CN108108918A - A kind of distribution line ground connection event management method and device - Google Patents
A kind of distribution line ground connection event management method and device Download PDFInfo
- Publication number
- CN108108918A CN108108918A CN201810062848.5A CN201810062848A CN108108918A CN 108108918 A CN108108918 A CN 108108918A CN 201810062848 A CN201810062848 A CN 201810062848A CN 108108918 A CN108108918 A CN 108108918A
- Authority
- CN
- China
- Prior art keywords
- ground connection
- information
- line
- distribution line
- work order
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
A kind of distribution line ground connection event management method and device provided in an embodiment of the present invention, are related to power system fault pre-alarming and method field.This method and device generate distribution line ground connection repairing work order when the ground connection information received meets presetting condition, and send distribution line ground connection repairing work order to the user terminal of any one type matching for being grounded repairing work order with the distribution line, it sends user terminal and repairs the associated in-situ processing information of work order with distribution line ground connection, and repairing work order is grounded to distribution line according to the ground connection information for receiving the time of in-situ processing information and receiving again and is tracked monitoring;So as to by generating distribution line ground connection repairing work order, monitoring is tracked to the performance that repairing work order is grounded to distribution line, realize closed loop management and control when occurring ground connection event to distribution line, strengthen the management and control ability to distribution line ground connection repairing, the stability of power distribution network operation level is improved, improves electricity consumption reliability level.
Description
Technical field
The present invention relates to power system fault pre-alarmings and method field, and thing is grounded in particular to a kind of distribution line
Part management method and device.
Background technology
Important public infrastructure of the power distribution network as national economy and social development, with scale is big, distribution is wide, network
The features such as connection and various method of operation.At present, it is most of to study skill since the power distribution network management level in China is also more weak
The administrative skill that art and major power supply enterprise are used has primarily directed to the differentiated control of electrical equipment and files on each of customers
Closing various distribution line ground connection in power distribution network, actively repairing and the technology for the supervisor that stops transport are less, and fail to be formed one from management and control system
It unites to power supply command centre and arrives the complete tissue system of repairing teams and groups again.
The content of the invention
In view of this, it is an object of the invention to provide a kind of distribution line ground connection event management method and device, with solution
The certainly above problem.
To achieve these goals, the technical solution that the embodiment of the present invention uses is as follows:
In a first aspect, an embodiment of the present invention provides a kind of distribution lines to be grounded event management method, applied to a power supply
Maneuvering platform is serviced, the electric service maneuvering platform is connected at least one user terminal communication, the distribution line ground connection
Event management method includes:
Receive ground connection information, ground connection time, higher level's line outage information and the troublshooting letter of public system transmission
Breath;
Line-to-ground influence area is determined according to the ground connection information;
According to the line-to-ground influence area, the ground connection time, higher level's line outage information and the event
Hinder repairing information generation distribution line ground connection repairing work order;
The matched user terminal transmission distribution line of repairing work order is grounded to any one with the distribution line to connect
Repair work order in ground;
The associated in-situ processing of work order is repaired according to being grounded with the distribution line for user terminal transmission is received
The time of information and the ground connection information received again are grounded the distribution line repairing work order and are tracked monitoring.
Second aspect, the embodiment of the present invention additionally provide a kind of distribution line ground connection incident management device, are supplied applied to one
Electricity service maneuvering platform, the electric service maneuvering platform are connected at least one user terminal communication, and the distribution line connects
Ground incident management device includes:
Data receipt unit, for receiving the ground connection information of public system transmission, ground connection time, higher level's line outage letter
Breath and fault repairing information;
Line-to-ground influence area determination unit, for determining line-to-ground influence area according to the ground connection information;
Work order generation unit, for stopping according to the line-to-ground influence area, the ground connection time, higher level's circuit
Transport information and fault repairing information generation distribution line ground connection repairing work order;
Transmitting element is sent out for being grounded the matched user terminal of repairing work order with the distribution line to any one
Delivery electric line ground connection repairing work order;
Tracing monitoring unit receives being grounded with the distribution line for user terminal transmission for foundation and repairs work
The time of single associated feedback information and the feedback information are grounded the distribution line repairing work order and are tracked monitoring.
Distribution line ground connection event management method and device provided in an embodiment of the present invention, expire in the ground connection information received
Generate distribution line ground connection repairing work order during the presetting condition of foot, and to any one and distribution line ground connection repairing work order
Type matching user terminal send distribution line ground connection repairing work order so that user terminal send with distribution line be grounded rob
The associated in-situ processing information of work order is repaiied, and according to the ground connection letter for receiving the time of in-situ processing information and receiving again
Breath is grounded distribution line repairing work order and is tracked monitoring;So as to repair work order by generating distribution line ground connection, to matching somebody with somebody
The performance of electric line ground connection repairing work order is tracked monitoring, realizes closed loop pipe when occurring ground connection event to power distribution network
Control, improves first-aid repair efficiency and service level, improves the stability of power distribution network operation level, enhance user experience.
For the above objects, features and advantages of the present invention is enable to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate
Appended attached drawing, is described in detail below.
Description of the drawings
It in order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of scope, for those of ordinary skill in the art, without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows the functional block diagram that can be applied to the maneuvering platform of the electric service in the embodiment of the present invention.
Fig. 2 shows the flow chart of distribution line ground connection event management method provided in an embodiment of the present invention.
Fig. 3 shows the particular flow sheet of step S203 in Fig. 2.
Fig. 4 shows the particular flow sheet of step S205 in Fig. 2.
Fig. 5 shows the functional block diagram of distribution line ground connection incident management device provided in an embodiment of the present invention.
Icon:100- electric service maneuvering platforms;111- memories;112- processors;113- communication units;200- distribution
Line-to-ground incident management device;210- data receipt units;220- line-to-grounds influence area determination unit;230- work orders are given birth to
Into unit;240- transmitting elements;250- tracing monitoring units.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.Usually exist
The component of the embodiment of the present invention described and illustrated in attached drawing can configure to arrange and design with a variety of herein.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed
The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment of the present invention, people in the art
Member's all other embodiments obtained on the premise of creative work is not made, belong to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
It should be noted that the relational terms of term " first " and " second " or the like be used merely to an entity or
Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any
This actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant be intended to it is non-exclusive
Property include so that process, method, article or equipment including a series of elements not only include those elements, but also
Further include other elements that are not explicitly listed or further include for this process, method, article or equipment it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described
Also there are other identical elements in the process of element, method, article or equipment.
The present invention provides a kind of electric service maneuvering platform 100, active management and control to power distribution network, O&M are used to implement,
And realize the real-time oversight to distribution problem.Referring to Fig. 1, Fig. 1 shows a kind of confession that can be applied in the embodiment of the present invention
The functional block diagram of electricity service maneuvering platform 100.The electric service maneuvering platform 100 includes distribution line and is grounded incident management device
200th, memory 111, storage control, one or more (one is only shown in figure) processors 112, communication unit 113.These
Component is mutually communicated by one or more communication bus/signal wire.It is described to treat that distribution line ground connection incident management device 200 wraps
Include at least one can be stored in the memory 111 or be solidificated in the power supply in the form of software or firmware (firmware)
Service the SFU software functional unit in the operating system (operating S4stem, OS) of maneuvering platform 100.
Memory 111 can be used for storage software program and unit, such as the software testing device in the embodiment of the present invention and
Program instruction/unit corresponding to method, the distribution line that processor 112 is stored in by operation in memory 111 are grounded thing
Part managing device, the software program of method and unit, so as to perform various functions application and data processing, such as the present invention is real
The distribution line ground connection event management method of example offer is provided.Wherein, the memory 111 may be, but not limited to, arbitrary access
Memory (Random Access Memory, RAM), read-only memory (Read Only Memory, ROM) may be programmed read-only
Memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable
Programmable Read-Only Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable
Programmable Read-Only Memory, EEPROM) etc..Processor 112 and other possible components are to memory
111 access can carry out under the control of storage control.
The communication unit 113 is used to establish the electric service maneuvering platform 100 and other communications by the network
Communication connection between terminal, and for passing through the network transceiving data.
It should be appreciated that structure shown in FIG. 1 is only to illustrate, electric service maneuvering platform 100 may also include than in Fig. 1
Shown more either less components or with the configuration different from shown in Fig. 1.Each component shown in Fig. 1 may be employed
Hardware, software or its combination are realized.
