CN108106309A - Automobile circulating water cooling tower - Google Patents

Automobile circulating water cooling tower Download PDF

Info

Publication number
CN108106309A
CN108106309A CN201810143211.9A CN201810143211A CN108106309A CN 108106309 A CN108106309 A CN 108106309A CN 201810143211 A CN201810143211 A CN 201810143211A CN 108106309 A CN108106309 A CN 108106309A
Authority
CN
China
Prior art keywords
cistern
deflector
shaft
cooling tower
bevel gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810143211.9A
Other languages
Chinese (zh)
Other versions
CN108106309B (en
Inventor
罗勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI HANGJIA AUTO PARTS MANUFACTURING Co.,Ltd.
Original Assignee
Chongqing Yong Ho Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yong Ho Trade Co Ltd filed Critical Chongqing Yong Ho Trade Co Ltd
Priority to CN201810143211.9A priority Critical patent/CN108106309B/en
Publication of CN108106309A publication Critical patent/CN108106309A/en
Application granted granted Critical
Publication of CN108106309B publication Critical patent/CN108106309B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28CHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA COME INTO DIRECT CONTACT WITHOUT CHEMICAL INTERACTION
    • F28C1/00Direct-contact trickle coolers, e.g. cooling towers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/02Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating liquids, e.g. brine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F25/00Component parts of trickle coolers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F25/00Component parts of trickle coolers
    • F28F25/02Component parts of trickle coolers for distributing, circulating, and accumulating liquid
    • F28F25/04Distributing or accumulator troughs

Abstract

The invention belongs to art of refrigeration units, a kind of automobile circulating water cooling tower are specifically disclosed, including cistern and stent, partition plate is equipped in cistern, partition plate top is hinged with deflector, and cistern inner wall is equipped with electromagnet, floating ball is also slidably connected on cistern inner wall;Clump weight is slidably connected on deflector;Water storage unit includes water outlet and mud mouth;Further include the spring for being fixedly connected on columns base, spring upper end is fixed with oscillating plate, oscillating plate lower end is connected with rack, first rotating shaft is equipped with and rack meshed gears, the first bevel gear is additionally provided in first rotating shaft, second shaft is equipped with the second bevel gear engaged with the first bevel gear, and for the second shaft through columns base is stretched into, the part that the second shaft is stretched into cistern is circumferentially connected with multiple scraper plates.Scheme using the present invention solves the problems, such as that cooling water liquid communication pipeline need to be closed so as to cause economic loss during the mud in cleaning cooling tower.

Description

Automobile circulating water cooling tower
Technical field
The invention belongs to art of refrigeration units, and in particular to a kind of automobile circulating water cooling tower.
Background technology
During automobile production, many manufacturing procedures are required for cooling down device, and since the specific heat capacity of water is larger, The mode of water cooling is generally used to be cooled down.Cooling water needs to drop cooling water after the heat of device generation is absorbed Temperature is to realize recycling for cooling water.And cooling tower is exactly to contact setting come cooling water with the direct or indirect of water using air It is standby.Cooling water flows into cooling tower after the heat in cooling system is absorbed, and carries out multistage cooling in cooling tower and realize cooling, Cooling water after cooling continues from cooling tower outflow and cooling system heat exchange is to realize the heat dissipation to device, realizes cooling water It recycles.
Cooling tower includes cistern and the multistage cooling body above cistern, be equipped in cistern water outlet with And mud mouth.After cooling tower uses a period of time, columns base meeting silting and sundries cause water outlet to block, therefore It needs to carry out mud cleaning.When carrying out mud cleaning, it is necessary to block and carry out the cooling water liquid communication pipeline of cooling tower After cooling water draining, staff enters back into the cistern of cooling tower and clears up away mud from mud mouth.Above-mentioned cooling tower There are following defects:It needs to close cooling water liquid communication pipeline when the 1st, clearing up, the cooling device being currently running is caused to be shut down, but Many large-scale plants can give out substantial amounts of heat at work, and cooling device shutdown can cause device to be damaged, cause certain Economic loss.2nd, manual cleaning mud is time-consuming and laborious, and manual cleaning is slower, and clearance time is longer, caused by economic loss get over Greatly.
The content of the invention
It is an object of the invention to provide a kind of automobile circulating water cooling tower, during solving the mud in cleaning cooling tower It needs to close the problem of cooling water liquid communication pipeline is so as to cause economic loss.
In order to achieve the above objectives, base case of the invention is:Automobile circulating water cooling tower, including cistern and position Multistage cooling body above cistern further includes the stent below cistern, is equipped in cistern by cistern point The partition plate of two water storage units is divided into, partition plate top is hinged with deflector, and deflector both ends are equipped with magnetic patch, the inner wall of cistern The upper magnetic patch lower section that is located at is equipped with electromagnet, is located on the inner wall of cistern below electromagnet and is additionally provided with to control electromagnet Limit switch is located on the inner wall of cistern below limit switch and also slidably connects floating ball;It slidably connects and matches somebody with somebody on deflector Pouring weight;Two water storage unit opposed separators are symmetrical arranged, water storage unit include be arranged on the water outlet of cistern lower sidewall with And the closed mud mouth of basin bottom is arranged on, strainer is equipped in water outlet;It further includes and is fixedly connected on columns base Spring, spring upper end is fixed with oscillating plate, and oscillating plate bottom is connected with rack, and rack is also wrapped through columns base is stretched out Include the first rotating shaft being rotatably connected on stent and the second shaft, first rotating shaft be equipped with rack meshed gears, first turn The first bevel gear is additionally provided on axis, gear and the first bevel gear are located at the both sides of partition plate respectively, and the second shaft is equipped with and first Second bevel gear of bevel gear engagement, for the second shaft through columns base is stretched into, the second shaft stretches into the part in cistern Circumferentially arranged with multiple scraper plates, the bottom of scraper plate and the bottom connection of cistern touch.
The operation principle of this base case is:
Deflector one end tilts down, and cooling water is flowed along deflector to deflector low side, and partition plate is low close to deflector The water storage cell operation of one side is held, cooling water is flowed into cistern, and is completed the cooling in cooling tower from water outlet outflow and followed Ring.
Mud is accumulated in cistern gradually blocks water outlet, and cooling water is continued to flow into cistern, since water outlet becomes Small that water yield is caused to reduce, the cooling water continued to flow into cistern gradually accumulates in cistern, the water level liter in cistern It is high.Floating ball is slidably connected on the inner wall of cistern, and limitation floating ball can only slide up and down, and floating ball is avoided to be cooled water and enters storage Impact in pond is so as to the irregular movement in cistern.When water level raises, floating ball is subject to buoyancy upward sliding, floats Ball touches limit switch, pressure activated limit switch during moving upwards, electromagnet starts, the magnetic field row that electromagnet generates Denounce magnetic patch, magnetic patch drives deflector deflection.
Guide functions of the cooling water due to being subject to deflector, are more concentrated into the current in the cistern of partition plate left end, Water impact is pressed downward oscillating plate on oscillating plate, and oscillating plate is subject to the upward reset response of spring simultaneously, occurs to shake up and down It is dynamic.Oscillating plate band carry-over bar moves up and down, rack move up and down the gear that is engaged with is driven to rotate forward, reversion, first rotating shaft with Gear rotates forward, reversion.First bevel gear is rotated with first rotating shaft, and the first bevel gear and the second bevel gear change first rotating shaft and the The transmission direction of two shafts, for the second shaft with the second bevel-gear rotating, the second shaft drives scraper plate in the cistern of partition plate right end The bottom of interior rotating forward, reversion and cistern rubs repeatedly, and the mud of columns base is scraped.Clump weight, which is slidably connected at, leads In flowing plate, when deflector deflects, clump weight slides on deflector to the low side of deflector, the silt that can will be accumulated on deflector Mud scrapes.
The advantageous effect of this base case is:
1st, two water storage units alternatelies use, and in a water storage cell operation, realize another storage of automation cleaning Mud in water unit, need not close cooling water liquid communication pipeline, and cooling tower can reduce unnecessary warp with continuous service Ji loss.
2nd, mud is accumulated in columns base, gradually blocks water outlet, water level in cistern is caused to rise, trigger electromagnet Work, driving deflector deflection, then the mud in cistern is cleared up, realize the automatic monitoring to amount of sludge in pond, The time that two water storage units alternatelies of automation control use.
3rd, clump weight slides on deflector, is on the one hand pressed downward deflector one end, and deflector is made to keep heeling condition, Another aspect clump weight can scrape the mud of the accumulation on deflector when sliding.
4th, deflector tilts one side water conservancy diversion cooling water so that two water storage units will not work at the same time;On the other hand pass through Cooling water after deflector water conservancy diversion is more concentrated, and cooling water enters the impact force in cistern, drives oscillating plate movement, further Realize mud cleaning.
The 5th, spring is set, the impact force of cooling water and the elastic force of spring are engaged, and realize oscillating plate up-down vibration, oscillating plate Up-down vibration band moving gear replaces rotating, realizes scraper plate interval rotating, scraper plate scrapes repeatedly in columns base, and generation rubs It wipes, the effect for clearing up mud is more preferable.
Further, partition plate top both sides are equipped with limited block.The angle that limited block deflects deflector provides constraints, and keeps away Exempt from deflector deflection angle it is excessive cause with cooling water contact area become smaller so as to water conservancy diversion effect it is bad.
Further, deflector low side is connected with telescopic rod, and telescopic rod lower end is connected with to block the sealing block of mud mouth. When deflector deflects, deflector drive telescopic rod be pulled up, after the level of stretch of extension bar, by sealing block from Mud mouth is extracted, and mud is discharged from mud mouth.
Further, deflector is V-type plate, and clump weight bottom is in and the matched V-arrangement of deflector.V-type plate can will cool down Water is all focused in intermediate groove, stronger to the impact dynamics of oscillating plate when cooling water flows downward, the movement width of oscillating plate Spend bigger.
Further, columns base, which is located at below mud mouth, is removably connected with collecting box.Facilitate and collect at mud concentration Reason.
Description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention;
Fig. 2 is the left view of partition plate, deflector and clump weight in Fig. 1;
Fig. 3 is Fig. 1 middle racks and the left view of first rotating shaft.
Specific embodiment
It is further described below by specific embodiment:
Reference numeral in Figure of description includes:Cistern 1, partition plate 2, deflector 3, clump weight 4, the first water outlet 5, Second water outlet 6, the second mud mouth 7, sealing block 8, oscillating plate 9, rack 10, first rotating shaft 11,12, second turns of the first bevel gear Axis 13, the second bevel gear 14, scraper plate 15, spring 16, sliding slot 17, floating ball 18, limit switch 19, limited block 20, gear 21, second Cistern 22, the first cistern 23.
As shown in Figure 1, automobile circulating water cooling tower, is provided with multistage cooling body, cistern 1 and branch from top to bottom Frame, cistern 1 are fixedly arranged in the middle of partition plate 2, partition plate 2 by cistern 1 be divided into left side the first water storage unit and right side the Two water storage units, the first water storage unit and the second water storage unit are symmetrical arranged along partition plate 2.First water storage unit includes the first water storage Pond 23, the second water storage unit include the second cistern 22, and the first water storage unit, which further includes, is arranged on 23 left side wall of the first cistern First water outlet 5 of lower part and the first mud mouth for being arranged on 23 bottom of the first cistern, the second water storage unit, which further includes, to be set Put 22 right side wall lower part of the second cistern the second water outlet 6 and be arranged on the second mud mouth of 22 bottom of the second cistern 7, strainer is equipped in the first water outlet 5 and the second water outlet 6.The bottom of first cistern 23 and the second cistern 22 passes through Collecting box is bolted, collecting box is located at the lower section of the first mud mouth and the second mud mouth 7 respectively.
First water storage unit includes being arranged on the longitudinal chute 17 of 23 left side wall of the first cistern, and the second water storage unit includes The longitudinal chute 17 of 22 right side wall of the second cistern is arranged on, floating ball 18, the first cistern 23 are slidably connected in sliding slot 17 Left side wall on be located at floating ball 18 top be fixedly connected with electromagnet and for control electromagnet start limit switch 19, Top on second cistern, 22 right side wall positioned at floating ball 18 is also fixedly connected with electromagnet and for electromagnet to be controlled to start Limit switch 19, limit switch 19 is located at below electromagnet.
First water storage unit further includes the spring 16 for being fixed on 23 bottom of the first cistern, and the second water storage unit also includes solid The spring 16 of 22 bottom of the second cistern is scheduled on, 16 upper end of spring is respectively and fixedly provided with oscillating plate 9, and 9 lower end of oscillating plate is connected with dredging Unit, also opposed separators 2 are symmetrical arranged two dredging units.With the dredging list connected on the oscillating plate 9 in the first cistern 23 Exemplified by member, dredging unit includes first turn being fixedly connected on the rack 10 of 9 lower end of oscillating plate and being rotatably connected in rack Axis 11, the second shaft 13, first rotating shaft 11 are laterally set, and the second shaft 13 is longitudinally disposed.Rack 10 is through the first water storage of stretching 23 bottom of pond.As shown in figure 3, first rotating shaft 11 is equipped with is located at the first cistern with 10 meshed gears 21 of rack, gear 21 23 lower sections, 11 right end of first rotating shaft are additionally provided with the first bevel gear 12, and the first bevel gear 12 is located at 22 lower section of the second cistern.Second Shaft 13 and central axes and the central axes of first rotating shaft 11 are mutually perpendicular to, and 13 top of the second shaft extends through to the second cistern In 22,13 lower end of the second shaft is equipped with the second bevel gear 14 engaged with the first bevel gear 12, and 13 top of the second shaft is circumferentially It is evenly equipped with four pieces of scraper plates 15.
As shown in Fig. 2, 2 upper end of partition plate is hinged with deflector 3, deflector 3 is V-type plate, and 3 both ends of deflector are equipped with magnetic Block, the magnetic pole of magnetic patch is identical with the magnetic pole after electromagnet energization, and when deflector 3 keeps level, the low side of deflector 3 is away from cistern The distance of 1 bottom is 1 meter.The left end and right end of 3 bottom surface of deflector are respectively connected with telescopic rod, and telescopic rod lower end is fixedly connected with Sealing block 8, sealing block 8 are located at the first mud mouth, the surface of the second mud mouth 7 respectively.It slides laterally and is connected on deflector 3 Clump weight 4, the lower end of clump weight 4 are in and 3 matched V-arrangement of deflector.Partition plate is equipped with limited block at left and right sides of 2 upper end 20。
During specific works, the first water storage unit and the second water storage units alternately work, only with the first water storage in the present embodiment It the course of work of unit and is switched to from the first water storage unit exemplified by the course of work of the second water storage unit.
3 left end of deflector of original state tilts down, and cooling water is flowed into through deflector 3 in the first cistern 23, and from First water outlet 5 is discharged, and completes the cooling cycle in cooling tower.The mud that cooling water generates in cooling procedure is also in water conservancy diversion The first cistern 23 is flowed into 3 left end of deflector on plate 3, since the first water outlet 5 is equipped with strainer, mud can not discharge, Mud accumulation in the first cistern 23, gradually blocks the first water outlet 5, and cooling water is continued to flow into the first cistern 23, by It is gradually accumulated in the first cistern 23, the water level rise in the first cistern 23.
Floating ball 18 is subject to the buoyancy of water, as water level is raised along 17 upward sliding of sliding slot.During 18 upward sliding of floating ball Limit switch 19 is touched, limit switch 19 controls electromagnet energization work, and there is magnetic patch in the magnetic field that electromagnet generates repulsion to make With the magnetic patch of 3 left end of deflector, which is subject to repel, to be moved upwards, while 3 left end of deflector pulls up telescopic rod, and deflector 3 is left End move upward to deflector 3 it is parallel with 1 bottom surface of cistern after, when continuing up, the range of stretch of telescopic rod exceeds After 1 meter of distance of the deflector 3 away from 1 bottom of cistern, telescopic rod pulls up sealing block 8, and the first mud mouth is opened.Counterweight simultaneously Block 4 slides to the right on deflector 3, and the mud on deflector 3 is scraped 3 right end of deflector, into the second cistern 22, after The continuous cooling water into cooling tower flows on deflector 3 to 3 right end of deflector, is flowed into the second cistern 22.
The water impact in the second cistern 22 is flowed on oscillating plate 9, is pressed downward oscillating plate 9, oscillating plate 9 is subject to simultaneously Up-down vibration occurs for the upward reset response of spring 16.Oscillating plate 9 moves up and down with carry-over bar 10, and rack 10 moves up and down The 21 interval forward and backward of gear being engaged with is driven, first rotating shaft 11 is with 21 interval forward and backward of gear.First bevel gear 12 with First rotating shaft 11 rotates and the second bevel gear 14 is driven to rotate, and the second shaft 13 is rotated with the second bevel gear 14, the second shaft 13 Scraper plate 15 is driven to be rotated forward in the first cistern 23, reversion, the mud of 23 bottom of the first cistern is scraped, while the first water storage The cooling water also stored in pond 23 is discharged with mud from the first mud mouth, since water level reduces in the first cistern 23, is floated Ball 18 and limit switch 19 depart from, and electromagnet is closed, and clump weight 4 moves to 3 right end of deflector at this time, in the gravity of clump weight 4 3 right end of deflector is pressed downward under effect, deflector 3 is made to keep heeling condition, the inclined degree to deflector 3 of limited block 20 rises To restriction effect.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these should also be considered as protection scope of the present invention, these all do not interfere with what the present invention was implemented Effect and practical applicability.

Claims (5)

1. automobile circulating water cooling tower, the multistage cooling body including cistern and above cistern, feature exist In:The stent below cistern is further included, the partition plate that cistern is divided into two water storage units is equipped in cistern, every Plate top is hinged with deflector, and deflector both ends are equipped with magnetic patch, are located on the inner wall of cistern below magnetic patch and are equipped with electromagnetism Iron is located on the inner wall of cistern below electromagnet and is additionally provided with to control the limit switch of electromagnet, on the inner wall of cistern Floating ball is also slidably connected below limit switch;Clump weight is slidably connected on deflector;Two water storage units it is opposite every Plate is symmetrical arranged, and water storage unit includes being arranged on the water outlet of cistern lower sidewall and is arranged on closing for basin bottom Mud mouth, strainer is equipped in water outlet;The spring for being fixedly connected on columns base is further included, spring upper end is fixed with vibration Plate, oscillating plate bottom are connected with rack, and rack further includes first turn be rotatably connected on stent through columns base is stretched out Axis and the second shaft, first rotating shaft be equipped with rack meshed gears, be additionally provided with the first bevel gear in first rotating shaft, gear and First bevel gear is located at the both sides of partition plate respectively, and the second shaft is equipped with the second bevel gear for being engaged with the first bevel gear, and second For shaft through columns base is stretched into, the second shaft stretches into the part in cistern circumferentially arranged with multiple scraper plates, the bottom of scraper plate The bottom connection of portion and cistern touches.
2. automobile circulating water cooling tower according to claim 1, it is characterised in that:Partition plate top both sides are equipped with Limited block.
3. automobile circulating water cooling tower according to claim 2, it is characterised in that:The deflector low side, which is connected with, to be stretched Contracting bar, telescopic rod lower end are connected with to block the sealing block of mud mouth.
4. automobile circulating water cooling tower according to claim 3, it is characterised in that:The deflector be V-type plate, counterweight Block bottom is in and the matched V-arrangement of deflector.
5. automobile circulating water cooling tower according to claim 4, it is characterised in that:The columns base is located at mud extraction Collecting box is removably connected with below mouthful.
CN201810143211.9A 2018-02-11 2018-02-11 Cooling tower for automobile circulating water Active CN108106309B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810143211.9A CN108106309B (en) 2018-02-11 2018-02-11 Cooling tower for automobile circulating water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810143211.9A CN108106309B (en) 2018-02-11 2018-02-11 Cooling tower for automobile circulating water

Publications (2)

Publication Number Publication Date
CN108106309A true CN108106309A (en) 2018-06-01
CN108106309B CN108106309B (en) 2020-04-21

Family

ID=62205662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810143211.9A Active CN108106309B (en) 2018-02-11 2018-02-11 Cooling tower for automobile circulating water

Country Status (1)

Country Link
CN (1) CN108106309B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109552259A (en) * 2018-11-27 2019-04-02 邵凌云 A kind of offroad vehicle automatic flushing device
CN111120018A (en) * 2020-01-19 2020-05-08 广州达都动力科技有限公司 Cooling circulation device for machinery
CN114043353A (en) * 2021-11-12 2022-02-15 中国十七冶集团有限公司 Intelligent processing equipment for recycling construction waste and operation method
CN115507616A (en) * 2022-09-16 2022-12-23 重庆思必水处理材料有限公司 Adjustable multistage cooling arrangement is used in production of liquid aluminium sulfate

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1153225A1 (en) * 1984-01-24 1985-04-30 Всесоюзный Научно-Исследовательский Институт Водоснабжения,Канализации,Гидротехнических Сооружений И Инженерной Гидрогеологии "Водгео" Cooling tower reservoir
JP2006078031A (en) * 2004-09-08 2006-03-23 Nihon Spindle Techno Co Ltd Cooling tower
CN202902998U (en) * 2012-10-22 2013-04-24 山西晋丰煤化工有限责任公司 Filtration device of cooling tower
CN205138250U (en) * 2015-11-04 2016-04-06 义乌华鼎锦纶股份有限公司 Improved cooling tower
CN205393132U (en) * 2016-02-25 2016-07-27 珠海格力电器股份有限公司 Cooling tower pond clearance system
CN106052473A (en) * 2016-07-12 2016-10-26 浙江国祥冷却科技有限公司 Cooling tower water accumulation tank
CN206177064U (en) * 2016-10-18 2017-05-17 天津京泊模具铸造有限公司 Cooling tower with self -cleaning function
CN206919700U (en) * 2017-06-14 2018-01-23 江西中氟化工有限公司 A kind of air-cooled cooling tower

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1153225A1 (en) * 1984-01-24 1985-04-30 Всесоюзный Научно-Исследовательский Институт Водоснабжения,Канализации,Гидротехнических Сооружений И Инженерной Гидрогеологии "Водгео" Cooling tower reservoir
JP2006078031A (en) * 2004-09-08 2006-03-23 Nihon Spindle Techno Co Ltd Cooling tower
CN202902998U (en) * 2012-10-22 2013-04-24 山西晋丰煤化工有限责任公司 Filtration device of cooling tower
CN205138250U (en) * 2015-11-04 2016-04-06 义乌华鼎锦纶股份有限公司 Improved cooling tower
CN205393132U (en) * 2016-02-25 2016-07-27 珠海格力电器股份有限公司 Cooling tower pond clearance system
CN106052473A (en) * 2016-07-12 2016-10-26 浙江国祥冷却科技有限公司 Cooling tower water accumulation tank
CN206177064U (en) * 2016-10-18 2017-05-17 天津京泊模具铸造有限公司 Cooling tower with self -cleaning function
CN206919700U (en) * 2017-06-14 2018-01-23 江西中氟化工有限公司 A kind of air-cooled cooling tower

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109552259A (en) * 2018-11-27 2019-04-02 邵凌云 A kind of offroad vehicle automatic flushing device
CN111120018A (en) * 2020-01-19 2020-05-08 广州达都动力科技有限公司 Cooling circulation device for machinery
CN114043353A (en) * 2021-11-12 2022-02-15 中国十七冶集团有限公司 Intelligent processing equipment for recycling construction waste and operation method
CN114043353B (en) * 2021-11-12 2023-03-07 中国十七冶集团有限公司 Intelligent processing equipment for recycling construction waste and operation method
CN115507616A (en) * 2022-09-16 2022-12-23 重庆思必水处理材料有限公司 Adjustable multistage cooling arrangement is used in production of liquid aluminium sulfate
CN115507616B (en) * 2022-09-16 2023-09-01 重庆思必水处理材料有限公司 Adjustable multistage cooling device for liquid aluminum sulfate production

Also Published As

Publication number Publication date
CN108106309B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN108106309A (en) Automobile circulating water cooling tower
KR101126787B1 (en) Automatic cleaning system for small sized heat exchangers
CN106145221A (en) A kind of hydraulic control slagging-off vertical gratings
KR101954997B1 (en) Semi-continuous circulation heat exchanger cleaning system
CN110326571B (en) Fish culture equipment convenient to wash
CN208461773U (en) A kind of cleaning device of photo-voltaic power generation station photovoltaic panel
CN208772089U (en) A kind of useless pail pack cleaning device
CN202420295U (en) Up-and-down turnover type internal cleaning device for indirect air-cooling tube bundle
CN116173590A (en) Sewage treatment device
CN202734668U (en) Novel funneling rubber ball recovery net
CN113349033B (en) Afforestation water saving fixtures
CN114768335A (en) Odor treatment device based on sludge heat drying and garbage power generation
CN114543359A (en) Intelligent solar air source heat pump all-in-one machine
KR100717722B1 (en) A floating adultration removable floating screen apparatus
CN113669933A (en) Geothermal fluid scale prevention device and scale removal method for Sichuan-Tibet region
JP4082588B2 (en) Sludge scraping machine
JP5424153B2 (en) Garbage removal device at water intake
CN112591018A (en) Automatic change river course sewage treatment equipment
CN109084598A (en) A kind of pond of cooling tower of structure optimization
CN209396945U (en) A kind of slag scraping mechanism for sewage treatment
CN219772334U (en) Cover body and wool making cleaning equipment with same
CN219175450U (en) Water storage structure for water conservancy building design
CN113245319B (en) Dirt cleaning device for inner wall of water-cooling water outlet pipe of receiving box
CN114558849B (en) Automatic oil pipe heat cleaning machine
JP6388263B2 (en) Water intake device and power generation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200910

Address after: 239500 east side of Wenhua Avenue, north side of Husong Road, Shitan Industrial Park, Shizi Town, Quanjiao County, Chuzhou City, Anhui Province

Patentee after: ANHUI HANGJIA AUTO PARTS MANUFACTURING Co.,Ltd.

Address before: 401220 Pinghu Road 6, Changshou District, Chongqing 5 5 1-13 minus 1-13

Patentee before: CHONGQING YONGLUO TRADING Co.,Ltd.