CN108123539A - Photovoltaic power station monitoring system based on bussing technique - Google Patents

Photovoltaic power station monitoring system based on bussing technique Download PDF

Info

Publication number
CN108123539A
CN108123539A CN201611057532.4A CN201611057532A CN108123539A CN 108123539 A CN108123539 A CN 108123539A CN 201611057532 A CN201611057532 A CN 201611057532A CN 108123539 A CN108123539 A CN 108123539A
Authority
CN
China
Prior art keywords
data
monitoring
power station
monitoring system
photovoltaic power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611057532.4A
Other languages
Chinese (zh)
Inventor
李建
刘梦波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning East Eagle New Energy Polytron Technologies Inc
Original Assignee
Liaoning East Eagle New Energy Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning East Eagle New Energy Polytron Technologies Inc filed Critical Liaoning East Eagle New Energy Polytron Technologies Inc
Priority to CN201611057532.4A priority Critical patent/CN108123539A/en
Publication of CN108123539A publication Critical patent/CN108123539A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0062
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)

Abstract

Photovoltaic power station monitoring system based on bussing technique belongs to monitoring system technical field more particularly to a kind of photovoltaic power station monitoring system based on bussing technique.The present invention provides the photovoltaic power station monitoring system based on bussing technique that a kind of communication stability is good, communication speed is fast.The present invention includes on-site supervision node, local communication controller and remote monitoring center;On-site supervision node includes photovoltaic DC-to-AC converter, environmental sensor, and on-site supervision node is arranged to fieldbus slave station, is communicated by fieldbus and local communication controller;Local communication controller is as fieldbus main website;The fieldbus main website carries out data transmission with individual field devices, and passes through WLAN and communicated with remote monitoring center.

Description

Photovoltaic power station monitoring system based on bussing technique
Technical field
The invention belongs to monitoring system technical fields more particularly to a kind of photovoltaic plant based on bussing technique to monitor system System.
Background technology
The energy of solar energy is the energy from outside of the earth celestial body(Mainly solar energy), it is the hydrogen nuclei in the sun The huge energy that fusion discharges in superhigh temperature, the overwhelming majority of necessary for human energy is all directly or indirectly from the sun.Often Year obtained solar energy of the earth is equivalent to the energy that the oil reservoir of 25cm thickness is contained.If the mankind can fully collect unrestrained To tellurian solar energy, the illumination of about 6h is just enough to supply the global every country energy of 1 year use.At present, photovoltaic electric The local communication mode for monitoring system of standing is relatively simple, mainly using RS485 bussing techniques, since its bus efficiency is low, system Real-time is poor, it is difficult to meet the needs of large-scale photovoltaic power station monitoring system from now on.With the quick hair of field bus technique Exhibition and extensive use, fieldbus are just gradually being displayed in the advantage of communication capacity, reliability, real-time etc..
The content of the invention
The present invention addresses the above problem, provides that a kind of communication stability is good, communication speed is fast based on bussing technique Photovoltaic power station monitoring system.
To achieve the above object, the present invention adopts the following technical scheme that, the present invention includes on-site supervision node, local communication Controller and remote monitoring center.On-site supervision node includes photovoltaic DC-to-AC converter, environmental sensor
, on-site supervision node is arranged to fieldbus slave station, communicated by fieldbus and local communication controller.Scene Communication controller is as fieldbus main website.
The fieldbus main website carries out data transmission with individual field devices, and passes through in WLAN and remote monitoring The heart communicates.
The remote monitoring center includes monitoring host computer and printer.Monitoring host computer includes real time data monitoring portion Divide, data store and processing analysis part, malfunction monitoring and alarm portion, system parameter setting part, offer report and trend Curved portion.
The real time data monitoring part carries out real-time data acquisition to system operation data and environmental parameter, transmits and leads to It crosses host computer interface and carries out data monitoring.
The data storage and processing analysis part periodically store photovoltaic plant operating condition automatically, while pass through processing point Phase separation related parameter obtains the data such as pollution reduction amount, economic benefit.
The boundary value and alarm priority of the malfunction monitoring and alarm portion initialization system operating parameter, when a certain link During beyond its normal range of operation, system is alarmed automatically.Simultaneity factor will record alert event content and processing each time As a result.
The system parameter setting part sets system relevant operating parameter, including baud rate, power station operating mode and Data storage cycle etc..
The offer report and trend curve part provide real time data report and historical data report, and power station data is supervised It surveys and analyzes, while related data trend curve is provided, calculate the influence that different parameters run photovoltaic plant.
As a preferred embodiment, system parameter setting part of the present invention comprises the following steps.
1) newly built construction is established, networking is carried out according to device therefor model, and distributes main website and slave station offset address.It sets total Line parameter is set including baud rate, target circulation time, foundation and time delay module.According to transmission data cases, led It stands and slave station relevant parameter designs, when wherein slave station is set, according to application layer protocol situation, corresponding input and output mould is set Block.
2) equipment test function is called, carries out equipment debugging, if not successfully, carrying out misarrangement according to diagnostic message, carrying out Data transmission.
As another preferred embodiment, the present invention includes 3 type slave stations, only has 1 to set in synchronization per class slave station Standby work.All types of slave station input byte numbers are 2byte, and output word joint number is respectively 9,27 and 15byte.
In addition, monitoring system of the present invention include user's login, system operation information, data analysis, alarm, energy-saving and emission-reduction and System sets interface.Wherein system operation interface is monitoring system main interface, carries out system operating mode switching.
Advantageous effect of the present invention.
Field bus technique is applied in photovoltaic power station monitoring system by the present invention, gives the network knot of monitoring system Structure realizes ipc monitor interface.The present invention has the characteristics that networking is simple, communication stability is good, communication speed is fast.In photovoltaic The automatization level of photovoltaic plant monitoring will be greatly improved today that generation technology uses on a large scale, generate good society's effect Benefit and economic benefit.
Description of the drawings
In order to which technical problem solved by the invention, technical solution and advantageous effect is more clearly understood, below in conjunction with The drawings and the specific embodiments, the present invention will be described in further detail.It should be appreciated that specific embodiment party described herein Formula is only used to explain the present invention, is not intended to limit the present invention.
Fig. 1 is schematic block circuit diagram of the present invention.
Fig. 2 is present system interfacial structure block diagram.
Specific embodiment
As shown in the figure, the present invention includes on-site supervision node, local communication controller and remote monitoring center.On-site supervision Node includes photovoltaic DC-to-AC converter, environmental sensor, and on-site supervision node is arranged to fieldbus slave station, by fieldbus and now Field communication controller is communicated.Local communication controller is as fieldbus main website.
The fieldbus main website carries out data transmission with individual field devices, and passes through in WLAN and remote monitoring The heart communicates.
The remote monitoring center includes monitoring host computer and printer.Monitoring host computer includes real time data monitoring portion Divide, data store and processing analysis part, malfunction monitoring and alarm portion, system parameter setting part, offer report and trend Curved portion.
The real time data monitoring part carries out real-time data acquisition to system operation data and environmental parameter, transmits and leads to It crosses host computer interface and carries out data monitoring.
The data storage and processing analysis part periodically store photovoltaic plant operating condition automatically, while pass through processing point Phase separation related parameter obtains the data such as pollution reduction amount, economic benefit.
The boundary value and alarm priority of the malfunction monitoring and alarm portion initialization system operating parameter, when a certain link During beyond its normal range of operation, system is alarmed automatically.Simultaneity factor will record alert event content and processing each time As a result.
The system parameter setting part sets system relevant operating parameter, including baud rate, power station operating mode and Data storage cycle etc..
The offer report and trend curve part provide real time data report and historical data report, and power station data is supervised It surveys and analyzes, while related data trend curve is provided, calculate the influence that different parameters run photovoltaic plant.
The system parameter setting part comprises the following steps.
1) newly built construction is established, networking is carried out according to device therefor model, and distributes main website and slave station offset address.It sets total Line parameter is set including baud rate, target circulation time, foundation and time delay module.According to transmission data cases, led It stands and slave station relevant parameter designs, when wherein slave station is set, according to application layer protocol situation, corresponding input and output mould is set Block.
2) equipment test function is called, carries out equipment debugging, if not successfully, carrying out misarrangement according to diagnostic message, carrying out Data transmission.
The present invention includes 3 type slave stations, there was only 1 equipment work in synchronization per class slave station.All types of slave stations are defeated It is 2byte to enter byte number, and output word joint number is respectively 9,27 and 15byte.
Monitoring system of the present invention includes user's login, system operation information, data analysis, alarm, energy-saving and emission-reduction and system Interface is set.Wherein system operation interface is monitoring system main interface, carries out system operating mode switching.
China's industrialization all-in-one machine is ground in remote monitoring center equipment choosing of the present invention.Operating system chooses Windows-XP systems System, had not only met the operating habit of most people, but also has met system requirements.By menu operation, the switching of different pictures is realized, respectively Picture dynamic intuitively describes the operating condition of photovoltaic plant, meanwhile, by KingView data analysis control quickly and easily Realize data analysis task.Largely operation data processing on, KingView is connected with database software, realize data into One step analyzes and processes function.
The above content is combine specific preferred embodiment to the further description of the invention made, it is impossible to assert this The specific implementation of invention is confined to these explanations, for those of ordinary skill in the art to which the present invention belongs, not On the premise of departing from present inventive concept, several simple deduction or replace can also be made, the present invention should be all considered as belonging to and be carried The protection domain that claims of friendship determine.

Claims (3)

1. the photovoltaic power station monitoring system based on bussing technique, including on-site supervision node, local communication controller and long-range prison Control center;It is characterized in that on-site supervision node includes photovoltaic DC-to-AC converter, environmental sensor, on-site supervision node is arranged to scene Bus slave station is communicated by fieldbus and local communication controller;Local communication controller is as fieldbus main website;
The fieldbus main website carries out data transmission with individual field devices, and passes through WLAN and lead to remote monitoring center News;
The remote monitoring center includes monitoring host computer and printer;Monitoring host computer includes real time data monitoring part, number According to storage and processing analysis part, malfunction monitoring and alarm portion, system parameter setting part, offer report and trend curve portion Point;
On real time data monitoring part carries out real-time data acquisition to system operation data and environmental parameter, transmits and passes through Position machine interface carries out data monitoring;
The data storage and processing analysis part periodically store photovoltaic plant operating condition automatically, while analyze phase by handling Related parameter obtains the data such as pollution reduction amount, economic benefit;
The boundary value and alarm priority of the malfunction monitoring and alarm portion initialization system operating parameter, when a certain link exceeds During its normal range of operation, system is alarmed automatically;Simultaneity factor will record alert event content and handling result each time;
The system parameter setting part sets system relevant operating parameter, including baud rate, power station operating mode and data Storage cycle etc.;
The offer report and trend curve part provide real time data report and historical data report, to power station data monitoring and Analysis, while related data trend curve is provided, calculate the influence that different parameters run photovoltaic plant;
Photovoltaic power station monitoring system based on bussing technique according to claim 1, it is characterised in that the systematic parameter is set Part is put to comprise the following steps:
1) newly built construction is established, networking is carried out according to device therefor model, and distributes main website and slave station offset address;Bus is set to join Number is set including baud rate, target circulation time, foundation and time delay module;According to transmission data cases, carry out main website and Slave station relevant parameter designs, and when wherein slave station is set, according to application layer protocol situation, sets corresponding input/output module;
2) equipment test function is called, carries out equipment debugging, if not successfully, carrying out misarrangement according to diagnostic message, carrying out data Transmission.
2. the photovoltaic power station monitoring system based on bussing technique according to claim 1, it is characterised in that including 3 types from It stands, there was only 1 equipment work in synchronization per class slave station;All types of slave stations input byte numbers are 2byte, output word joint number Respectively 9,27 and 15byte.
3. the photovoltaic power station monitoring system based on bussing technique according to claim 1, it is characterised in that monitoring system includes User's login, system operation information, data analysis, alarm, energy-saving and emission-reduction and system set interface;Wherein system operation interface is Monitoring system main interface carries out system operating mode switching.
CN201611057532.4A 2016-11-26 2016-11-26 Photovoltaic power station monitoring system based on bussing technique Pending CN108123539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611057532.4A CN108123539A (en) 2016-11-26 2016-11-26 Photovoltaic power station monitoring system based on bussing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611057532.4A CN108123539A (en) 2016-11-26 2016-11-26 Photovoltaic power station monitoring system based on bussing technique

Publications (1)

Publication Number Publication Date
CN108123539A true CN108123539A (en) 2018-06-05

Family

ID=62223536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611057532.4A Pending CN108123539A (en) 2016-11-26 2016-11-26 Photovoltaic power station monitoring system based on bussing technique

Country Status (1)

Country Link
CN (1) CN108123539A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109150681A (en) * 2018-09-07 2019-01-04 深圳市雷赛控制技术有限公司 RTEX bus networking method and system
CN110837812A (en) * 2019-11-14 2020-02-25 深圳罗兰得技术有限公司 Test monitoring method and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109150681A (en) * 2018-09-07 2019-01-04 深圳市雷赛控制技术有限公司 RTEX bus networking method and system
CN109150681B (en) * 2018-09-07 2021-03-16 深圳市雷赛控制技术有限公司 RTEX bus networking method and system
CN110837812A (en) * 2019-11-14 2020-02-25 深圳罗兰得技术有限公司 Test monitoring method and system
CN110837812B (en) * 2019-11-14 2022-11-15 戴西茶 Test monitoring method and system

Similar Documents

Publication Publication Date Title
CN107330056B (en) Wind power plant SCADA system based on big data cloud computing platform and operation method thereof
CN202384835U (en) Monitoring system of distributed photovoltaic grid-connected power inverters
CN104269922B (en) A kind of distributed power source parameter monitoring method and system based on GPRS/GIS
CN105024397A (en) Dynamic simulation system of offshore wind power power-transmission and grid-connected system through VSC-MTDC
CN102325149B (en) Intelligent network remote terminal unit (RTU) system of electrified railway
CN103812724A (en) Communication management device for transformer substation online monitoring system
CN107124465A (en) Towards the distributed photovoltaic remote data acquisition system framework method accessed on a large scale
CN107302588A (en) A kind of intelligent network energy monitor control system based on Web
CN206004617U (en) A kind of photovoltaic generation monitoring system
CN106200389A (en) A kind of intelligent electric energy meter based on embedded system
CN108123539A (en) Photovoltaic power station monitoring system based on bussing technique
CN203968150U (en) The long-range intensive management system of distributed energy
CN207470355U (en) A kind of wind power generation farm monitoring system
CN206757872U (en) Photovoltaic application system remote monitoring system
CN103424649A (en) Energy efficiency acquisition terminal
CN211878729U (en) Intelligent monitoring system for acquisition equipment
CN202721499U (en) Wind power plant remote monitoring system based on wireless network
CN203761400U (en) Central control communication chamber for photovoltaic power station measuring system
CN205334216U (en) Multiple energy remote monitering system
CN210402688U (en) Photovoltaic power station wireless data acquisition system
CN106933116A (en) Micro-capacitance sensor emulation debugging method with MATLB interfaces
CN205038504U (en) Wind stores up monitored control system
CN105554111A (en) Modularized solar irradiance monitoring method based on Zigbee protocol
CN207200771U (en) A kind of photovoltaic plant production monitoring platform
CN205665871U (en) Intelligent building energy consumption monitored control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180605

WD01 Invention patent application deemed withdrawn after publication