CN108118887A - A kind of steel structure scaffold of garden layout - Google Patents

A kind of steel structure scaffold of garden layout Download PDF

Info

Publication number
CN108118887A
CN108118887A CN201711391946.5A CN201711391946A CN108118887A CN 108118887 A CN108118887 A CN 108118887A CN 201711391946 A CN201711391946 A CN 201711391946A CN 108118887 A CN108118887 A CN 108118887A
Authority
CN
China
Prior art keywords
block
link block
casting lug
steel structure
distance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711391946.5A
Other languages
Chinese (zh)
Inventor
付贤昆
杨锐波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Municipal Park And Garden Construction Co Ltd Of Permanent Fortune
Original Assignee
Municipal Park And Garden Construction Co Ltd Of Permanent Fortune
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Municipal Park And Garden Construction Co Ltd Of Permanent Fortune filed Critical Municipal Park And Garden Construction Co Ltd Of Permanent Fortune
Priority to CN201711391946.5A priority Critical patent/CN108118887A/en
Publication of CN108118887A publication Critical patent/CN108118887A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/20Stiff scaffolding clamps for connecting scaffold members of common shape for ends of members only, e.g. for connecting members in end-to-end relation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses a kind of steel structure scaffolds of garden layout, and including steel structure support tube, steel structure support tube lower end is installed with connection sub-block, and the steel structure support tube upper end is fixedly installed with being connected the matched connection mother tuber of sub-block;The connection mother tuber includes be fixedly connected with the steel structure support tube upper end first and fixes matrix, the first opening up lock hole is provided in the first fixation matrix upper surface, the first fixation matrix upper surface is located at the first lock hole right end and is fixedly installed the first link block upwardly extended, the first link block left side and the first lock hole right end wall flush, the first link block upper end is provided with the first casting lug thereon extended to the left, the first locking protrusion is provided on the left of the first casting lug thereon upper surface, first locking protrusion left side and the first casting lug thereon left side flush, apparatus of the present invention can improve security during construction, and installation and removal are also all very convenient, garden layout efficiency can be improved.

Description

A kind of steel structure scaffold of garden layout
Technical field
The present invention relates to a kind of garden layout field, the steel structure scaffold of specifically a kind of garden layout.
Background technology
During garden layout, some small buildings can be built in gardens, so as to increase the diversification in gardens, built It makes in these small buildings, generally requires to need to use scaffold, scaffold is completed when building, it is necessary to install substantial amounts of screw It is fastenedly connected, therefore dismounting is required for consuming the substantial amounts of time and removes dismounting screw every time, and also screw quantity is more, it is easy to does It loses, adds worker to the management intensity on part, add the labor intensity dismounted every time, moreover, in use, spiral shell Silk easily generates loosening, therefore current steel structure scaffold, there are more deficiency, there is also very big security risks.
The content of the invention
For the deficiency of above-mentioned technology, the present invention proposes a kind of steel structure scaffold of garden layout.
A kind of steel structure scaffold of garden layout of the present invention, including steel structure support tube, the steel structure support tube lower end Connection sub-block is installed with, the steel structure support tube upper end is fixedly installed female with the matched connection of connection sub-block Block;
The connection mother tuber includes be fixedly connected with the steel structure support tube upper end first and fixes matrix, and described first fixes base The first opening up lock hole is provided in block upper surface, the first fixation matrix upper surface is located at first lock hole Right end is fixedly installed the first link block upwardly extended, the first link block left side and the first lock hole right end wall Flush, the first link block upper end are provided with the first casting lug thereon extended to the left, the first casting lug thereon upper surface left side It is provided with the first locking protrusion, the first locking protrusion left side and the first casting lug thereon left side flush, described the In one link block push rod component is provided at first casting lug thereon;
The connection sub-block includes be fixedly connected with the steel structure support tube lower face second and fixes matrix, and described first fixes It is provided with downward opening in matrix lower face and protrudes matched second lock hole with the described first locking, described second is solid Determine matrix lower face and be located at the second lock hole left end to be fixedly installed the second link block extended downwardly, second connection Block right side and the second lock hole left end wall flush, the second link block lower end are fixedly installed the extended to the right Two casting lug thereons, the second casting lug thereon lower face right side are fixedly installed and matched second lock tab of first lock hole Go out, the second locking protrusion right side and the second casting lug thereon right side flush, be provided in second link block Elastic pin assembly;
The elasticity pin assembly includes being arranged in second link block and is open towards right telescopic chute and is slidably mounted on Holding pin in the telescopic chute, the flexible groove bottom wall is concordant with the second link block upper surface, and on the telescopic chute Limit sliding chutes are symmetrically arranged in lower bottom wall, position limiting slide block, the position limiting slide block and institute are slidably fitted in the limit sliding chutes It states position limiting slide block to be fixedly connected, the top pressure spring to offset with the position limiting slide block, institute is also installed in the limit sliding chutes State top pressure spring to by the position limiting slide block to the right top pressure and make the holding pin right side and the second link block right end Face is concordant;
The push rod component includes being arranged in first link block and opening is connected towards right sliding groove, with the sliding groove Logical and opening is towards right pushing tow slot, the mandril being slidably mounted in the sliding groove and is slidably mounted in the pushing tow slot Push block, the push block are fixedly connected with the mandril, are provided with what is communicated with the sliding groove in the slip groove bottom wall Positioning runner is installed with magnetic patch in the positioning runner right end wall, is slidably fitted in the positioning runner and the magnetic The matched iron block of block, the iron block are fixedly connected with the mandril.
Further technical solution, distance and the iron block of the magnetic patch left side to the first link block left side The distance of right side to the mandril left side is equal, when the iron block coordinates with the magnetic patch and is offseted as a result, the mandril Left side is concordant with the first link block left side, the thickness difference of the length of the positioning runner and the iron block and described the The distance of two casting lug thereon right sides to the second link block right side is equal.
Further technical solution, it is described first locking protrusion upper surface to the first casting lug thereon bottom face distance and The distance that the second casting lug thereon upper surface fixes matrix bottom face to described second is equal.
Further technical solution, it is described second locking protrusion bottom face to the second casting lug thereon upper surface distance and The distance that the first casting lug thereon bottom face fixes matrix upper surface to described first is equal.
Further technical solution, distance and institute of the second casting lug thereon right side to the second link block right side The distance for stating the first casting lug thereon left side to the first link block left side is equal.
Further technical solution, the first locking protrusion protrude the height phase in vertical direction with the described second locking Deng, and the holding pin is equal with the described first locking protrusion in the thickness of vertical direction.
The beneficial effects of the invention are as follows:
Apparatus of the present invention when in use, are promoted the holding pin using the first casting lug thereon left side to the left, when described When one casting lug thereon and the first locking protrusion offset with second link block, second casting lug thereon and the locking Block offsets with first link block, then pushes down on the described second fixation matrix, and the first locking protrusion is inserted into In second lock slots, and the second locking protrusion is inserted into first lock slots, when the described first locking protrusion When protruding respectively with second lock slots and fully mated first lock slots with the described second locking, first protrusion Space is formed between block and the second casting lug thereon, and under the action of the top pressure spring, the holding pin extend into described first In space between casting lug thereon and the second casting lug thereon, the connection sub-block is relatively fixed with the connection mother tuber as a result, by This completes the fixation of neighbouring two steel structure support tube;
When needing to separate neighbouring two steel structures support tube, the push block is driven to slide to the left, the push block can band The mandril is moved to slide to the left, and the mandril may act on the holding pin, thus the holding pin can be made to slide to the left, when When the iron block left side offsets with the positioning runner left end wall, when the holding pin is fully retracted in the telescopic chute, Described second is driven to fix the upward lifting of matrix at this time, when the described first locking protrusion and the described second locking protrusion depart from respectively When second lock slots and first lock slots, neighbouring two steel structures support tube can be separated;
Apparatus of the present invention are installed without the cooperation of screw thread, it is therefore not necessary to worry the loosening of screw thread and cause adjacent two A steel structure scaffold it is unstable, apparatus of the present invention can improve security during construction, and it is also all ten to mount and dismount It is convenient to divide, and can improve garden layout efficiency.
Description of the drawings
It, below will be to embodiment or the prior art in order to illustrate more clearly of inventive embodiments or technical solution of the prior art Attached drawing is briefly described needed in description, it should be apparent that, the accompanying drawings in the following description is only one invented A little embodiments, for those of ordinary skill in the art, without creative efforts, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is a kind of structure diagram of the steel structure scaffolding structure of municipal construction of the present invention;
Fig. 2 is the structure diagram of the connection mother tuber in a kind of steel structure scaffolding structure of municipal construction of the present invention;
Fig. 3 is the structure diagram of the connection sub-block in a kind of steel structure scaffolding structure of municipal construction of the present invention;
Fig. 4 be connection mother tuber be connected sub-block it is fully mated when structure diagram.
Specific embodiment
All features or disclosed all methods disclosed in this specification or in the process the step of, except mutually exclusive spy Beyond sign and/or step, it can combine in any way.
This specification(Including any accessory claim, summary and attached drawing)Disclosed in any feature, except non-specifically chatting It states, can be replaced by other alternative features that are equivalent or have similar purpose.I.e., unless specifically stated, each feature It is an example in a series of equivalent or similar characteristics.
As shown in Figures 1 to 4, the steel structure scaffold of a kind of garden layout of apparatus of the present invention, including steel structure support tube 10,10 lower end of steel structure support tube be installed with connection sub-block 130,10 upper end of steel structure support tube be fixedly installed with The matched connection mother tuber 300 of connection sub-block 130;
The connection mother tuber 300 includes be fixedly connected with 10 upper end of steel structure support tube first and fixes matrix 30, and described the The first opening up lock hole 34 is provided in one 30 upper surface of fixation matrix, 30 upper surface of the first fixation matrix is located at First lock hole, 34 right end is fixedly installed the first link block 31 upwardly extended, 31 left side of the first link block with First lock hole, the 34 right end wall flush, 31 upper end of the first link block is provided with the first casting lug thereon extended to the left 32, be provided with the first locking protrusion 33 on the left of 32 upper surface of the first casting lug thereon, the first locking 33 left sides of protrusion with First casting lug thereon, the 32 left side flush is provided with mandril group in first link block at first casting lug thereon Part;
The connection sub-block 130 includes be fixedly connected with 10 lower face of steel structure support tube second and fixes matrix 13, described It is provided with downward opening in first 30 lower face of fixation matrix and is locked with the described first locking protrusion 33 matched second Hole 34,13 lower face of the second fixation matrix are located at 34 left end of the second lock hole and are fixedly installed second extended downwardly Link block 23,23 right side of the second link block and the 34 left end wall flush of the second lock hole, second link block 23 lower ends are fixedly installed the second casting lug thereon 18 extended to the right, be fixedly installed on the right side of 18 lower face of the second casting lug thereon with The locking of first lock hole 34 matched second protrusion 19, the second locking 19 right sides of protrusion and the described second protrusion 18 right side flush of block is provided with elastic pin assembly in second link block 23;
The elasticity pin assembly includes being arranged in second link block 23 and is open towards right telescopic chute 17 and slides peace Holding pin 20 in the telescopic chute 17,17 bottom wall of telescopic chute is concordant with 23 upper surface of the second link block, and The telescopic chute is symmetrically arranged with limit sliding chutes 14 in bottom wall about 17, position limiting slide block is slidably fitted in the limit sliding chutes 14 21, the position limiting slide block 21 is fixedly connected with the position limiting slide block 21, be also installed in the limit sliding chutes 14 with it is described The top pressure spring 15 that position limiting slide block 21 offsets, the top pressure spring 15 to by the position limiting slide block 21 to the right top pressure and make described 20 right side of holding pin is concordant with 23 right side of the second link block;
The push rod component include being arranged in first link block 31 and opening towards right sliding groove, with the sliding groove phase It connects and is open towards right pushing tow slot 39, the mandril 38 being slidably mounted in the sliding groove and is slidably mounted on the pushing tow Push block 40 in slot 39, the push block 40 are fixedly connected with the mandril 38, are provided with and institute in the slip groove bottom wall The positioning runner 35 that sliding groove communicates is stated, magnetic patch 37, the positioning runner are installed in the 35 right end wall of positioning runner It is slidably fitted in 35 and is fixedly connected with the 37 matched iron block 36 of magnetic patch, the iron block 36 with the mandril 38.
Valuably or illustratively, wherein, 37 left side of magnetic patch to the distance of 31 left side of the first link block Equal with the distance of 36 right side of iron block to 38 left side of mandril, the iron block 36 is matched somebody with somebody with the magnetic patch 37 as a result, When closing and offseting, 38 left side of mandril is concordant with 31 left side of the first link block, the length of the positioning runner 35 With the thickness difference of the iron block 36 and the distance phase of 18 right side of the second casting lug thereon to 23 right side of the second link block Deng.
Valuably or illustratively, wherein, 33 upper surfaces to 32 bottom of the first casting lug thereon are protruded in first locking The distance that the distance in face fixes 13 bottom face of matrix with 18 upper surface of the second casting lug thereon to described second is equal.
Valuably or illustratively, wherein, second locking protrudes 19 bottom faces to 18 upper end of the second casting lug thereon The distance that the distance in face fixes 30 upper surface of matrix with 32 bottom face of the first casting lug thereon to described first is equal.
Valuably or illustratively, wherein, 18 right side of the second casting lug thereon to 23 right side of the second link block Distance it is equal with the distance of 32 left side of the first casting lug thereon to 31 left side of the first link block.
Valuably or illustratively, wherein, the first locking protrusion 33 protrudes 19 in upper and lower with the described second locking To height it is equal, and the holding pin 20 is 33 equal in the thickness of vertical direction and the described first locking protrusion.
Apparatus of the present invention are in original state, and under the action of the top pressure spring 15, the holding pin 20 is pushed up to the right It presses and makes 20 right side of holding pin concordant with 23 right side of the second link block, the iron block 36 is matched somebody with somebody with the magnetic patch 37 It closes and offsets, so as to which 38 left side of mandril is concordant with 31 left side of the first link block.
In use, promoted the holding pin 20 to the left using 32 left side of the first casting lug thereon, when described first convex Go out block 32 and when the first locking protrusion 33 offsets with second link block 23, second casting lug thereon 18 and described Clamping block 19 offsets with first link block 31, then pushes down on the described second fixation matrix 13, first locking Protrusion 33 is inserted into second lock slots 22, and the second locking protrusion 19 is inserted into first lock slots 34, When the described first locking protrusion 33 and the second locking protrusion 19 lock respectively with second lock slots 22 and described first When slot 34 is fully mated, space is formed between 32 and second casting lug thereon 18 of the first casting lug thereon, and in the top pressure spring 15 Under the action of, the holding pin 20 is extend into the space between 32 and second casting lug thereon 18 of the first casting lug thereon, as a result, institute It states connection sub-block 130 to be relatively fixed with the connection mother tuber 300, thus completes consolidating for neighbouring two steel structure support tubes It is fixed;
When needing to separate neighbouring two steel structures support tube, the push block 40 is driven to slide to the left, the push block 40 The mandril 38 can be driven to slide to the left, and the mandril 38 may act on the holding pin 20, thus can make the holding pin 20 slide to the left, and when 36 left side of iron block offsets with the 35 left end wall of positioning runner, the holding pin 20 is received completely When being reduced in the telescopic chute 17, described second is driven to fix 13 upward lifting of matrix at this time, when the described first locking protrusion 33 It, can will be neighbouring when departing from second lock slots 22 and first lock slots 34 respectively with the described second locking protrusion 19 Two steel structure support tube separation.
The beneficial effects of the invention are as follows:Apparatus of the present invention when in use, using the first casting lug thereon left side will described in Holding pin promotes to the left, when first casting lug thereon and it is described first locking protrusion with second link block offset when, institute It states the second casting lug thereon and the clamping block to offset with first link block, then pushes down on the described second fixation matrix Dynamic, the first locking protrusion is inserted into second lock slots, and the second locking protrusion is inserted into first lock Determine in slot, when the described first locking protrusion and the second locking protrusion lock respectively with second lock slots and described first When slot is fully mated, space is formed between first casting lug thereon and the second casting lug thereon, and under the action of the top pressure spring, The holding pin is extend into the space between first casting lug thereon and the second casting lug thereon, as a result, the connection sub-block and institute It states the connection mother tuber to be relatively fixed, thus completes the fixation of neighbouring two steel structure support tube;
When needing to separate neighbouring two steel structures support tube, the push block is driven to slide to the left, the push block can band The mandril is moved to slide to the left, and the mandril may act on the holding pin, thus the holding pin can be made to slide to the left, when When the iron block left side offsets with the positioning runner left end wall, when the holding pin is fully retracted in the telescopic chute, Described second is driven to fix the upward lifting of matrix at this time, when the described first locking protrusion and the described second locking protrusion depart from respectively When second lock slots and first lock slots, neighbouring two steel structures support tube can be separated;
Apparatus of the present invention are installed without the cooperation of screw thread, it is therefore not necessary to worry the loosening of screw thread and cause adjacent two A steel structure scaffold it is unstable, apparatus of the present invention can improve security during construction, and it is also all ten to mount and dismount It is convenient to divide, and can improve garden layout efficiency.
Basic principle, main feature and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these variation and Improvement is both fallen in claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (6)

1. a kind of steel structure scaffold of garden layout, including steel structure support tube, the steel structure support tube lower end is installed with Sub-block is connected, the steel structure support tube upper end is fixedly installed and the connection matched connection mother tuber of sub-block;
The connection mother tuber includes be fixedly connected with the steel structure support tube upper end first and fixes matrix, and described first fixes base The first opening up lock hole is provided in block upper surface, the first fixation matrix upper surface is located at first lock hole Right end is fixedly installed the first link block upwardly extended, the first link block left side and the first lock hole right end wall Flush, the first link block upper end are provided with the first casting lug thereon extended to the left, the first casting lug thereon upper surface left side It is provided with the first locking protrusion, the first locking protrusion left side and the first casting lug thereon left side flush, described the In one link block push rod component is provided at first casting lug thereon;
The connection sub-block includes be fixedly connected with the steel structure support tube lower face second and fixes matrix, and described first fixes It is provided with downward opening in matrix lower face and protrudes matched second lock hole with the described first locking, described second is solid Determine matrix lower face and be located at the second lock hole left end to be fixedly installed the second link block extended downwardly, second connection Block right side and the second lock hole left end wall flush, the second link block lower end are fixedly installed the extended to the right Two casting lug thereons, the second casting lug thereon lower face right side are fixedly installed and matched second lock tab of first lock hole Go out, the second locking protrusion right side and the second casting lug thereon right side flush, be provided in second link block Elastic pin assembly;
The elasticity pin assembly includes being arranged in second link block and is open towards right telescopic chute and is slidably mounted on Holding pin in the telescopic chute, the flexible groove bottom wall is concordant with the second link block upper surface, and on the telescopic chute Limit sliding chutes are symmetrically arranged in lower bottom wall, position limiting slide block, the position limiting slide block and institute are slidably fitted in the limit sliding chutes It states position limiting slide block to be fixedly connected, the top pressure spring to offset with the position limiting slide block, institute is also installed in the limit sliding chutes State top pressure spring to by the position limiting slide block to the right top pressure and make the holding pin right side and the second link block right end Face is concordant;
The push rod component includes being arranged in first link block and opening is connected towards right sliding groove, with the sliding groove Logical and opening is towards right pushing tow slot, the mandril being slidably mounted in the sliding groove and is slidably mounted in the pushing tow slot Push block, the push block are fixedly connected with the mandril, are provided with what is communicated with the sliding groove in the slip groove bottom wall Positioning runner is installed with magnetic patch in the positioning runner right end wall, is slidably fitted in the positioning runner and the magnetic The matched iron block of block, the iron block are fixedly connected with the mandril.
2. a kind of steel structure scaffold of garden layout according to claim 1, it is characterised in that:The magnetic patch left side Distance to the first link block left side is equal with the distance of the iron block right side to the mandril left side, as a result, When the iron block coordinates with the magnetic patch and offseted, the mandril left side is concordant with the first link block left side, described The length of positioning runner and the thickness difference of the iron block and the second casting lug thereon right side to the second link block right side Distance it is equal.
3. a kind of steel structure scaffold of garden layout according to claim 1, it is characterised in that:First lock tab The distance for going out upper surface to the first casting lug thereon bottom face fixes matrix with the second casting lug thereon upper surface to described second The distance of bottom face is equal.
4. a kind of steel structure scaffold of garden layout according to claim 1, it is characterised in that:Second lock tab The distance for going out bottom face to the second casting lug thereon upper surface fixes matrix with the first casting lug thereon bottom face to described first The distance of upper surface is equal.
5. a kind of steel structure scaffold of garden layout according to claim 1, it is characterised in that:Second casting lug thereon Right side to the distance of the second link block right side and the first casting lug thereon left side to the first link block left end The distance in face is equal.
6. a kind of steel structure scaffold of garden layout according to claim 1, it is characterised in that:First lock tab Go out equal in the height of vertical direction with the described second locking protrusion, and the holding pin is in the thickness and described the of vertical direction One locking protrusion is equal.
CN201711391946.5A 2017-12-21 2017-12-21 A kind of steel structure scaffold of garden layout Pending CN108118887A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711391946.5A CN108118887A (en) 2017-12-21 2017-12-21 A kind of steel structure scaffold of garden layout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711391946.5A CN108118887A (en) 2017-12-21 2017-12-21 A kind of steel structure scaffold of garden layout

Publications (1)

Publication Number Publication Date
CN108118887A true CN108118887A (en) 2018-06-05

Family

ID=62230762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711391946.5A Pending CN108118887A (en) 2017-12-21 2017-12-21 A kind of steel structure scaffold of garden layout

Country Status (1)

Country Link
CN (1) CN108118887A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643792A (en) * 2013-12-31 2014-03-19 湖州职业技术学院 Building scaffold connecting structure
CN107119900A (en) * 2017-07-06 2017-09-01 何丽娟 steel structure scaffold
CN107437389A (en) * 2016-12-31 2017-12-05 广州市迪越网络科技有限公司 A kind of advertising board device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643792A (en) * 2013-12-31 2014-03-19 湖州职业技术学院 Building scaffold connecting structure
CN107437389A (en) * 2016-12-31 2017-12-05 广州市迪越网络科技有限公司 A kind of advertising board device
CN107119900A (en) * 2017-07-06 2017-09-01 何丽娟 steel structure scaffold

Similar Documents

Publication Publication Date Title
CN105888239A (en) Sliding block type early-dismantling concrete formwork supporting head
CN108118887A (en) A kind of steel structure scaffold of garden layout
CN108221684A (en) A kind of steel structure scaffolding structure of municipal construction
CN210568258U (en) Highway street light pole that joint strength is high
CN108149910B (en) A kind of building iron structure scaffold device
CN104499703A (en) Novel non-bolted joint snap joint scaffold
CN208777699U (en) A kind of punching block component applied to concrete staircase
CN204626262U (en) Beam face suspension cable positioner
CN216195456U (en) Connecting device for concrete outer wall and steel structure building
CN109853990A (en) A kind of modular support for shuttering for building
CN204592635U (en) A kind of flange with pile body mounting hole mould
CN204551465U (en) A kind of site construction pile driver
CN204183247U (en) A kind of guide rail card fixing apparatus
CN204551832U (en) The removable pin of a kind of fast-assembling
CN205660068U (en) Fixing device of electric tube expander for condenser
CN109487934B (en) Short-groove type telescopic stone pendant system and stone installation method of pendant system
CN207079858U (en) It is interior to hang fast keel
CN207790556U (en) Clamping structure and vehicle
CN208345652U (en) A kind of general-purpose type jack
CN210002766U (en) Metal combined frame for kinds of external walls
CN201725652U (en) Dry type transformer housing
CN104259889A (en) Guide rail clamping fixing device
CN210797660U (en) Collapse-preventing well cover
KR19990035156U (en) for construction mold fixing equipment
CN211850685U (en) Construction engineering outer wall scaffold device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605

RJ01 Rejection of invention patent application after publication