CN108105487A CN201810078774.4A CN201810078774A CN108105487A CN 108105487 A CN108105487 A CN 108105487A CN 201810078774 A CN201810078774 A CN 201810078774A CN 108105487 A CN108105487 A CN 108105487A
Authority
CN
China
Prior art keywords
inner tube
tube
sleeve
outer layer
layer sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810078774.4A
Other languages
Chinese (zh)
Other versions
CN108105487B (en
Inventor
赵学博
袁志明
宋冬林
汪伦
王伟
刘波波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Virology of CAS
Original Assignee
Wuhan Institute of Virology of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Virology of CAS filed Critical Wuhan Institute of Virology of CAS
Priority to CN201810078774.4A priority Critical patent/CN108105487B/en
Publication of CN108105487A publication Critical patent/CN108105487A/en
Application granted granted Critical
Publication of CN108105487B publication Critical patent/CN108105487B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/18Double-walled pipes; Multi-channel pipes or pipe assemblies
    • F16L9/19Multi-channel pipes or pipe assemblies
    • F16L9/20Pipe assemblies
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/17Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by means of rings, bands or sleeves pressed against the outside surface of the pipe or hose
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/02Preventing, monitoring, or locating loss

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The invention discloses a kind of bilayer sleeves for high-level prevention room discharge active-poison sewage,Including discharging inner tube,Outer layer sleeve,Multiple inner tube supporting frames and patch short tube,Discharge inner tube is located in outer layer sleeve,Each inner tube supporting frame is located between discharge inner tube and outer layer sleeve,And each inner tube supporting frame is sequentially distributed along the axial direction of discharge inner tube,Each inner tube supporting frame radially can freely stretch along discharge inner tube,The fixed part of each inner tube supporting frame is connected with discharge inner tube,The pars contractilis of each inner tube supporting frame is contacted with outer layer sleeve,Multiple patch short tubes are axially set on outer layer sleeve successively along outer layer sleeve,The first sealing ring is equipped between each patch short tube and outer layer sleeve,The inlet of outer layer sleeve is equipped with ascending pipe,The exit of outer layer sleeve is equipped with delivery pipe,Sealing element is respectively equipped in injection tube inlet and delivery pipe outlet.The double-layer sleeve structure is simple, securely and reliably, easy for construction.

Description

A kind of bilayer sleeve for high-level prevention room discharge active-poison sewage
Technical field
The present invention relates to high-level closed laboratory installation technical fields, and in particular to one kind is used for high-level prevention Discharge the bilayer sleeve of active-poison sewage in room.
Background technology
High-level biological safety protection laboratory is using physics complete isolated guard technology and protective barrier, passes through phase Corresponding strict control measure reaches and high pathogenic risk biotic factor is avoided to spill into environment to generate serious biological risk Purpose.Different according to biological risk and hazard degree, pathogenic microorganism is divided into four grades.First kind pathogenic microorganism and the mankind Health and human diseases are unrelated, non-hazardous to the mankind;Second class pathogenic microorganism can damage to human health, but its Extent of injury very little, and have very effective prevention and treatment means;Three classes pathogenic microorganism can make human health Into more serious harm or cause infection dead, this kind of pathogenic microorganism may have prevention or treatment means;4th class cause of disease is micro- Biology can cause human health very to seriously endanger or directly result in death, and without prevention or treatment means, such as charcoal Subcutaneous ulcer bacillus, Ebola virus, variola virus etc..Highest level biological safety protection laboratory is exactly to be used for studying the 4th class cause of disease The laboratory of the high protection level of microorganism, therefore it protects quarantine measures requirement high, to ensure without any high infective pathogen Microorganism loss to environment possibility.
The country there is no the biological risk active-poison sewage row of bilayer dedicated for high-level biological safety protection laboratory at present Put and handle pipeline.There is also problems with for similar techniques:
Firstth, it is domestic at present not yet to find the ripe biological risk of the bilayer for high-level biological safety protection laboratory Active-poison sewage discharges and processing pipe technology.
Secondth, for external at present double-deck active-poison sewage casing based on welding, this is very high to welding process requirement, and welds Construction is often subject to the limitations such as pipe arrangement.
3rd, known external double-deck active-poison sewage pipe technology pipe inside support is fixed support, is adjusted and mobile Ability is poor, support it is inadequate with inner and outer pipes compactness, easily because equipment operation or other factors generate vibrations, cause weld or There is leakage hidden danger in connecting portion.
4th, ripe double-skin duct maintenance, disinfection and maintenance subsequent processing technical tactic and embodiment be there is no at present.
The content of the invention
In order to solve the above-mentioned problems of the prior art, arranged the present invention provides one kind for high-level prevention room The bilayer sleeve of active-poison sewage is put, the double-layer sleeve structure is simple, securely and reliably, easy for construction, has filled up current high-level life The technological gap of double-skin duct, overcomes other technologies similar to double-skin duct in the active-poison sewage discharge of object security laboratory and processing Defect.
Technical solution is used by realizing above-mentioned purpose of the present invention:
A kind of bilayer sleeve for high-level prevention room discharge active-poison sewage, including discharge inner tube and outer layer jacket Pipe, discharge inner tube are located in outer layer sleeve, further include multiple inner tube supporting frames and patch short tube, each inner tube supporting frame is located at It discharges between inner tube and outer layer sleeve, and each inner tube supporting frame is sequentially distributed along the axial direction of discharge inner tube, each inner tube supporting rack Body radially can freely stretch along discharge inner tube, and the fixed part of each inner tube supporting frame is connected with discharge inner tube, each inner tube supporting rack The pars contractilis of body is contacted with outer layer sleeve, and multiple patch short tubes are axially set on outer layer sleeve successively along outer layer sleeve, each to mend The first sealing ring is equipped between fourth short tube and outer layer sleeve.
The inner tube supporting frame includes multiple telescope supports, circumferential uniform point along discharge inner tube of multiple telescope supports Cloth, telescope support include sleeve, spring and ball, sleeve one end open, and spring is located in sleeve, and one end of spring and sleeve are close The connection of inner surface center is blocked, the other end is connected with ball, and the natural length of spring is less than the depth of sleeve, a part for ball Outside sleeve, each sleeve seal end outer surface is fixedly connected with discharge inner tube, and each ball is contacted with outer layer sleeve.
Multiple retainer rings are further included, retainer ring is equal with the number of inner tube supporting frame, multiple retainer rings edge discharge inner tubes Axial direction for fixing sleeve loaded in discharge inner tube, the sealed end outer surfaces of multiple sleeves on each inner tube supporting frame is solid respectively successively Due in corresponding retainer ring.
The retainer ring is enclosed by elastic steel sheet, and the both ends of elastic steel sheet are bolted on discharge inner tube On.
The outer layer sleeve by it is multiple segmentation outer tubes be connected in sequence, segmentation outer tube be straight tube, three-way pipe or bend pipe, Segmentation inner tube is reducer pipe, and in adjacent two segmentations outer tube, one of them is segmented one end of outer tube as outer insertion short tube, another point One end of section outer tube is outer access short tube, and connection, institute are compressed in the outer outer access short tube of insertion short tube insertion and by high pressure mode The inner layer sleeve stated is connected in sequence by multiple segmentation inner tubes, and segmentation inner tube is straight tube, three-way pipe or bend pipe, divides segmentation inner tube It is reducer pipe, in adjacent two segmentations inner tube, one end of one of segmentation inner tube is interior insertion short tube, another segmentation outer tube One end for interior access short tube, compress connection in interior insertion short tube insertion in access short tube and by high pressure mode.
Outer insertion short tube is equipped with the first internal projecting ring, and outer access short tube is equipped with outside first to match with the first internal projecting ring Groove, the first internal projecting ring are located in the first external groove, and outer access short tube is equipped with the first sealing ring, and interior insertion short tube is equipped with the Two internal projecting rings, interior access short tube are equipped with the second external groove to match with the second internal projecting ring, and the second internal projecting ring is located at outside second In groove, interior access short tube is equipped with the second sealing ring.
One end and outer insertion short tube welding that outer access short tube is connected with outer insertion short tube, interior access short tube and interior insertion are short One end of pipe connection and interior insertion short tube welding.
Ring is separated along axial be equipped with successively of inner layer sleeve between outer layer sleeve and inner layer sleeve, respectively separates the inner side edge edge of ring Be tightly connected with discharge inner tube, respectively separate the outer side edges of ring along and outer layer sleeve be tightly connected, it is adjacent more than two to separate Ring and outer layer sleeve and discharge inner tube form an independent sealed detection unit, set in each detection unit there are one ascending pipe with More than one delivery pipe injects in tube inlet and the outlet of each delivery pipe and is respectively equipped with sealing element.
Compared with prior art, advantages and advantages of the invention are:
1st, bilayer sleeve of the invention sets inner tube supporting frame, supporting rack top between discharge inner tube and outer layer protect casing End ball can effectively improve Pipe installing technique, can effectively reduce discharge inner tube because of equipment operation or the vibrations of current generation, prevent Junction is only compressed because vibrations generate loosening, sealing effect is influenced, pipeline maintenance attended operation ability can be effectively improved.
2nd, discharge inner tube of the invention and outer layer sleeve are segmented junction using high pressure compression type connection mode at it, only exist Connection end is welded, and the problems such as can avoiding deforming because of the material that high temperature generates in conventional bonding technique, can effectively avoid The problem of influencing sealing effect because of welding.
3rd, bilayer sleeve of the invention adds multiple patch short tubes outside outer layer sleeve, when outer layer sleeve ruptures When, the part that outer layer sleeve ruptures can be cut off, then patch short tube is moved to the both ends of outer layer sleeve rupture section, then passed through Patch short tube is pressed on outer layer sleeve by high pressure mode, and patch short tube is made to make up rupture section as patch;When discharge inner tube It when upper segmentation inner tube ruptures, can will be cut off at the corresponding outer layer sleeve of segmentation inner tube, replace segmentation inner tube, then will Patch short tube is moved to the both ends that outer layer sleeve cuts off section, then patch short tube is pressed on outer layer sleeve by high pressure mode, Patch short tube is made to be made up as patch and cuts off section;It can be seen that due to the presence of patch short tube, it can be easily to outer layer Casing and discharge inner tube carry out maintenance, and substantially prolong the service life of bilayer sleeve, greatly reduce the processing of active-poison sewage Cost.
4th, bilayer sleeve of the invention can carry out segmentation and suppress and disinfection, can effectively improve and suppress detection efficiency and standard True rate.
5th, double-layer sleeve structure of the invention is simple, installation is convenient, and safe and reliable, real available for high-level protection Test the emission treatment of room active-poison sewage.
Description of the drawings
Fig. 1 is the structure diagram for the bilayer sleeve that active-poison sewage is discharged for high-level prevention room.
Fig. 2 is the partial enlarged view of I in Fig. 1.
Fig. 3 is the part-structure schematic diagram being segmented when outer tube and segmentation inner tube are three-way pipe.
Fig. 4 is the part-structure schematic diagram being segmented when outer tube and segmentation inner tube are bend pipe.
Fig. 5 be Fig. 1 in A-A to sectional view.
Fig. 6 is the structure diagram of telescope support.
Wherein, 1- outer layer sleeves, 2- discharges inner tube, 3- inner tubes supporting frame, 4- ascending pipes, 5- delivery pipes, 6- patches are short Pipe, 7- sleeves, 8- springs, 9- balls, 10- elastic steel sheets, 11- bolts, 12- segmentation outer tube are inserted into short tube outside 13-, outside 14- Access short tube, 15- is segmented inner tube, the interior access short tube of insertion short tube, 17-, the first internal projecting rings of 18-, 19- first are recessed outside in 16- Slot, the second sealing rings of 20-, the second internal projecting rings of 21-, the second external grooves of 22-, the 3rd sealing rings of 23-, the first sealing rings of 24-, 25- Separate ring.
Specific embodiment
The present invention is described in detail below in conjunction with the accompanying drawings.
Provided by the present invention for structure such as Fig. 1 institutes of the bilayer sleeve of high-level prevention room discharge active-poison sewage Show, which includes discharge inner tube 2, outer layer sleeve 1, multiple patch short tubes 25, multiple inner tube supporting frames 3 and multiple Retainer ring.Discharge inner tube 2 is located in outer layer sleeve 1, discharges inner tube and outer layer sleeve and uses stainless steel.
Multiple patch short tubes 25 are set with successively along outer layer sleeve axial (laid according to pipeline and execution conditions are designed) In on outer layer sleeve 1, the first sealing ring 24 is equipped between each patch short tube 25 and outer layer sleeve 1, the presence of patch short tube can be with Discharge inner tube and outer layer sleeve are carried out maintenance, the service life of bilayer sleeve is extended, reduces cost.
The outer layer sleeve 1 is connected in sequence by multiple segmentation outer tubes 12.It can be straight tube, curved to be segmented outer tube 12 Pipe, three-way pipe or other more siphunculus, bend pipe are used for the connection at outer layer sleeve turning, and it is more that more siphunculus can be used for bilayer sleeve Connection at branch shunting.Segmentation outer tube 12 is reducer pipe, in adjacent two segmentations outer tube 12, one end of one of segmentation outer tube 12 For outer insertion short tube 13, one end of another segmentation outer tube 12 is outer access short tube 14, and outer insertion short tube 13 is equipped in first Bulge loop 18, outer access short tube 14 are equipped with the first external groove 19 to match with the first internal projecting ring, and outer insertion short tube 13 is inserted into outer Connection is compressed in access short tube 14 and by high pressure mode, and the first internal projecting ring 18 is located in the first external groove 19, outer insertion is short The second sealing ring 20 is equipped between pipe 13 and outer access short tube 14.Outer tube is segmented using variable diameter design, and adjacent two are segmented outer tube Between connected by the way of grafting and high pressure pressing molding, and sealing ring (such as rubber seal) is set, purpose is to increase Strong outer layer sleeve is respectively segmented the leakproofness of outer tube junction, ensures that outer layer sleeve does not have any leakage.Outer access short tube 14 Welded with outer one end for be connected of insertion short tube 13 and outer insertion short tube 13, so can to avoid it is external enter short tube and outer insertion short tube One end of connection can slowly tilt after using for a longer period, influence sealing effect.
The discharge inner tube is connected in sequence by multiple segmentation inner tubes 15.Be segmented inner tube 15 can be straight tube, bend pipe, Three-way pipe or other more siphunculus, bend pipe are used for the connection at bilayer sleeve turning, and it is branched that more siphunculus can be used for discharge inner tube Connection at shunting.Segmentation inner tube 15 is reducer pipe, in adjacent two segmentations inner tube 15, one end of one of segmentation inner tube 15 For interior insertion short tube 16, one end of another segmentation inner tube 15 is interior access short tube 17, and interior insertion short tube 16 is equipped in second Bulge loop 21, interior access short tube 17 are equipped with the second external groove 22 to match with the second internal projecting ring, and interior insertion short tube 16 is inserted into interior Connection is compressed in access short tube 17 and by high pressure mode, and the second internal projecting ring 21 is located in the second external groove 22, interior insertion is short The 3rd sealing ring 23 is equipped between pipe 16 and interior access short tube 17.Inner tube is segmented using variable diameter design, and adjacent two are segmented inner tube Between connected by the way of grafting and high pressure pressing molding, and sealing ring (such as rubber seal) is set, purpose is to increase Forced-ventilated puts the leakproofness that inner tube is respectively segmented inner tube junction, ensures that discharge inner tube does not have any leakage.It is interior access short tube with One end of interior insertion short tube connection and interior insertion short tube welding so can be inserted into what short tube was connected into short tube to avoid being inscribed with interior One end can slowly tilt after using for a longer period, influence sealing effect.
Each inner tube supporting frame 3 is sequentially distributed along the axial direction of discharge inner tube 2, and inner tube supporting frame plays the work of support inner tube With, while also to facilitate discharge inner tube and outer layer sleeve installation.The inner tube supporting frame 3 includes multiple telescope supports, respectively Multiple telescope supports of inner tube supporting frame are distributed uniformly and circumferentially between discharge inner tube 2 and outer layer sleeve 1, this implementation In example, telescope support has 3.
The telescope support includes sleeve 7, spring 8 and ball 9,7 one end open of sleeve, and spring 8 is located in sleeve 7, One end of spring 8 is connected with 7 sealed end inner surface of sleeve center, and the other end is connected with ball 9, and the natural length of spring 8 is less than The depth of sleeve 7, a part for ball 9 are located at outside sleeve 7.
Retainer ring is equal with the number of inner tube supporting frame 3, the axial direction fixing sleeve successively of multiple retainer rings along discharge inner tubes Loaded in discharge inner tube.The fixation steel loop is enclosed by elastic steel sheet 10, and the both ends of elastic steel sheet pass through bolt 11 It is fixed in discharge inner tube 2.
The sealed end outer surface of 3 sleeves on each inner tube supporting frame is individually fixed in corresponding retainer ring, By setting retainer ring, avoid sleeve and be directly welded in discharge inner tube, so as to avoid inner tube is discharged in welding because of height The deformation that temperature generates, and then add the leakproofness of discharge inner tube.3 balls 9 and outer layer sleeve on each inner tube supporting frame 3 1 contact by the cooperation of ball and spring, can make outer layer sleeve be easily installed in each inner tube supporting frame, and spring can be with The length of meaning adjustment inner tube supporting frame, ball can reduce the friction between outer layer sleeve and inner tube supporting frame.
Ring 25 is separated along axial be equipped with successively of inner layer sleeve between outer layer sleeve and inner layer sleeve, separates ring 25 by stainless steel It makes, respectively separates the inner side edge of ring 25 along with discharge inner tube welding, the outer side edges for respectively separating ring 25 are welded along with outer layer sleeve, phase Adjacent more than two rings 25 that separate form an independent sealed detection unit with outer layer sleeve 1 and discharge inner tube 2, each to detect It is set on unit there are one ascending pipe and more than one delivery pipe, injects in tube inlet and the outlet of each delivery pipe and be respectively equipped with sealing Part.Since entire bilayer sleeve length is longer and pipe branch is more, it has not been convenient to pipeline closed and soaking disinfection are detected, Ring is separated for this purpose, devise herein, entire bilayer sleeve is subjected to segmentation detection by separating ring, such as:When entire double braid covering Manage it is relatively easy, when only straight tube and bend pipe are formed, when also just saying that entire bilayer sleeve does not have branch, as shown in Figure 1, passing through phase Adjacent two separate ring and entire bilayer sleeve are divided into multiple detection units, set ascending pipe 4 in one end of each detection unit, separately One end is equipped with delivery pipe 5, and when surveying formula detection unit seal and soaking disinfection, gases at high pressure and thimerosal are injected from ascending pipe, Gases at high pressure and thimerosal are discharged from delivery pipe;If entire bilayer sleeve is relative complex, it is made of straight tube, bend pipe and three-way pipe When, to be separated out a detection unit, it is necessary to which multiple rings that separate are separated, and the detection unit after separating just has multiple Port, using one of port as inlet, other ports as floss hole, this according to actual conditions (pipeline lay and Execution conditions) it is laid, it no longer illustrates herein.
Cross-distribution is answered in the segmentation junction and the segmentation junction of outer layer protection casing of active-poison sewage discharge inner tube, therebetween Gauge is determined from according to Specific construction environment.
The bilayer inner tube requires draining water (flow) direction, both current should by wherein one segmentation inner tube interior insertion short tube with One end of segmentation inner tube main body connection is flowed in another segmentation inner tube, with reach current are unimpeded in pipeline, do not accumulate raffinate, Reduce the risk because surprisingly causing to generate active-poison sewage leakage during the loosening of junction.

Claims (8)

1. a kind of bilayer sleeve for high-level prevention room discharge active-poison sewage, including discharging inner tube and outer layer sleeve, Discharge inner tube is located in outer layer sleeve, it is characterised in that:Further include multiple inner tube supporting frames and patch short tube, each inner tube support Frame body is located between discharge inner tube and outer layer sleeve, and each inner tube supporting frame is sequentially distributed along the axial direction of discharge inner tube, each interior Pipe supporting frame radially can freely stretch along discharge inner tube, and the fixed part of each inner tube supporting frame is connected with discharge inner tube, each interior The pars contractilis of pipe supporting frame is contacted with outer layer sleeve, and multiple patch short tubes are axially set in outer layer sleeve successively along outer layer sleeve On, the first sealing ring is equipped between each patch short tube and outer layer sleeve.
2. the bilayer sleeve according to claim 1 for high-level prevention room discharge active-poison sewage, feature exists In:The inner tube supporting frame includes multiple telescope supports, and multiple telescope supports are circumferentially uniformly distributed along discharge inner tube, stretch Stent includes sleeve, spring and ball, sleeve one end open, and spring is located in sleeve, in one end of spring and sleeve seal end Face center connects, and the other end is connected with ball, and the natural length of spring is less than the depth of sleeve, and a part for ball is located at set Cylinder is outer, and each sleeve seal end outer surface is fixedly connected with discharge inner tube, and each ball is contacted with outer layer sleeve.
3. the bilayer sleeve according to claim 2 for high-level prevention room discharge active-poison sewage, feature exists In:Multiple retainer rings are further included, retainer ring is equal with the number of inner tube supporting frame, axial direction of multiple retainer rings along discharge inner tube Fixing sleeve is loaded in discharge inner tube successively, the sealed end outer surfaces of multiple sleeves on each inner tube supporting frame be individually fixed in In its corresponding retainer ring.
4. the bilayer sleeve according to claim 3 for high-level prevention room discharge active-poison sewage, feature exists In:The retainer ring is enclosed by elastic steel sheet, and the both ends of elastic steel sheet are bolted in discharge inner tube.
5. the bilayer sleeve according to claim 1 for high-level prevention room discharge active-poison sewage, feature exists In:The outer layer sleeve is connected in sequence by multiple segmentation outer tubes, and segmentation outer tube is straight tube, three-way pipe or bend pipe, is segmented Inner tube is reducer pipe, and in adjacent two segmentations outer tube, one end of one of segmentation outer tube is outer insertion short tube, another segmentation is outer One end of pipe is outer access short tube, and connection is compressed in the outer outer access short tube of insertion short tube insertion and by high pressure mode, described Inner layer sleeve is connected in sequence by multiple segmentation inner tubes, and segmentation inner tube is straight tube, three-way pipe or bend pipe, and segmentation inner tube is to become Footpath is managed, and in adjacent two segmentations inner tube, one end of one of segmentation inner tube is interior insertion short tube, one end of another segmentation outer tube For interior access short tube, interior insertion short tube insertion is interior to be accessed in short tube and compresses connection by high pressure mode.
6. the bilayer sleeve according to claim 5 for high-level prevention room discharge active-poison sewage, feature exists In:Outer insertion short tube is equipped with the first internal projecting ring, and outer access short tube is equipped with the first external groove to match with the first internal projecting ring, First internal projecting ring is located in the first external groove, and outer access short tube is equipped with the second sealing ring, and interior insertion short tube is equipped in second Bulge loop, interior access short tube are equipped with the second external groove to match with the second internal projecting ring, and the second internal projecting ring is located at the second external groove In, interior access short tube is equipped with the 3rd sealing ring.
7. the bilayer sleeve according to claim 6 for high-level prevention room discharge active-poison sewage, feature exists In:One end and outer insertion short tube welding that outer access short tube is connected with outer insertion short tube, interior access short tube connect with interior insertion short tube The one end connect and interior insertion short tube welding.
8. the bilayer sleeve for high-level prevention room discharge active-poison sewage according to claim 1-7 is any, It is characterized in that:Ring is separated along axial be equipped with successively of inner layer sleeve between outer layer sleeve and inner layer sleeve, respectively separates the inner side edge of ring Along and discharge inner tube be tightly connected, respectively separate the outer side edges of ring along and outer layer sleeve be tightly connected, it is adjacent it is more than two every Open loop and outer layer sleeve and discharge inner tube form an independent sealed detection unit, set in each detection unit there are one ascending pipe With more than one delivery pipe, inject in tube inlet and the outlet of each delivery pipe and be respectively equipped with sealing element.
CN201810078774.4A 2018-01-23 2018-01-23 Double-layer sleeve for discharging live-poison wastewater in high-level protection laboratory Active CN108105487B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810078774.4A CN108105487B (en) 2018-01-23 2018-01-23 Double-layer sleeve for discharging live-poison wastewater in high-level protection laboratory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810078774.4A CN108105487B (en) 2018-01-23 2018-01-23 Double-layer sleeve for discharging live-poison wastewater in high-level protection laboratory

Publications (2)

Publication Number Publication Date
CN108105487A true CN108105487A (en) 2018-06-01
CN108105487B CN108105487B (en) 2022-03-08

Family

ID=62221219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810078774.4A Active CN108105487B (en) 2018-01-23 2018-01-23 Double-layer sleeve for discharging live-poison wastewater in high-level protection laboratory

Country Status (1)

Country Link
CN (1) CN108105487B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027473A (en) * 2018-10-29 2018-12-18 江苏亿超工程塑料有限公司 A kind of engineering plastics flange and its application easy to disassemble
CN109340486A (en) * 2018-10-29 2019-02-15 江苏亿超工程塑料有限公司 A kind of shock resistance engineering plastics flange easy to disassemble
CN113531233A (en) * 2021-09-10 2021-10-22 江苏淮海新材料科技有限公司 Industrial waste gas treatment pipe of convenient clearance

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3826521A (en) * 1972-10-30 1974-07-30 P Wilhelmsen Glued replacement unit for repairing ruptured pipe
US4357960A (en) * 1977-03-24 1982-11-09 Arthur S. Bittinger Plumbing method and composition for use in same
US5033512A (en) * 1989-02-14 1991-07-23 Tuboscope Inc. Replacement pipe section for a defective pipeline
EP2096347A1 (en) * 2008-02-22 2009-09-02 HERA S.p.A. Method for joining together steel pipes for conveying fluids under pressure
CN202597934U (en) * 2012-03-23 2012-12-12 梁强 Water pipe with frost burst prevention function
CN203868539U (en) * 2014-03-18 2014-10-08 天津市昊航复合管业有限公司 Anti-impact composite tube
CN204879111U (en) * 2015-08-27 2015-12-16 山西省交通科学研究院 Resistant drain pipe that freezes
RU2589422C1 (en) * 2015-05-05 2016-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" Multichannel pipeline for transportation of liquid or gas

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3826521A (en) * 1972-10-30 1974-07-30 P Wilhelmsen Glued replacement unit for repairing ruptured pipe
US4357960A (en) * 1977-03-24 1982-11-09 Arthur S. Bittinger Plumbing method and composition for use in same
US5033512A (en) * 1989-02-14 1991-07-23 Tuboscope Inc. Replacement pipe section for a defective pipeline
EP2096347A1 (en) * 2008-02-22 2009-09-02 HERA S.p.A. Method for joining together steel pipes for conveying fluids under pressure
CN202597934U (en) * 2012-03-23 2012-12-12 梁强 Water pipe with frost burst prevention function
CN203868539U (en) * 2014-03-18 2014-10-08 天津市昊航复合管业有限公司 Anti-impact composite tube
RU2589422C1 (en) * 2015-05-05 2016-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" Multichannel pipeline for transportation of liquid or gas
CN204879111U (en) * 2015-08-27 2015-12-16 山西省交通科学研究院 Resistant drain pipe that freezes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027473A (en) * 2018-10-29 2018-12-18 江苏亿超工程塑料有限公司 A kind of engineering plastics flange and its application easy to disassemble
CN109340486A (en) * 2018-10-29 2019-02-15 江苏亿超工程塑料有限公司 A kind of shock resistance engineering plastics flange easy to disassemble
CN113531233A (en) * 2021-09-10 2021-10-22 江苏淮海新材料科技有限公司 Industrial waste gas treatment pipe of convenient clearance
CN113531233B (en) * 2021-09-10 2021-11-30 江苏淮海新材料科技有限公司 Industrial waste gas treatment pipe of convenient clearance

Also Published As

Publication number Publication date
CN108105487B (en) 2022-03-08

Similar Documents

Publication Publication Date Title
CN108105487A (en) A kind of bilayer sleeve for high-level prevention room discharge active-poison sewage
US9933327B2 (en) Method for detecting leaks in a fuel circuit of a gas turbine fuel supply system
CN105841896A (en) Device for testing sealing performance of steel plastic pipe
CN208058164U (en) A kind of bilayer sleeve for high-level prevention room discharge active-poison sewage
CN103962361B (en) Scanning leak detection high-efficiency negative-pressure exhaust hood
CN106474505A (en) A kind of employing high-temperature steam promotes the Full automatic sterilizing device that sealing ring is combined with door
CN207133022U (en) A kind of sylphon seal performance test apparatus
CN105823610A (en) Pressurization detection device
CN208109360U (en) A kind of ship boiler boiler tube leakage detection apparatus
CN105716805A (en) Blocking detection device
CN108775459A (en) With highly pressurised liquid or the gasket seal device and method of gas barrier material leakage
CN105865727A (en) Pressure-keeping detection device
CN105666100A (en) Sealing tester
CN105547605B (en) A kind of air-tightness detection device applied to cooler
CN206095543U (en) Hollow composite insulator air -tight test device
CN103329232B (en) For extracting the equipment of protective gas out from container
CN105628315A (en) Pressurization testing machine
CN105757056A (en) Sealed leak detection device
CN105841895A (en) Joint sealing equipment
CN206656835U (en) Pump case sealing detection equipment
CN104100767B (en) Aseptic isolating device for valve rod of main valve in freeze dryer
CN108533859A (en) The sealing structure and encapsulating method of highly pressurised liquid or gas barrier formula flange
CN206882380U (en) A kind of waste material waste gas collection device
CN105715965B (en) A kind of anti-leak water lute drainer for realizing safety
CN105699024A (en) Internal pressurizing testing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant