CN108082396A CN201611036366.XA CN201611036366A CN108082396A CN 108082396 A CN108082396 A CN 108082396A CN 201611036366 A CN201611036366 A CN 201611036366A CN 108082396 A CN108082396 A CN 108082396A
Authority
CN
China
Prior art keywords
pylon
ladder
fixed
jack
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611036366.XA
Other languages
Chinese (zh)
Other versions
CN108082396B (en
Inventor
赵云
袁新勇
赵利兴
赵迎九
张清涛
王小合
逯鹏
杨亚东
张健翔
陈聪
郝利忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Heavy Industries Co Ltd
China Huadian Engineering Group Co Ltd
Guodian Nanjing Automation Co Ltd
Original Assignee
Huadian Heavy Industries Co Ltd
China Huadian Engineering Group Co Ltd
Guodian Nanjing Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Heavy Industries Co Ltd, China Huadian Engineering Group Co Ltd, Guodian Nanjing Automation Co Ltd filed Critical Huadian Heavy Industries Co Ltd
Priority to CN201611036366.XA priority Critical patent/CN108082396B/en
Publication of CN108082396A publication Critical patent/CN108082396A/en
Application granted granted Critical
Publication of CN108082396B publication Critical patent/CN108082396B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/14Arrangement of ship-based loading or unloading equipment for cargo or passengers of ramps, gangways or outboard ladders ; Pilot lifts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention discloses a kind of jack up boarding ladders, including main ladder, tail ladder and pylon, tail ladder is connected with main ladder, one end of main ladder is fixed on by Assembly of pin on pylon, the other end is connected by pulley assembly with the motor being fixed on platform, and spring push-rod is provided on pylon, and the connector portions of spring push-rod are connected with main ladder, locking device is provided with below spring push-rod, locking device is fixed on pylon.Boarding ladder of the present invention can pack up, will not occupy offshore wind farm self-elevating work platform loop wheel machine, its can be with the balance for being instantaneously moved to itself of tender, boarding ladder can be rotated as the passage between platform and tender as tender instantaneously moves caused by sea level fluctuation tide and wave.Present invention occupancy platform space is small, reliability is high, safe and easy for installation, uses the present invention that can effectively improve the efficiency that offshore wind farm is constructed.

Description

A kind of jack up boarding ladder
Technical field
The present invention relates to a kind of jack up boarding ladders, belong to technical field of ships.
Background technology
At present in offshore wind farm work progress the upper lower platform of personnel by cage, and using cage when need by loop wheel machine this One precious resources influences the efficiency of offshore construction, it is therefore desirable to which research one kind can realize personnel in the case of without using loop wheel machine The equipment of upper and lower offshore wind farm self-elevating work platform.
Ship etc. above and below personnel when boarding ladder is mainly used for the upper and lower ship of shipyard personnel at present, ship goes to dock.Harbour It is that harbour is fixed in one end with boarding ladder structure type, the other end is overlapped on ship, since the sea level of dock area is opposite Calm, ship does not have instantaneous big movement, and the boarding ladder being fixed on harbour only needs can be with the variation of fluctuation tide It slowly rotates and meets the requirements;Or boarding ladder one end is made to be fixed on ship, the other end is overlapped on harbour, boarding ladder with Ship is mobile and rotates, and boarding ladder is made to be overlapped on always on harbour, meets personnel's requirement up and down.Although it is fixed on platform On ladder rung of going on board can be adjusted with the angle change of boarding ladder, but when at sea constructing, put down for offshore construction The two relative movements of platform and tender are more frequent, and the instantaneous larger ship of relative motion, this harbour with boarding ladder not Reliably, it is and dangerous.
The content of the invention
It is an object of the present invention to provide a kind of jack up boarding ladders, can be rotated with the movement of tender, and It can adjust, offshore wind farm self-elevating work platform be influenced small as tender instantaneously moves.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:A kind of jack up boarding ladder, including master Ladder, tail ladder and pylon, tail ladder are connected with main ladder, and one end of main ladder is fixed on by Assembly of pin on pylon, and the other end passes through cunning Wheel assembly is connected with the motor being fixed on platform, and spring push-rod, the connector portions of spring push-rod and main ladder are provided on pylon It connects, is provided with locking device below spring push-rod, locking device is fixed on pylon.
Above-mentioned boarding ladder whole Transporting can be made after processing and manufacturing factory whole processing and debugging to offshore wind farm jack up On industry platform, integral hoisting.The supporting leg of pylon need to be only welded and fixed during installation, installation difficulty is reduced, sea is greatly saved The construction and installation time.
Main ladder can be fixed on one end rotation on pylon, convenient for automatic deploying and retracting on pylon, Bu Huizhan by Assembly of pin With the excessive space of operation platform, the loop wheel machine of platform will not be more occupied, it, will not be because occupying loop wheel machine so as in lower platform on personnel And influence the construction efficiency on platform.
Tail ladder can instantaneously mobile automatic adjustment reaches Equilibrium with tender.Tail ladder is using self-balancing ladder, using certainly The cylinder of balancing can reach the balance of any position this principle in itself rotatable scope, for main ladder and tender Between connection, when tender is instantaneously moved with wave, ocean current, enable instantaneous movement of the self-balancing ladder with tender And reach any equilbrium position.Step plate on self-balancing ladder remains horizontal by the step plate of linkage mechanism and main ladder, Facilitate above and below personnel.
The setting of pylon not only avoids the loop wheel machine occupied on platform, and floor space is small, and convenient for fixed main ladder and tail Ladder reduces main ladder and influence of the tail ladder to operation platform.
A kind of foregoing jack up boarding ladder, the locking device include horizontal collision block, locking pin, spring, it is lower locking case, Pull rod, steel wire rope, rope cramp and lock handle, horizontal collision block and locking pin connection, locking pin are connected with lower locking case, lower lock Tight case is connected with pull rod, and one end of the tail end connecting steel wire ropes of pull rod, the steel wire rope other end is connected with lock handle, and spring is set In locking slightly.Locking device is used to main ladder being fixed on pylon, when main ladder is reset to from use state in pylon, sets Main ladder is firmly fixed on pylon in the locking device close to pylon top.
A kind of foregoing jack up boarding ladder, the spring push-rod include sliding bar, seamless steel pipe, fixed plate, sliding bar One end be connected with connector portions, the other end passes through seamless steel pipe exposed end, sets that there are two fixed plates on seamless steel pipe.As general When main ladder is put down from pylon, using above locking device and being fixed on the spring push-rod on pylon and promote main ladder, To overcome the problems, such as that due to the center of gravity of main terraced tailing ladder is more than its pivot use state can not be automatically rotated to.Sliding bar by It gradually extends, and promotes the main ladder being connected with connector portions.
A kind of foregoing jack up boarding ladder, it is described it is main ladder include frame, big pull rod, railing and step plate, big pull rod and Railing is mounted on frame, and step plate is installed on by bearing assembly on frame.Bearing assembly includes axis pin, spacer, stainless Steel plastic-spraying bearing and soket head cap screw, the step plate of main ladder are mounted on the A support tubes of frame or B support tubes by bearing assembly On.
A kind of foregoing jack up boarding ladder, the frame include connecting plate, frame and multiple stulls arranged in parallel, even Fishplate bar is connected with frame.
A kind of foregoing jack up boarding ladder is provided with A support tubes and B support tubes, the diameter of A support tubes on the frame Size is less than the diameter dimension of B support tubes.
A kind of foregoing jack up boarding ladder, the A support tubes are relatively arranged on B support tubes on frame.
A kind of foregoing jack up boarding ladder, the pulley assembly are consolidated including two a pulleys being fixed on frame, one Due to the b pulleys and steel wire cable on pylon top, steel wire cable one end is fixed on pylon, and the other end passes through a pulleys and b pulleys It is connected with motor.
A kind of foregoing jack up boarding ladder, it is described it is main ladder and tail ladder on be both provided with linkage mechanism, pass through linkage mechanism The step plate of main ladder is made to remain horizontal and the step plate on tail ladder is made to be protected always by the step plate of linkage mechanism and main ladder Water holding is put down.
Compared with prior art, boarding ladder of the present invention can be packed up, will not occupy offshore wind farm self-elevating work platform Loop wheel machine, its can with the balance for being instantaneously moved to itself of tender, boarding ladder as the passage between platform and tender, It can be rotated as tender instantaneously moves caused by sea level fluctuation tide and wave.The present invention occupy platform space it is small, Reliability is high, safe and easy for installation, and the efficiency of offshore wind farm construction can be effectively improved using the present invention.
Description of the drawings
Fig. 1 is the collapsed state schematic diagram of the present invention;
Fig. 2 is the structure diagram of locking device of the present invention;
Fig. 3 is the structure diagram of spring push-rod of the present invention;
Fig. 4 is the schematic diagram of the main terraced top sheave installation site of the present invention;
Fig. 5 is the structure diagram of the main ladder of the present invention;
Fig. 6 is the Section A-A figure of Fig. 5;
Fig. 7 is the section B-B figure of Fig. 5.
Reference numeral:The main ladders of 1-, 2- tails ladder, 3- Assembly of pin, 4- pylons, 5- pulley assemblies, 6- motor, 7- springs push away Bar, 8- connector portions, 9- locking devices, the horizontal collision blocks of 10-, 11- locking pins, 12- springs lock case, 14- pull rods, 15- under 13- Steel wire rope, 16- rope cramps, 17- lock handles, 18- sliding bars, 19- seamless steel pipes, 20- fixed plates, 21- connecting plates, 22- Frame, the big pull rods of 23-, 24- railings, 25- step plates, 26- bearing assemblies, 27- frames, 28- stulls, 29-A support tubes, 30-B Support tube, 31-a pulleys, 32-b pulleys, 33- steel wire cables.
The present invention is further illustrated with reference to the accompanying drawings and detailed description.
Specific embodiment
The embodiment of the present invention 1:A kind of jack up boarding ladder, including main terraced 1, tail ladder 2 and pylon 4, tail ladder 2 and main terraced 1 Connection, main terraced 1 one end are fixed on by Assembly of pin 3 on pylon 4, and the other end is by pulley assembly 5 and is fixed on platform Motor 6 connect, be provided with spring push-rod 7 on pylon 4, the connector portions 8 of spring push-rod 7 are connected with main terraced 1, and spring pushes away The lower section of bar 7 is provided with locking device 9, and locking device 9 is fixed on pylon 4.
The embodiment of the present invention 2:A kind of jack up boarding ladder, including main terraced 1, tail ladder 2 and pylon 4, tail ladder 2 and main terraced 1 Connection, main terraced 1 one end are fixed on by Assembly of pin 3 on pylon 4, and the other end is by pulley assembly 5 and is fixed on platform Motor 6 connect, be provided with spring push-rod 7 on pylon 4, the connector portions 8 of spring push-rod 7 are connected with main terraced 1, and spring pushes away The lower section of bar 7 is provided with locking device 9, and locking device 9 is fixed on pylon 4.
Locking device 9 includes horizontal collision block 10, locking pin 11, spring 12, lower locking case 13, pull rod 14, steel wire rope 15, steel Cord folder 16 and lock handle 17, horizontal collision block 10 are connected with locking pin 11, and locking pin 11 is connected with lower locking case 13, lower locking Case 13 is connected with pull rod 14, and one end of the tail end connecting steel wire ropes 15 of pull rod 14,15 other end of steel wire rope connects with lock handle 17 It connects, spring 12 is arranged on locking pin 11.
Spring push-rod 7 includes sliding bar 18, seamless steel pipe 19, fixed plate 20, and one end and the connector portions 8 of sliding bar 18 connect It connects, the other end passes through 19 exposed end of seamless steel pipe, sets that there are two fixed plates 20 on seamless steel pipe 19.
Main terraced 1 includes frame 22, big pull rod 23, railing 24 and step plate 25, and big pull rod 23 and railing 24 are mounted on frame On frame 22, step plate 25 is installed on by bearing assembly 26 on frame 22.
Frame 22 includes connecting plate 21, frame 27 and multiple stulls 28 arranged in parallel, connecting plate 21 and is connected with frame 27.
A support tubes 29 and B support tubes 30 are provided on frame 22, the diameter dimension of A support tubes 29 is less than B support tubes 30 Diameter dimension.
Pulley assembly 5 includes two a pulleys being fixed on frame 22,31, b pulleys 32 for being fixed on 4 top of pylon And steel wire cable 33,33 one end of steel wire cable are fixed on pylon 4, the other end passes through a pulleys 31 and b pulleys 32 and motor 6 Connection.
The operation principle of the present invention:Pylon 4 is fixed on platform by the present invention, tail ladder 2 and main terraced 1 connection, can be with main terraced 1 Rotation.During collapsed state, main terraced 1 is fixed on by locking device 9 in pylon 4;During working condition, locking device 9 is unlocked to tower The fastening of frame 4, by motor 6 drive slide component, make main terraced 1 Unscrew, when positioned at main terraced 1 top ends tail ladder 2 with When tender is connected, stop the driving of motor 6.During main terraced 1 opens, main ladder is pushed out by spring push-rod 7 1, so that main terraced 1 smoothly rotates to horizontal direction from vertical direction.
Main terraced 1 uses rotatable main terraced 1, and one end is fixed on by Assembly of pin 3 on pylon 4, and the other end passes through steel wire rope 15 are fixed on around b pulleys 32 and two a pulleys 31 on the motor 6 being installed on platform.Construction period, above and below staff During offshore wind farm self-elevating work platform, main terraced 1 can it is different from tender difference height difference and horizontal distance with operation platform and Adjustment ensures that main terraced 1 marks time and remains horizontal by linkage mechanism, personnel by when it is safer, comfortable.
Tail ladder 2 can reach the balance of any position using cylinder in itself rotatable scope, for main terraced 1 and traffic Connection between ship when tender is instantaneously moved with wave, ocean current, can be reached with the instantaneous movement of tender To any equilbrium position.The step plate 25 being arranged on tail ladder 2 remains water by linkage mechanism and main terraced 1 step plate 25 It is flat, facilitate above and below personnel.
Reduce the influence to offshore construction platform simultaneously for the ease of in-site installation, erection tower 4 is with fixation on platform Main terraced 1 and tail ladder 2;Main terraced 1 can pack up and be put into pylon 4, be fixed conveniently, and it is small to occupy platform space.
When pylon 4 designs, only deck bearing strength need to be verified, and after the completion of processing factory's integral assembling main terraced 1 and tail ladder 2, By it, integrally sea-freight transport is live to project, and integral hoisting is convenient and efficient, and installation can be completed in the basic suspension column of fixed pylon 4, Improve offshore construction efficiency.
Boarding ladder of the present invention is when not in use, it is necessary to main terraced 1 is retracted into pylon 4, and if main terraced 1 packs up rear only steel Wire rope 33 hauls, and 33 rope of steel wire rope is more soft, and being rocked when platform moves can be more severe.In tower after being resetted according to main terraced 1 Position on frame 4, the locking device 9 set on pylon 4 make boarding ladder, in locking state, when packing up, be put down when packing up It will not be rocked in platform moving process.
When boarding ladder is packed up, main terraced 1 comes to 4 inside of pylon convenient for fixing, main terraced 1 and the whole center of gravity of tail ladder 2 packed up More than its pivot, in use, after motor 6 unclasps steel wire cable 33, because center of gravity can not automatic rotary more than pivot Use state is gone to, main terraced 1 is promoted using spring push-rod 7, main terraced 1 smooth rotation can be made.

Claims (9)

1. a kind of jack up boarding ladder, which is characterized in that including main terraced (1), tail terraced (2) and pylon (4), tail ladder (2) and main ladder (1) connect, the one end of main terraced (1) is fixed on by Assembly of pin (3) on pylon (4), and the other end passes through pulley assembly (5) It is connected with the motor (6) being fixed on platform, is provided with spring push-rod (7) on the pylon (4), spring push-rod (7) connect Head (8) is connected with main terraced (1), and locking device (9), the locking device are provided with below the spring push-rod (7) (9) it is fixed on pylon (4).
2. a kind of jack up boarding ladder according to claim 1, which is characterized in that the locking device (9) includes level Collision block (10), locking pin (11), spring (12), lower locking case (13), lower link bar (14), steel wire rope (15), rope cramp (16) With lock handle (17), horizontal collision block (10) is connected with locking pin (11), and locking pin (11) is connected with lower locking case (13), lower lock Tight case (13) is connected with lower link bar (14), and the tail end of lower link bar (14) connects one end of the steel wire rope (15), steel wire rope (15) The other end is connected with the lock handle (17), and the spring (12) is arranged on locking pin (11).
3. a kind of jack up boarding ladder according to claim 1, which is characterized in that the spring push-rod (7) includes push rod (18), seamless steel pipe (19), fixed plate (20), one end of the sliding bar (18) are connected with connector portions (8), and the other end passes through nothing Steel pipe (19) exposed end is stitched, sets that there are two fixed plates (20) on seamless steel pipe (19).
4. a kind of jack up boarding ladder according to claim 1, which is characterized in that described main terraced (1) include frame (22), Big pull rod (23), railing (24) and step plate (25), the big pull rod (23) and railing (24) are mounted on the frame (22) On, the step plate (25) is installed on by bearing assembly (26) on frame (22).
5. a kind of jack up boarding ladder according to claim 4, which is characterized in that the frame (22) includes connecting plate (21), frame (27) and multiple stulls (28) arranged in parallel, the connecting plate (21) are connected with frame (27).
6. a kind of jack up boarding ladder according to claim 4, which is characterized in that be provided with A branch on the frame (22) Stay tube (29) and B support tubes (30), the diameter dimension of the A support tubes (29) are less than the diameter dimension of B support tubes (30).
7. a kind of jack up boarding ladder according to claim 6, which is characterized in that the A support tubes (29) and B support tubes (30) it is relatively arranged on frame (22).
8. a kind of jack up boarding ladder according to claim 4, which is characterized in that the pulley assembly (5) includes two The a pulleys (31) that are fixed on frame (22), one be fixed on the b pulleys (32) on pylon (4) top and steel wire cable (33), steel Wire rope (33) one end is fixed on pylon (4), and the other end is connected by a pulleys (31) and b pulleys (32) with the motor (6) It connects.
9. a kind of jack up boarding ladder according to claim 4, which is characterized in that on main terraced (1) and tail terraced (2) Linkage mechanism is provided with, by linkage mechanism the step plate (25) of main terraced (1) is made to remain horizontal and make on tail terraced (2) Step plate (25) remains horizontal by the step plate (25) of linkage mechanism and main terraced (1).
CN201611036366.XA 2016-11-22 2016-11-22 A kind of jack up boarding ladder Active CN108082396B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611036366.XA CN108082396B (en) 2016-11-22 2016-11-22 A kind of jack up boarding ladder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611036366.XA CN108082396B (en) 2016-11-22 2016-11-22 A kind of jack up boarding ladder

Publications (2)

Publication Number Publication Date
CN108082396A true CN108082396A (en) 2018-05-29
CN108082396B CN108082396B (en) 2019-04-12

Family

ID=62169892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611036366.XA Active CN108082396B (en) 2016-11-22 2016-11-22 A kind of jack up boarding ladder

Country Status (1)

Country Link
CN (1) CN108082396B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112471030A (en) * 2020-12-23 2021-03-12 烟台中集来福士海洋工程有限公司 Aquaculture net cage and climbing ladder thereof
CN113086098A (en) * 2021-05-06 2021-07-09 江苏赛尔橡胶股份有限公司 Combined telescopic gangway ladder of deep sea drilling ship
CN114233173A (en) * 2021-11-18 2022-03-25 武汉船用机械有限责任公司 Tower climbing device for offshore wind power tower

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103523179A (en) * 2013-10-28 2014-01-22 江苏熔盛重工有限公司 Wharf boarding ladder
US20150259047A1 (en) * 2009-09-01 2015-09-17 Lockheed Martin Corporation Closed-loop control system for controlling a device
CN105539742A (en) * 2016-02-18 2016-05-04 江苏蓝潮海洋风电工程建设有限公司 Accommodation ladder for wind power platform and accommodation ship
CN205396460U (en) * 2016-02-18 2016-07-27 江苏蓝潮海洋风电工程建设有限公司 A gangway ladder that is used for wind -powered electricity generation platform and tender
US20160304169A1 (en) * 2012-11-19 2016-10-20 U-Sea Beheer B.V. Transfer System, Ship and Method for Transferring Persons and/or Goods to and/or from a Floating Ship

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150259047A1 (en) * 2009-09-01 2015-09-17 Lockheed Martin Corporation Closed-loop control system for controlling a device
US20160304169A1 (en) * 2012-11-19 2016-10-20 U-Sea Beheer B.V. Transfer System, Ship and Method for Transferring Persons and/or Goods to and/or from a Floating Ship
CN103523179A (en) * 2013-10-28 2014-01-22 江苏熔盛重工有限公司 Wharf boarding ladder
CN105539742A (en) * 2016-02-18 2016-05-04 江苏蓝潮海洋风电工程建设有限公司 Accommodation ladder for wind power platform and accommodation ship
CN205396460U (en) * 2016-02-18 2016-07-27 江苏蓝潮海洋风电工程建设有限公司 A gangway ladder that is used for wind -powered electricity generation platform and tender

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112471030A (en) * 2020-12-23 2021-03-12 烟台中集来福士海洋工程有限公司 Aquaculture net cage and climbing ladder thereof
CN112471030B (en) * 2020-12-23 2023-02-24 烟台中集来福士海洋工程有限公司 Aquaculture net cage and climbing ladder thereof
CN113086098A (en) * 2021-05-06 2021-07-09 江苏赛尔橡胶股份有限公司 Combined telescopic gangway ladder of deep sea drilling ship
CN113086098B (en) * 2021-05-06 2022-03-29 江苏赛尔橡胶股份有限公司 Combined telescopic gangway ladder of deep sea drilling ship
CN114233173A (en) * 2021-11-18 2022-03-25 武汉船用机械有限责任公司 Tower climbing device for offshore wind power tower
CN114233173B (en) * 2021-11-18 2023-09-15 武汉船用机械有限责任公司 Tower climbing device for offshore wind power tower

Also Published As

Publication number Publication date
CN108082396B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
EP2641825B1 (en) Ship for installing offshore wind turbines, and method for installing offshore wind turbines using same
CN202007400U (en) Marine foundation construction platform for jacket construction
CN108082396B (en) A kind of jack up boarding ladder
KR102450895B1 (en) Turbine systems and mooring systems
JP2011112045A (en) Wind turbine fixing and lifting apparatus and movable operating platform on water
CN103381879B (en) Docking facilities for promoting the transfer between ship and Offshore Structures
JP2011112044A (en) Wind turbine fixing and lifting apparatus and movable operating platform on water
RU2595227C2 (en) Method and device to prevent deviation of guiding cable
CN108454789A (en) Ocean platform steps on quadrupler
CN108412291A (en) A kind of intelligent single-pipe tower that the anti-climbing safety coefficient based on Internet of Things is high
US20110140059A1 (en) Device for the use of technical equipment underwater
US20190263638A1 (en) Marine crane vessel and method of operation
CN208393602U (en) It is a kind of for detecting the diving cage of operation under water
DK3083391T3 (en) Saddle and hook system
CN114981200A (en) Marine vessel crane
CN210912785U (en) Self-elevating offshore platform climbing ladder
CN110712718A (en) Device and method for boarding offshore wind power platform
CN110130348B (en) Large-diameter floating combined pile embracing system and construction method thereof
CN210468622U (en) Cable back-twist device
CN108438177A (en) A kind of diving cage for underwater detection operation
JP2019217801A (en) Floating-type wind power generator and its preparation method
CN101850833B (en) Swing arm type crane barge for mounting wind power equipment
CN215155473U (en) Offshore wind power platform boarding device
CN220245406U (en) Cloth recycling device for high-level platform
CN216665490U (en) Tower climbing equipment for operation and maintenance of offshore wind turbine generator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant