CN108104420A - Indoor super large-scale lithotome paving structure - Google Patents
Indoor super large-scale lithotome paving structure Download PDFInfo
- Publication number
- CN108104420A CN108104420A CN201711338791.9A CN201711338791A CN108104420A CN 108104420 A CN108104420 A CN 108104420A CN 201711338791 A CN201711338791 A CN 201711338791A CN 108104420 A CN108104420 A CN 108104420A
- Authority
- CN
- China
- Prior art keywords
- bed course
- lithotome
- scale
- super large
- stone plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/08—Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/20—Separately-laid insulating layers; Other additional insulating measures; Floating floors for sound insulation
- E04F15/203—Separately-laid layers for sound insulation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention provides a kind of indoor super large-scale lithotome paving structures, it includes stone plate, stone plate fixation is paved on ground, and the first bed course is provided between stone plate and ground, and the first bed course is sandy gravel stratum, multiple embedded parts are provided in first bed course, one end of embedded part extends to the bottom of stone plate, and the opposite other end of embedded part is extended in the first bed course, and the first frame of diamond shape is connected on the opposite other end of embedded part, roll body is equipped in frame, roll body is arranged in the first bed course.The present invention can efficiently solve the problem of hollowing and deformation after stone material paving in the prior art.
Description
Technical field
The present invention relates to a kind of stone material pavement techniques, mat formation in particular to a kind of indoor super large-scale lithotome
Structure.
Background technology
At present, domestic and international stone floor is mainly based on natural stone material, and over nearly twenty or thirty year, international stone industries develop
It is very rapid.Since nineteen ninety, global stone material output and the volume of trade are increased every year with the speed of 7.3% and 9.2% respectively,
All higher than other industry, the development of entire Ornamental Stone Industry is significantly faster than that the development of global economy.The number of Chinese stone material production
Amount is to rise year by year, the internal and external ornament plate built at home, this is that stone material uses a maximum part;Followed by build
With stone, including gardens, engineering stone;Besides stone carving quarter, the stone art work, tombstone product etc..And made with Decorative Building Stone
Dosage is most.
The construction technology generally use cement mortar wet method paving of ground stone ground pavement and adhesive paving, but both
All inevitably there is stone material hollowing phenomenon in wet construction, and be easy to cause the deformation of stone material for a long time, and usually repairs
All it is to be removed using destructive, causes the waste of natural resources, and pollution is caused to construction environment.After construction with
Big face stone material is inconsistent, affects the overall effect of decoration, also creates very big waste, extend the construction time.
The content of the invention
In consideration of it, the present invention provides a kind of indoor super large-scale lithotome paving structures, it is intended to solve the prior art
The problem of hollowing after middle stone material paving and deformation.
For this purpose, the present invention provides a kind of indoor super large-scale lithotome paving structure, including stone plate, stone plate
Fixation is paved on ground, and the first bed course is provided between stone plate and ground, and the first bed course is sandy gravel stratum, is set in the first bed course
Multiple embedded parts are equipped with, one end of embedded part extends to the bottom of stone plate, and the opposite other end of embedded part is extended in the first bed course,
The first frame of diamond shape is connected on the opposite other end of embedded part, is equipped with roll body in frame, roll body is arranged in the first bed course.
Further, there is the connecting portion of V-arrangement between above-mentioned embedded part and the bottom of stone plate.
Further, the bottom of above-mentioned first frame is connected with the second frame of V-arrangement.
Further, it is provided with the first muscle body in above-mentioned second frame.
Further, the second bed course is provided between above-mentioned stone plate and the first bed course.
Further, above-mentioned second bed course is sandy gravel stratum.
Further, it is provided with the 3rd bed course between above-mentioned first bed course and the second bed course.
Further, above-mentioned 3rd bed course is sandy gravel stratum.
Further, the second muscle body extended laterally is provided in above-mentioned 3rd bed course, the second muscle body is connected on embedded part,
The end of second muscle body has the bending part extended obliquely out.
A kind of indoor super large-scale lithotome paving structure provided by the present invention, including stone plate, stone plate is solid
Surely it is paved on ground, the first bed course is provided between stone plate and ground, the first bed course is sandy gravel stratum, is set in the first bed course
There are multiple embedded parts, one end of embedded part extends to the bottom of stone plate, and the opposite other end of embedded part is extended in the first bed course, buried
The first frame of diamond shape is connected on the opposite other end of part, is equipped with roll body in frame, roll body is arranged in the first bed course;It carries
For the setting of said structure, using the structure of the embedded part of setting, the first frame and roll body, can be formed more firm under stone material
Support construction, and the first frame and roll body can form the anti-deformation effect for stone material, so as to efficiently solve
Hollowing after stone material paving and the problem of deformation in the prior art.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field
Technical staff will be apparent understanding.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the structure diagram of indoor super large-scale lithotome paving structure provided in an embodiment of the present invention;
Fig. 2 is the enlarged drawing in A portions in Fig. 1.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Completely it is communicated to those skilled in the art.
Referring to Fig. 1 to Fig. 2, show that indoor super large-scale lithotome provided in an embodiment of the present invention is mated formation knot in figure
Structure, including stone plate 1, the fixation of stone plate 1 is paved on ground 2, and the first bed course 3 is provided between stone plate 1 and ground 2,
First bed course 3 is sandy gravel stratum, is provided with multiple embedded parts 31 in the first bed course 3, one end of embedded part 31 extends to the bottom of stone plate 1
Portion, the opposite other end of embedded part 31 are extended in the first bed course 3, and the of diamond shape is connected on the opposite other end of embedded part 31
One frame 32, frame 32 is interior to be equipped with roll body 33, and roll body 33 is arranged in the first bed course 3.
A kind of indoor super large-scale lithotome paving structure that the present embodiment is provided, including stone plate, stone plate
Fixation is paved on ground, and the first bed course is provided between stone plate and ground, and the first bed course is sandy gravel stratum, is set in the first bed course
Multiple embedded parts are equipped with, one end of embedded part extends to the bottom of stone plate, and the opposite other end of embedded part is extended in the first bed course,
The first frame of diamond shape is connected on the opposite other end of embedded part, is equipped with roll body in frame, roll body is arranged in the first bed course;
The setting of said structure is provided, using the structure of the embedded part of setting, the first frame and roll body, can be formed more steady under stone material
Solid support construction, and the first frame and roll body can form the anti-deformation effect for stone material, so as to effectively solve
The certainly hollowing after stone material paving and the problem of deformation in the prior art.
With continued reference to Fig. 1 to Fig. 2, there is the connecting portion 34 of V-arrangement between embedded part 31 and the bottom of stone plate 1;First frame
32 bottom is connected with the second frame 35 of V-arrangement;The first muscle body 351 is provided in second frame 35.Setting with this configuration,
It can cause stronger for the supportive of Integral stone, and stronger anti-deformation effect can be formed.
With continued reference to Fig. 1 to Fig. 2, the second bed course 4 is provided between 1 and first bed course 3 of stone plate;Second bed course 4 is sand
Gravel bed;The 3rd bed course 5 is provided between first bed course 3 and the second bed course 4;3rd bed course 5 is sandy gravel stratum.Setting with this configuration
It puts, can cause integral strength higher.
With continued reference to Fig. 1 to Fig. 2, the second muscle body 51 extended laterally is provided in the 3rd bed course 5, the second muscle body 51 connects
In on embedded part 31, the end of the second muscle body 51 has the bending part 52 extended obliquely out.Setting with this configuration so that stone material is horizontal
The anti-deformation effect for stress is upwardly formed, and is formed to noise to the guiding of side, achievees the effect that noise reduction.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
God and scope.In this way, if these modifications and changes of the present invention belongs to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these modification and variations.
Claims (9)
1. super large-scale lithotome paving structure in Room, which is characterized in that including stone plate (1), the stone plate (1) is fixed
It is paved on ground (2), the first bed course (3), first bed course is provided between the stone plate (1) and the ground (2)
(3) multiple embedded parts (31) are provided with for sandy gravel stratum, in first bed course (3), one end of the embedded part (31) extends to described
The bottom of stone plate (1), the opposite other end of the embedded part (31) are extended in first bed course (3), the embedded part
(31) the first frame (32) of diamond shape is connected on the opposite other end, roll body (33) is equipped in the frame (32), it is described
Roll body (33) is arranged in first bed course (3).
2. interior super large-scale lithotome paving structure according to claim 1, which is characterized in that the embedded part (31)
There is the connecting portion (34) of V-arrangement between the bottom of the stone plate (1).
3. interior super large-scale lithotome paving structure according to claim 1, which is characterized in that first frame
(32) bottom is connected with the second frame (35) of V-arrangement.
4. interior super large-scale lithotome paving structure according to claim 3, which is characterized in that second frame
(35) the first muscle body (351) is provided in.
5. interior super large-scale lithotome paving structure according to claim 1, which is characterized in that the stone plate
(1) the second bed course (4) is provided between first bed course (3).
6. interior super large-scale lithotome paving structure according to claim 5, which is characterized in that second bed course
(4) it is sandy gravel stratum.
7. interior super large-scale lithotome paving structure according to claim 5, which is characterized in that first bed course
(3) the 3rd bed course (5) is provided between second bed course (4).
8. interior super large-scale lithotome paving structure according to claim 7, which is characterized in that the 3rd bed course
(5) it is sandy gravel stratum.
9. interior super large-scale lithotome paving structure according to claim 7, which is characterized in that the 3rd bed course
(5) the second muscle body (51) extended laterally is provided in, the second muscle body (51) is connected on the embedded part (31), and described the
The end of two muscle bodies (51) has the bending part (52) extended obliquely out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711338791.9A CN108104420B (en) | 2017-12-14 | 2017-12-14 | Indoor oversized natural stone paving structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711338791.9A CN108104420B (en) | 2017-12-14 | 2017-12-14 | Indoor oversized natural stone paving structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108104420A true CN108104420A (en) | 2018-06-01 |
CN108104420B CN108104420B (en) | 2023-05-23 |
Family
ID=62215972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711338791.9A Active CN108104420B (en) | 2017-12-14 | 2017-12-14 | Indoor oversized natural stone paving structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108104420B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622450A (en) * | 2020-06-05 | 2020-09-04 | 陕西福磊建设集团有限公司 | Stone ground construction process |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201794254U (en) * | 2010-08-23 | 2011-04-13 | 浙江亚厦装饰股份有限公司 | Building structure of stone ground |
CN107237476A (en) * | 2017-07-18 | 2017-10-10 | 苏州美瑞德建筑装饰有限公司 | Accomodation ground stone material paving mounting structure |
CN207919979U (en) * | 2017-12-14 | 2018-09-28 | 苏州美瑞德建筑装饰有限公司 | Indoor super large-scale lithotome paving structure |
-
2017
- 2017-12-14 CN CN201711338791.9A patent/CN108104420B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201794254U (en) * | 2010-08-23 | 2011-04-13 | 浙江亚厦装饰股份有限公司 | Building structure of stone ground |
CN107237476A (en) * | 2017-07-18 | 2017-10-10 | 苏州美瑞德建筑装饰有限公司 | Accomodation ground stone material paving mounting structure |
CN207919979U (en) * | 2017-12-14 | 2018-09-28 | 苏州美瑞德建筑装饰有限公司 | Indoor super large-scale lithotome paving structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622450A (en) * | 2020-06-05 | 2020-09-04 | 陕西福磊建设集团有限公司 | Stone ground construction process |
Also Published As
Publication number | Publication date |
---|---|
CN108104420B (en) | 2023-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556557A (en) | Manufacturing method of color concrete granite flamed-surface terrace | |
CN207919979U (en) | Indoor super large-scale lithotome paving structure | |
Benghida | Adobe bricks: the best eco-friendly building material | |
CN103953205A (en) | Bamboo earthquake-proof reinforcing structure of existing raw soil wall and method thereof | |
CN108104420A (en) | Indoor super large-scale lithotome paving structure | |
CN107435390A (en) | The structure and construction method that a kind of steel structure keel combines with concrete prefabricated hanging plate | |
CN104790617B (en) | A kind of assembled composite board | |
CN103790168A (en) | Application method of soil nailing wall in deep foundation pit supporting | |
CN104790618B (en) | A kind of assembled composite board | |
CN204491906U (en) | With the cracking-proof frame construction infilled wall of tension rib | |
CN207959202U (en) | A kind of CFG bracing means | |
CN207919950U (en) | Imitative stone material vitreous brick wall paving structure | |
CN2924014Y (en) | Composite anchor-rod tray | |
CN102561161A (en) | Method for paving water-permeable brick-paved ground and water permeation locator | |
ATE236313T1 (en) | THIN-WALLED COMPONENT MADE OF HYDRAULICLY HARDENED CEMENT STONE MATERIAL AND METHOD FOR THE PRODUCTION THEREOF | |
CN101949182B (en) | Structure of stone wall constructed by strip stone cut by machine and method thereof | |
CN107829428A (en) | A kind of variable diameters bamboo joint type mortar pile | |
CN201785896U (en) | Machine cutting stone slab masonry stone wall structure | |
CN107975189A (en) | A kind of roof structure and its crack repairing method | |
CN203821190U (en) | Ecological water storing brick | |
CN207296466U (en) | Concrete structure reinforced by externally-attached BRB damping frame | |
CN202899141U (en) | Foundation pit supporting structure suitable for basin type excavation method | |
CN205134604U (en) | Strengthen muddy whole anti -seismic performance's in house of retail shop's brick device along street | |
CN202401380U (en) | Pervious locator for pervious brick paving floor | |
CN206256570U (en) | Novel belt tenon stone walling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |