CN108131019A CN201711485054.1A CN201711485054A CN108131019A CN 108131019 A CN108131019 A CN 108131019A CN 201711485054 A CN201711485054 A CN 201711485054A CN 108131019 A CN108131019 A CN 108131019A
Authority
CN
China
Prior art keywords
discharging platform
construction safety
safety system
platform construction
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711485054.1A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
No 3 Construction Co Ltd of Chongqing Construction Engineering Group
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN201711485054.1A priority Critical patent/CN108131019A/en
Publication of CN108131019A publication Critical patent/CN108131019A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/52Weighing apparatus combined with other objects, e.g. furniture
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G3/00Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances
    • G01G3/12Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances wherein the weighing element is in the form of a solid body stressed by pressure or tension during weighing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of discharging platform construction safety systems, including control mechanism and load carrier, load carrier includes girder and crossbeam, multigroup crossbeam is connected between two groups of relatively parallel girders, fixation forms under(-)chassis between girder and crossbeam, have on under(-)chassis along its circumferentially disposed lateral seal plate and the bottom lock plate positioned at under(-)chassis top surface, lateral seal plate is additionally provided with door body on one side towards building, further includes at least three Weighing modules for being located at under(-)chassis vertex;Assembling and disassembling of the present invention is time saving and energy saving.

Description

A kind of discharging platform construction safety system
Technical field
The present invention relates to a kind of discharging platform construction safety systems.
Background technology
Building unit is needed when carrying out multilayer, executive information systems main body construction the template in floor And its support system material transport is to a upper floor.The relatively conventional practice is at present:It is certain in the floor installation of form removal The platform of quantity, the Platform Steel cord be fixed on it is on building and protruding, template, steel pipe, fastener removed etc. On material pile to platform, then construction floor is transported to by tower crane.Some construction enterprises are integrally molded molding using shaped steel Structure, but due to platform by volume big (general 4-6 meter long, 2-3 meter wide), weight weight (often having more than 300kg), inventory with turn Fortune is inconvenient and is gradually eliminated.More common at present is to take fabricated platform structure, its each component uses spiral shell Bolt is attached, inventory and transhipment when as needed can be by each component removal.
But this structure, since bolt is more, installation, dismounting generally require the long period.And due to mould of not weighing Block, worker often use platform overload, there are poles in pile material in order to save the time of transhipment material beyond regulation Big security risk.The platform led to therefrom across collapse, personal height falls etc., and serious accidents are also reported in media often.
In short, existing technology and product are time-consuming and laborious in the presence of installing, removing, no Weighing module is particularly present in reality There is the shortcomings that safety accident when easily being used in because overloading.
Invention content
The invention is intended to provide a kind of assembling and disassembling time saving and energy saving discharging platform construction safety system.
A kind of discharging platform construction safety system, including control mechanism and load carrier, load carrier includes girder And crossbeam, connect multigroup crossbeam between two groups of relatively parallel girders, control mechanism include power supply, central processing unit, with center The memory of processor electrical connection and the display device being electrically connected with central processing unit, wherein Weighing module and central processing unit Between be electrically connected;It is fixed between girder and crossbeam to form under(-)chassis, have on under(-)chassis along its circumferentially disposed lateral envelope Closing plate and the bottom lock plate positioned at under(-)chassis top surface, lateral seal plate are additionally provided with door body on one side towards building, also The Weighing module for being located at under(-)chassis vertex including at least three.
Compared with prior art, the advantage of the invention is that:
Entire load carrier convenient and efficient can be mounted on building, in use, construction material is placed on discharging platform Afterwards, Weighing module, which can perceive, monitors corresponding load, and transmit signals to central processing unit judge whether it is overweight, if super It is heavy then to being gone out warning message at the scene, while can also show on the display apparatus, unlawful practice can also be carried out record it is convenient after Phase is checked and rated, so as to effectively ensure the construction safety at scene.
Tool, regularization and the standardization of present invention discharging platform easy to implement;When platform load reaches setting value, Weighing module can effectively carry out load early warning, prevent platform overload from using, it is ensured that safety.
Further, bolt is set on main beam rear end, and main beam rear end penetrates the ground anchor ring on building;By ground anchor ring and The setting of bolt, girder are firmly secured on building.
Further, Weighing module includes deformation piece, travel switch, battery pack, alarm;Travel switch and battery pack, report Alert device forms electrical connection open in usual, the moving contact after the deformation piece deformation that is further applied load reaches set amount with travel switch Contact, and moving contact is pushed to be moved along deformation direction, until setting position is followed by circuit passband circuit, alarm equipment alarm, load reduces Or moving contact resets under action of reset spring after disappearing;Weighing module can bear discharging platform using the setting of deformation piece Load is monitored, if overload, which occurs, can send out alarm signal so as to effectively realize safe construction.
Further, it is connect respectively with building including main suspension cable, secondary suspension cable, main suspension cable and secondary suspension cable upper end; Girder front end is provided with main oblique pull ring and secondary oblique pull ring, and main suspension cable lower end connects main oblique pull ring, secondary suspension cable lower end auxiliary connection Oblique pull ring;Strengthen the stability and bearing capacity of discharging platform.
Further, lateral seal plate further includes the lateral frame for being used to support lateral seal plate, lateral frame lower end and bottom Portion's frame is fixed;By the setting of lateral frame, the structural strength and stability of lateral seal plate can be enhanced.
Further, the door body is inside opposite opened;It is easy to use, it is simple in structure.
Further, the load-bearing steel plate for being arranged on deformation piece upper/lower terminal is further included, the equal one end of load-bearing steel plate is fixed on crossbeam On;By setting steel plate deformation piece of weighing that can preferably bear the load from discharging platform.
Further, four vertex of under(-)chassis are equipped with Weighing module;So set, Weighing module monitoring is cleverer Quick, stress is more balanced.
Further, the monitor being arranged on building is further included, is electrically connected between monitor and central processing unit;It is convenient The Construction Condition at scene is completely recognized, avoids that alarm erroneous judgement occurs.
Further, it is additionally provided with the communication module being electrically connected with central processing unit;By setting communication module, can realize pair The functions such as the remote short messages Advise By Wire of relevant work personnel, so as to more intelligent.
Description of the drawings
Fig. 1 is the structure diagram of the embodiment of the present invention 1;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the side view of Fig. 1.
Specific embodiment
Below by the further details of explanation of specific embodiment:
Reference numeral in Figure of description includes:Girder 10, lateral frame 11, lateral seal plate 12, secondary oblique pull ring 13, Weighing module 20, alarm 21, battery pack 22, crossbeam 30.
Embodiment 1:
Substantially as illustrated in the accompanying drawings from 1 to 3:A kind of discharging platform construction safety system, including control mechanism and carrying machine Structure, load carrier include girder 10 and crossbeam 30, multigroup crossbeam 30, control mechanism are connected between two groups of relatively parallel girders 10 It is filled including power supply, central processing unit, the memory being electrically connected with central processing unit and the display being electrically connected with central processing unit It puts, is wherein electrically connected between Weighing module 20 and central processing unit;Fixation forms under(-)chassis, bottom between girder 10 and crossbeam 30 Have on portion's frame along its circumferentially disposed lateral seal plate 12 and the bottom lock plate positioned at under(-)chassis top surface, it is lateral to seal Closing plate 12 is additionally provided with door body on one side towards building, further includes at least three Weighing modules for being located at under(-)chassis vertex 20, it is additionally provided with the communication module being electrically connected with central processing unit;By setting communication module, can realize to relevant work personnel The functions such as remote short messages Advise By Wire, so as to more intelligent, further include the monitor being arranged on building, monitor with It is electrically connected between central processing unit;The convenient Construction Condition to scene is completely recognized, and avoids that alarm erroneous judgement occurs.
Bolt is set on 10 rear end of girder, and 10 rear end of girder penetrates the ground anchor ring on building;By ground anchor ring and insert The setting of pin, girder 10 are firmly secured on building.
Weighing module 20 includes deformation piece, travel switch, battery pack 22, alarm 21;Travel switch and battery pack 22, report Alert device 21 forms electrical connection open in usual, is touched after the deformation piece deformation that is further applied load reaches set amount with the dynamic of travel switch Head contact, and moving contact is pushed to be moved along deformation direction, until setting position is followed by circuit passband circuit, alarm 21 is alarmed, load Moving contact resets under action of reset spring after reducing or disappearing;Weighing module 20 can put down discharging using the setting of deformation piece The load of platform is monitored, if overload, which occurs, can send out alarm signal so as to effectively realizing safe construction, including main suspension cable, Secondary suspension cable, main suspension cable and secondary suspension cable upper end are connect respectively with building;10 front end of girder is provided with main oblique pull ring and pair Oblique pull ring 13, main suspension cable lower end connect main oblique pull ring, secondary suspension cable lower end auxiliary connection oblique pull ring 13;Strengthen the steady of discharging platform Qualitative and bearing capacity.
Lateral seal plate 12 further includes the lateral frame 11 for being used to support lateral seal plate 12, lateral 11 lower end of frame and bottom Portion's frame is fixed;By the setting of lateral frame 11, the structural strength and stability of lateral seal plate 12 can be enhanced.
Door body is inside opposite opened;It is easy to use, it is simple in structure, further include the load-bearing for being arranged on deformation piece upper/lower terminal Steel plate, the equal one end of load-bearing steel plate are fixed on crossbeam 30;By setting weigh steel plate deformation piece can preferably bear come The load of self-discharging platform.
Four vertex of under(-)chassis are equipped with Weighing module 20;So set, Weighing module 20 monitor it is sensitiveer, by Power is more balanced.
The innovative design on the basis of former tool-type discharging platform, sets Weighing module in platform, by Weighing module and instrument Table and warning device connection, and a rated weight value is set in instrument in advance, when operating personnel is more than in charging process During rated weight, warning device can send out sound-light alarm automatically, on-site personnel be prompted to correct immediately in time, such as lasting report Alert, system will record violation information automatically, while data pass cloud platform back, the violation information recorded by inquiry system, can and When processing violating the regulations is carried out to on-site personnel, prevented the act of violating regulations of the overweight pile material of discharging platform substantially.
Entire load carrier convenient and efficient can be mounted on building, in use, construction material is placed on discharging platform Afterwards, Weighing module 20, which can perceive, monitors corresponding load, and transmit signals to central processing unit judge whether it is overweight, if It is overweight, to warning message is gone out at the scene, while can also show on the display apparatus, it is convenient that unlawful practice can also be carried out to record Later stage is checked and rated, so as to effectively ensure the construction safety at scene.
Tool, regularization and the standardization of present invention discharging platform easy to implement;When platform load reaches setting value, Weighing module 20 can effectively carry out load early warning, prevent platform overload from using, it is ensured that safety.
Embodiment 2:
With differing only in for embodiment 1:The lateral seal plate 12 include corrugated sheet, with corrugated sheet welding Flat layer forms several cavitys between corrugated sheet and flat layer, cavity is vertically arranged and both ends penetrate through, and cavity lower end is respectively mounted There are sealing iron hoop and the sealing-plug being slidably matched with sealing iron hoop, sealing-plug is made of magnet, usually sealing-plug and sealing iron hoop It is attracted, corrugated sheet lower end is sealed, aluminum sulfate solution is filled in which part cavity, hydroxide is filled in portion cavity Sodium solution;After building site encounters fire, flat layer, sealing iron hoop, sealing-plug and corrugated sheet easily absorb heat heating, sealing-plug Quickly reach Curie temperature and it is magnetic disappear and come off, produced after the aluminum sulfate solution, sodium hydroxide solution outflow mixing in cavity Raw a large amount of carbon dioxide gas, and then play the effect to putting out a fire or controlling burning things which may cause a fire disaster.

Claims (10)

1. a kind of discharging platform construction safety system, including control mechanism and load carrier, load carrier include girder and Crossbeam connects multigroup crossbeam between two groups of relatively parallel girders, it is characterised in that:
Control mechanism includes power supply, central processing unit, the memory being electrically connected with central processing unit and electric with central processing unit It is electrically connected between the display device of connection, wherein Weighing module and central processing unit;Fixation forms bottom between girder and crossbeam Frame has on under(-)chassis along its circumferentially disposed lateral seal plate and the bottom lock plate positioned at under(-)chassis top surface, Lateral seal plate is additionally provided with door body on one side towards building, further includes at least three moulds of weighing for being located at under(-)chassis vertex Block.
2. a kind of discharging platform construction safety system according to claim 1, it is characterised in that:It is set on main beam rear end Bolt, main beam rear end penetrate the ground anchor ring on building.
3. a kind of discharging platform construction safety system according to claim 1, it is characterised in that:Weighing module includes shape Become piece, travel switch, battery pack, alarm;Travel switch and battery pack, alarm form it is open in usual be electrically connected, applying lotus The deformation of deformation piece contacts after reaching set amount with the moving contact of travel switch in the case of load, and moving contact is pushed to be transported along deformation direction Dynamic, until setting position is followed by circuit passband circuit, alarm equipment alarm, moving contact is under action of reset spring after load reduces or disappears It resets.
4. according to a kind of claim 1-3 any one of them discharging platform construction safety system, it is characterised in that:Including master Suspension cable, secondary suspension cable, main suspension cable and secondary suspension cable upper end are connect respectively with building;Girder front end is provided with main oblique pull ring With secondary oblique pull ring, main suspension cable lower end connects main oblique pull ring, secondary suspension cable lower end auxiliary connection oblique pull ring.
5. a kind of discharging platform construction safety system according to claim 4, it is characterised in that:Lateral seal plate also wraps The lateral frame for being used to support lateral seal plate is included, lateral frame lower end is fixed with under(-)chassis.
6. a kind of discharging platform construction safety system according to claim 4, it is characterised in that:The door body is inside Opposite opened door body.
7. a kind of discharging platform construction safety system according to claim 3, it is characterised in that:It further includes and is arranged on shape Become the load-bearing steel plate of piece upper/lower terminal, the equal one end of load-bearing steel plate is fixed on crossbeam.
8. a kind of discharging platform construction safety system according to claim 1, it is characterised in that:Four tops of under(-)chassis Weighing module is equipped at angle.
9. a kind of discharging platform construction safety system according to claim 1, it is characterised in that:It further includes to be arranged on and build The monitor on object is built, is electrically connected between monitor and central processing unit.
10. a kind of discharging platform construction safety system according to claim 1, it is characterised in that:It is additionally provided with and center The communication module of processor electrical connection.
CN201711485054.1A 2017-12-29 2017-12-29 A kind of discharging platform construction safety system Pending CN108131019A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711485054.1A CN108131019A (en) 2017-12-29 2017-12-29 A kind of discharging platform construction safety system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711485054.1A CN108131019A (en) 2017-12-29 2017-12-29 A kind of discharging platform construction safety system

Publications (1)

Publication Number Publication Date
CN108131019A true CN108131019A (en) 2018-06-08

Family

ID=62394122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711485054.1A Pending CN108131019A (en) 2017-12-29 2017-12-29 A kind of discharging platform construction safety system

Country Status (1)

Country Link
CN (1) CN108131019A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113763344A (en) * 2021-08-31 2021-12-07 中建一局集团第三建筑有限公司 Operation platform safety detection method and device, electronic equipment and medium
CN114170773A (en) * 2021-12-06 2022-03-11 中建新疆建工集团第一建筑工程有限公司 Overhanging type unloading platform bearing capacity early warning device and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8648914B1 (en) * 2009-12-31 2014-02-11 Teledyne Scientific & Imaging, Llc Laser communication system for spatial referencing
CN204163415U (en) * 2014-10-24 2015-02-18 中国建筑土木建设有限公司 There is the discharging platform of auto-alarm function
CN104790662A (en) * 2015-04-20 2015-07-22 湖南省第六工程有限公司 Assembled type unloading platform with weighing device
CN107165427A (en) * 2017-06-28 2017-09-15 中国冶集团有限公司 A kind of intelligent overhanging unloading platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8648914B1 (en) * 2009-12-31 2014-02-11 Teledyne Scientific & Imaging, Llc Laser communication system for spatial referencing
CN204163415U (en) * 2014-10-24 2015-02-18 中国建筑土木建设有限公司 There is the discharging platform of auto-alarm function
CN104790662A (en) * 2015-04-20 2015-07-22 湖南省第六工程有限公司 Assembled type unloading platform with weighing device
CN107165427A (en) * 2017-06-28 2017-09-15 中国冶集团有限公司 A kind of intelligent overhanging unloading platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113763344A (en) * 2021-08-31 2021-12-07 中建一局集团第三建筑有限公司 Operation platform safety detection method and device, electronic equipment and medium
CN114170773A (en) * 2021-12-06 2022-03-11 中建新疆建工集团第一建筑工程有限公司 Overhanging type unloading platform bearing capacity early warning device and method
CN114170773B (en) * 2021-12-06 2024-02-27 中建新疆建工集团第一建筑工程有限公司 Cantilever type unloading platform bearing capacity early warning device and method

Similar Documents

Publication Publication Date Title
CN201458576U (en) Crane remote control system with overload limiting function
CN108131019A (en) A kind of discharging platform construction safety system
CN104986676A (en) Tower crane comprehensive intelligent monitoring device
CN110064149A (en) Couple the new energy bus battery automatic fire extinguisher and control method of BMS
CN207739649U (en) A kind of construction discharging platform
CN203497916U (en) Top cover part of reactor of nuclear power plant and moving device thereof
CN103832927A (en) Load protection system based on proximity sensors and application thereof
CN110032123A (en) A kind of control of surface mine power shovel intelligent remote is automatic to be loaded and uninstalling system
CN204719920U (en) DCS system tripping alarm device
CN204163415U (en) There is the discharging platform of auto-alarm function
CN206301448U (en) A kind of equipment fire hazard monitoring alarm electric box
CN108166765A (en) A kind of construction discharging platform
CN201181815Y (en) Fusion tube disassembly and assembly operation device
CN204752090U (en) Motor -driven elevating gear of pole
CN216512480U (en) Crown block anti-top-collision protection circuit
CN211701618U (en) Intelligent power distribution cabinet monitoring system
CN104790662A (en) Assembled type unloading platform with weighing device
CN213399949U (en) Engineering vehicle anti-overturning early warning device
CN203806981U (en) Proximity-sensor-based load protection system
CN205740069U (en) Tower crane overturning-preventing prior-warning device
CN211215130U (en) Automatic early warning extinguishing device for port machinery
CN106567606A (en) Safe fence support
CN202049568U (en) Prewarning safety device of power transformer
CN204661161U (en) The lift heavy warning device of Minitype swing machine
CN102530674B (en) Calibration method for overload protector on lifter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180608