CN108130915A - Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method - Google Patents

Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method Download PDF

Info

Publication number
CN108130915A
CN108130915A CN201810127846.XA CN201810127846A CN108130915A CN 108130915 A CN108130915 A CN 108130915A CN 201810127846 A CN201810127846 A CN 201810127846A CN 108130915 A CN108130915 A CN 108130915A
Authority
CN
China
Prior art keywords
frame
alter
raft
long side
lower frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810127846.XA
Other languages
Chinese (zh)
Inventor
蒋文娟
胡斌
赵璐
骆军
牛文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU 7TH CONSTRUCTION GROUP CO Ltd
Original Assignee
GANSU 7TH CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU 7TH CONSTRUCTION GROUP CO Ltd filed Critical GANSU 7TH CONSTRUCTION GROUP CO Ltd
Priority to CN201810127846.XA priority Critical patent/CN108130915A/en
Publication of CN108130915A publication Critical patent/CN108130915A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/013Shuttering specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction methods, the template includes the cuboid steel bar framework modular unit that multiple head and the tail are fixedly connected, steel bar framework modular unit includes upper frame, lower frame and the steel plate for sealing water being arranged between frame and lower frame, steel plate for sealing water is two and is respectively welded between frame long side face and lower frame long side side, mesh template face layer is equipped on two long side sides of upper frame and two long side sides of lower frame, two long side sides top part of upper frame is not fixed with comb mould.The present invention is changed after the completion of the binding of raft board post poured band position reinforcing bar, then carries out site welding, binding, installation, the construction technology for blocking alter-pouring strips mould plate, is promoted to shift to an earlier date at the beginning of subsequent handling, is accelerated construction speed, saved the duration.Meanwhile narrow construction space between raft slab muscle is changed, execution conditions are improved, and construction quality is guaranteed.

Description

Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method
Technical field
The invention belongs to technical field of building construction, and in particular to be poured after a kind of prefabricated assembling type reinforced frame raft foundation Band template and its construction method.
Background technology
In recent years, with the rapid economic development in our country, high level, high-rise building are more and more, large-scale, superthick raft plate Basic accounting gradually increases, and cast-in-place concrete structure is eliminated due to autogenous shrinkage unevenness or mitigated concrete because of temperature in order to prevent Degree, humidity deformation and structure sediment deformation etc. have an adverse effect to building, should be on Base isolation system and main structure body it is suitable When position setting post-cast strip, and the construction quality of raft board post poured band becomes the key of raft foundation construction.
The fabrication and installation of traditional alter-pouring strips mould plate and steel plate for sealing water need the reinforcing bar in raft board post poured band position to bind and complete Afterwards, then in-site installation, welding are carried out, at the beginning of constraining subsequent handling, delays foundation construction progress, and Welder Work operates on raft slab muscle, and welding quality is difficult to ensure that, fixation is not firm, is easy to cause and runs mould, spillage and other issues, Different-thickness raft plate juncture area, installation quality are more difficult to control, and construction efficiency is relatively low.
Invention content
The purpose of the present invention is for the technical problems in the prior art, provide it is a kind of it is simple in structure, be easy to make, The prefabricated assembled steel for being easily installed and working efficiency being improved, reduce operation difficulty, save construction cost, promoting project benefit Muscle frame raft foundation alter-pouring strips mould plate.
Another object of the present invention is to provide for a kind of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate Construction method.
In order to achieve the above object, the present invention uses following technical scheme:A kind of prefabricated assembling type reinforced frame raft plate base Plinth alter-pouring strips mould plate, including the cuboid steel bar framework modular unit that multiple head and the tail are fixedly connected, the steel bar framework template Unit includes upper frame, lower frame and the steel plate for sealing water being arranged between frame and lower frame, and the steel plate for sealing water is two Root and be respectively welded between frame long side face and lower frame long side side, two long side sides of the upper frame and Mesh template face layer is equipped on two long side sides of lower frame, two long side sides top part of the upper frame Gu Ding not There is comb mould.
Further, the long side face of the upper frame includes two be arranged in parallel upper frame longitudinal direction cross bars and installation The more upper ledges on two between the cross bar of frame longitudinal direction erect bar, are equipped between two long side sides of the upper frame multigroup Frame connecting rod component includes about the two upper frame transverse direction cross bars being arranged in parallel on upper frame connecting rod component and every group.
Further, it is equipped with the setting that intersects between two of the upper frame connecting rod component upper frame transverse direction cross bars Two upper frame diagonal braces.
Further, the upper frame connecting rod component for three groups and be separately positioned on frame long side face both ends and Middle part.
Further, the long side face of the lower frame includes two lower frame longitudinal direction cross bars being arranged in parallel and installation The more lower frame upright bars between two lower frame longitudinal direction cross bars are equipped between two long side sides of the lower frame multigroup Lower frame connects bar component and every group of lower frame connection bar component includes about the two lower frame transverse direction cross bars being arranged in parallel.
Further, it is equipped with the setting that intersects between two lower frame transverse direction cross bars of the lower frame connection bar component Two lower frame diagonal braces.
Further, lower frame connection bar component for three groups and be separately positioned on lower frame long side side both ends and Middle part.
Further, composite structure or fast-easy closing-up net of the mesh template face layer for expanded metal lath and steel wire.
Further, the comb mould includes a tree, used in making timber for boats wood, and the bottom of a tree, used in making timber for boats wood is uniformly provided with a plurality of groove.
A kind of construction method of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate, includes the following steps:
A, preparation of construction:Calculate the size at each position in post-cast strip, design in detail according to raft plate construction drawing by construction technical staff The size of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate, and processing drawing is drawn, make assembled steel reinforced frame Raft foundation alter-pouring strips mould plate;
B, the construction line-putting:The position line of post-cast strip is released according to design drawing;
C, bed course, waterproof layer, protective layer construction:By the construction of progress requirements of plan tissue bed course, waterproof layer and protective layer, simultaneously Installation binding post-cast strip additional bar;
D, tissue Fa Ban lower floors bar-mat reinforcement installation binding:The first binding installation Fa Ban lower floors reinforcing bar since the position of post-cast strip, then to Other regions extend;
E, alter-pouring strips mould plate is installed:The lower floor bar-mat reinforcement binding of post-cast strip position carries out alter-pouring strips mould plate after installation is complete immediately Installation, due to alter-pouring strips mould plate employ segmentation it is prefabricated, using tower crane by steel bar framework modular unit be lifted into post-cast strip position Place is put, then using electric welding, each steel bar framework modular unit is welded into entirety, while steel plate for sealing water is welded and is penetrated through;
F, mesh template face layer is arranged:By each steel bar framework modular unit welding it is integral after, to mesh template face layer carry out it is whole Reason blocks, and especially the beneath of steel bar framework modular unit junction and Fa Ban lower floors reinforcing bar will be blocked tightly, by mesh template face Layer extends downwardly, and is overlapped with raft plate bed course, then is blocked using the pea gravel concreten of a grade higher than raft board concrete intensity;
G, raft plate top bars are bound:After the completion of the reinforcing bar binding of Fa Ban lower floors, raft plate top mat is bound immediately, is assembled at this time Formula steel bar framework raft foundation alter-pouring strips mould plate can again be separately provided as the stent of raft plate top bars without at this position Stent;
H, comb mould is installed:After the completion of the binding of raft plate top mat, according to bar diameter and bar spacing size that a tree, used in making timber for boats is wooden Lower part cuts into comb form, mounted on the top of post-cast strip position, for blocking raft plate Surface layer's concrete, the height of comb mould It should be slightly bigger than the thickness of raft slab tendon protective layer;
I, casting concrete:After the completion of the binding of raft slab muscle, after each side's acceptance(check), you can casting concrete.
The present invention has the advantages that compared with the prior art:The prefabricated assembling type reinforced frame raft foundation of the present invention Alter-pouring strips mould plate includes the cuboid steel bar framework modular unit that multiple head and the tail are fixedly connected, each steel bar framework modular unit It, can setting according to post-cast strip in advance including upper frame, lower frame and the steel plate for sealing water being arranged between upper frame and lower frame It counts size and adds the good a certain number of steel bar framework modular units of work outside place, while raft slab muscle is bound, installation Alter-pouring strips mould plate changes after the completion of the binding of raft board post poured band position reinforcing bar, then carries out site welding, binding, installation, closure The construction technology of alter-pouring strips mould plate promotes to shift to an earlier date at the beginning of subsequent handling, accelerates construction speed, saved the duration.Together When, due to the pre-production outside place, welded, installed, the work such as bind without getting into raft plate steel reinforcement cage, changed Narrow construction space, execution conditions are improved between raft slab muscle, and construction quality is guaranteed.In addition, steel bar framework has There are certain bearing capacity, rigidity and stability, the stent of part raft plate top bars can be served as, cost has both been saved, also carried The high safety of construction.The configuration of the present invention is simple easily makes, is easily installed, and reduces operation difficulty, improves work effect Rate has saved construction cost, improves project benefit.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structure diagram of steel bar framework modular unit of the present invention;
Fig. 3 is the structure diagram of the upper frame of the present invention;
Fig. 4 is the structure diagram of lower frame of the present invention.
Reference numeral meaning of the present invention is as follows:1st, upper frame;2nd, lower frame;3rd, steel plate for sealing water;4th, mesh template face layer;5、 Comb mould;101st, upper frame longitudinal direction cross bar;102nd, upper frame transverse direction cross bar;103rd, upper ledge erects bar;104th, upper frame diagonal brace; 201st, lower frame longitudinal direction cross bar;202nd, lower frame transverse direction cross bar;203rd, lower frame upright bar;204th, lower frame diagonal brace.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and detailed description.
As shown in Figs. 1-2, a kind of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate, is fixed including multiple head and the tail The cuboid steel bar framework modular unit of connection, steel bar framework modular unit include upper frame 1, lower frame 2 and are arranged on Steel plate for sealing water 3 between upper frame 1 and lower frame 2, steel plate for sealing water 3 for two and be respectively welded at 1 long side side of frame with Between 2 long side side of lower frame, net is equipped on two long side sides of upper frame 1 and two long side sides of lower frame 2 Shape mould board finish 4, mesh template face 4 composite structure or fast-easy closing-up net for expanded metal lath and steel wire of layer, is enclosed in frame 1 Two long side sides and lower frame 2 two long side sides outer surface, play barrier concrete, it is ensured that post-cast strip is by setting Molding effect is counted, two long side sides top part of upper frame 1 is not fixed with comb mould 5, and comb mould 5 includes a tree, used in making timber for boats wood, a tree, used in making timber for boats wood Bottom be uniformly provided with a plurality of groove.
As shown in figure 3, the long side face of upper frame 1 includes two be arranged in parallel upper frame longitudinal direction cross bars 101 and peace The more upper ledges between two upper frame longitudinal direction cross bars 101 erect bar 103, are set between two long side sides of upper frame 1 There is multigroup upper frame connecting rod component, upper frame connecting rod component is three group and is separately positioned on the two of 1 long side side of frame End and middle part, frame connecting rod component includes the about two upper frame transverse direction cross bars 102 being arranged in parallel, upper frame company on every group Two upper frame diagonal braces 104 of the setting that intersects are equipped between the upper frame transverse direction cross bar 102 of two of extension bar component.
As shown in figure 4, the long side face of lower frame 2 includes two lower frame longitudinal direction cross bars 201 being arranged in parallel and peace The more lower frame upright bars 203 between two lower frame longitudinal direction cross bars 201 are set between two long side sides of lower frame 2 There is a multigroup lower frame connection bar component, lower frame connection bar component is three group and is separately positioned on the two of 2 long side side of lower frame End and middle part, every group of lower frame connection bar component include about the two lower frame transverse direction cross bars 202 being arranged in parallel, and lower frame connects Two lower frame diagonal braces 204 of the setting that intersects are equipped between two lower frame transverse direction cross bars 202 of extension bar component.
Include the following steps when being constructed using the prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate:
A, preparation of construction:Calculate the size at each position in post-cast strip, design in detail according to raft plate construction drawing by construction technical staff The size of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate, and processing drawing is drawn, make assembled steel reinforced frame Raft foundation alter-pouring strips mould plate.
B, the construction line-putting:The position line of post-cast strip is released according to design drawing.
C, bed course, waterproof layer, protective layer construction:By the construction of progress requirements of plan tissue bed course, waterproof layer and protective layer, Binding post-cast strip additional bar is installed simultaneously.
D, tissue Fa Ban lower floors bar-mat reinforcement installation binding:The first binding installation Fa Ban lower floors reinforcing bar since the position of post-cast strip, It is extended again to other regions.
E, alter-pouring strips mould plate is installed:The lower floor bar-mat reinforcement binding of post-cast strip position carries out post-cast strip after installation is complete immediately The installation of template, due to alter-pouring strips mould plate employ segmentation it is prefabricated, poured after using tower crane, steel bar framework modular unit is lifted into At band position, then using electric welding, each steel bar framework modular unit is welded into entirety, while steel plate for sealing water 3 is welded perforation.
F, mesh template face layer is arranged:By each steel bar framework modular unit welding it is integral after, to mesh template face layer 4 into Row is arranged, is blocked, and especially the beneath of steel bar framework modular unit junction and Fa Ban lower floors reinforcing bar will be blocked tightly, by netted mould Board finish 4 extends downwardly, and is overlapped with raft plate bed course, then is carried out using the pea gravel concreten of a grade higher than raft board concrete intensity It blocks.
G, raft plate top bars are bound:After the completion of the reinforcing bar binding of Fa Ban lower floors, raft plate top mat is bound immediately, at this time Assembled steel reinforced frame raft foundation alter-pouring strips mould plate can be as the stent of raft plate top bars, without independent again at this position Stent is set.
H, comb mould is installed:After the completion of the binding of raft plate top mat, according to bar diameter and bar spacing size by a tree, used in making timber for boats The lower part of wood cuts into comb form and comb mould 5 is made, mounted on the top of post-cast strip position, for blocking raft plate surface layer coagulation Soil, the height of comb mould 5 should be slightly bigger than the thickness of raft slab tendon protective layer.
I, casting concrete:After the completion of the binding of raft slab muscle, after each side's acceptance(check), you can casting concrete.

Claims (10)

1. a kind of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate, it is characterised in that:It fixes and connects including multiple head and the tail The cuboid steel bar framework modular unit connect, the steel bar framework modular unit include upper frame(1), lower frame(2)And It is arranged on frame(1)With lower frame(2)Between steel plate for sealing water(3), the steel plate for sealing water(3)For two and it is separately fixed at Upper frame(1)Long side side and lower frame(2)Between long side side, the upper frame(1)Two long side sides and lower frame Frame(2)Two long side sides on be equipped with mesh template face layer(4), the upper frame(1)Two long side sides top part It is not fixed with comb mould(5).
2. prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to claim 1, it is characterised in that:It is described Upper frame(1)Long side face include be arranged in parallel two upper frame longitudinal direction cross bars(101)And mounted on two upper frames Longitudinal cross bar(101)Between more upper ledges erect bar(103), the upper frame(1)Two long side sides between be equipped with it is more Frame connecting rod component includes about the two upper frame transverse direction cross bars being arranged in parallel on frame connecting rod component and every group in group (102).
3. prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to claim 2, it is characterised in that:It is described The upper frame transverse direction cross bar of two of upper frame connecting rod component(102)Between be equipped with two of the setting upper frame diagonal braces that intersect (104).
4. the prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to Claims 2 or 3, it is characterised in that: The upper frame connecting rod component is three groups and is separately positioned on frame(1)The both ends and middle part of long side side.
5. prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to claim 1, it is characterised in that:It is described Lower frame(2)Long side face include two lower frame longitudinal direction cross bars being arranged in parallel(201)And mounted on two lower frames Longitudinal cross bar(201)Between more lower frame upright bars(203), the lower frame(2)Two long side sides between be equipped with it is more Group lower frame connection bar component and every group of lower frame connect bar component and include about the two lower frame transverse direction cross bars being arranged in parallel (202).
6. prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to claim 5, it is characterised in that:It is described Lower frame connects two lower frame transverse direction cross bars of bar component(202)Between be equipped with the two lower frame diagonal braces of setting of intersecting (204).
7. prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to claim 5 or 6, it is characterised in that: The lower frame connection bar component is three groups and is separately positioned on lower frame(2)The both ends and middle part of long side side.
8. prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to claim 1, it is characterised in that:It is described Mesh template face layer(4)Composite structure or fast-easy closing-up net for expanded metal lath and steel wire.
9. prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate according to claim 1, it is characterised in that:It is described Comb mould(5)Including a tree, used in making timber for boats wood, the bottom of a tree, used in making timber for boats wood is uniformly provided with a plurality of groove.
A kind of 10. construction method of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate, it is characterised in that this method packet Include following steps:
A, preparation of construction:Calculate the size at each position in post-cast strip, design in detail according to raft plate construction drawing by construction technical staff The size of prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate, and processing drawing is drawn, make assembled steel reinforced frame Raft foundation alter-pouring strips mould plate;
B, the construction line-putting:The position line of post-cast strip is released according to design drawing;
C, bed course, waterproof layer, protective layer construction:By the construction of progress requirements of plan tissue bed course, waterproof layer and protective layer, simultaneously Installation binding post-cast strip additional bar;
D, tissue Fa Ban lower floors bar-mat reinforcement installation binding:The first binding installation Fa Ban lower floors reinforcing bar since the position of post-cast strip, then to Other regions extend;
E, alter-pouring strips mould plate is installed:The lower floor bar-mat reinforcement binding of post-cast strip position carries out alter-pouring strips mould plate after installation is complete immediately Installation, due to alter-pouring strips mould plate employ segmentation it is prefabricated, using tower crane by steel bar framework modular unit be lifted into post-cast strip position It puts place, then using electric welding, each steel bar framework modular unit is welded into entirety, while by steel plate for sealing water(3)Welding perforation;
F, mesh template face layer is arranged:By each steel bar framework modular unit welding it is integral after, to mesh template face layer(4)It carries out It arranges, block, especially the beneath of steel bar framework modular unit junction and Fa Ban lower floors reinforcing bar will be blocked tightly, by mesh template Face layer(4)It extends downwardly, is overlapped with raft plate bed course, then carried out using the pea gravel concreten of a grade higher than raft board concrete intensity It blocks;
G, raft plate top bars are bound:After the completion of the reinforcing bar binding of Fa Ban lower floors, raft plate top mat is bound immediately, is assembled at this time Formula steel bar framework raft foundation alter-pouring strips mould plate can again be separately provided as the stent of raft plate top bars without at this position Stent;
H, comb mould is installed:After the completion of the binding of raft plate top mat, according to bar diameter and bar spacing size that a tree, used in making timber for boats is wooden Lower part cuts into comb form and comb mould is made(5), mounted on the top of post-cast strip position, for blocking raft plate surface layer coagulation Soil, comb mould(5)Height should be slightly bigger than the thickness of raft slab tendon protective layer;
I, casting concrete:After the completion of the binding of raft slab muscle, after each side's acceptance(check), you can casting concrete.
CN201810127846.XA 2018-02-08 2018-02-08 Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method Pending CN108130915A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810127846.XA CN108130915A (en) 2018-02-08 2018-02-08 Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810127846.XA CN108130915A (en) 2018-02-08 2018-02-08 Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method

Publications (1)

Publication Number Publication Date
CN108130915A true CN108130915A (en) 2018-06-08

Family

ID=62430704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810127846.XA Pending CN108130915A (en) 2018-02-08 2018-02-08 Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method

Country Status (1)

Country Link
CN (1) CN108130915A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820785A (en) * 2019-11-14 2020-02-21 中国建筑第八工程局有限公司 Shear assembly and construction method thereof
CN113833004A (en) * 2021-11-04 2021-12-24 中铁三局集团有限公司 Deep large raft foundation post-cast strip formwork system and foundation construction method
CN114673346A (en) * 2022-04-17 2022-06-28 南通新华建筑集团有限公司 Modular post-cast strip assembled side mold structure and construction method thereof
CN115233720A (en) * 2022-08-28 2022-10-25 中建八局第一建设有限公司 Super-thick radiation-proof raft plate L-shaped construction joint structure and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101109320B1 (en) * 2011-06-27 2012-02-08 주식회사 한양피씨 Field assembly concrete culvert box having underground excavation prevention structure and construction method thereof
CN102635128A (en) * 2012-04-27 2012-08-15 天津二十冶建设有限公司 Foundation slab post-cast strip waterproof steel plate combined structure and bracing method thereof
CN102720216A (en) * 2012-07-11 2012-10-10 南通市达欣工程股份有限公司 Foundation post-pouring belt template constructing method
CN203795479U (en) * 2014-05-05 2014-08-27 上海绿地建设(集团)有限公司 Raft post-pouring joint construction structure
CN105133663A (en) * 2015-09-18 2015-12-09 中铁十六局集团城市建设发展有限公司 Post-cast strip device and construction method thereof
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN207959244U (en) * 2018-02-08 2018-10-12 甘肃第七建设集团股份有限公司 Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101109320B1 (en) * 2011-06-27 2012-02-08 주식회사 한양피씨 Field assembly concrete culvert box having underground excavation prevention structure and construction method thereof
CN102635128A (en) * 2012-04-27 2012-08-15 天津二十冶建设有限公司 Foundation slab post-cast strip waterproof steel plate combined structure and bracing method thereof
CN102720216A (en) * 2012-07-11 2012-10-10 南通市达欣工程股份有限公司 Foundation post-pouring belt template constructing method
CN203795479U (en) * 2014-05-05 2014-08-27 上海绿地建设(集团)有限公司 Raft post-pouring joint construction structure
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN105133663A (en) * 2015-09-18 2015-12-09 中铁十六局集团城市建设发展有限公司 Post-cast strip device and construction method thereof
CN207959244U (en) * 2018-02-08 2018-10-12 甘肃第七建设集团股份有限公司 Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820785A (en) * 2019-11-14 2020-02-21 中国建筑第八工程局有限公司 Shear assembly and construction method thereof
CN113833004A (en) * 2021-11-04 2021-12-24 中铁三局集团有限公司 Deep large raft foundation post-cast strip formwork system and foundation construction method
CN114673346A (en) * 2022-04-17 2022-06-28 南通新华建筑集团有限公司 Modular post-cast strip assembled side mold structure and construction method thereof
CN115233720A (en) * 2022-08-28 2022-10-25 中建八局第一建设有限公司 Super-thick radiation-proof raft plate L-shaped construction joint structure and construction method

Similar Documents

Publication Publication Date Title
CN108130915A (en) Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate and its construction method
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN207959244U (en) Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate
CN106968367A (en) A kind of new 3D printing reinforced wall and its construction method
CN106284840B (en) A kind of second pouring steel reinforced concrete frame beam and its construction method
CN102251667B (en) Construction method for reinforced concrete arched roof of grain store
TWI689652B (en) Beam-slab structure and construction method
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN206174120U (en) Prefabricated constructional column and structure thereof
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN104831932A (en) Construction technology for high-grade concrete column base
CN208981597U (en) A kind of laminated floor slab
CN209353550U (en) A kind of sandwich loss of weight superimposed sheet
CN203924669U (en) A kind of precast concrete scaffold base and making mould thereof
CN210177770U (en) Box template for building floor
CN208347063U (en) The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall
CN208009463U (en) A kind of steel-pipe pile concrete bearing platform
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN205444088U (en) Ecological environment -friendly bank dyke revetment and be used for H type prestressed concrete pile of this protective wall
CN108442594A (en) A kind of thin floor and its construction technology
CN106836641A (en) Side sticking steel plate formula Combined concrete coupling beam
CN209179319U (en) The connecting joint structure of Liang Yuliang
CN209780081U (en) Light assembling stairway with steel concrete combined flat bottom plate and filler
CN209261049U (en) Precast beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination