CN108104837A CN201711056700.2A CN201711056700A CN108104837A CN 108104837 A CN108104837 A CN 108104837A CN 201711056700 A CN201711056700 A CN 201711056700A CN 108104837 A CN108104837 A CN 108104837A
Authority
CN
China
Prior art keywords
main pipeline
tunnel
section
joint
liner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711056700.2A
Other languages
Chinese (zh)
Other versions
CN108104837B (en
Inventor
宋华
林春刚
王百泉
杨君华
王�华
王助锋
杨露伟
尚伟
李荆
刘作威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRTG Survey and Design Institute Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201711056700.2A priority Critical patent/CN108104837B/en
Publication of CN108104837A publication Critical patent/CN108104837A/en
Application granted granted Critical
Publication of CN108104837B publication Critical patent/CN108104837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Abstract

A kind of method that tunnel-liner fast continuous placing is realized using automatic material distributing device,This method is realized by automatic material distributing device,Automatic material distributing device includes main pipeline fixed section,Joint mechanism,Swing mechanism,Lateral,Main pipeline rotates section,The discharge port of main pipeline fixed section lower end and concrete mixer is connected,The upper end of main pipeline rotation section is alignd with the flared joint in lateral,Sliding sleeve in joint mechanism is pushed outwardly and compression is docked with flared joint,Then nut is used,Straight pin and connecting rod fasten sliding sleeve and pressing plate,Under the pressure effect of concrete mixer,Concrete can be along main pipeline fixed section,Main pipeline rotates section,Lateral and several perfusing holes, which reach, corresponding treats pouring area,Pouring for pouring area is treated in completion,Constantly repeat casting process,All tunnel-liner fast continuous placings for treating pouring area in whole tunnel can be completed.

Description

A kind of method that tunnel-liner fast continuous placing is realized using automatic material distributing device
Technical field
It is especially a kind of to realize tunnel-liner using automatic material distributing device the invention belongs to lining construction technical field The method of fast continuous placing.
Background technology
Tunnel-liner is bearing formation pressure, prevents the main building object of surrouding rock deformation, slump.It need to be incited somebody to action when pouring building lining big Inside the concrete injection lining shuttering of amount, specific method is to connect one end of concrete delivery pipe and concrete mixer discharge port It connects, concrete under the pressure effect of concrete mixer, is poured into lining shuttering by the perfusing hole connection of the other end and lining trolley It is internal.
When constructing at this stage whenever pouring one region of completion, worker is required for be connected to concrete delivery pipe next A perfusing hole.Lining trolley usually has multiple perfusing holes, often replaces a perfusing hole, is required for dismounting joint, then connects again Next connector is connect, worker's duplication of labour amount is more, and delivery pipe and connector are usually heavier, and the working space on lining trolley has Limit, operation is extremely inconvenient, and labor intensity is high, efficiency is low, complete entire lining cutting casting process take it is longer.In addition between pouring Overlong time of having a rest will have a negative impact to lining cutting pouring quality.
The content of the invention
To solve the above problems, realize that tunnel-liner is quickly continuously poured using automatic material distributing device the present invention provides a kind of Concrete continuous can be quickly assigned to casting area by the method built, this method, have easy to operate, labor strength Feature low, construction efficiency is high can shorten the time to ensure that tunnel-liner poured smoothly completes.
For achieving the above object, the present invention adopts the following technical scheme that:
A kind of method that tunnel-liner fast continuous placing is realized using automatic material distributing device, in the method:Tunnel surrounding is The unstable structure layer formed after tunnel excavation, tunnel-liner are the permanent construction layers formed by concreting, casting moulds Plate corresponds to configuration according to tunnel arch and it is provided with several perfusing holes, and cast template and tunnel surrounding, which form, pours tunnel The required cavity of lining cutting;The automatic material distributing device includes main pipeline fixed section, joint mechanism, swing mechanism, branched pipe Road, main pipeline rotation section, this method use concrete mixer, lining trolley, it is characterized in that:
In the automatic material distributing device:
The lower end of main pipeline fixed section couples with the discharge port of concrete mixer, and the upper end is connected and fixed by pipe clamp in lining cutting On the platform of trolley, section is rotated with main pipeline by rotary joint again afterwards and is coupled;
Swing mechanism is also connected and fixed on the platform of lining trolley, and swing mechanism mainly contains turntable fixed pedestal, worm gear snail Bar turntable and rotating pipe stent, turntable fixed pedestal are connected and fixed on the platform of lining trolley, worm and gear turntable with Turntable fixed pedestal couples, and rotating pipe stent is connected and fixed on worm and gear turntable;
Main pipeline rotation section is connected in rotating pipe after being each passed through the intermediate throughholes of turntable fixed pedestal and worm and gear turntable On stent, by rotary joint main pipeline is made to rotate the lower end of section and realize that rotation couples with the upper end of main pipeline fixed section;
Joint mechanism is connected in the upper end of main pipeline rotation section, and joint mechanism mainly contains electric pushrod, sliding sleeve, dust-proof Circle, wear ring, sealing ring, straight pin, connecting rod, rubber ring, pressing plate, nut and flared joint, electric pushrod are connected in supervisor In the outer circle of road rotation section, sliding sleeve is connected in the outer circle of main pipeline rotation section upper end and couples with electric pushrod, in cunning Several grooves are offered on the inner ring of moving sleeve, dustband, wear ring and sealing ring, rubber are connected respectively in the groove Circle is connected in the end of sliding sleeve, and flared joint couples with a side ports of lateral, and pressing plate is connected in horn mouth and connects The necking end of head, the both sides of pressing plate couple each connecting rod respectively, and each connecting rod is coupled with pressing plate by nut, each connecting rod and sliding sleeve Coupled by straight pin;By joint mechanism one end of lateral and main pipeline is made to rotate section and couple, and its other end can be with Several outlets in parallel are formed, each parallel connection exports then one perfusing hole of corresponding connection;
When needing to pour tunnel-liner, first the discharge port of the lower end of main pipeline fixed section and concrete mixer is connected, passes through drive Dynamic swing mechanism aligns the upper end of main pipeline rotation section with the flared joint in lateral, by the cunning in joint mechanism Moving sleeve is pushed outwardly and compression is docked with flared joint, then using nut, straight pin and connecting rod by sliding sleeve and pressure Plate fastens, to ensure that sliding sleeve and flared joint connection are reliable;Start concrete mixer afterwards, in the pressure of concrete mixer Under power effect, concrete can be along main pipeline fixed section, main pipeline rotation section, lateral and the arrival pair of several perfusing holes That answers treats pouring area;Pay attention to:Since each outlet in parallel uniquely corresponds to perfusing hole casting area corresponding with its, So several outlets in parallel can correspond to several perfusing holes and several corresponding casting area, and several corresponding casting area are just The part that continuous contact pin can be formed treats pouring area, can be achieved with tunnel-liner and quick is continuously poured what the part was treated in pouring area It builds;
It needs to stop concrete mixer work behind pouring area when completing part described above, straight pin and connecting rod be disengaged, then Joint mechanism is retracted in situ, move swing mechanism again after withdrawing several outlets in parallel afterwards, then main pipeline is rotated into section Snap to it is another treat pouring area and repeat above-mentioned docking step, another treat the several of pouring area when several outlets in parallel are corresponding Can just start concrete mixer when perfusing hole and several corresponding casting area, realize tunnel-liner it is another treat it is fast in pouring area Fast continuous placing;
Tunnel-liner is constantly repeated in above-mentioned another fast continuous placing process treated in pouring area, you can complete whole tunnel institute Need the tunnel-liner fast continuous placing of pouring area.
Due to using technical solution as described above, the present invention generates following good effect:
1st, the present invention is realized in each tunnel-liner fast continuous placing treated in pouring area, and several outlets in parallel can be with Quick distribution concreting, is advantageously implemented the requirement of concrete delamination continuous placing.
2nd, automatic material distributing device of the invention has the characteristics that easy to operate, labor intensity is low, efficient, adjacent to wait to pour The intermittent time that pours in area is greatly shortened, and reduces plugging, the risk of cold seam, it can be ensured that treats pouring area inner tunnel lining What block poured is rapidly completed.
3rd, automatic material distributing device of the invention has the characteristics that automatization level height, favorably with promoting lining construction Mechanization Level.
4th, present invention may also apply to other construction equipments, a kind of efficient, reliable implement is provided for concrete distributing And construction method.
Description of the drawings
Fig. 1 is the stereoscopic schematic diagram of the present invention;
Fig. 2 is the structure schematic diagram of swing mechanism in automatic material distributing device of the present invention;
Fig. 3 is the structure schematic diagram of automatic material distributing device center tap mechanism of the present invention.
In above-mentioned figure:1- tunnel surroundings;2- tunnel-liners;3- cast templates;4- main pipeline fixed sections;5- perfusing holes;6- Platform;7- joint mechanisms;8- swing mechanisms;9- laterals;10- pipe clamps;11- rotary joints;12- main pipelines rotate section;13- Turntable fixed pedestal;14- worm and gear turntables;15- rotating pipe stents;16- electric pushrods;17- sliding sleeves;18- is dust-proof Circle;19- wear rings;20- sealing rings;21- straight pins;22- connecting rods;23- rubber rings;24- pressing plates;25- nuts;26- horn mouths Connector.
Specific embodiment
1-3 makes technical solution of the present invention and is explained further below in conjunction with the accompanying drawings, and not described part is with the technology Subject to scheme, do not repeat separately.
Fig. 1 is the stereoscopic schematic diagram of the present invention, and the quantity of pipeline and arrangement pattern are only that a kind of signal is former in figure Reason, particular number and arrangement needed for site operation pour specific requirement by lining cutting and determine.Tunnel surrounding 1 is tunnel excavation The unstable structure formed afterwards, tunnel-liner 2 are the permanent constructions poured by concrete soil.Lining trolley is that lining cutting is applied The special equipment of work, cast template 3 and tunnel surrounding 1, which form, pours 2 required cavity of tunnel-liner.3 table of cast template Several perfusing holes 5 are left in face, are used as the operation window of casting concrete.
The present invention automatic material distributing device mainly include main pipeline fixed section 4, main pipeline rotation section 12, swing mechanism 8, Joint mechanism 7, lateral 9.
Main pipeline fixed section 4, swing mechanism 8 and joint mechanism 7 are connected and fixed on platform 6, and lateral 9 is mounted on Couple on cast template 3 and respectively with each perfusing hole 5.Swing mechanism 8 can do the rotary motion within 360 °.Joint mechanism 7 is pacified Mounted in the end of swing mechanism 8, stretching motion can be done along the radial direction of the revolution circumference of swing mechanism 8, it can be with either branch pipe It is docked in road 9.Lateral 9 is uniformly distributed along the revolution circumference of swing mechanism 8, can be conveniently delivered to specify by concrete Region is conducive to the requirement for reaching stratified continuous pouring.
Fig. 2 illustrates the structural principle of swing mechanism 8, and main pipeline fixed section 4 is connected and fixed by pipe clamp 10 in platform 6 On bottom surface.Rotary joint 11 rotates section 12 and main pipeline fixed section 4 for coupling main pipeline.Worm and gear turntable 14 is to realize back The core component that rotation mechanism 8 rotates, is fixed on by turntable fixed pedestal 13 above platform 6.Rotating pipe stent 15 and worm gear 14 rotatable parts of worm screw turntable couple.Main pipeline rotation section 12 is connected and fixed on rotating pipe stent 15, can be with rotating pipe Stent 15 rotates simultaneously.Main pipeline rotates section 12 itself and the weight of joint mechanism 7 is carried by rotating pipe stent 15.
Fig. 3 illustrates the structural principle of joint mechanism 7, and piecing devices 7 are mounted on the end of main pipeline rotation section 12.It is electronic Push rod 16 is connected and fixed in the outer circle of main pipeline rotation section 12, and sliding sleeve 17 is connected in the inner circle of main pipeline rotation section 12 On.The push rod and sliding sleeve 17 of electric pushrod 16 couple, and under the action of electric pushrod 16, sliding sleeve 17 is revolved in main pipeline Turn 12 internal slide of section.It is fluted in the inner circle of sliding sleeve 17, it is equipped in the contact section with main pipeline rotation section 12 anti- Konisphere 18, wear ring 19 and sealing ring 20 prevent that concrete spillage and external foreign matter enter slidingsurface in lining cutting casting process. It is docked for convenience of pipeline, flared joint 26 is employed in interface position.For ensure sliding sleeve 17 and flared joint 26 it Between have good sealing performance, rubber ring 23 is installed in the end of sliding sleeve 17.It installs 26 necking side of flared joint There are one pressing plates 24, are coupled between pressing plate 24 and connecting rod 22 using nut 25, and sliding sleeve 17 uses straight pin 21 with connecting rod 22 Connection.After electric pushrod 16 promotes sliding sleeve 17 to press to flared joint 26, nut 25 is manually tightened, you can ensure sliding sleeve Cylinder 17 and flared joint 26 dock reliably.
By joint mechanism 7 one end of lateral 9 and main pipeline is made to rotate section 4 and couple, and its other end can be formed Several outlets in parallel, each parallel connection export then one perfusing hole 5 of corresponding connection.
By the structure setting of the automatic material distributing device, the present invention has the characteristics that automatization level height and realization The primary condition of the method for the present invention, favorably with promoted lining construction Mechanization Level.
When needing to pour tunnel-liner, first the discharge port of the lower end of main pipeline fixed section 4 and concrete mixer is connected, is led to It overdrives swing mechanism 8, the upper end of main pipeline rotation section 12 is alignd with the flared joint 26 in lateral 9, by connector Sliding sleeve 17 in mechanism 7 is pushed outwardly and docks compression with flared joint 26, then using nut 25,21 and of straight pin Connecting rod 22 fastens sliding sleeve 17 and pressing plate 24, to ensure that sliding sleeve 17 and flared joint 26 couple reliably;It opens afterwards Dynamic concrete mixer, under the pressure effect of concrete mixer, concrete can be rotated along main pipeline fixed section 4, main pipeline Section 12, lateral 9 and several perfusing holes 5, which reach, corresponding treats pouring area;Pay attention to:Due to each outlet in parallel only One corresponds to a perfusing hole 5 casting area corresponding with its, then several outlets in parallel can correspond to several 5 Hes of perfusing hole Several corresponding casting area, the part which can just form continuous contact pin treat pouring area, can be achieved with tunnel The fast continuous placing in pouring area is treated in road lining cutting in the part.
It needs to stop concrete mixer work behind pouring area when completing part described above, straight pin 21 and connecting rod 22 is taken off It opens, then joint mechanism 7 is retracted original position, swing mechanism 8 is moved again after withdrawing several outlets in parallel afterwards, then will supervisor Road rotation section 12 snap to it is another treat pouring area and repeat above-mentioned docking step, when several outlet correspondences in parallel are another to be poured Concrete mixer can just be started when building several perfusing holes 5 in area and several corresponding casting area, realize that tunnel-liner is treated another Fast continuous placing in pouring area.
Tunnel-liner is constantly repeated in above-mentioned another fast continuous placing process treated in pouring area, you can complete whole tunnel All tunnel-liner fast continuous placings for treating pouring area in road.
By above statement this it appears that:The present invention is realized quickly to be connected in each tunnel-liner treated in pouring area Continuous to pour, several outlets in parallel can quickly distribute concreting, be advantageously implemented concrete delamination continuous placing it It is required that.
Above example is merely to illustrate technical scheme, but the present invention is not limited to above-described embodiment, in ability This is belonged to any modification of the present invention, equivalent substitute and improvement etc. in the knowledge that domain those of ordinary skill possesses Invent the scope being claimed.

Claims (1)

1. a kind of method that tunnel-liner fast continuous placing is realized using automatic material distributing device, in the method:Tunnel surrounding (1) it is the unstable structure layer that is formed after tunnel excavation, tunnel-liner (2) is the permanent construction formed by concreting Layer, cast template (3) corresponds to configuration according to tunnel arch and it is provided with several perfusing holes (5), cast template (3) and tunnel Country rock (1), which forms, pours tunnel-liner (2) required cavity;The automatic material distributing device includes main pipeline fixed section (4), joint mechanism (7), swing mechanism (8), lateral (9), main pipeline rotation section (12), this method uses concrete Pump truck, lining trolley, it is characterized in that:
In the automatic material distributing device:
The lower end of main pipeline fixed section (4) couples with the discharge port of concrete mixer, and the upper end is coupled admittedly by pipe clamp (10) It is scheduled on the platform (6) of lining trolley, rotating section (12) with main pipeline by rotary joint (11) again afterwards couples;
Swing mechanism (8) is also connected and fixed on the platform (6) of lining trolley, and swing mechanism (8) mainly contains turntable and fixes base Seat (13), worm and gear turntable (14) and rotating pipe stent (15), turntable fixed pedestal (13) are connected and fixed in lining trolley Platform (6) above, worm and gear turntable (14) couples with turntable fixed pedestal, and rotating pipe stent (15) is connected and fixed in snail On worm and gear turntable (14);
Main pipeline rotation section (12) joins after being each passed through the intermediate throughholes of turntable fixed pedestal (13) and worm and gear turntable (14) It is connected on rotating pipe stent (15), by rotary joint (11) main pipeline is made to rotate the lower end of section (12) and main pipeline fixed section (4) rotation connection is realized in upper end;
Joint mechanism (7) be connected in main pipeline rotation section (12) upper end, joint mechanism (7) mainly contain electric pushrod (16), Sliding sleeve (17), dustband (18), wear ring (19), sealing ring (20), straight pin (21), connecting rod (22), rubber ring (23), Pressing plate (24), nut (25) and flared joint (26), electric pushrod (16) are connected in the outer circle of main pipeline rotation section (12), Sliding sleeve (17) is connected in the outer circle of main pipeline rotation section (12) upper end and couples with electric pushrod (16), in sliding sleeve (17) several grooves are offered on inner ring, dustband (18), wear ring (19) and sealing are connected respectively in the groove It encloses (20), rubber ring (23) is connected in the end of sliding sleeve, and flared joint (26) and a side ports of lateral (9) join It connects, pressing plate (24) is connected in the necking end of flared joint (26), and the both sides of pressing plate (24) couple each connecting rod (22), respectively connect respectively Bar (22) is coupled with pressing plate (24) by nut (25), and each connecting rod (22) is coupled with sliding sleeve (17) by straight pin (21); By joint mechanism (7) one end of lateral (9) and main pipeline is made to rotate section (4) and couple, and its other end can form number A outlet in parallel, each parallel connection export then one perfusing hole (5) of corresponding connection;
When needing to pour tunnel-liner, first the discharge port of the lower end of main pipeline fixed section (4) and concrete mixer is connected, is passed through Swing mechanism (8) is driven, the upper end of main pipeline rotation section (12) is alignd with the flared joint (26) in lateral (9), Sliding sleeve (17) in joint mechanism (7) is pushed outwardly and docks compression with flared joint (26), then using nut (25), straight pin (21) and connecting rod (22) fasten sliding sleeve (17) and pressing plate (24), to ensure sliding sleeve (17) and loudspeaker The connection of mouth connector (26) is reliable;Start concrete mixer afterwards, under the pressure effect of concrete mixer, concrete can edge It is corresponding to be poured main pipeline fixed section (4), main pipeline rotation section (12), lateral (9) and several perfusing holes (5) arrival Build area;Pay attention to:Since each outlet in parallel uniquely corresponds to a perfusing hole (5) and its corresponding casting area, then Several outlets in parallel can correspond to several perfusing holes (5) and several corresponding casting area, and several corresponding casting area are just The part that continuous contact pin can be formed treats pouring area, can be achieved with tunnel-liner and quick is continuously poured what the part was treated in pouring area It builds;
It needs to stop concrete mixer work behind pouring area when completing part described above, straight pin (21) and connecting rod (22) is de- It opens, then joint mechanism (7) is retracted in situ, swing mechanism (8) is moved again after withdrawing several outlets in parallel afterwards, then will Main pipeline rotation section (12) snap to it is another treat pouring area and repeat above-mentioned docking step, when several outlets in parallel are corresponding another One can just start concrete mixer when several perfusing holes (5) of pouring area and several corresponding casting area, realize tunnel-liner In another fast continuous placing treated in pouring area;
Tunnel-liner is constantly repeated in above-mentioned another fast continuous placing process treated in pouring area, you can complete whole tunnel institute Need the tunnel-liner fast continuous placing of pouring area.
CN201711056700.2A 2017-11-01 2017-11-01 A method of tunnel-liner fast continuous placing is realized using automatic material distributing device Active CN108104837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711056700.2A CN108104837B (en) 2017-11-01 2017-11-01 A method of tunnel-liner fast continuous placing is realized using automatic material distributing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711056700.2A CN108104837B (en) 2017-11-01 2017-11-01 A method of tunnel-liner fast continuous placing is realized using automatic material distributing device

Publications (2)

Publication Number Publication Date
CN108104837A true CN108104837A (en) 2018-06-01
CN108104837B CN108104837B (en) 2019-03-22

Family

ID=62206278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711056700.2A Active CN108104837B (en) 2017-11-01 2017-11-01 A method of tunnel-liner fast continuous placing is realized using automatic material distributing device

Country Status (1)

Country Link
CN (1) CN108104837B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661675A (en) * 2018-08-03 2018-10-16 齐洪军 A kind of technique and equipment for tunnel lining trolley casting concrete with pressure
CN108952757A (en) * 2018-06-07 2018-12-07 中铁隧道股份有限公司 A kind of tunnel-liner automatic distributing system
CN110130935A (en) * 2019-05-24 2019-08-16 洛阳中铁强力机械有限公司 A kind of concrete dispenser for tunnel double-lining
CN110130941A (en) * 2019-06-25 2019-08-16 成都锐龙机械制造有限公司 A kind of rotary distributing device for tunnel double-lining
CN110259463A (en) * 2019-06-13 2019-09-20 孔德玲 The shield all-in-one machine of tunnel support body disposable moulding by casting
CN110344849A (en) * 2019-07-30 2019-10-18 中交一公局厦门工程有限公司 A kind of rotary tunnel double-lining block material distributing machine easy to assemble
CN110374639A (en) * 2019-08-02 2019-10-25 中煤第三建设(集团)有限责任公司 Cereal injection device and cereal method for implanting
CN110424990A (en) * 2019-07-11 2019-11-08 华北科技学院 A kind of driving poured support construction equipment and method
CN112324469A (en) * 2020-12-09 2021-02-05 洛阳腾誉隧道机械有限公司 Automatic material distribution system matched with lining trolley of multiple pouring windows

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012229546A (en) * 2011-04-26 2012-11-22 Gifu Kogyo Co Ltd Form for secondary lining concrete of tunnel
CN203846783U (en) * 2014-04-23 2014-09-24 中国水利水电第十三工程局有限公司 Divider cone for concrete placement
CN104555391A (en) * 2015-01-19 2015-04-29 中国葛洲坝集团股份有限公司 Continuous transporting device and method capable of simultaneously unloading concretes by multiple points
CN105736013A (en) * 2016-03-28 2016-07-06 将乐县国通隧道机械有限公司 Tunnel lining trolley provided with sub-feed apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012229546A (en) * 2011-04-26 2012-11-22 Gifu Kogyo Co Ltd Form for secondary lining concrete of tunnel
CN203846783U (en) * 2014-04-23 2014-09-24 中国水利水电第十三工程局有限公司 Divider cone for concrete placement
CN104555391A (en) * 2015-01-19 2015-04-29 中国葛洲坝集团股份有限公司 Continuous transporting device and method capable of simultaneously unloading concretes by multiple points
CN105736013A (en) * 2016-03-28 2016-07-06 将乐县国通隧道机械有限公司 Tunnel lining trolley provided with sub-feed apparatus

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952757A (en) * 2018-06-07 2018-12-07 中铁隧道股份有限公司 A kind of tunnel-liner automatic distributing system
CN108661675A (en) * 2018-08-03 2018-10-16 齐洪军 A kind of technique and equipment for tunnel lining trolley casting concrete with pressure
CN108661675B (en) * 2018-08-03 2023-11-03 齐洪军 Process and equipment for pouring concrete under pressure for tunnel lining trolley
CN110130935A (en) * 2019-05-24 2019-08-16 洛阳中铁强力机械有限公司 A kind of concrete dispenser for tunnel double-lining
CN110259463A (en) * 2019-06-13 2019-09-20 孔德玲 The shield all-in-one machine of tunnel support body disposable moulding by casting
CN110259463B (en) * 2019-06-13 2024-03-29 孔德玲 One-step casting molding shield all-in-one machine for tunnel supporting body
CN110130941A (en) * 2019-06-25 2019-08-16 成都锐龙机械制造有限公司 A kind of rotary distributing device for tunnel double-lining
CN110424990A (en) * 2019-07-11 2019-11-08 华北科技学院 A kind of driving poured support construction equipment and method
CN110344849A (en) * 2019-07-30 2019-10-18 中交一公局厦门工程有限公司 A kind of rotary tunnel double-lining block material distributing machine easy to assemble
CN110374639A (en) * 2019-08-02 2019-10-25 中煤第三建设(集团)有限责任公司 Cereal injection device and cereal method for implanting
CN110374639B (en) * 2019-08-02 2021-06-01 中煤第三建设(集团)有限责任公司 Grain injection device and grain injection method
CN112324469A (en) * 2020-12-09 2021-02-05 洛阳腾誉隧道机械有限公司 Automatic material distribution system matched with lining trolley of multiple pouring windows

Also Published As

Publication number Publication date
CN108104837B (en) 2019-03-22

Similar Documents

Publication Publication Date Title
CN108104837A (en) A kind of method that tunnel-liner fast continuous placing is realized using automatic material distributing device
CN208831012U (en) Two lining concrete placing installations
CN111335922B (en) Lining trolley and tunnel secondary lining construction method using lining trolley
CN207920627U (en) A kind of intelligent tunnel lining trolley
CN108867844A (en) Combined-type sewage well prefabricated component
CN208934702U (en) A kind of AUTOMATIC ZONING pours device by window
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN207647515U (en) A kind of automatic material distributing device for tunnel-liner
CN207620811U (en) A kind of anti-turned-down edge stripper apparatus on cable duct trolley
CN205325942U (en) Piping lane box culvert pouring mold
CN208934701U (en) A kind of automatic pouring device
CN206277487U (en) A kind of piping lane mould
CN206988689U (en) A kind of underground piping partial collapse restoring means
CN206736955U (en) A kind of comprehensive pipe gallery die
CN211762341U (en) Mould positioning and assembling device for concrete prefabricated part production
CN104912209B (en) Bars In Poured Concrete Slab reserved holes of pipes plugging device and processing and plugging construction method
CN209011845U (en) A kind of tunnel grouting structure
CN210134948U (en) Rotary automatic pressure double-side distributing machine
CN208040405U (en) A kind of tunnel double-lining trolley vault assembled secondary grouting system
CN102267178B (en) Forming head of pipe making machine
CN110130935A (en) A kind of concrete dispenser for tunnel double-lining
CN110645023A (en) Tunnel secondary lining arch anti-void longitudinal withdrawal pipe type belt mold grouting equipment
CN218375314U (en) Device is pour in construction of main part is built in room
CN219753973U (en) Combined mounting-dismounting type cantilever scaffold section steel hole template device
CN209537994U (en) A kind of mold that civil construction pours

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lin Chungang

Inventor after: Wang Peng

Inventor after: He Shanning

Inventor after: Wang Baiquan

Inventor after: Yang Junhua

Inventor after: Song Hua

Inventor after: Wang Hua

Inventor after: Shang Wei

Inventor after: Li Jing

Inventor after: Yuan Pengfei

Inventor after: Zhang Hongda

Inventor before: Song Hua

Inventor before: Liu Zuowei

Inventor before: Lin Chungang

Inventor before: Wang Baiquan

Inventor before: Yang Junhua

Inventor before: Wang Hua

Inventor before: Wang Zhufeng

Inventor before: Yang Luwei

Inventor before: Shang Wei

Inventor before: Li Jing