First embodiment
An embodiment of the present invention provides a kind of distribution lines to be grounded event management method, applied to electric service maneuvering platform
100, active management and control to power distribution network, O&M are used to implement, and realizes the real-time oversight to distribution problem.Referring to Fig. 2, Fig. 2
Show a kind of flow chart of distribution line ground connection event management method provided in an embodiment of the present invention.The distribution line is grounded thing
Part management method includes:
Step S201:Receive ground connection information, ground connection time, higher level's line outage information and the event of public system transmission
Hinder repairing information.
Specifically, public system is used to gather ground connection information, ground connection time, higher level's line outage information and troublshooting
Information, and ground connection information, ground connection time, higher level's line outage information and fault repairing information are transmitted to electric service commander
Platform 100.The public system includes but are not limited to electrical power distribution automatization system, Energy Management System (EMS), power production management
System (PMS), power information acquisition system, marketing system etc..
Wherein, ground connection information is for representing that ground connection event occurs in line related in distribution, including Energy Management System (EMS)
The EMS system telemetering of acquisition, remote signalling data etc.;It is due to power-off time caused by the ground connection event to be grounded the time;Higher level's circuit
Stop information refers to the line-to-ground influence area of some special line ground connection or reclosing;Fault repairing information is stopped for each region
Electricity plan.
Step S202:Line-to-ground influence area is determined according to ground connection information.
Specifically, ground connection information can be divided into two classes:Respectively main line ground connection information and branch line ground connection information.
When electric service maneuvering platform 100 receives main line ground connection information, built in advance is based in response to main line ground connection information
Vertical topological structure of electric determines line-to-ground influence area from the first preset path;Wherein, the first preset path i.e. serve as theme-
The direction of branch line, specifically, electric service maneuvering platform 100 by the direction from main line to branch line to the topological structure of power grid into
Row analysis, to determine the specific location of line-to-ground influence area.
When electric service maneuvering platform 100 receives branch line ground connection information, built in advance is based in response to branch line ground connection information
Vertical topological structure of electric determines line-to-ground influence area from the second preset path;Wherein, the second preset path is branch line-master
Power supply point is traced back to public master by the direction of line-branch line, specifically, electric service maneuvering platform 100 from branch line toward main line direction
Trunk switch, then using this trunk wiretap as starting point, toward its branch line direction carry out topological structure of electric analysis so that it is determined that
Line-to-ground influence area.
Step S203:According to line-to-ground influence area, ground connection time, higher level's line outage information and troublshooting letter
Breath generation distribution line ground connection repairing work order.
Referring to Fig. 3, the particular flow sheet for step S203.Step S203 includes:
Sub-step S2031:Judge idle time whether less than the first preset time and line-to-ground influence area and higher level
Whether line outage information and fault repairing information match, if it is, performing step S201;If it is not, then perform step
S2032。
By judging whether idle time is less than the first preset time, it may be determined that whether the ground connection event, which belongs to public become, connects
Ground event.
Fault repairing information includes the stoppage in transit plan in certain region, thus line-to-ground influence area and fault repairing information
With the reason for referring to, generate the line-to-ground influence area be region in planned stoppage in transit.
Higher level's line outage information can represent the failure with higher level's circuit of the relevant circuit in line-to-ground influence area
Information, line-to-ground influence area refers to higher level's line outage information matches, generates the line-to-ground influence area
Reason is exactly that the higher level of the circuit such as occurs being grounded at the failures.
By judging whether line-to-ground influence area matches with higher level's line outage information and the fault repairing information,
It can filter due to the power failure in regional planning or be grounded event caused by the ground connection as caused by higher level's failure, so as to avoid giving birth to
Into repetition or invalid distribution line ground connection repairing work order.
Step S2032:Generate distribution line ground connection repairing work order.
It is to be appreciated that when idle time is less than the first preset time and line-to-ground influence area and higher level's line outage
When information and fault repairing information mismatch, show the ground connection situation necessary being, and be not appearance ground connection thing in region
When stopping transport caused by part and not inside the plan stoppage in transit or higher level's failure, generation distribution line ground connection repairing work order, to remind dimension
It repaiies personnel as early as possible to overhaul stoppage in transit region, to recover normal power supply.
Step S204:The matched user terminal transmission distribution line of repairing work order is grounded to any one with distribution line to connect
Repair work order in ground.
It should be noted that each user terminal is stored with the identity of the line teams and groups using the user's terminal,
The identity shows the business of the line teams and groups.For example, a line teams and groups can be but be not limited only to handle active forewarning
Work order, data exception processing work order, distribution line ground connection repairing work order and work order etc. of taking the initiative in offering a hand.
Thus, the user terminal that the type matching of repairing work order is grounded with distribution line refers to, is stored in the user's terminal
Identity and distribution line ground connection repairing work order type matching, i.e. the identity shows that a line teams and groups can be handled
Distribution line ground connection repairing work order.
Step S205:The associated feedback information of work order is repaired according to being grounded with distribution line for user terminal transmission is received
Time and feedback information to distribution line be grounded repairing work order be tracked monitoring.
It should be noted that feedback information includes confirmation message and in-situ processing information.Wherein, confirmation message is a line
After teams and groups receive distribution line ground connection repairing work order by user terminal, input instruction is so that the information that user terminal is sent.
In-situ processing information reaches line-to-ground influence area and after being handled, is passing through the pass that user terminal is sent for a line teams and groups
In information such as repairing progress, electric line earth fault reason and the dispositions at scene.
In a kind of preferred embodiment, referring to Fig. 4, step S205 includes:
Sub-step S2051:Judge whether to receive confirmation message in the second preset time, if it is not, then performing sub-step
Rapid S2052;If it is, perform sub-step S2053.
By judging whether the time for receiving confirmation message is more than the second preset time, electric service maneuvering platform 100
It can be seen that whether a line teams and groups receive distribution line ground connection repairing work order within the time limit, repaired with realizing to be grounded distribution line
The tracing monitoring of work order.
Sub-step S2052:Generate the first prompt message.
When not receiving confirmation message in the second preset time, show that a line teams and groups also have not enough time to check the distribution
Line-to-ground repairs work order or repairing work order is not grounded to distribution line in time and handles, thus generates the first prompting letter
Breath reminds a line teams and groups.
Sub-step S2053:Judge whether to receive in-situ processing information in the 3rd preset time, if it is not, then performing
Sub-step S2054;If it is, perform sub-step S2055.
By judging whether to receive in-situ processing information in the 3rd preset time, electric service maneuvering platform 100 can
It learns whether a line teams and groups are grounded distribution line repairing work order within the time limit and are handled, distribution line is grounded with realizing
Repair the tracing monitoring of work order.
Sub-step S2054:Generate the second prompt message.
When the time for receiving in-situ processing information being more than three preset times, show that a line teams and groups are right not within the time limit
Distribution line ground connection repairing work order is handled, thus generates the first prompt message and one line teams and groups are reminded.
Sub-step S2055:According to in-situ processing information, receive the time of confirmation message, receive in-situ processing information
Time and distribution line ground connection repairing work order generation archive information.
When receiving the confirmation message in the second preset time and receive the scene in the 3rd preset time
When handling information, represent to be solved the problem of including in distribution line ground connection repairing work order, at this time according to in-situ processing
Information, the time for receiving confirmation message, the time for receiving in-situ processing information and distribution line ground connection repairing work order generation
Archive information carries out the operations such as performance appraisal available for the line teams and groups.
Second embodiment
Referring to Fig. 5, a kind of distribution line that Fig. 5, which is present pre-ferred embodiments, to be provided is grounded incident management device 200
Functional block diagram.It should be noted that the distribution line ground connection incident management device 200 that the present embodiment is provided, basic
Principle and the technique effect of generation are identical with above-described embodiment, and to briefly describe, the present embodiment part does not refer to part, can refer to
Corresponding contents in the above embodiments.Distribution line ground connection incident management device 200 includes data receipt unit 210, circuit
It is grounded influence area determination unit 220, work order generation unit 230, transmitting element 240 and tracing monitoring unit 250.
Wherein, data receipt unit 210 is for the ground connection information of reception one public system transmission, ground connection time, higher level's line
Road stop information and fault repairing information.
It is to be appreciated that in a kind of preferred embodiment, data receipt unit 210 can be used for performing step S201.
Line-to-ground influence area determination unit 220 is used to determine line-to-ground influence area according to ground connection information.
Specifically, ground connection information includes main line ground connection information and branch line ground connection information, and line-to-ground influence area determines
Unit 220 is used to determine that circuit connects from the first preset path based on pre-established topological structure of electric in response to main line ground connection information
Ground influence area;Line-to-ground influence area determination unit 220 is additionally operable in response to branch line ground connection information and based on pre-established electricity
Net topology structure determines line-to-ground influence area from the second preset path.
It is to be appreciated that in a kind of preferred embodiment, line-to-ground influence area determination unit 220 can be used for performing
Step S202.
Work order generation unit 230 be used for according to line-to-ground influence area, the ground connection time, higher level's line outage information and
Fault repairing information generation distribution line ground connection repairing work order.
Specifically, when idle time is less than the first preset time and line-to-ground influence area and higher level's line outage information
And fault repairing information is when mismatching, generation distribution line ground connection repairing work order.
It is to be appreciated that in a kind of preferred embodiment, work order generation unit 230 can be used for performing step S203.
Transmitting element 240 is used to be grounded the matched user terminal transmission distribution of repairing work order to any one and distribution line
Work order is repaired in line-to-ground.
Tracing monitoring unit 250 is used for foundation and receives being associated with distribution line ground connection repairing work order for user terminal transmission
Feedback information time and feedback information to distribution line be grounded repairing work order be tracked monitoring.
Specifically, tracing monitoring unit 250 is used for when not receiving confirmation message in the second preset time, generation the
One prompt message;When receiving confirmation message in the second preset time and do not receive in-situ processing in the 3rd preset time
During information, the second prompt message is generated;When receiving confirmation message in the second preset time and be inscribed in the 3rd preset time
When receiving in-situ processing information, according to in-situ processing information, receive the time of confirmation message, receive in-situ processing information
Time and distribution line ground connection repairing work order generation archive information.
It is to be appreciated that in a kind of preferred embodiment, tracing monitoring unit 250 can be used for performing step S205, son
Step S2051, sub-step S2052, sub-step S2053, sub-step S2054 and sub-step S2055.
In conclusion distribution line ground connection event management method provided in an embodiment of the present invention and device, what is received
Ground connection information generates distribution line ground connection repairing work order when meeting presetting condition, and is connect to any one and the distribution line
The user terminal of the type matching of ground repairing work order sends distribution line ground connection repairing work order, so that user terminal is sent and distribution
The associated in-situ processing information of work order is repaired in line-to-ground, and foundation receives the time of in-situ processing information and receives again
To ground connection information to distribution line be grounded repairing work order be tracked monitoring;So as to by generating distribution line ground connection repairing work
It is single, monitoring is tracked to the performance that repairing work order is grounded to distribution line, realizes and occurs ground connection event to power distribution network
When closed loop management and control, improve first-aid repair efficiency and service level, improve the stability of power distribution network operation level, enhance use
Family experience sense.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter exists
Similar terms is represented in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, is then not required in subsequent attached drawing
It is further defined and is explained.
Claims (10)
1. a kind of distribution line is grounded event management method, which is characterized in that applied to an electric service maneuvering platform, the confession
Electricity service maneuvering platform is connected at least one user terminal communication, and the distribution line ground connection event management method includes:
Receive line-to-ground information, ground connection time, higher level's line outage information and the troublshooting letter of public system transmission
Breath;
Line-to-ground influence area is determined according to the ground connection information;
According to the line-to-ground influence area, the ground connection time, higher level's line outage information and the failure report
Repair information generation distribution line ground connection repairing work order;
The matched user terminal transmission distribution line ground connection of repairing work order is grounded to any one with the distribution line to rob
Repair work order;
According to receive that the user terminal sends with the distribution line be grounded the repairing associated feedback information of work order when
Between and the feedback information to the distribution line be grounded repairing work order be tracked monitoring.
2. distribution line according to claim 1 is grounded event management method, which is characterized in that described according to the circuit
It is grounded influence area, the ground connection time, higher level's line outage information and fault repairing information generation distribution wire
The step of road ground connection repairing work order, includes:
Believe when the idle time less than the first preset time and the line-to-ground influence area with higher level's line outage
When breath and the fault repairing information mismatch, the distribution line ground connection repairing work order is generated.
3. distribution line according to claim 1 is grounded event management method, which is characterized in that the ground connection information includes
Main line ground connection information and branch line ground connection information, described the step of determining line-to-ground influence area according to the ground connection information, wrap
It includes:
It responds the main line ground connection information and the circuit is determined from the first preset path based on pre-established topological structure of electric
It is grounded influence area;
It responds the branch line ground connection information and the circuit is determined from the second preset path based on pre-established topological structure of electric
It is grounded influence area.
4. the distribution line ground connection event management method according to any one in claim 1-3, which is characterized in that described
Feedback information includes confirmation message and in-situ processing information, and the foundation receives matching somebody with somebody with described for the user terminal transmission
The time of the electric line ground connection repairing associated feedback information of work order and the feedback information are grounded the distribution line and repair
Work order, which is tracked the step of monitoring, to be included:
When not receiving the confirmation message in the second preset time, the first prompt message is generated;
When receiving the confirmation message in the second preset time, according to time, the reception for receiving the confirmation message
Repairing work order is grounded to the distribution line to the time of the in-situ processing information and the in-situ processing information to chase after
Track monitors.
5. distribution line according to claim 4 is grounded event management method, which is characterized in that the foundation receives institute
The time of confirmation message, the time for receiving the in-situ processing information and the in-situ processing information are stated to the distribution wire
The step of road ground connection repairing work order is tracked monitoring includes:
When receiving the confirmation message in the second preset time and do not received in the 3rd preset time at the scene
When managing information, the second prompt message is generated;
When receiving the confirmation message in the second preset time and receive the in-situ processing in the 3rd preset time
During information, according to the in-situ processing information, receive the time of the confirmation message, receive the in-situ processing information
Time and distribution line ground connection repairing work order generation archive information.
6. a kind of distribution line is grounded incident management device, which is characterized in that applied to an electric service maneuvering platform, the confession
Electricity service maneuvering platform is connected at least one user terminal communication, and the distribution line ground connection incident management device includes:
Data receipt unit, for receive a public system transmission ground connection information, ground connection the time, higher level's line outage information with
And fault repairing information;
Line-to-ground influence area determination unit, for determining line-to-ground influence area according to the ground connection information;
Work order generation unit, for according to the line-to-ground influence area, the ground connection time, higher level's line outage letter
Breath and fault repairing information generation distribution line ground connection repairing work order;
Transmitting element is matched somebody with somebody for being grounded the matched user terminal transmission of repairing work order with the distribution line to any one
Electric line ground connection repairing work order;
Tracing monitoring unit receives being grounded with the distribution line for the user terminal transmission for foundation and repairs work order pass
The time of the feedback information of connection and the feedback information are grounded the distribution line repairing work order and are tracked monitoring.
7. distribution line according to claim 6 is grounded incident management device, which is characterized in that the work order generation unit
Believe for working as the idle time less than the first preset time and the line-to-ground influence area with higher level's line outage
When breath and the fault repairing information mismatch, the distribution line ground connection repairing work order is generated.
8. distribution line according to claim 6 is grounded incident management device, which is characterized in that the ground connection information includes
Main line ground connection information and branch line ground connection information, line-to-ground influence area determination unit are grounded for responding the main line
Information and the line-to-ground influence area is determined from the first preset path based on pre-established topological structure of electric;
Line-to-ground influence area determination unit is additionally operable to respond the branch line ground connection information and based on pre-established power grid
Topological structure determines the line-to-ground influence area from the second preset path.
9. the distribution line ground connection incident management device according to right wants any one in 6-8, which is characterized in that described anti-
Feedforward information includes confirmation message and in-situ processing information, and the tracing monitoring unit is used to not to be inscribed in the second preset time
When receiving the confirmation message, the first prompt message is generated;
The tracing monitoring unit is additionally operable to when receiving the confirmation message in the second preset time, and foundation receives institute
The time of confirmation message, the time for receiving the in-situ processing information and the in-situ processing information are stated to the distribution wire
Road ground connection repairing work order is tracked monitoring.
10. distribution line according to claim 9 is grounded incident management device, which is characterized in that the tracing monitoring list
Member is additionally operable to when receiving the confirmation message in the second preset time and not receive in the 3rd preset time described existing
During the processing information of field, the second prompt message is generated;
The tracing monitoring unit is additionally operable to when receiving the confirmation message in the second preset time and when the 3rd is default
In when receiving the in-situ processing information, according to the in-situ processing information, receive the time of the confirmation message, connect
Receive the time of the in-situ processing information and distribution line ground connection repairing work order generation archive information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810062848.5A CN108108918B (en) | 2018-01-23 | 2018-01-23 | Distribution line grounding event management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810062848.5A CN108108918B (en) | 2018-01-23 | 2018-01-23 | Distribution line grounding event management method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108108918A true CN108108918A (en) | 2018-06-01 |
CN108108918B CN108108918B (en) | 2022-03-11 |
Family
ID=62219244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810062848.5A Active CN108108918B (en) | 2018-01-23 | 2018-01-23 | Distribution line grounding event management method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108108918B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050076052A1 (en) * | 2002-11-14 | 2005-04-07 | Nec Fielding, Ltd. | Maintenance service system, method and program |
CN103761625A (en) * | 2014-02-13 | 2014-04-30 | 国家电网公司 | Outage management system based on information exchange bus and data processing method thereof |
CN105305393A (en) * | 2015-10-21 | 2016-02-03 | 珠海许继芝电网自动化有限公司 | Distribution network emergency repair commanding system and method based on marketing and distribution communication |
CN105701596A (en) * | 2015-12-24 | 2016-06-22 | 国家电网公司 | Method for lean distribution network emergency maintenance and management system based on big data technology |
-
2018
- 2018-01-23 CN CN201810062848.5A patent/CN108108918B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050076052A1 (en) * | 2002-11-14 | 2005-04-07 | Nec Fielding, Ltd. | Maintenance service system, method and program |
CN103761625A (en) * | 2014-02-13 | 2014-04-30 | 国家电网公司 | Outage management system based on information exchange bus and data processing method thereof |
CN105305393A (en) * | 2015-10-21 | 2016-02-03 | 珠海许继芝电网自动化有限公司 | Distribution network emergency repair commanding system and method based on marketing and distribution communication |
CN105701596A (en) * | 2015-12-24 | 2016-06-22 | 国家电网公司 | Method for lean distribution network emergency maintenance and management system based on big data technology |
Also Published As
Publication number | Publication date |
---|---|
CN108108918B (en) | 2022-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108320086A (en) | A kind of power distribution network risk management method and device | |
KR101278309B1 (en) | Outage schedule management apparatus and method in ems | |
CN108229841A (en) | A kind of data exception processing method and processing device | |
CN107220775A (en) | A kind of active power distribution network various visual angles collaboration vulnerability assessment method for considering information system effect | |
CN104219070B (en) | The method and Network Fault Detecting system of Network Fault Detecting | |
CN104751305A (en) | Trouble analysis and repair-based intelligent interaction system and control method thereof | |
CN103745536B (en) | A kind of thing cabinet management system based on dynamic password | |
CN109523040A (en) | A kind of user equipment that protecting privacy reports method, server, system and medium for repairment | |
CN108171362A (en) | Power supply facilities breakdown repair method, system and terminal device | |
CN109685483A (en) | Key management system and key management method | |
CN108183813A (en) | Group's barrier processing method and processing device | |
CN110086260A (en) | A kind of power distribution network Intellisense control device | |
CN103955185A (en) | Immediate power distribution fault handling information interaction terminal and fault handling method thereof | |
CN110007170A (en) | Charging pile failure automated processing system | |
CN107832886A (en) | A kind of method that big data supports Utilities Electric Co.'s operation and development | |
CN106532660A (en) | Master station system with relay setting change, remote system and control method | |
CN108287290A (en) | A kind of power grid cascading fault pre-alarming analysis system based on the operation of big regional power grid | |
CN108460517A (en) | A kind of power distribution network management-control method and device | |
CN108460468A (en) | It is a kind of public to become failure event management method and device | |
CN103607048B (en) | An electric power network device fault diagnosis method and a system | |
CN108900328A (en) | A kind of electricity grid network data safety test macro and method | |
CN108108918A (en) | A kind of distribution line ground connection event management method and device | |
CN107748672A (en) | Secondary remote interface integrated management approach based on IEC61850 sites protection model | |
CN207339915U (en) | A kind of vulnerability scanning managing device | |
CN106443333A (en) | Integrated intelligent communication first-aid repair control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |