CN108085440A - Stove method is taken off in a kind of blast furnace overhaul - Google Patents

Stove method is taken off in a kind of blast furnace overhaul Download PDF

Info

Publication number
CN108085440A
CN108085440A CN201711337222.2A CN201711337222A CN108085440A CN 108085440 A CN108085440 A CN 108085440A CN 201711337222 A CN201711337222 A CN 201711337222A CN 108085440 A CN108085440 A CN 108085440A
Authority
CN
China
Prior art keywords
residual iron
stove
furnace
blast furnace
residual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711337222.2A
Other languages
Chinese (zh)
Other versions
CN108085440B (en
Inventor
章锐
师志民
晋杰
陈克胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Magang Equipment Overhaul Co Ltd
Original Assignee
Anhui Magang Equipment Overhaul Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Magang Equipment Overhaul Co Ltd filed Critical Anhui Magang Equipment Overhaul Co Ltd
Priority to CN201711337222.2A priority Critical patent/CN108085440B/en
Publication of CN108085440A publication Critical patent/CN108085440A/en
Application granted granted Critical
Publication of CN108085440B publication Critical patent/CN108085440B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/04Blast furnaces with special refractories
    • C21B7/06Linings for furnaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Blast Furnaces (AREA)

Abstract

Stove method is taken off the invention discloses a kind of blast furnace overhaul, furnace bottom carbon brick upper surface elevation line and beams of concrete lower surface elevation line are identified on furnace shell during including 1) building blast furnace;2) bore position when taking some positions as residual iron placing on the blast furnace between two elevation lines in 1), removes this cooling wall and furnace shell, then radial bore, if occurs the situation that residual iron can not be put Chu Lai after the completion of drilling, boring point, redrilling are moved up immediately, until residual iron can release;3) residual iron placing removes bulk cargo in stove to when going out without residual flowing molten iron by the method for explosion;4) the residual iron position being not bled off in blast furnace cooling stave and furnace shell to stove is removed, is cleared up the upper surface of residual iron once again with Drilling machine;5) after removing whole furnace shells and cooling wall, sawed using rope and carry out sawing, then transport the residual iron of piecemeal.The advantages of comprehensive residual iron placing of the present invention and rope saw sawing process take off stove takes off stove with the method for online sawing after residual iron placing, simple for process, the safety and construction time is controllable.

Description

Stove method is taken off in a kind of blast furnace overhaul
Technical field
The invention belongs to field of metallurgy, stove method is taken off in more particularly to a kind of blast furnace overhaul.
Background technology
Blast furnace overhaul need to remove furnace shell and the equipment to connect together with furnace shell such as cooling wall etc., remove bulk cargo in stove, resistance to Residual iron below fiery material and Tie Kou positions, there are two types of method that residual iron is removed is general, one kind is opened in the suitable position of cupola well Hole releases most of molten iron, when remaining residual trivet stove crushed by the method for explosion after remove;One kind is residual iron placing or does not put Residual iron is directly and furnace shell drags furnace foundation away from together, is removed after sawing sawing using rope.
It is common when first method is current blast furnace overhaul to take off stove method, due to every blast-melted erosion furnace bottom carbon brick Degree it is different, position of opening during residual iron placing in cupola well position determines relatively difficult, and height, remaining molten iron mistake are opened in position More, position is opened low, it is possible to put not molten iron discharging, so taking off the time of stove can all greatly prolong.
The technics comparing that second method is related to is complicated, and the special equipment of input is more, and furnace shell is required to remove circuit On structure or equipment all remove, so domestic only have a small number of qualified blast furnaces that can implement, also only only a few is looked forward to Industry possesses construction ability.
Usually without considering using, major defect is not the method for residual iron placing direct-on-line sawing:
1st, remaining molten iron capacity is excessive, it is not easy to cure, and containing rubber constituent, it is necessary to which molten iron is cooled to one in saw of restricting Rear can be used below constant temperature degree, and the main line duration occupied when so constructing is longer.
2:In the Tie Kou positions of blast furnace, beams of concrete is enclosed along furnace shell one, its upper surface is high after remaining molten iron cures It cannot directly be removed behind the lower surface of beams of concrete, residual iron sawing piecemeal.
3:During residual iron sawing piecemeal, if piecemeal is very few, every piece of preponderance is not easy to transport, if piecemeal is excessive, by It is limited in by saw cutting speed, can equally increase the time of main line construction.
The content of the invention
For the deficiency in background technology, stove method, comprehensive residual iron placing are taken off in a kind of blast furnace overhaul of present invention offer And rope saws the advantages of sawing process takes off stove, and stove, simple for process, safety and construction time are taken off with the method for online sawing after residual iron placing Controllably.
The technical solution that the present invention solves technical problem is as follows:
Stove method is taken off in a kind of blast furnace overhaul of the present invention, is included the following steps:
1) beams of concrete that the upper surface elevation line of furnace bottom carbon brick and Tie Kou positions are enclosed along furnace shell one when blast furnace is built Lower surface elevation line be identified on furnace shell;
2) drilling when taking a line parallel with two elevation lines as residual iron placing between two elevation lines in step 1) The position line chooses one piece of cooling wall on bore position line, removes the furnace shell of this cooling wall and the cooling wall position, and selection is wanted The cooling wall position of dismounting will be convenient for setting up the groove that flows out residual iron, then in this position radial bore, if going out after the completion of drilling The situation that existing residual iron can not be put Chu Lai moves up boring point, redrilling immediately, until residual iron can release;
3) residual iron placing removes the bulk cargo in stove by the method for explosion to when going out without residual flowing molten iron;
4) blast furnace cooling stave and furnace shell are removed, when tearing open to the residual iron position being not bled off in stove, with Drilling machine by residual iron Upper surface is cleared up once again;
5) remaining whole furnace shells and cooling wall are removed, after the completion of dismounting, is sawed using rope and carries out sawing, then by the residual of piecemeal Iron transports.
Further, during furnace shell and cooling wall at bore position when residual iron placing is removed in the step 2), if the position It puts at upper and lower two layers of cooling wall joint, then removes lower floor's cooling wall.
Further, during the bore position line in the step 2) during residual iron placing is between two elevation lines in step 1) Line.
Further, in the step 2) during radial bore, drilling rod holding is horizontal or slightly upwardly tilts.
Further, elevator machine travel is crossed by the residual Tie Tong of piecemeal in the step 5), will by setting sliding slot outside blast furnace Residual iron slides to ground, then entrucking transports.
Compared with current existing technology, present invention process is simple, and safe operation, the construction time is controllable, and integrated use is put Residual iron and rope saw sawing process the advantages of taking off stove, bore position accurate and effective ensures the timely releasing of residual iron, residual iron placing during residual iron placing Transporting for the residual iron of piecemeal has been effectively ensured in the efficient combination of online sawing afterwards, has significantly saved the time of blast furnace overhaul so that high Stove can put into production as early as possible, cost-effective, have good economic benefit;In addition, the present invention can be in any blast furnace overhaul Using, have many advantages, such as to have a wide range of application, application value it is high.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the structure diagram of blast furnace of the present invention;
In figure:The upper surface elevation line of furnace bottom carbon brick, the lower surface elevation line of 2. beams of concretes, 3. are bored when 1. blast furnace is built Hole site, 4. cooling walls, 5. sliding slots, 6. furnace shells, 7. iron mouths, 8. residual iron, 9, furnace bottom carbon brick, 10. furnace foundations, 11. bore position lines, 12. beams of concrete, 13. cupola wells.
Specific embodiment
Embodiment 1:
Stove method is taken off in a kind of blast furnace overhaul of the present invention, and the furnace structure is as shown in Figure 1, blast furnace includes furnace foundation 10,10 top of furnace foundation is furnace body, and furnace body includes cupola well 13, and the bottom of cupola well 13 is furnace bottom carbon brick 9, and the outside of cupola well 13 is followed successively by Cooling wall 4 and furnace shell 6 are additionally provided with iron mouth 7 on furnace body, and 7 position of iron mouth is provided with beams of concrete 12 in 6 one weeks along furnace shell;It is described Stove method is taken off to include the following steps:
1) concrete that the upper surface elevation line 1 of furnace bottom carbon brick and 7 position of iron mouth are enclosed along furnace shell 6 one when blast furnace is built The lower surface elevation line 2 of beam is identified on furnace shell 6;
2) drilling when taking a line parallel with two elevation lines as residual iron placing between two elevation lines in step 1) The position line 11, which is bore position 3, removes a cooling wall 4 at this position And the furnace shell 6 of corresponding size, then in this position to 13 radial bore of cupola well, do not put not come out if occurring residual iron 8 after the completion of drilling Situation, move up boring point immediately, redrilling, until residual iron 8 can release;
3) residual iron placing 8 removes the bulk cargo in stove by the method for explosion to when being flowed out without residual iron 8;
4) when removing the residual iron position being not bled off in blast furnace cooling stave 4 and furnace shell 6 to stove, with Drilling machine by the upper of residual iron 8 Surface is cleared up once again;
5) after removing whole furnace shells 6 and cooling wall 4, sawed using rope and carry out sawing, then transport the residual iron 8 of piecemeal.
When the furnace shell 6 and cooling wall 4 of the bore position 3 in step 2) described in the present embodiment during dismounting residual iron placing, if should Lower floor's cooling wall 4 is then removed in upper and lower two layers of cooling wall, 4 seam crossing in position.
Bore position line 11 described in the present embodiment in step 2) during residual iron placing may be configured as two absolute altitudes in step 1) Center line between line by bore position line 11 in this way, residual iron can be released effectively after piercing, ensures the need of blast furnace overhaul It will.
Described in the present embodiment in step 2) during radial bore, furnace bottom carbon brick 9 suffers erosion during due to blast fumance feelings Condition is different, can be horizontal by drilling rod holding or slightly upwardly tilt, and can so ensure to be not in feelings that residual iron can not be put Chu Lai substantially Condition.
The residual iron 8 of piecemeal can be by elevator machine travel, by setting cunning outside blast furnace in step 5) described in the present embodiment Residual iron 8 after piecemeal is slided to ground by slot 5, then entrucking transports.
The method of stove and the direct-on-line sawing of non-residual iron placing are taken off by explosion after the method for the invention and residual iron placing Method is compared, and is taken off 21 days method used times of stove after residual iron placing by explosion on the large blast furnace of same volume, is taken off stove and account for With about 9 days main line durations;Not residual iron placing direct-on-line sawing used time 14 days all occupy the main line duration in this 14 days;Use this hair It is 8 days method used times of direct-on-line sawing after bright residual iron placing, simple for process although this occupies the main line duration for 8 days, safety and Construction time is controllable.
The foregoing is merely a prefered embodiment of the invention, but protection scope of the present invention is not limited thereto, any to be familiar with sheet In the technical scope disclosed by the present invention, the change or replacement that can be readily occurred in should all be covered those skilled in the art Within protection scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection domain that claim is defined.

Claims (5)

1. stove method is taken off in a kind of blast furnace overhaul, include the following steps:
1) under the beams of concrete that the upper surface elevation line of furnace bottom carbon brick and Tie Kou positions are enclosed along furnace shell one when blast furnace is built Surface level line is identified on furnace shell;
2) bore position when taking a line parallel with two elevation lines as residual iron placing between two elevation lines in step 1) Line chooses one piece of cooling wall on bore position line, removes the furnace shell at this cooling wall and the cooling wall, and selection to be removed Cooling wall position will be convenient for setting up the groove for flowing out residual iron, then in this position radial bore, if occurring residual iron after the completion of drilling Situation about can not putting Chu Lai moves up boring point, redrilling immediately, until residual iron can release;
3) residual iron placing removes the bulk cargo in stove by the method for explosion to when going out without residual flowing molten iron;
4) blast furnace cooling stave and furnace shell are removed, when tearing open to the residual iron position being not bled off in stove, with Drilling machine by the upper table of residual iron Face is cleared up once again;
5) remaining whole furnace shells and cooling wall are removed, after all removing, is sawed using rope and carries out sawing, then transport the residual iron of piecemeal Go out.
2. stove method is taken off in a kind of blast furnace overhaul according to claim 1, when removing residual iron placing in the step 2) Bore position at furnace shell and cooling wall when, if lower floor's cooling wall is removed in the position at upper and lower two layers of cooling wall joint.
3. stove method is taken off in a kind of blast furnace overhaul according to claim 1 or 2, in the step 2) during residual iron placing Bore position line is the center line between two elevation lines in step 1).
4. stove method is taken off in a kind of blast furnace overhaul according to claim 1, in the step 2) during radial bore, bore Bar holding is horizontal or slightly upwardly tilts.
5. stove method is taken off in a kind of blast furnace overhaul according to claim 1, the residual Tie Tong of piecemeal in the step 5) Elevator machine travel is crossed, by setting sliding slot outside blast furnace, residual iron is slided into ground, then entrucking transports.
CN201711337222.2A 2017-12-14 2017-12-14 Furnace method is taken off in a kind of blast furnace overhaul Expired - Fee Related CN108085440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711337222.2A CN108085440B (en) 2017-12-14 2017-12-14 Furnace method is taken off in a kind of blast furnace overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711337222.2A CN108085440B (en) 2017-12-14 2017-12-14 Furnace method is taken off in a kind of blast furnace overhaul

Publications (2)

Publication Number Publication Date
CN108085440A true CN108085440A (en) 2018-05-29
CN108085440B CN108085440B (en) 2019-07-02

Family

ID=62175636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711337222.2A Expired - Fee Related CN108085440B (en) 2017-12-14 2017-12-14 Furnace method is taken off in a kind of blast furnace overhaul

Country Status (1)

Country Link
CN (1) CN108085440B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108728599A (en) * 2018-06-22 2018-11-02 攀钢集团工程技术有限公司 A kind of Blast Furnace Bottom residue iron method for dismounting
CN110846449A (en) * 2019-11-29 2020-02-28 中国十九冶集团有限公司 Blast furnace tapping slag removal method
CN111270032A (en) * 2019-11-29 2020-06-12 中国十九冶集团有限公司 Blast furnace hearth residual iron blasting method
CN111809012A (en) * 2020-07-04 2020-10-23 北京首钢建设集团有限公司 Construction method for removing accumulated iron in iron-making blast furnace by using residual iron discharging mode
CN114854913A (en) * 2022-05-19 2022-08-05 宝武集团鄂城钢铁有限公司 Method for repairing cooling vertical pipe jump connection in blast furnace

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000256717A (en) * 1999-03-11 2000-09-19 Nippon Steel Corp Method for removing residual iron in blast furnace
CN102337361A (en) * 2011-10-13 2012-02-01 山西太钢不锈钢股份有限公司 Method for positioning discharged residual iron during overhaul of blast furnace
CN102399926A (en) * 2011-11-21 2012-04-04 攀钢集团攀枝花钢钒有限公司 Furnace halt residue iron outlet method for middle and large-sized blast furnaces
CN103103303A (en) * 2011-11-15 2013-05-15 上海宝冶集团有限公司 Method for disintegrating large-scale blast furnace residual iron
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN107119158A (en) * 2017-06-09 2017-09-01 河钢股份有限公司承德分公司 A kind of residual iron placing method of schreyerite steelmaking furnace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000256717A (en) * 1999-03-11 2000-09-19 Nippon Steel Corp Method for removing residual iron in blast furnace
CN102337361A (en) * 2011-10-13 2012-02-01 山西太钢不锈钢股份有限公司 Method for positioning discharged residual iron during overhaul of blast furnace
CN103103303A (en) * 2011-11-15 2013-05-15 上海宝冶集团有限公司 Method for disintegrating large-scale blast furnace residual iron
CN102399926A (en) * 2011-11-21 2012-04-04 攀钢集团攀枝花钢钒有限公司 Furnace halt residue iron outlet method for middle and large-sized blast furnaces
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN107119158A (en) * 2017-06-09 2017-09-01 河钢股份有限公司承德分公司 A kind of residual iron placing method of schreyerite steelmaking furnace

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108728599A (en) * 2018-06-22 2018-11-02 攀钢集团工程技术有限公司 A kind of Blast Furnace Bottom residue iron method for dismounting
CN108728599B (en) * 2018-06-22 2020-05-22 攀钢集团工程技术有限公司 Blast furnace bottom residual iron dismantling method
CN110846449A (en) * 2019-11-29 2020-02-28 中国十九冶集团有限公司 Blast furnace tapping slag removal method
CN111270032A (en) * 2019-11-29 2020-06-12 中国十九冶集团有限公司 Blast furnace hearth residual iron blasting method
CN111809012A (en) * 2020-07-04 2020-10-23 北京首钢建设集团有限公司 Construction method for removing accumulated iron in iron-making blast furnace by using residual iron discharging mode
CN114854913A (en) * 2022-05-19 2022-08-05 宝武集团鄂城钢铁有限公司 Method for repairing cooling vertical pipe jump connection in blast furnace
CN114854913B (en) * 2022-05-19 2023-06-27 宝武集团鄂城钢铁有限公司 Method for repairing jump-connection of cooling vertical pipe in blast furnace

Also Published As

Publication number Publication date
CN108085440B (en) 2019-07-02

Similar Documents

Publication Publication Date Title
CN108085440B (en) Furnace method is taken off in a kind of blast furnace overhaul
CN102912078B (en) The Multifunctional arc furnace system of minimumization power consumption and the processing procedure of manufacture product made from steel
CN104726625B (en) Waste material and the method for quickly eliminating of residual ferrum in stove in a kind of blast furnace overhaul
CN109082509B (en) Heat treatment method for manufacturing high-wind-pressure down-the-hole drill bit by using 40CrNi2MoV and down-the-hole drill bit
CN105714006A (en) Method for blast furnace stopping for heavy maintenance
BRPI0616162B1 (en) HIGH OVEN RESIDUAL GUSA IRON REMOVAL METHOD
CN100567507C (en) The method for dismounting of blast furnace
SE448170B (en) PROCEDURE FOR BLOWING GAS BELOW IN A REFINING VESSEL WITH MELTED STEEL
CN104575631B (en) High-temperature molten release device
CN107243603A (en) A kind of offshore oil and gas drilling and producing platform casing thin-section casting manufacture method
CN106086498A (en) Aluminium alloy wheel hub gravity melt casting process
CN108342533A (en) A kind of blast furnace safety residual iron placing shedding control method
KR101004451B1 (en) Explosive demolition method of residual iron in blast furnace
KR100578749B1 (en) Removal method of rebound loss
CN208748128U (en) A kind of super-huge blast furnace overhaul quickly takes off furnace system
CN203212615U (en) Hot aluminum ash separating machine
JP2005200704A (en) Method for repairing molten steel tapping hole in converter
CN208214287U (en) A kind of efficient casting system
CN109628673A (en) A kind of decomposition method of the residual iron of blast furnace
JP6471553B2 (en) Casting apparatus and casting method
JP6779466B2 (en) How to separate molten metal and slag
KR101295067B1 (en) Method for manufacturing low strength base metal
CN110202094B (en) Casting method of movable arm seat beam of large-scale loader
KR100431602B1 (en) Drain promotion method of melting matter existing in the blast furnace when air dropping
US239619A (en) Repairing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190702