207 is managed is updated.
In addition, when not utilizing the utilization of integration, i.e. accumulator group 200 not by integration control, there can not also be integration Counter 207,603.Such as in the utilization for being not based on integrating but controlling accumulator group 200 based on period and usage charges etc. When, there can not also be integration counter 207,603.
Fig. 3 is the flow chart for representing the work shown in FIG. 1 for lending system 100.First, the user of accumulator group 200 It is registered as member (S101).Specifically, the address of user, name, age, telephone number, mail address and bank Account etc. is input into server unit 600, is stored in the memory 605 of server unit 600.
Then, the integration (S102) that setting utilizes accumulator group 200 for user.For example, to accumulator group The integration that 200 207 initial setting user of integration counter possesses.Then, accumulator group 200 is lent to user.
Later, when user will utilize accumulator group 200, the judging device 205 of accumulator group 200 determines whether there is utilization The integration (S103) that person possesses.(the S103 when there is integration:It is), judging device 205 allows accumulator group 200 to be utilized (S104). Specifically, switch 203 is connected in judging device 205.(the S103 when not integrating:It is no), judging device 205 forbids accumulator group 200 are utilized (S107).Specifically, judging device 205 ends switch 203.
After accumulator group 200 is allowed to be allowed to, accumulator group 200 is able to utilize (S105).Moreover, for example according to electric power storage Pond group 200 during use or usage amount, the integration managed by the integration counter 207 of accumulator group 200 can be reduced (S106).Then, the judging device 205 of accumulator group 200 determines whether there is the integration (S103) that user possesses again.
Based on above-mentioned work, user can utilize accumulator group 200, until integration uses until exhausted.User is basic On can take accumulator group 200 to service centre, borrow sets integration when integration is finished or integration is when becoming few New accumulator group 200.User can make electric equipment work using the new accumulator group 200 for setting integration as a result,.
In addition, in above-mentioned work, the integration managed by the integration counter 207 of accumulator group 200 is according to electric power storage Pond group 200 during use or usage amount and be updated.Other than the work or the work can also be replaced, according to Accumulator group 200 during use or the product that is managed the integration counter 603 that updates by server unit 600 of usage amount Point.Furthermore, it is also possible to according to the integration managed by the integration counter 603 of server unit 600, control accumulator group 200 It could be utilized.
In addition, when accumulator group 200 is appropriately utilization, accumulator group 200 is taken to service to omit The operation at center can also be bought via what communication network 500 was integrated.On the other hand, it is not fitted in accumulator group 200 When utilized, it for the confirmation that the heart in service carries out the state of accumulator group 200, does not preferably omit 200 band of accumulator group To the operation of service centre.
Then, server unit 600 is when user is appropriately utilization to accumulator group 200 so that without inciting somebody to action Accumulator group 200 takes service centre to, and the integration for continuing with can be bought via communication network 500.
Fig. 4 is the flow chart for the work for representing server unit 600 shown in Fig. 2.First, the control of server unit 600 Device 601 processed obtains the utilization obstacle (S201) of accumulator group 200.
For example, the communicator 602 of server unit 600 utilizes shape from the reception expression accumulator of accumulator group 200 group 200 The information of condition, the controller 601 of server unit 600 obtain the utilization obstacle for representing accumulator group 200 via communicator 602 Information.Specifically, controller 601 can also obtain the information of the usage amount for representing accumulator group 200 etc. as expression electric power storage The information of the utilization obstacle of pond group 200.
In addition, the utilization obstacle in accumulator group 200 when identifying, can be controlled according to the identification information of accumulator group 200 Device 601 processed can also obtain information of the identification information of accumulator group 200 as the utilization obstacle for representing accumulator group 200.Control Device 601 processed according to the identification information of accumulator group 200, can also identify the state of accumulator group 200 and accumulator group 200 User etc..In addition, controller 601 can also be identified according to the identification information of accumulator group 200 and represent accumulator group 200 The update situation of the information of state.
Then, controller 601 judges whether the utilization obstacle of accumulator group 200 meets the utilization condition of accumulator group 200 (S202).Such as it is that the utilization obstacle of accumulator group 200 utilizes shape for appropriate using condition as described above to be using condition Condition.
For example, controller 601 can also identify the utilization of accumulator group 200 according to the identification information of accumulator group 200 Whether person, the user of judgement accumulator group 200 had abided by return time deadline in the past, judged whether utilization obstacle meets as a result, Utilize condition.In addition, controller 601 can also represent accumulator group 200 according to the identification information of accumulator group 200 to identify The update situation of the information of state, determines whether to be updated according to the update time limit, judges whether utilization obstacle meets as a result, Utilize condition.
Controller 601 can also be by determining whether to have reached accumulator group using accumulator group 200 within the scheduled period More than 200 amount of recommending, whether judgement utilization obstacle, which meets, utilizes condition.Specifically, or, if at 1 month Within the charge and discharge cycles of 1 or more have been carried out to accumulator group 200, then controller 601 is determined as that utilization obstacle meets and utilizes Condition.
Moreover, controller 601 is when the utilization obstacle of accumulator group 200 meets the utilization condition of accumulator group 200 (S202:It is), send the information (S203) of the formality for being continued on communication network 500.Controller 601 both may be used To be sent using Email for the information of the formality continued with, other communication means can also be utilized to send letter Breath.The formality continued with is, for example, to buy the formality of the integration for continuing to utilize.
Then, (the S204 when the formality continued with has been carried out of controller 601:It is), it is used in and continues to utilize Integration increase (S205).
(the S202 when the utilization obstacle of accumulator group 200 is unsatisfactory for the utilization condition of accumulator group 200:It is no), it does not send Information for the formality continued on communication network 500, does not increase integration.In addition, in the formality continued with (S204 when not carried out:It is no), do not increase integration.Moreover, when integration is finished, accumulator group 200 is forbidden to be utilized, and occur Accumulator group 200 is taken to the operation of service centre.
In addition, part processing can also be carried out by the device different from server unit 600.For example, server unit 600, when utilization obstacle meets using condition, send information (S202, S203) used in formality.Other processing (S201, S204, S205) it can also be carried out by the device different from server unit 600.
Fig. 5 is to represent the flow chart shown in FIG. 1 for lending the formality continued in system 100.
When the utilization obstacle of accumulator group 200 meets the utilization condition of accumulator group 200, server unit 600 is for example Transmission buys password used in integration as the information used in the formality for making it possible to continue with.Moreover, it stores The information terminal 300 that the user of battery pack 200 possesses receives password (S301) from server unit 600.
Information used in the formality for making it possible to continue with, which can also contain, represents that buying integration is used Website information.In this example, website used in buying integration is provided by server unit 600.But buy integration institute The website used can also be provided by other devices different from server unit 600.
Website used in integration is bought in the operation that information terminal 300 is carried out according to the user of accumulator group 200, access (S302).Then, the operation that information terminal 300 is carried out according to the user of accumulator group 200, what is shown from website is more The project (S303) that selection integration is bought in a project.Information terminal 300 shows that the input that is used for as shown in Figure 6 is bought as a result, The input picture of password used in integration.
The password that is received in advance by information terminal 300 from server unit 600 of user's input, information terminal 300 by Manage the input (S304) of password.The password inputted is sent to and is filled as the server for providing source of website by information terminal 300 Put 600.
The controller 601 of server unit 600 by judge the password that is sent in advance via communicator 602 with via communication Whether the password that device 602 receives is consistent, and whether judgement password is correct (S305).(the S305 in password bad:It is no), control Device 601 urges inputting again (S304) for password.
(the S305 when password is correct:It is), the controller 601 of server unit 600 is via communicator 602 to information terminal 300 send the information for inputting the input picture for buying integration.Information terminal 300 receives the information from server unit 600, According to the information received from server unit 600, the input picture of integration is bought in display for inputting.
Here, when utilizing usage amount integration as using the integration of accumulator group 200, server unit 600 Controller 601 sends the information for inputting picture for buying usage amount integration to information terminal 300.On the other hand, it is utilizing When period integration is as utilizing the integration of accumulator group 200, the controller 601 of server unit 600 is to information terminal 300 Send the information of input picture for being integrated during buying.
Moreover, information terminal 300 shows to buy usage amount product according to the information received from server unit 600 The input picture divided or the input picture for being integrated during buying.
Usage amount integration is with the usage amount of accumulator group 200 and the integration that is consumed, e.g. according to charging times, Discharge time, charge volume, discharge capacity or combination thereof etc. and the integration being consumed.That is, usage amount is utilized During integration, usage amount integration is reduced with the usage amount of accumulator group 200.Moreover, when usage amount integration is finished, forbid storing Battery pack 200 is utilized.
In addition, in order to promote the utilization of accumulator group 200, the additional time limit can also be integrated to usage amount.If usage amount is accumulated Point expired, then usage amount integration can also fail.That is, it is invalid to integrate expired usage amount.
Period integration is and the usage amount of accumulator group 200 integration that is unrelated, and being consumed with time going by.Also It is to say, during being utilized during integration, during which integration is reduced with time going by.Moreover, when period, integration was finished, prohibit Only accumulator group 200 is utilized.
It about user is integrated during integrating or utilize using usage amount, can be borrowed in user in service centre It is determined during accumulator group 200.In addition, bought in user for make it possible the integration continued with when, can also determine Integration during usage amount is integrated using or bought is bought to be utilized.
In addition can also, usage amount integration with period integrate allows hand over.In the switching of usage amount integration and period integration In, usage amount quadrature conversion that user possesses can be both integrated into period, integrated during can also user be possessed It is converted into usage amount integration.
(the S306 when being integrated using usage amount:" usage amount integration "), information terminal 300 is according to from server unit 600 The information of reception shows the input picture for being used to buy usage amount integration as shown in Figure 7.Then, information terminal 300 accepts purchase Enter the input (S307) of integration.
Moreover, information terminal 300, according to the integration of buying inputted, the amount of money is bought in display.In addition, in accumulator group 200 During accumulator group for electrically assisted bicycle, information terminal 300 can also buy integration according to what is inputted, and display is bought The amount of money and total driving range (S308).In (S309 when buying integration inappropriate (reasonable) inputted:It is no), information terminal 300 operations carried out again according to user receive to buy the input (S307) of integration.
(S306 when being integrated during utilization:" period integration "), information terminal 300 is received according to from server unit 600 Information, show as shown in Figure 8 for the input picture that integrates during buying.Then, information terminal 300, which is accepted, buys integration Input (S310).
Moreover, information terminal 300, according to the integration of buying inputted, display is bought between the amount of money and entire service life (S311). Inputted buy integration it is inappropriate when (S312:It is no), the operation that information terminal 300 is carried out again according to user receives Buy the input (S310) of integration.
Moreover, inputted buy integration it is appropriate when (S309:It is, S312:It is), information terminal 300 is according to user The selection (S313) operated to accept confirmation of progress.Then, information terminal 300 buys integration via communication network by what is inputted Network 500 is sent to server unit 600.
The controller 601 of server unit 600 buys integration via communication network 500 and the reception of communicator 602, according to Integration is bought, carries out charge processing (S314).For example, controller 601 can also make the amount of money of buying corresponding with buying integration Memory 605 is stored in for the charge amount for user.In addition, controller 601 can also be from the registered silver of user Row account carries out the processing of transferring accounts for buying the amount of money corresponding with buying integration to the predetermined bank account for lending businessman.
Moreover, the controller 601 of server unit 600 according to integration is bought, increases the integration that user possesses.Service The controller 601 of device device 600 can also make the integration as user in the integration counter 603 of server unit 600 The integration managed increases.In addition, the controller 601 of server unit 600 can also be via communicator 602 and communication network Network 500 etc. increases the integration managed in the integration counter 207 of accumulator group 200 as the integration of user. That is, the controller 601 of server unit can also control communicator 602, the memory 208 for making integration counter 207 is deposited The increased information of integration of storage is sent to accumulator group 200 via communication network 500.
Server unit 600 can be increased, so as to make electric power storage based on above-mentioned formality by the integration for possessing user Pond group 200 can continue to utilize.
Fig. 6 is to represent the concept map shown in FIG. 1 for lending the input picture for being used to input password in system 100.Such as Fig. 6 It is such to be selected from multiple projects of predetermined website according to work shown in fig. 5 for inputting the input picture of password Integration is shown in information terminal 300 when buying.User is inputted in advance in the password box of input picture from server unit 600 The password of acquirement.
Then, if having selected " next step ", the inputted password of judgement is close with being provided in advance from server unit 600 Whether code is consistent.Moreover, when the password inputted is consistent with the password provided from server unit 600 in advance, show to purchase Enter the input picture of usage amount integration or period integration, the input picture of integration is specifically bought for input.
The password that is inputted in advance from the password that server unit 600 provides it is inconsistent when, do not show to purchase for inputting Enter the input picture of integration, and show the input picture for inputting password again.Limitation continues what integration was bought as a result, Formality.If in addition, having selected " return ", such as it can also show the initial picture of website.
Fig. 7 is to represent the concept shown in FIG. 1 for lending the input picture for being used to buy usage amount integration in system 100 Figure.Since the password inputted is consistent with the password provided in advance from server unit 600, integrates the formality bought and continued It carries out.Moreover, when being integrated using usage amount, input picture as shown in Figure 7 is shown in information terminal 300.In addition, Fig. 7 Example when input picture is the accumulator group that accumulator group 200 is electrically assisted bicycle.
The input picture of Fig. 7 includes inputting the input frame bought integration and integrated as usage amount.User is inputting Integration is bought in input in frame.
In addition, the input picture of Fig. 7 includes current integration, buys integration and adds up to integration as display project.Currently Integration is the remaining integration that user currently possesses.It is the product that user newly buys as the integration of buying shown by display project Point, by with inputted buy integration it is consistent in a manner of change.Total integration is current integration and buys the total of integration, according to The integration of buying inputted changes.
In addition, the input picture of Fig. 7 further includes and buys the amount of money and total driving range as display project.Buy the amount of money It is with buying the corresponding expense of integration, is to enable the usage charges continued with.Pass through specifically, buying the amount of money to each The unit price of a integration, which is multiplied by, buys integration to obtain.Total driving range is according to electronic with the corresponding usage amount of total integration The substantially benchmark for the distance that auxiliary bike can travel.Specifically, total driving range is by multiplying total integration It is obtained with estimated rate.
In the input picture of Fig. 7, if having selected to confirm, integration is bought according to what is inputted, buys usage amount integration. Moreover, the usage amount integration that user possesses can increase.After processing is bought, net can also be shown in information terminal 300 again The initial picture stood.If in addition, having selected to stop, usage amount integration is not bought, can show the initial picture of website again.
Fig. 8 is to represent the concept map for the input picture of integration during buying shown in FIG. 1 lent in system 100. Since the password inputted is consistent with the password provided in advance from server unit 600, integrate the formality bought be able to continue into Row.Moreover, when being integrated during utilization, input picture as shown in Figure 8 is shown in information terminal 300.In addition, the input of Fig. 8 Example when picture is the accumulator group that accumulator group 200 is electrically assisted bicycle.
The input picture of Fig. 8 includes inputting the input frame bought integration and integrated as during.User is in input frame Integration is bought in middle input.Such as 1 integration corresponds to 1 day during use.
In addition, the input picture of Fig. 8 includes current integration, buys integration and adds up to integration as display project.Currently Integration is the remaining integration that user currently possesses.It is the product that user newly buys as the integration of buying shown by display project Point, by with inputted buy integration it is consistent in a manner of change.Total integration is current integration and buys the total of integration, according to The integration of buying inputted changes.
In addition, the input picture of Fig. 8, which further includes to buy, is used as display project between the amount of money and entire service life.Buy the amount of money be with The corresponding expense of integration is bought, is to enable the usage charges continued with.Pass through specifically, buying the amount of money to each product The unit price divided, which is multiplied by, buys integration to obtain.It is between entire service life and total integration corresponding period.
In the input picture of Fig. 8, if having selected to confirm, integration is bought according to what is inputted, is integrated during buying.And And user possess during integrate and can increase.After processing is bought, website can also be shown in information terminal 300 again Initial picture.If in addition, having selected to stop, integrated during not buying, can show the initial picture of website again.
In Fig. 6~input shown in Fig. 8 picture, the formality that integration is bought is carried out, the integration that user possesses as a result, increases Add, can continue to be utilized.
In addition it is also possible to after appropriate password is had input in the input picture in Fig. 6, it is to utilize to make that will be used for selection The input picture integrated during dosage integration or utilization is shown in information terminal 300.Furthermore, it is also possible to it if selects to utilize Usage amount integrates, then the input picture of Fig. 7 is shown in information terminal 300.On the other hand, can also, if having selected period of use Between integrate, then the input picture of Fig. 8 is shown in information terminal 300.
In addition, in the example of Fig. 5~Fig. 8, meet the utilization of accumulator group 200 in the utilization obstacle of accumulator group 200 During condition, the password for buying integration is sent.Such example is not limited to, it can also be right when user is registered as member User gives ID and password.
Moreover, when the utilization obstacle of accumulator group 200 meets the utilization condition of accumulator group 200, server unit 600 Controller 601 can also allow the ID given using the user to accumulator group 200 and password buy integration.Also It is to say, at this point, controller 601 can also accept the ID given using the user to accumulator group 200 and password to buy The formality of integration.
In addition, when the utilization obstacle of accumulator group 200 meets the utilization condition of accumulator group 200, server unit 600 Controller 601 can also will represent can to buy via communicator 602 information of integration as information used in formality into Row is sent.
On the other hand, when the utilization obstacle of accumulator group 200 is unsatisfactory for the utilization condition of accumulator group 200, server The controller 601 of device 600 can also forbid the ID given using the user to accumulator group 200 and password to buy product Point.That is, at this point, controller 601, which can not also be accepted, utilizes the ID that gives to the user of accumulator group 200 and close Code buys the formality of integration.In addition, at this point, controller 601 can not also send the information for representing that integration can be bought.
In addition, in the above description, show electrically assisted bicycle as the electric equipment using accumulator group 200 Example, but it is not limited to electrically assisted bicycle using the electric equipment of accumulator group 200.Using accumulator group 200 electric equipment both It can be electric vehicle or Segway Human Transporter or portable terminal or mobile phone, can also be Smart mobile phone.
As described above, the server unit 600 in present embodiment has controller 601 and communicator 602.Server Device 600 can also be also equipped with integration counter 603 and memory 605.
Communicator 602 communicates with information terminal 300.Controller 601 meets in the utilization obstacle of accumulator group 200 to be stored During the utilization condition of battery pack 200, information used in the formality carried out via communication network 500 is sent out via communicator 602 It is sent to information terminal 300.The formality carried out via communication network 500 is accumulator group 200 to be enable to continue profit for paying The formality of usage charges.
Server unit 600 can make storage when the utilization obstacle of accumulator group 200 is appropriate utilization obstacle as a result, Battery pack 200 can continue to utilize.Therefore, server unit 600 can be to the appropriate auxiliary using carrying out of accumulator group 200 It helps.
For example, it is also possible to it is to include the condition of the state for management of battery group 200 using condition.Server as a result, Under the utilization obstacle that device 600 can suitably be managed in accumulator group 200, accumulator group 200 is enable to continue to utilize.
In addition, or, it is for example the utilization in accordance with return time deadline using user of the condition including accumulator group 200 Person.Server unit 600 can be directed to the user in accordance with return time deadline as a result, and accumulator group 200 is enable to continue profit With.
In addition, for example or, include to represent the information of state of accumulator group 200 using condition in the update time limit It is sent to server unit 600 before.Server unit 600 can be in the information quilt for the situation for representing accumulator group 200 as a result, When being appropriately update, accumulator group 200 is enable to continue to utilize.
In addition, for example or, the condition utilized for promoting accumulator group 200 is included using condition.It takes as a result, Business device device 600 can meet the condition utilized for promoting accumulator group 200 in the utilization obstacle of accumulator group 200 When, accumulator group 200 is enable to continue to utilize.Therefore, server unit 600 can promote the utilization of accumulator group 200.By This, server unit 600 can be to the appropriate using assisting of accumulator group 200.
In addition, for example or, include reaching accumulator group using accumulator group 200 within the scheduled period using condition It is more than 200 amount of recommending.Server unit 600 can be in the profit that accumulator group 200 has been sufficiently carried out utilizing as a result, It continues to utilize with accumulator group 200 under situation, is enable.Therefore, server unit 600 can promote accumulator group 200 It utilizes.
In addition, for example or, controller 601 is via communicator 602 and information terminal 300 from accumulator group 200 Obtain the information for representing utilization obstacle.Even if server unit 600 can not also can with 200 direct communication of accumulator group as a result, According to the utilization obstacle obtained via information terminal 300, accumulator group 200 is enable to continue to utilize.
In addition, for example or, information used in formality is used in that buy can be as the product that usage charges use Point.Server unit 600 can be sent and used when the utilization obstacle of accumulator group 200 is appropriate utilization obstacle as a result, In buying information that accumulator group 200 is enable to continue the integration utilized.Therefore, server unit 600 can be to accumulator Group 200 it is appropriate using being assisted.
In addition, for example or, controller 601 is being accepted from information terminal 300 to via communication via communicator 602 During the formality that network 500 carries out, increase the integration that the user of accumulator group 200 possesses.
Server unit 600 can be used in accumulator group according to the formality carried out via communication network 500 as a result, 200 can continue the integration utilized increase.Server unit 600 can be according to the hand carried out via communication network 500 as a result, It is continuous, accumulator group 200 is enable to continue to utilize.
As described above, by the server unit 600 in the disclosure, appropriate utilize of accumulator group 200 is assisted.
In addition, in the above-described embodiment, each integral part can both be formed with dedicated hardware, can also pass through execution It is realized suitable for the software program of each integral part.Each integral part can also pass through the program execution departments such as CPU or processor The software program being recorded in the recording mediums such as hard disk or semiconductor memory is read and executed to realize.Here, it realizes The software of the server unit of the above embodiment etc. is following program.
That is, the program makes computer perform method control as follows:Meet accumulator group in the utilization obstacle of accumulator group During using condition, information used in the formality carried out via communication network is sent to information terminal, the formality is to be used for Pay the formality that accumulator group is enable to continue the usage charges utilized.
In addition, in the above-described embodiment, each integral part can also be circuit.Multiple inscapes can both be used as whole Body and form 1 circuit, respective circuit can also be respectively constituted.In addition, circuit is respectively either general circuit, also may be used To be dedicated circuit.
More than, although server unit being related to one or more technical solutions based on embodiment etc. is said It is bright, but the present disclosure is not limited to the embodiments.Without departing from the purport of the disclosure, those skilled in the art are expected various Inscape in different embodiments mode and is combined and builds obtained from present embodiment by deformation implementation Mode can also be contained in the range of one or more technical solutions.
For example, in the above-described embodiment, specific inscape can also be replaced and held by other inscape Processing performed by the specific inscape of row.Alternatively, it is also possible to become the sequence of more processing, can also be performed in parallel more A processing.
Industrial availability
The disclosure can be used in accumulator group using the server unit assisted, can be suitable for accumulator Group lends system, the management system of accumulator group and toll collection system etc..
Label declaration
100 lend system;200 accumulator groups;201 accumulators;202 working controllers;203 switches;204 detectors;205 Judging device;206 information controllers;207th, 603 integration counter;208th, 604,605 memory;209 electric current counters;210、 602 communicators;211st, 213 power terminal;212 communication terminals;300 information terminals;400 routers;500 communication networks;600 clothes Business device device;601 controllers.

Claims (15)

1. a kind of server unit, has:
Communicator communicates with information terminal;And
When the utilization obstacle of accumulator group meets using condition, the formality carried out via communication network is made for controller Information is sent to described information terminal via the communicator, and the formality is to enable the accumulator group for paying Enough continue the formality of the usage charges utilized.
2. server unit according to claim 1,
It is described to include the condition for managing the state of the accumulator group using condition.
3. server unit according to claim 2,
Described using condition is that the accumulator group lends inequality in utilizing condition, and the user including the accumulator group is In accordance with the user of return time deadline.
4. server unit according to claim 2,
Described using condition is that the accumulator group lends inequality in utilizing condition, including being not above the accumulator group It updates the time limit or the information for the state for representing the accumulator group is sent to the server before the update time limit Device.
5. server unit according to claim 1,
The condition utilized included using condition for promoting the accumulator group.
6. server unit according to claim 5,
Described using condition is that the accumulator group lends inequality in utilizing condition, including using the storage within the scheduled period Battery pack reaches more than the amount of recommending of the accumulator group.
7. server unit according to claim 1,
The communicator obtains the information for representing the utilization obstacle via described information terminal from the accumulator group.
8. server unit according to claim 7,
When the communicator achieves the information for representing the utilization obstacle via described information terminal from the accumulator group,
The controller judges whether the utilization obstacle meets and described utilizes condition.
9. server unit according to claim 1,
Information used in the formality is used in the integration bought and can used as the usage charges.
10. server unit according to claim 9,
Have memory, which stores the integration that the user of the accumulator group possesses,
It is accepted in the communicator from described information terminal to during the formality, it is described that the controller controls the memory to make The integration that user possesses increases.
11. server unit according to claim 9,
It is accepted in the communicator from described information terminal to during the formality,
The controller controls the communicator, the increased information of the integration that the memory for making the accumulator group is stored The accumulator group is sent to via described information terminal.
12. a kind of accumulator group lends method, including:
The information for the utilization obstacle for representing the accumulator group is obtained from accumulator group,
When the utilization obstacle meets using condition, information used in the formality carried out via communication network is sent to letter Terminal is ceased, the formality is for paying the formality that the accumulator group is enable to continue the usage charges utilized.
13. a kind of utilization method of accumulator group, including:
The information for the utilization obstacle for representing accumulator group is sent to server unit,
When the utilization obstacle meets using condition, the formality institute carried out via communication network is received from the server unit The information used, the formality are the accumulator group to be enable to continue the formalities of the usage charges utilized for paying,
Information used in the formality received is sent to the server unit via the communication network.
14. a kind of server unit, has:
1st receiver obtains the utilization obstacle of the accumulator group from at least one party in accumulator group and information terminal;
1st memory stores the utilization condition of the accumulator group;
1st judging device judges whether the utilization obstacle meets and described utilizes condition;
Follower when the utilization obstacle meets the utilization condition, exports password used in formality, the formality is In order to pay enable the accumulator group continue using usage charges and the formality that is carried out via communication network;
The password is sent to described information terminal by transmitter;
2nd memory stores the integration that the user of the accumulator group possesses;
2nd receiver receives the information of the formality from described information terminal;
2nd judging device judges whether the described information that the 2nd receiver receives is consistent with the password;And
Controller when described information is consistent with the password, controls the 2nd memory to increase the integration.
15. a kind of control method is the control method in the system for include accumulator group, information terminal and server unit, packet It includes:
The information for the utilization obstacle for representing the accumulator group is sent to the server unit by the accumulator group,
The server unit meets the feelings using condition that storage part stored in the utilization obstacle for being judged as receiving Under condition, password used in the formality of integration will be bought and be sent to described information terminal, the integration, which can be used as, makes the storage Battery pack can continue the usage charges utilized to use,
The password received from the server unit is sent to the server unit by described information terminal,
The server unit is consistent with the password that the storage part is stored in the password for being judged as receiving In the case of, perform the integration buys formality, increases the integration that the storage part is stored.
CN201680049427.8A 2016-02-03 2016-12-14 Server unit Pending CN108140219A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2016019329 2016-02-03
JP2016-019329 2016-02-03
PCT/JP2016/087136 WO2017134934A1 (en) 2016-02-03 2016-12-14 Server device

Publications (1)

Publication Number Publication Date
CN108140219A true CN108140219A (en) 2018-06-08

Family

ID=59499489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201680049427.8A Pending CN108140219A (en) 2016-02-03 2016-12-14 Server unit

Country Status (3)

Country Link
JP (1) JP6998546B2 (en)
CN (1) CN108140219A (en)
WO (1) WO2017134934A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019164643A (en) * 2018-03-20 2019-09-26 本田技研工業株式会社 Information providing device, information providing method and system
JP7542187B2 (en) 2020-09-16 2024-08-30 パナソニックIpマネジメント株式会社 Information terminal device, charging and discharging system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060036545A1 (en) * 2001-09-20 2006-02-16 Sony Corporation Management system and management method for charging object apparatus, management apparatus and charging object apparatus
JP2006099152A (en) * 2004-09-28 2006-04-13 Telepark Corp System and method for prepaying and receiving charge
JP2011118638A (en) * 2009-12-03 2011-06-16 Nec Corp Battery rental system server, method, program, and portable electronic equipment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004252931A (en) 2002-12-26 2004-09-09 Sony Corp Electronic device, device function control method and server
JP4218381B2 (en) 2003-03-17 2009-02-04 オムロン株式会社 Ticket gate system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060036545A1 (en) * 2001-09-20 2006-02-16 Sony Corporation Management system and management method for charging object apparatus, management apparatus and charging object apparatus
JP2006099152A (en) * 2004-09-28 2006-04-13 Telepark Corp System and method for prepaying and receiving charge
JP2011118638A (en) * 2009-12-03 2011-06-16 Nec Corp Battery rental system server, method, program, and portable electronic equipment

Also Published As

Publication number Publication date
JPWO2017134934A1 (en) 2018-11-29
JP6998546B2 (en) 2022-01-18
WO2017134934A1 (en) 2017-08-10

Similar Documents

Publication Publication Date Title
JP6800124B2 (en) Power billing system and power billing method
US20230289871A1 (en) Rental fee setting apparatus, rental fee setting method and rental fee setting system
US8355965B2 (en) Battery exchange service system and charging method therefor, and portable device
KR102492114B1 (en) Secondary battery management device and secondary battery management program
CN104396115B (en) Control the apparatus and method of the charging capacity balancing run of secondary battery cell
CN109994787A (en) System and method based on use state maintenance energy storage device
JP6445908B2 (en) Power distribution system and power distribution method
CN108336785A (en) Battery sharing method, device and system
US11532037B2 (en) Rental fee setting apparatus, rental fee setting method and rental fee setting system
US20030034757A1 (en) Utilizing portable electrical power sources
CN113327035B (en) Electric quantity distribution method and device, electronic equipment and storage medium
JP2003288539A (en) Accounting system for battery pack
JP2001306961A (en) Server computer and rental control system and rental control method and battery charging system
CN107533724A (en) Server unit and its control method
CN106485484A (en) A kind of intelligent payment system of automatic identification vehicle identity information
CN108629660A (en) A kind of shared charger baby based on mobile terminal electricity leases configuration method, device and its system
CN110033297A (en) Determining rental device, notification method and system for determining rental
CN108140219A (en) Server unit
JP2020173684A (en) Pre-paid management device and gas management system
CN110555612A (en) Payment system and method based on credit rating evaluation of power consumer
CN105659464B (en) Accumulator control device
JP2002291110A (en) Method of collecting rental of battery
CN107945320A (en) Information processing method, electronic equipment and storage medium
CN107404532A (en) Shared electricity consumption interactive system and method
JP6927001B2 (en) Information processing equipment, information processing methods and information processing systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination