CN108086262A - Fish system is crossed in cut-off dam hydraulic engineering - Google Patents
Fish system is crossed in cut-off dam hydraulic engineering Download PDFInfo
- Publication number
- CN108086262A CN108086262A CN201711207654.1A CN201711207654A CN108086262A CN 108086262 A CN108086262 A CN 108086262A CN 201711207654 A CN201711207654 A CN 201711207654A CN 108086262 A CN108086262 A CN 108086262A
- Authority
- CN
- China
- Prior art keywords
- fish
- attracting
- checkdam
- cut
- hydraulic engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 241000251468 Actinopterygii Species 0.000 claims abstract description 190
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 75
- 230000005012 migration Effects 0.000 claims abstract description 32
- 238000013508 migration Methods 0.000 claims abstract description 32
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 30
- 230000007246 mechanism Effects 0.000 claims abstract description 23
- 230000032258 transport Effects 0.000 claims description 30
- 238000004891 communication Methods 0.000 claims description 10
- 230000000694 effects Effects 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000013461 design Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 235000013601 eggs Nutrition 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000017448 oviposition Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
- E02B8/085—Devices allowing fish migration, e.g. fish traps
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/60—Ecological corridors or buffer zones
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Marine Sciences & Fisheries (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Farming Of Fish And Shellfish (AREA)
Abstract
Fish system is crossed the invention discloses a kind of, especially disclose a kind of cut-off dam hydraulic engineering crosses fish system, belongs to hydraulic and hydroelectric engineering Building Design building technology field.A kind of operation smooth operation is provided, smaller suitable for water flow, reservoir water level is shallower, moisture storage capacity relatively also smaller cut-off dam hydraulic engineering cross fish system.The fish system of crossing includes the checkdam that shuts off, the fish system of crossing further includes attracting capture mechanism and transport establishment, the ecological water that the migration shoal of fish in the downstream side river of the checkdam that shuts off is introduced by the attracting capture mechanism, which lures, to be collected, and the migration shoal of fish after temptation collection is transported to by the transport establishment in the river of the upstream side of the checkdam that shuts off.
Description
Technical field
Fish system is crossed the present invention relates to a kind of, fish system is crossed more particularly, to a kind of cut-off dam hydraulic engineering, belongs to
Hydraulic and hydroelectric engineering Building Design building technology field.
Background technology
Fish pass is the passage for fish migration.It is described with popular language, some fish, which have from lower reaches of river, to be migrated to river
The habit of upstream oviposition is flowed, after river has blocked river since artificial origin has such as built checkdam, fish are upstream whirled
The passage of trip will be destroyed.In order to protect the habit of fish, it is necessary to which passing through dam builds artifical flume as fish migration
Passage, i.e. referred to as fish pass.Current enter fish pass from upstream, flow out fish pass from downstream, but fish are from downstream into fish pass, from upper
Fish pass is swum out of, thus fish pass upstream intake is referred to as fishway exit, and fish pass downstream water outlet is fish pass import.
In order to realize that fish pass crosses the purpose of fish, fish pass usually requires to meet claimed below:First, depth of water requirement, fish pass domestic demand
Keep 1.0~1.5m depth of waters;2nd, slope requirement, in order to enable fish along current upstream migration, flow rate of water flow in fish pass
It is less than the speed of fish migration, this requires fish pass needs to keep a gradient that is relatively slow and stablizing;3rd, when upper pond level becomes
During change, fishway exit needs the measure that can adapt to SEA LEVEL VARIATION, it is ensured that keep 1.0 under various water levels, in fish pass for a long time~
1.5m the depth of water.
In order to meet above-mentioned requirements, at present frequently with following two fishway exit arrangements in engineering:
1 existing program one
Fishway exit is arranged in checkdam upstream by the program, and sets multiple fishes simultaneously along elevation in eulittoral zone
Road exports, and each outlet is controlled using 1 bulkhgead gate.The characteristics of structure, is:1st, fishway exit is arranged
In checkdam upstream;2nd, in upper pond level luffing area, fish pass multiple outlets along elevation arrangement, each fishway exit is on elevation
It is mutually linked;3rd, each fishway exit arranges the lower stream that sluices of 1 plate steel gate control.The major advantage of the structure is:
In upper pond level luffing area, each elevation section is arranged with fishway exit, when upper pond level is located at a certain elevation, only needs to open
The gate of corresponding elevation fishway exit, and close the gate of other fishway exits, you can meet 1.0~1.5m depth of waters in fish pass
It is required that.The major defect of the structure is:1st, fishway exit is arranged in upstream, longer to length along river, corresponding excavated volume
Or concrete works amount is larger, fish pass construction investment is larger;2nd, fishway exit quantity is more, and needs the feelings according to upper pond level
Condition carries out each gate opening and closing in time, when upper pond level amplitude of fluctuation is larger, changes more frequent, fishway exit gate
Operation control is also relatively complicated.
2 existing programs two
Fishway exit is combined arrangement with checkdam by the program, and is set gradually along the water blocking axis of dam in eulittoral zone more
A fishway exit controls each fishway exit using 1 bulkhgead gate.The advantages of structure, is:1st, by fishway exit with
Checkdam combines arrangement, is arranged successively along the water blocking axis of dam in each fishway exit horizontal direction, elevation is mutually linked on direction, phase
Adjacent fishway exit is connected by the linking channel in downstream, and lowest elevation fishway exit is connected by being connected channel with fish pass import;
2nd, for single fishway exit, upper middle part is provided with 1 plate work gate opening/closing, and downstream sets linking channel and next stage fish
Road outlet connects.The major defect of the structure is:1st, to adapt to the requirement of range of stage, upstream needs to set along the axis of dam more
A fishway exit, it is impossible to suitable for the checkdam of Narrow Valleys;2nd, since each fishway exit is both needed to set 1 plate work lock
Door, and need, according to the situation of upper pond level, to carry out each gate opening and closing in time, when upper pond level amplitude of fluctuation is larger,
When changing more frequent, the operation control of fishway exit gate is also relatively complicated.
Either above-mentioned any scheme, all there are one it is apparent the characteristics of, that is, it is all deeper applied to reservoir water level,
In the larger large and medium-sized hydroelectric project of moisture storage capacity.And it is smaller in some water flows, reservoir water level is shallower, and moisture storage capacity is relatively also smaller
Mini engineering in and do not apply to.Therefore, find it is a kind of adapt to middle-size and small-size hydraulic and hydroelectric engineering cross fish system become in order to
The technical issues of those skilled in the art are badly in need of solving.
The content of the invention
The technical problems to be solved by the invention are:A kind of operation smooth operation, reservoir area smaller suitable for water flow are provided
Water level is shallower, moisture storage capacity relatively also smaller cut-off dam hydraulic engineering cross fish system.
Used technical solution is to solve above-mentioned technical problem:Fish system is crossed in a kind of cut-off dam hydraulic engineering,
Including the checkdam that shuts off, the fish system of crossing further includes attracting capture mechanism and transport establishment, positioned at the checkdam that shuts off
Downstream side river in the ecological water that is introduced by the attracting capture mechanism of the migration shoal of fish lure and collect, after temptation is collected
The migration shoal of fish is transported to by the transport establishment in the river of the upstream side of the checkdam that shuts off.
The beneficial effects of the invention are as follows:The application is by setting a set of fish excessively including attracting capture mechanism and transport establishment
System, and the migration shoal of fish in the downstream side river of the checkdam that shuts off is introduced by the attracting capture mechanism
Ecological water temptation is collected, and then again the migration shoal of fish after collecting will be lured to be transported to the gear that shuts off by the transport establishment
In the river of dam upstream side.In this way, the habit according to the shoal of fish itself, it is only necessary to which the water flow of very little can be in downstream river course
The shoal of fish that migration is needed to lay eggs into upper river of existence is lured near the downstream side for the checkdam that shuts off and captures, Ran Houzai
Be transported to by the transport establishment in the river of the checkdam upstream side of shutting off, realize both made be very little water flow,
And river is trapped the migration that the shoal of fish is still ensured that after checkdam physical break, adapts to that water flow is smaller, and reservoir water level is shallower,
Moisture storage capacity also smaller middle-size and small-size hydraulic and hydroelectric engineering relatively.The application provide cross fish system shoal of fish migration principle with it is existing
The shoal of fish in technology is entirely different along the principle of the free migration of current, but collects what is realized with mechanical transport by traping, and protects
It has demonstrate,proved and has crossed the steady of fish system operation operation.
It is further that the transport establishment includes upper supporting row frame, lower supporting row frame and the rope containing fish gathering structure
Road conveyer, the cableway conveyer pass through the upper supporting row frame and the moveable cloth of lower supporting row frame
It puts between the dam crest of the checkdam that shuts off and the attracting trapping region of the attracting capture mechanism;Pass through the attracting catching machine
The migration shoal of fish that the ecological water temptation that structure introduces is collected, by the fish gathering structure under the cooperation of the cableway conveyer
It is transported in the river of the checkdam upstream side of shutting off.
Said program it is preferable that, the fish gathering structure be strip collection fish tank, the cableway conveyer
Including transporting cableway and power source, the liftable strip collection fish tank being packed on the transport cableway, in the power source
Cooperation lower edge is transported cableway and is reciprocally moveable.
It is further that the attracting capture mechanism is included along water (flow) direction order arrangement ecological water drainage piping, collection
Water run-off and attracting capture system, the ecological water input terminal of the ecological water drainage piping and the upstream side for the checkdam that shuts off connect
Logical, the ecological water output terminal of the ecological water drainage piping is connected with the run-off that catchments, it is described catchment run-off and
The attracting capture is sequential communication, and the fish gathering structure movement of the transport establishment is arranged in luring for the attracting capture system
In fish trapping region.
Said program it is preferable that, the ecological water drainage piping include aqueduct and control valve, through institute
The upper end of the aqueduct for the checkdam that shuts off and the upstream side communication of the checkdam that shuts off are stated, through the diversion of the checkdam that shuts off
The lower end of pipe is connected with the run-off that catchments.
It is further that the run-off that catchments includes collecting-tank and the downflow weir positioned at the collecting-tank downstream side, institute
The catchment downstream side and the attracting capture that run-off passes through the downflow weir stated are sequential communication.
Said program it is preferable that, the attracting capture system include be arranged in attracting trapping region fish screen and catch up with
Fish corral, fish screen described in the arrangement of the fish gathering structure movement and described catches up between fish corral.
It is further, in the attracting passage that the downstream side of the attracting trapping region is also associated with connecting with downstream water.
It is further to be set on the bottom plate of the attracting passage and help migration protrusion.
It is further, in the attracting passage that the downstream side of the attracting trapping region is also associated with connecting with downstream water,
It is set on the bottom plate of the attracting passage and helps migration protrusion.
Description of the drawings
Fig. 1 is the attracting operating mode schematic diagram for crossing fish system of cut-off dam hydraulic engineering of the present invention;
Fig. 2 is the fish gathering operating mode schematic diagram for crossing fish system of cut-off dam hydraulic engineering of the present invention;
Fig. 3 is the fortune fish operating mode schematic diagram for crossing fish system of cut-off dam hydraulic engineering of the present invention;
Fig. 4 puts fish operating mode schematic diagram for the fish system excessively of cut-off dam hydraulic engineering of the present invention.
In figure mark for:Shut off checkdam 1, attracting capture mechanism 2, transport establishment 3, upper supporting row frame 4, lower supporting row frame
5th, fish gathering structure 6, cableway conveyer 7, attracting trapping region 8, transport cableway 9, ecological water drainage piping 10, catchment run-off
11st, attracting capture is 12, aqueduct 13, control valve 14, collecting-tank 15, downflow weir 16, fish screen 17, catches up with fish corral 18, attracting
Passage 19 helps migration protrusion 20.
Specific embodiment
As shown in Figure 1, Figure 2, be a kind of operation smooth operation provided by the invention shown in Fig. 3 and Fig. 4, suitable for water flow compared with
Small, reservoir water level is shallower, moisture storage capacity relatively also smaller cut-off dam hydraulic engineering cross fish system.Described crosses fish system bag
The checkdam 1 that shuts off is included, the fish system of crossing further includes attracting capture mechanism 2 and transport establishment 3, positioned at the checkdam that shuts off
The ecological water that the migration shoal of fish in 1 downstream side river is introduced by the attracting capture mechanism 2, which lures, to be collected, after temptation is collected
The migration shoal of fish be transported to by the transport establishment 3 in the river of 1 upstream side of checkdam of shutting off.The application is by setting
Put a set of fish system, and will be positioned at the downstream side of the checkdam 1 that shuts off excessively including attracting capture mechanism 2 and transport establishment 3
The ecological water that the migration shoal of fish in river is introduced by the attracting capture mechanism 2, which lures, to be collected, after then temptation is collected again
The migration shoal of fish be transported to by the transport establishment 3 in the river of 1 upstream side of checkdam of shutting off.In this way, according to fish
Group's habit of itself, it is only necessary to which the water flow of very little can need migration to lay eggs into upper river to what is survived in downstream river course
The shoal of fish lure near the downstream side for the checkdam 1 that shuts off and capture, be then transported to again by the transport establishment 3 described
Shut off in the river of 1 upstream side of checkdam, even realize the water flow of very little, and river is trapped 1 physics of checkdam and cuts
It has no progeny and still ensures that the migration of the shoal of fish, smaller to adapt to water flow, reservoir water level is shallower, and moisture storage capacity is relatively also smaller middle-size and small-size
Hydraulic and hydroelectric engineering.The shoal of fish migration principle for crossing fish system that the application provides freely is whirled with the shoal of fish of the prior art along current
The principle of trip is entirely different, but collects what is realized with mechanical transport by traping, and ensure that the flat of fish system operation operation
Surely.
In the above embodiment, smaller in order to adapt to the water flow that the application is directed to, reservoir water level is shallower, and moisture storage capacity is opposite
Also the realistic situation of smaller middle-size and small-size hydraulic and hydroelectric engineering, while simplify attracting capture mechanism 2 described herein and fortune again
The structure of transfer mechanism 3, to facilitate construction and/or making, installation and postorder maintenance, repair, while also reduce throw time into
This, transport establishment 3 described herein includes upper supporting row frame 4, lower supporting row frame 5 and the cableway containing fish gathering structure 6 and transports
Device 7, the cableway conveyer 7 pass through the upper supporting row frame 4 and the lower supporting row frame 5, moveable cloth
It puts between the dam crest of the checkdam 1 that shuts off and the attracting trapping region 8 of the attracting capture mechanism 2, is caught by the attracting
The migration shoal of fish that the ecological water temptation of the introducing of mechanism 2 is collected is obtained, by the fish gathering structure 6 in the cableway conveyer 7
Cooperation under be transported in the river of 1 upstream side of checkdam of shutting off.At this point, the fish gathering structure 6 is preferably to be caught with attracting
The adaptable strip collection fish tank in area 8 is obtained, the cableway conveyer 7 includes transporting cableway 9 and power source, liftable solid
Strip collection fish tank on the transport cableway 9 transports cableway 9 in power source cooperation lower edge and is reciprocally moveable;And
The attracting capture mechanism 2 is also corresponding to be included along water (flow) direction order arrangement ecological water drains piping 10, catchment run-off
11 and attracting capture be 12, the ecological water input terminal of ecological water drainage piping 10 and the upstream side communication for the checkdam 1 that shuts off,
The ecological water output terminal of the ecological water drainage piping 10 is connected with the run-off 11 that catchments, the run-off 11 that catchments
It is 12 sequential communications with the attracting capture, 6 activity of fish gathering structure of the transport establishment 3 is arranged in the attracting capture
Be 12 attracting trapping region 8 in.In order to which the ecological water is made to drain piping 10, catchments run-off 11 and attracting capture is 12 points
Structure that can be well with the checkdam 1 that shuts off is adapted, and ecological water drainage piping 10 preferably comprises aqueduct 13
With control valve 14, the aqueduct 13 passes through the upper end and upstream side communication after the checkdam 1 that shuts off, lower end and collection
Water run-off 11 connects;The run-off 11 that catchments preferably comprises collecting-tank 15 and overflowing positioned at 15 downstream side of collecting-tank
Weir 16 is flowed, the catchment downstream side and the attracting capture that run-off 11 passes through the downflow weir 16 are that 12 orders connect
It is logical;Described attracting capture is 12 to preferably comprise the fish screen 17 for being arranged in attracting trapping region 8 and catch up with fish corral 18, the collection
It fish screen 17 described in the arrangement of the activity of fish structure 6 and catches up between fish corral 18.
Further, the shoal of fish of the existence in downstream river course can conveniently attracted to attracting capture system for convenience
In 12, in the attracting passage 19 that the downstream side of the attracting trapping region 8 is also associated with connecting with downstream water, lead in the attracting
It is set on the bottom plate in road 19 and helps migration protrusion 20.
In conclusion the fish system of crossing of the said structure provided using the application has following advantageous effects:
1) using including putting fish hole and put fishpond puts fish system instead of fishway exit structure, the fishpond depth of water is put less than upper
Minimum operation water level is swum, while upper pond level luffing requirement is met, the quantities of fishway exit is also greatly saved;
2) fish system is transported instead of wearing dam channel and Channel of Downstream using including lower framed bent, upper framed bent and fortune fish sets of cables,
When water-head is larger in checkdam upstream and downstream, the quantities of Channel of Downstream will be greatlyd save;
3) cross fish structure and arrangement is combined with ecological flow buret, arrangement is more compact, being capable of effectively save Narrow Valleys water blocking
The horizontal space on dam;Using ecological flow attracting, without letting out fish flow under special again, saving can be crossed fish flow for sending out
Electricity increases engineering power benefit;
4) compared with traditional fish pass, without carrying out complicated operating gate, operation behaviour further according to variation of water level situation
Make more simple.
Embodiment one
The key structural feature of the present embodiment:
A. aqueduct 13 and control valve that fish structure forms ecological water drainage piping 10 with checkdam, ecological flow buret are crossed
Door 14 combines arrangement;
B. cross fish structure and be and put fish to be to form by attracting system, fish gathering system, fortune fish, wherein the attracting system and fish gathering system
Above-mentioned attracting capture mechanism 2 is collectively referred to as, it is the transport establishment 3 being collectively referred to as that fortune fish therein, which is and puts fish,;
C. attracting system includes ecological flow buret, control valve, collecting-tank, downflow weir, attracting channel composition, using ecological flow
Buret aerial drainage attracting;
D. fish gathering by fish screen, catch up with fish corral, collection fish tank sum aggregate fish hawser form.Wherein fish screen is arranged under downflow weir
Trip, top are more than the level of tail water;Fish corral is caught up with to be arranged in fish screen downstream, using the layout pattern similar to lever, upstream end is solid
Fixed, downstream is connected by fish gathering hawser with lower framed bent;Between collection fish tank is arranged in fish screen and catches up with fish corral, by transporting fish hawser
It is connected with fortune fish system.
E. fish is transported by being arranged on the lower framed bent in checkdam downstream, being arranged on the upper framed bent of checkdam dam crest and transporting fish hawser
Composition;
F. putting fish owner will be formed by being arranged on putting fish hole and putting fishpond in checkdam, wherein the bottom elevation for putting fishpond is low
In upstream minimum operation water level elevation.
The concrete operations mode of the present embodiment
1) attracting operating mode, as shown in Figure 1
Upper water stream under ecological flow buret by letting out to collecting-tank, then by being let out under downflow weir, through fish screen and in water
Level state catch up with fish corral after, until attracting channel.Fish in downstream river course through attracting channel and can catch up with fish corral along direction of flow
Afterwards, reach fish screen and catch up between fish corral.
2) fish gathering operating mode, as shown in Figure 2
After certain time attracting, fish corral pull-up will be caught up with by fish gathering hawser, then carried by transporting fish hawser by fish tank is collected
It rises, you can by fish screen and the fish between fish corral is caught up with to be collected into collection fish tank.
3) fish operating mode is transported, as shown in Figure 3
By transporting fish hawser, collection fish tank can be transported to upper framed bent from lower framed bent.
4) fish operating mode is put, as shown in Figure 4
When collecting fish tank and reaching upper framed bent setting position, you can by transport fish hawser will collect fish tank by put fish hole transfer to
Fishpond is put, that is, completes the work that fish are carried to upstream from checkdam downstream.
After fish is put in completion, then by transport fish hawser by collect fish tank lift, between being shipped back fish screen and catching up with fish corral, then pass through
Fish gathering hawser will catch up with fish corral to transfer to water level position, cross fish system and be restored to attracting state again.
Claims (10)
1. fish system is crossed in a kind of cut-off dam hydraulic engineering, including the checkdam that shuts off (1), it is characterised in that:Described crosses fish
System further includes attracting capture mechanism (2) and transport establishment (3), in the downstream side river of the checkdam that shuts off (1)
The ecological water that the migration shoal of fish is introduced by the attracting capture mechanism (2), which lures, to be collected, and the migration shoal of fish after temptation is collected passes through
The transport establishment (3) is transported in the river of the upstream side of the checkdam (1) that shuts off.
2. fish system is crossed in cut-off dam hydraulic engineering according to claim 1, it is characterised in that:The transport establishment
(3) upper supporting row frame (4), lower supporting row frame (5) and the cableway conveyer (7) containing fish gathering structure (6), the rope are included
Road conveyer (7) is arranged in described cut by the way that the upper supporting row frame (4) and the lower supporting row frame (5) are moveable
It flows between the dam crest of checkdam (1) and the attracting trapping region (8) of the attracting capture mechanism (2);Pass through the attracting catching machine
The migration shoal of fish that the ecological water temptation that structure (2) introduces is collected, by the fish gathering structure (6) in the cableway conveyer
(7) it is transported under cooperation in the river of checkdam (1) upstream side of shutting off.
3. fish system is crossed in cut-off dam hydraulic engineering according to claim 2, it is characterised in that:The fish gathering structure
(6) it is strip collection fish tank, the cableway conveyer (7) includes transporting cableway (9) and power source, liftable to be packed in
The strip collection fish tank transported on cableway (9) transports cableway (9) in power source cooperation lower edge and is reciprocally moveable.
4. the fish system excessively of the cut-off dam hydraulic engineering according to Claims 2 or 3, it is characterised in that:The attracting
Capture mechanism (2) includes capturing along water (flow) direction order arrangement ecological water drainage piping (10), the run-off that catchments (11) and attracting
It is (12) the ecological water input terminal of the ecological water drainage piping (10) and the upstream side communication for checkdam (1) of shutting off, the life
The ecological water output terminal of state water drainage piping (10) is connected with the run-off that catchments (11), the run-off that catchments (11)
With described attracting capture system (12) sequential communication, fish gathering structure (6) activity of the transport establishment (3) is arranged in described lure
In the attracting trapping region (8) of fish capture system (12).
5. fish system is crossed in cut-off dam hydraulic engineering according to claim 4, it is characterised in that:The ecological water draws
Flow tube system (10) include aqueduct (13) and control valve (14), through the checkdam that shuts off (1) aqueduct (13) it is upper
The upstream side communication with the checkdam that shuts off is held, the lower end through the aqueduct (13) of the checkdam that shuts off (1) is excessive with catchmenting
Flow pond (11) connection.
6. fish system is crossed in cut-off dam hydraulic engineering according to claim 5, it is characterised in that:The overflow of catchmenting
Pond (11) includes collecting-tank (15) and the downflow weir (16) positioned at collecting-tank (15) downstream side, the run-off that catchments (11)
Downstream side and described attracting capture system (12) sequential communication by the downflow weir (16).
7. fish system is crossed in cut-off dam hydraulic engineering according to claim 6, it is characterised in that:The attracting capture
System (12) includes being arranged in the fish screen (17) of attracting trapping region (8) and catches up with fish corral (18), the fish gathering structure (6) activity
It the arrangement fish screen (17) and described catches up between fish corral (18).
8. fish system is crossed in cut-off dam hydraulic engineering according to claim 7, it is characterised in that:It is captured in the attracting
The downstream side in area (8) is also associated with the attracting passage (19) connected with downstream water.
9. fish system is crossed in cut-off dam hydraulic engineering according to claim 8, it is characterised in that:In the attracting passage
(19) set on bottom plate and help migration protrusion (20).
10. fish system is crossed in cut-off dam hydraulic engineering according to claim 1, it is characterised in that:It is caught in the attracting
The downstream side for obtaining area (8) is also associated with the attracting passage (19) connected with downstream water, in the bottom plate of the attracting passage (19)
It is raised (20) that upper setting helps migration.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711207654.1A CN108086262B (en) | 2017-11-27 | 2017-11-27 | Fish passing system for hydraulic engineering of closure dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711207654.1A CN108086262B (en) | 2017-11-27 | 2017-11-27 | Fish passing system for hydraulic engineering of closure dam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108086262A true CN108086262A (en) | 2018-05-29 |
CN108086262B CN108086262B (en) | 2024-02-23 |
Family
ID=62173225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711207654.1A Active CN108086262B (en) | 2017-11-27 | 2017-11-27 | Fish passing system for hydraulic engineering of closure dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086262B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371932A (en) * | 2018-11-30 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | Waterpower vertical shaft type crosses fish structure |
CN109469030A (en) * | 2018-12-21 | 2019-03-15 | 中国电建集团贵阳勘测设计研究院有限公司 | A collection fortune fish system for diversion formula power generation high dam |
CN109853492A (en) * | 2019-03-28 | 2019-06-07 | 中水珠江规划勘测设计有限公司 | Gate valve duct type crosses fish method |
CN109924172A (en) * | 2019-04-09 | 2019-06-25 | 四川大学 | A kind of cable car type fish lift device |
CN110080178A (en) * | 2019-04-01 | 2019-08-02 | 河海大学 | A kind of fish pass design method |
CN112681253A (en) * | 2020-12-14 | 2021-04-20 | 三峡大学 | Novel fishway that import was arranged |
CN114304088A (en) * | 2021-11-30 | 2022-04-12 | 杭州市农业科学研究院 | Mountain stream catching method |
CN117717030A (en) * | 2024-02-08 | 2024-03-19 | 四川弘信天启科技有限公司 | Fish luring screening device and fish lifting machine system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0853831A (en) * | 1994-08-12 | 1996-02-27 | Dam Suigenchi Kankyo Seibi Center | Lift type fishway device |
CN105421307A (en) * | 2015-12-25 | 2016-03-23 | 中水北方勘测设计研究有限责任公司 | Rail type fish passing structure applied to medium and high-water-head barrage hubs |
CN106087906A (en) * | 2016-06-28 | 2016-11-09 | 罗富强 | A kind of ecological dam with fish migration passage |
CN106522177A (en) * | 2016-11-18 | 2017-03-22 | 中国电建集团成都勘测设计研究院有限公司 | Fishway system arranged inside water retaining dam |
CN207512708U (en) * | 2017-11-27 | 2018-06-19 | 中国电建集团成都勘测设计研究院有限公司 | Fish system is crossed in cut-off dam hydraulic engineering |
-
2017
- 2017-11-27 CN CN201711207654.1A patent/CN108086262B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0853831A (en) * | 1994-08-12 | 1996-02-27 | Dam Suigenchi Kankyo Seibi Center | Lift type fishway device |
CN105421307A (en) * | 2015-12-25 | 2016-03-23 | 中水北方勘测设计研究有限责任公司 | Rail type fish passing structure applied to medium and high-water-head barrage hubs |
CN106087906A (en) * | 2016-06-28 | 2016-11-09 | 罗富强 | A kind of ecological dam with fish migration passage |
CN106522177A (en) * | 2016-11-18 | 2017-03-22 | 中国电建集团成都勘测设计研究院有限公司 | Fishway system arranged inside water retaining dam |
CN207512708U (en) * | 2017-11-27 | 2018-06-19 | 中国电建集团成都勘测设计研究院有限公司 | Fish system is crossed in cut-off dam hydraulic engineering |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371932A (en) * | 2018-11-30 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | Waterpower vertical shaft type crosses fish structure |
CN109371932B (en) * | 2018-11-30 | 2024-02-13 | 中国电建集团成都勘测设计研究院有限公司 | Hydraulic shaft type fish passing structure |
CN109469030A (en) * | 2018-12-21 | 2019-03-15 | 中国电建集团贵阳勘测设计研究院有限公司 | A collection fortune fish system for diversion formula power generation high dam |
CN109469030B (en) * | 2018-12-21 | 2024-03-19 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish gathering and transporting system for diversion type power generation high dam |
CN109853492A (en) * | 2019-03-28 | 2019-06-07 | 中水珠江规划勘测设计有限公司 | Gate valve duct type crosses fish method |
CN110080178A (en) * | 2019-04-01 | 2019-08-02 | 河海大学 | A kind of fish pass design method |
CN109924172A (en) * | 2019-04-09 | 2019-06-25 | 四川大学 | A kind of cable car type fish lift device |
CN112681253A (en) * | 2020-12-14 | 2021-04-20 | 三峡大学 | Novel fishway that import was arranged |
CN114304088A (en) * | 2021-11-30 | 2022-04-12 | 杭州市农业科学研究院 | Mountain stream catching method |
CN114304088B (en) * | 2021-11-30 | 2024-02-06 | 杭州市农业科学研究院 | Method for catching mountain stream |
CN117717030A (en) * | 2024-02-08 | 2024-03-19 | 四川弘信天启科技有限公司 | Fish luring screening device and fish lifting machine system |
CN117717030B (en) * | 2024-02-08 | 2024-05-03 | 四川弘信天启科技有限公司 | Fish luring screening device and fish lifting machine system |
Also Published As
Publication number | Publication date |
---|---|
CN108086262B (en) | 2024-02-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108086262A (en) | Fish system is crossed in cut-off dam hydraulic engineering | |
CN108005040A (en) | Minisize ecological natural flow station | |
KR200440994Y1 (en) | Slope method Drain for a living rock debris barrier | |
CN204000904U (en) | A kind of mesh duct for solid slope water storage | |
EP2098640B1 (en) | Device for lowering eels to hydraulic structures | |
CN101260661A (en) | Automatic irrigation and drainage method and system for agricultural land | |
CN109736255B (en) | Fish lifting machine device for collecting fish by utilizing tail water of hydropower station and fish collecting method thereof | |
CN110230297A (en) | Ecological fishway for river network in plain areas | |
CN109371932A (en) | Waterpower vertical shaft type crosses fish structure | |
CN207512709U (en) | Minisize ecological natural flow station | |
CN207512708U (en) | Fish system is crossed in cut-off dam hydraulic engineering | |
CN206916920U (en) | It is automatically separated the grid of suspended material | |
CN101519869B (en) | Settlement type water and soil conservation method | |
CN209429074U (en) | Waterpower vertical shaft type crosses fish structure | |
CN209941630U (en) | Pump valve pipeline type fish passing facility | |
CN107700442A (en) | Export structure for fish pass system | |
CN215367094U (en) | Slope protection device for hydraulic engineering | |
CN206706712U (en) | A kind of split type net cage for intercepting floating object | |
CN104775505A (en) | Self-cleaning and high-capacity greenhouse rainwater collecting pool and use thereof | |
CN109548721A (en) | A kind of later period pond breeding method of sea cucumber | |
CN109930568B (en) | Pump valve pipeline type fish passing facility | |
CN214015602U (en) | Fish trapping system suitable for mountain rivers in fish elevator engineering | |
CN204662643U (en) | A kind of self-cleaning Large Copacity greenhouse catchment of rainfall pond | |
CN209798707U (en) | Diversion type power station overflow dam section ecological reconstruction structure | |
CN109452214B (en) | Fish elevator observation pond with domestication function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |