CN108100911A - A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting - Google Patents

A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting Download PDF

Info

Publication number
CN108100911A
CN108100911A CN201711335500.0A CN201711335500A CN108100911A CN 108100911 A CN108100911 A CN 108100911A CN 201711335500 A CN201711335500 A CN 201711335500A CN 108100911 A CN108100911 A CN 108100911A
Authority
CN
China
Prior art keywords
petroleum pipeline
screw
different
laid
boom hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711335500.0A
Other languages
Chinese (zh)
Inventor
李奇宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711335500.0A priority Critical patent/CN108100911A/en
Publication of CN108100911A publication Critical patent/CN108100911A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • B66C1/445Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a kind of petroleum pipelines suitable for different-diameter to be laid with installation boom hoisting, including supporting rack, supporting rack upper end is equipped with crossbearer, guide pad is installed in the middle part of crossbearer lower end, screw rod is installed in the middle part of guide pad, screw rod left end is equipped with drive disk, guide pad lower end is hinged with the first pull rod, first pull rod lower end is equipped with lifter plate, fixed cylinder is installed in the middle part of lifter plate lower end, screw is installed inside fixed cylinder, elevator is installed in the middle part of screw, elevator left and right ends are equipped with hinge bar, the second pull rod is installed on the outside of hinge bar, second pull rod lower end is hinged with clamping bar, clamping ring is installed on the inside of clamping bar, fixed cylinder bottom is equipped with fixed block.The present invention, realizes the lifting to the petroleum pipeline of different-diameter, has both effectively prevented the double swerve that petroleum pipeline generates in the process in lifting so that petroleum pipeline can prepare is sent to installation site, while also reduces the labor intensity of worker.

Description

A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting
Technical field
The present invention relates to oil equipment field, specifically a kind of petroleum pipeline suitable for different-diameter is laid with to use and install Device for hoisting.
Background technology
Oil, also referred to as crude oil are a kind of sticky, dark brown (sometimes a little green) liquid.Upper crustal is partly There is petroleum storage in area.The property of oil is different due to the place of production, and range of viscosities is very wide, and solidification point difference is very big (30-60 degrees Celsius), boiling Point range for room temperature to 500 degrees Celsius or more, dissolve in a variety of organic solvents, it is not soluble in water, but can with water formed emulsion.No The composition and appearance for the oil for crossing different oil fields can be distinguished very big.Oil is mainly used as fuel oil and gasoline, fuel oil and One of current primary energy most important in the world of gasoline composition.Oil is also many chemical industries such as solvent, chemical fertilizer, kills The raw material of worm agent and plastics etc..During the long history constantly to develop in the earth, there are " special " period, such as Paleozoic Era And Mesozoic Era, after substantial amounts of plant and animal death, the organic substance for forming its body constantly decomposes, and sinks with silt or carbonic acid matter The material mixings such as starch form sedimentary.Since deposit constantly accumulates thickening, temperature and pressure is caused to rise, with this The continuous progress of process, sedimentary become sedimentary rock, and then form sedimentary basin, this just for oil generation provide it is basic Geological environment.
Oil carries out transfer oil by petroleum pipeline, and for petroleum pipeline when installation, generally requiring boom hoisting will Petroleum pipeline is hung to setting height(from bottom) and is installed, and most of traditional boom hoisting is all to be sleeved on petroleum pipeline to carry out with rope Operation, petroleum pipeline easily shake during lifting, can not accurately install petroleum pipeline, reduce work Efficiency or oil construction worker are lifted what pipeline one was cut onto job location manually, this seriously increases work again The labor intensity of people, poor practicability.
The content of the invention
It is laid with it is an object of the invention to provide a kind of petroleum pipeline suitable for different-diameter and uses installation boom hoisting, with Solve the problems mentioned above in the background art.
To achieve the above object, the present invention provides following technical solution:
A kind of petroleum pipeline suitable for different-diameter is laid with boom hoisting is installed, including supporting rack, support frame as described above upper end Crossbearer is installed, guide pad in the middle part of crossbearer lower end is installed, screw rod is installed in the middle part of guide pad, screw rod left end is equipped with driving Disk, the guide pad lower end are hinged with the first pull rod, and the first pull rod lower end is equipped with lifter plate, is equipped in the middle part of lifter plate lower end Fixed cylinder is equipped with screw inside fixed cylinder, elevator is equipped in the middle part of screw, and elevator left and right ends are equipped with hinge bar, Second pull rod is installed, the second pull rod lower end is hinged with clamping bar, gripping block is equipped on the inside of clamping bar, clamps on the outside of hinge bar Clamping ring is installed, the fixed cylinder bottom is equipped with fixed block, and conflict pad is equipped in the middle part of fixed block lower end on the inside of block.
As further embodiment of the present invention:The screw upper end is connected with driving motor, and driving motor is installed on lifting Plate upper center.
As further embodiment of the present invention:The lifting groove to cooperate with lifter plate is equipped on the inside of support frame as described above.
As further embodiment of the present invention:The guide pad includes trapezoid block and sliding block, is set in the middle part of the crossbearer lower end There is the dovetail groove to cooperate with trapezoid block, the first threaded hole to cooperate with screw rod is equipped in the middle part of sliding block.
As further embodiment of the present invention:The screw rod left end is equipped with left-hand thread, and screw rod right end is equipped with right-hand thread.
As further embodiment of the present invention:The second threaded hole to cooperate with screw is equipped in the middle part of the elevator.
As further embodiment of the present invention:Two walls are equipped with the /V to cooperate with hinge bar in the middle part of the fixed cylinder Slot.
As further embodiment of the present invention:The drive disk left end is equipped with driving handle, is equipped on the outside of driving handle Anti-skidding salient point.
As further embodiment of the present invention:Buffer spring is cased on the outside of screw between the fixed block and elevator.
As further scheme of the invention:Support frame as described above lower end is equipped with cushion pad, and cushion pad lower end is equipped with Universal wheel.
Compared with prior art, the beneficial effects of the invention are as follows:
A kind of petroleum pipeline suitable for different-diameter is laid with boom hoisting is installed, and rational in infrastructure, novel design passes through Mutual cooperation between the clamping ring and conflict pad that are equipped with, realizes the lifting to the petroleum pipeline of different-diameter, both effectively kept away The double swerve that petroleum pipeline generates in the process in lifting is exempted from so that petroleum pipeline can prepare is sent to installation site, together When also reduce the labor intensity of worker, meet the needs of petroleum pipeline laying, it is highly practical.
Description of the drawings
Fig. 1 is the structure diagram that boom hoisting is installed in a kind of petroleum pipeline laying suitable for different-diameter.
Fig. 2 is the cross section structure that elevator boom hoisting is installed in a kind of petroleum pipeline laying suitable for different-diameter Schematic diagram.
Fig. 3 is the middle part section that fixed cylinder boom hoisting is installed in a kind of petroleum pipeline laying suitable for different-diameter Structure diagram.
Fig. 4 is the structural representation that screw rod boom hoisting is installed in a kind of petroleum pipeline laying suitable for different-diameter Figure.
Fig. 5 is the side structure that guide pad boom hoisting is installed in a kind of petroleum pipeline laying suitable for different-diameter Schematic diagram.
Specific embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
In the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ", The orientation or position relationship of the instructions such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description rather than instruction or dark Show that signified device or element there must be specific orientation, with specific azimuth configuration and operation, thus it is it is not intended that right The limitation of the present invention.In addition, term " first ", " second " etc. are only used for description purpose, and it is not intended that instruction or hint phase To importance or the implicit quantity for indicating indicated technical characteristic.The feature for defining " first ", " second " etc. as a result, can To express or implicitly include one or more this feature.In the description of the present invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the present invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or be integrally connected;It can To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Refering to Fig. 1~5, in the embodiment of the present invention, a kind of petroleum pipeline suitable for different-diameter is laid with installation lifting Device, including supporting rack 1,1 lower end of support frame as described above is equipped with cushion pad 2, reduces what is generated in the whole device course of work It rocks, 2 lower end of cushion pad is equipped with universal wheel 22, is used to implement the movement of whole device, and 1 upper end of support frame as described above is equipped with Crossbearer 7, is equipped with guide pad 5 in the middle part of 7 lower end of crossbearer, and the guide pad 5 includes trapezoid block 28 and sliding block 29, under the crossbearer 7 End middle part is equipped with the dovetail groove to cooperate with trapezoid block 28, so that guide pad 5 can be moved left and right along crossbearer, Ensureing the linearity in 5 moving process of guide pad, 29 middle part of sliding block is equipped with the first threaded hole 30 to cooperate with screw rod 8, For the transform linear motion of screw rod 8 to be moved along a straight line for the left and right of guide pad 5,5 middle part of guide pad is equipped with screw rod 8, described 8 left end of screw rod is equipped with left-hand thread 26, and 8 right end of screw rod is equipped with right-hand thread 27, and the screw thread that 8 both ends of screw rod are equipped with different rotation directions makes Two guide pads 5 are obtained in moving process along opposite direction, 8 left end of screw rod is equipped with drive disk 4, and the drive disk 4 is left End is equipped with driving handle 3, for drive disk 4 to be driven to be rotated, so that screw rod 8 rotates synchronously, outside driving handle 3 Side is equipped with anti-skidding salient point, increases the frictional force between driving handle 3 and human hand, 5 lower end of guide pad is hinged with the first drawing Bar 9,9 lower end of the first pull rod are equipped with lifter plate 11, and 1 inside of support frame as described above is equipped with the lifting groove to cooperate with lifter plate 11 16, for playing guiding role to moving up and down for lifter plate 11, avoid lifter plate 11 that double swerve, 11 lower end of lifter plate occurs Middle part is equipped with fixed cylinder 10, and 10 two walls of middle part of fixed cylinder are equipped with the limiting slot 25 to cooperate with hinge bar 24, are used for Guiding role is played to moving up and down for hinge bar 24, elevator 12 is avoided to be rotated together with screw 14, fixed cylinder Screw 14 is installed inside 10,14 upper end of screw is connected with driving motor 6, for screw 14 to be driven to be rotated, driving Motor 6 is installed on 11 upper center of lifter plate, and 14 middle part of screw is equipped with elevator 12, and 12 middle part of elevator is equipped with and silk The second threaded hole 23 that bar 14 cooperates for the linear motion by the convert rotational motion of screw 14 for elevator 12, rises 12 left and right ends of drop block are equipped with hinge bar 24, and 24 outside of hinge bar is equipped with the second pull rod 17, and 17 lower end of the second pull rod is hinged There is clamping bar 13,13 inside of clamping bar is equipped with gripping block 21, and 21 inside of gripping block is equipped with clamping ring 19, the fixed cylinder 10 Bottom is equipped with fixed block 18, and 14 outside of screw between the fixed block 18 and elevator 12 is cased with buffer spring 15, is used for Cushioning effect is played to the up and down motion of elevator 12, is equipped in the middle part of 18 lower end of fixed block and contradicts pad 20.
A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting, during work, passes through universal wheel 22 drive whole device to be moved back and forth, when device is moved to the petroleum pipeline upper end for needing to carry, rotation driving hand Handle 6 so that rotating disk 4 drives screw rod 8 to be rotated, so that two guide pads 5 are mobile toward 8 middle part of screw rod, Jin Ertong The effect of pull rod 9 is crossed so that lifter plate 11 drives entire fixed cylinder 10 to move down, so that petroleum pipeline position to be handled In the middle part of clamping ring 19, afterwards, start driving motor 6, screw 14 driven to be rotated so that elevator 12 drive it is past Lower movement, so as to by the effect of pull rod 17 clamping bar 13 be driven to move down, and then by clamping ring 19 toward petroleum pipeline Middle part direction is moved, and is cooperated with contradicting pad 20, is realized the clamping to petroleum pipeline, then rotate backward driving hand Handle 3 so that lifter plate 11 up moves the petroleum pipeline that clamping ring 19 is driven to clamp and synchronously moves up, then mobile entire dress It puts, after petroleum pipeline is transported to infield, rotates backward driving handle 3 again so that petroleum pipeline moves down, while reversely Start driving motor 6 so that clamping ring 19 unclamps petroleum pipeline, and then realizes the lifting handling installation to petroleum pipeline.This Invention, it is rational in infrastructure, it is novel in design, by the clamping ring 19 being equipped with and the mutual cooperation between pad 20 is contradicted, is realized to not With the lifting of the petroleum pipeline of diameter, the double swerve that petroleum pipeline generates in the process in lifting had both been effectively prevented so that stone What oil-piping can prepare is sent to installation site, while also reduces the labor intensity of worker, meets petroleum pipeline laying It needs, it is highly practical.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modifications, equivalent replacements and improvements are made should all be included in the protection scope of the present invention god.

Claims (7)

1. a kind of petroleum pipeline suitable for different-diameter is laid with boom hoisting is installed, including supporting rack(1), feature exists In support frame as described above(1)Upper end is equipped with crossbearer(7), crossbearer(7)Guide pad is installed in the middle part of lower end(5), guide pad(5)In Portion is equipped with screw rod(8), the screw rod(8)Left end is equipped with left-hand thread(26), screw rod(8)Right end is equipped with right-hand thread(27), screw rod (8)Left end is equipped with drive disk(4), the guide pad(5)Lower end is hinged with the first pull rod(9), the first pull rod(9)It installs lower end There is lifter plate(11), support frame as described above(1)Inside is equipped with and lifter plate(11)The lifting groove of mutual cooperation(16), lifter plate(11) Fixed cylinder is installed in the middle part of lower end(10), fixed cylinder(10)Inside is equipped with screw(14), the screw(14)Upper end is connected with Driving motor(6), driving motor(6)It is installed on lifter plate(11)Upper center, screw(14)Middle part is equipped with elevator(12), Elevator(12)Left and right ends are equipped with hinge bar(24), hinge bar(24)Outside is equipped with the second pull rod(17), the second pull rod (17)Lower end is hinged with clamping bar(13), clamping bar(13)Inside is equipped with gripping block(21), gripping block(21)Inside is equipped with Clamping ring(19), the fixed cylinder(10)Bottom is equipped with fixed block(18), fixed block(18)Conflict pad is installed in the middle part of lower end (20).
2. a kind of petroleum pipeline suitable for different-diameter according to claim 1 is laid with installation boom hoisting, spy Sign is, the guide pad(5)Including trapezoid block(28)And sliding block(29), the crossbearer(7)Lower end middle part is equipped with and trapezoid block (28)The dovetail groove of mutual cooperation, sliding block(29)Middle part is equipped with and screw rod(8)The first threaded hole to cooperate(30).
3. a kind of petroleum pipeline suitable for different-diameter according to claim 1 is laid with installation boom hoisting, spy Sign is, the elevator(12)Middle part is equipped with and screw(14)The second threaded hole to cooperate(23).
4. a kind of petroleum pipeline suitable for different-diameter according to claim 1 is laid with installation boom hoisting, spy Sign is, the fixed cylinder(10)Two wall of middle part is equipped with and hinge bar(24)The limiting slot of mutual cooperation(25).
5. a kind of petroleum pipeline suitable for different-diameter according to claim 1 is laid with installation boom hoisting, spy Sign is, the drive disk(4)Left end is equipped with driving handle(3), driving handle(3)Outside is equipped with anti-skidding salient point.
6. a kind of petroleum pipeline suitable for different-diameter according to claim 1 is laid with installation boom hoisting, spy Sign is, the fixed block(18)With elevator(12)Between screw(14)Outside is cased with buffer spring(15).
7. a kind of petroleum pipeline suitable for different-diameter according to claim 1 is laid with installation boom hoisting, spy Sign is, support frame as described above(1)Lower end is equipped with cushion pad(2), cushion pad(2)Lower end is equipped with universal wheel(22).
CN201711335500.0A 2017-12-14 2017-12-14 A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting Pending CN108100911A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711335500.0A CN108100911A (en) 2017-12-14 2017-12-14 A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711335500.0A CN108100911A (en) 2017-12-14 2017-12-14 A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting

Publications (1)

Publication Number Publication Date
CN108100911A true CN108100911A (en) 2018-06-01

Family

ID=62216901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711335500.0A Pending CN108100911A (en) 2017-12-14 2017-12-14 A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting

Country Status (1)

Country Link
CN (1) CN108100911A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108858117A (en) * 2018-06-22 2018-11-23 姜玉欣 A kind of pipe cutting processing short distance transportation device
CN108913863A (en) * 2018-07-05 2018-11-30 芜湖市泰能电热器具有限公司 Clamping device is used in a kind of extraction of aluminum pipe
CN108910494A (en) * 2018-07-06 2018-11-30 安徽贝昂科技有限公司 A kind of electronic test equipment mobile device
CN110092314A (en) * 2019-05-07 2019-08-06 中国石油大学(华东) A kind of fluid pressure type petroleum pipeline lifting handling installation equipment
CN110386579A (en) * 2019-07-10 2019-10-29 中航飞机起落架有限责任公司 A kind of high reliability locking device for being promoted, being launched
CN112283452A (en) * 2020-10-27 2021-01-29 德清博发智能科技有限公司 Mechanical clamping device for petroleum oil pipe
CN112360405A (en) * 2020-11-04 2021-02-12 山东华冠能源技术有限公司 Filling tool and method for multiple screen pipes
CN113287482A (en) * 2021-06-30 2021-08-24 许昌学院 Ecological fixing device that transplants of macrophyte
CN113894716A (en) * 2021-09-01 2022-01-07 中交二航局第一工程有限公司 Telescopic clamp for pipeline installation and use method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2107973U (en) * 1992-01-13 1992-06-24 潘锦海 Pipeline locator
CN201316874Y (en) * 2008-11-27 2009-09-30 中冶京唐建设有限公司 Secondary line bond for welding pipelines
CN105905818A (en) * 2016-06-24 2016-08-31 成都高普石油工程技术有限公司 Pipe lifting device
CN106041903A (en) * 2016-06-24 2016-10-26 成都高普石油工程技术有限公司 Pipeline moving device based on fastness improving
CN106743540A (en) * 2015-11-20 2017-05-31 华南理工大学 A kind of holding Transport Machinery arm of tubing
CN107360868A (en) * 2017-07-19 2017-11-21 佛山市广师自动化科技有限公司 A kind of comprehensive greenbelt clipping device in municipal gardens

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2107973U (en) * 1992-01-13 1992-06-24 潘锦海 Pipeline locator
CN201316874Y (en) * 2008-11-27 2009-09-30 中冶京唐建设有限公司 Secondary line bond for welding pipelines
CN106743540A (en) * 2015-11-20 2017-05-31 华南理工大学 A kind of holding Transport Machinery arm of tubing
CN105905818A (en) * 2016-06-24 2016-08-31 成都高普石油工程技术有限公司 Pipe lifting device
CN106041903A (en) * 2016-06-24 2016-10-26 成都高普石油工程技术有限公司 Pipeline moving device based on fastness improving
CN107360868A (en) * 2017-07-19 2017-11-21 佛山市广师自动化科技有限公司 A kind of comprehensive greenbelt clipping device in municipal gardens

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108858117A (en) * 2018-06-22 2018-11-23 姜玉欣 A kind of pipe cutting processing short distance transportation device
CN108913863A (en) * 2018-07-05 2018-11-30 芜湖市泰能电热器具有限公司 Clamping device is used in a kind of extraction of aluminum pipe
CN108910494A (en) * 2018-07-06 2018-11-30 安徽贝昂科技有限公司 A kind of electronic test equipment mobile device
CN110092314A (en) * 2019-05-07 2019-08-06 中国石油大学(华东) A kind of fluid pressure type petroleum pipeline lifting handling installation equipment
CN110092314B (en) * 2019-05-07 2020-11-10 中国石油大学(华东) Hydraulic petroleum pipeline hoisting, carrying and installing equipment
CN110386579A (en) * 2019-07-10 2019-10-29 中航飞机起落架有限责任公司 A kind of high reliability locking device for being promoted, being launched
CN112283452A (en) * 2020-10-27 2021-01-29 德清博发智能科技有限公司 Mechanical clamping device for petroleum oil pipe
CN112360405A (en) * 2020-11-04 2021-02-12 山东华冠能源技术有限公司 Filling tool and method for multiple screen pipes
CN113287482A (en) * 2021-06-30 2021-08-24 许昌学院 Ecological fixing device that transplants of macrophyte
CN113894716A (en) * 2021-09-01 2022-01-07 中交二航局第一工程有限公司 Telescopic clamp for pipeline installation and use method thereof

Similar Documents

Publication Publication Date Title
CN108100911A (en) A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting
CN207566729U (en) A kind of petroleum pipeline suitable for different-diameter is laid with installation boom hoisting
CN206654651U (en) It is capable of the lifting appliance of Fast Installation petroleum pipeline
CN106927359A (en) Petrochemical pipe installs boom hoisting
CN204511475U (en) A kind of bolting and rope support device and comprise the anchor shaft anchor cable drill carriage of this device
CN108249273A (en) A kind of mechanical petroleum pipeline installation carrying boom hoisting
CN104314480B (en) A kind of pipe tool erection device
CN106761774A (en) A kind of push bench process Tunnel Engineering tube coupling stopping device
CN208981336U (en) A kind of foundation pit concrete supporting structure
CN204186306U (en) A kind of pipe erection device
CN205855849U (en) A kind of power equipment elevator
CN207551861U (en) Mechanical carrying and hoisting device for petroleum pipeline installation
CN102259394A (en) Splitter
CN204282365U (en) Pile tube locating rack
CN208441828U (en) A kind of mining heading equipment
CN204457431U (en) One is enclosed extra large double-shaft two-way and is mixed rig
CN206174867U (en) Detachable well rig of frame
CN206128160U (en) Operation device that open caisson sinks unearthedly
CN205012942U (en) Derrick formula coiled tubing centering structure
CN209469456U (en) A kind of tunnel ditch template
CN204588530U (en) A kind of removable swinging gig
CN208792943U (en) A kind of excavating device of Quick-moving type electric pole foundation pit
CN206693937U (en) A kind of novel automatic hydraulic drill rig
CN204252122U (en) A kind of self-propelled automatic lifting full circle swinging integrally constructs machine
CN205855895U (en) A kind of power equipment hoisting mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601