CN108075429A - Cable channel cover plate support base - Google Patents

Cable channel cover plate support base Download PDF

Info

Publication number
CN108075429A
CN108075429A CN201611004087.5A CN201611004087A CN108075429A CN 108075429 A CN108075429 A CN 108075429A CN 201611004087 A CN201611004087 A CN 201611004087A CN 108075429 A CN108075429 A CN 108075429A
Authority
CN
China
Prior art keywords
hole
support bar
supporting block
block
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611004087.5A
Other languages
Chinese (zh)
Inventor
赵星辰
牛学娇
于友军
朱秀娟
田琦
马国强
蔡丽佳
刘政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611004087.5A priority Critical patent/CN108075429A/en
Publication of CN108075429A publication Critical patent/CN108075429A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
    • H02G9/025Coverings therefor, e.g. tile

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The present invention provides a kind of cable channel cover plate support bases, including pedestal, fixed block is connected on pedestal, sliding slot is equipped in fixed block, the first supporting block is slidably fitted in sliding slot, fixed block side wall is equipped with first through hole, first supporting block side wall is equipped with and corresponding second through hole of first through hole, first through hole, the first fixing bolt simultaneously with the two inserting connection is equipped in second through hole, first fixing bolt is equipped with the first locking nut being threadedly coupled therewith, in summary, present invention mounting stability in cable duct is strong, it is easy to operate, it is easy to disassemble, it is repeatable to utilize, highly adjustment is accurate.

Description

Cable channel cover plate support base
Technical field
The present invention relates to machinery field more particularly to a kind of cable channel cover plate support bases.
Background technology
During two layer arrangement electrical equipment of indoor substation, design ground cable channel is generally required, it is common practice to structure The constant thickness for increasing surface layer of layer.But with the construction of Intelligent transformer station, the number of cables in ditch increases, universal cordage ditch Size is difficult to meet the requirement of intelligent substation, increases cable duct width, but after cable duct width increase, common 5mm is thick Checkered steel plate it is yielding, can not normal use, ordinary reinforced concrete cover sheet thickness is big, can reduce effective depth of cable duct Degree;Composite cable trench cover cost is high, is unsatisfactory for requiring, and staff considers to set a kind of support cover board side in cable duct Formula is so as to being continuing with the checkered steel plate of 5mm thickness.
Existing mode to preset the cement block of certain altitude in cable duct as support, consolidate by such mode height It is fixed, height adjusting cannot be carried out, on the other hand concrete prefabricated support, which is built and removed, need to expend substantial amounts of financial resources, after dismounting Concrete prefabricated support can not be used again, separately have other moveable support equipments that can exist under the non-uniform pressure of cover board Occurs position deviation in cable duct, it is impossible to meet support requirement.
The content of the invention
The present invention provides a kind of cable channel cover plate support base against the above deficiency, and the present apparatus installs stabilization in cable duct Property it is strong, easy to operate, easy to disassemble, repeatable utilize, height adjust it is accurate.
To solve the above problems, a kind of cable channel cover plate support base, including pedestal, is connected with fixed block on pedestal, it is fixed Sliding slot is equipped in block, the first supporting block is slidably fitted in sliding slot, fixed block side wall is equipped with first through hole, the first supporting block side wall Equipped with corresponding second through hole of first through hole, the simultaneously with the two inserting connection is equipped in first through hole, the second through hole One fixing bolt, the first fixing bolt are equipped with the first locking nut being threadedly coupled therewith.
Pedestal is directly contacted as the support of whole device with ground in groove, and the first supporting block is to slide with fixed block Cooperation, the first supporting block can slide up and down in sliding slot, by adjusting position of the fixed block in sliding slot, so as to fulfill entire dress The adjustment of height is put, fixed block is equipped with first through hole, and the first supporting block is equipped with the second through hole, first through hole and the second through hole After alignment, be inserted by the first fixing bolt in first through hole and the second through hole, so as to fulfill the first supporting block and fixed block it Between fixation, the first fixing bolt is locked on fixed block by the first locking nut, places the first fixing bolt from first through hole and the Depart from two through holes.
As an improvement, further including first support bar, second support bar, one end of first support bar is hingedly mounted on pedestal On, the other end of first support bar is hingedly equipped with slip pipe, and one end of second support bar is hingedly mounted on pedestal, the second support The other end of bar is hingedly equipped with screw rod, and screw rod is socketed in slip pipe and is to be slidably matched with slip pipe, is equipped with therewith on screw rod The second locking nut being threadedly coupled.
One end of first support bar is hingedly mounted on pedestal one side, and the other end is clamped on the one side inner wall of groove, equally , one end of second support bar is hingedly mounted on pedestal the same side, and the other end is clamped on the opposite side inner wall of groove, first It is connected between strut and second support bar by the slide bar being slidably installed with screw rod, the second locking being threaded on screw rod Nut slides for the contraction between Limit screw and slip pipe, in use, first support bar is adjacent to respectively with second support bar On the side wall of groove, sliding sleeve at this moment relatively slides to a position therewith with screw rod, then is locked by the second locking nut, real Existing first support bar and second support bar and pedestal therebetween are fixed compared with the position between two inner wall of groove, so as to Realize the fixation of whole device in the trench, the opposite side of pedestal is again provided with the first support bar equally connected and the second support Bar further increases the stability of pedestal installation site in the trench.
As an improvement, second through hole is side walls that are multiple and being vertically arranged in the first supporting block.
Second through hole is two row arranged side by side, i.e., per a line all there are two the second through hole on second support bar side, each Second through hole corresponds to a first through hole, and any first through hole communicated is inserted by the first fixing bolt with the second through hole and connected, It ensure that the stability that the second support plate is connected with fixed block, multiple second through holes ensure that the second supporting block on fixed block Multiple installation sites by selecting the second different through holes, and then realize the adjustment of the height of whole device.
As an improvement, being connected with the second supporting block on the first supporting block upper surface, the second supporting block, which is equipped with, to be oriented to Hole is slidably fitted with guide rod in pilot hole, is oriented to rod end surface and is connected with the 3rd supporting block.
3rd supporting block is moved up and down by guide rod and being slidably matched for pilot hole so as to fulfill along vertical direction, When in use, the upper surface of the 3rd supporting block is directly contacted with steel plate, for carrying the pressure from steel plate, by adjusting the 3rd Supporting block is compared with the distance of the second supporting block so as to further adjust the height of whole device.
As an improvement, second supporting block is equipped with threaded hole, the adjusting spiral shell being threadedly coupled therewith is equipped in threaded hole Bolt is connected with link block on the 3rd supporting block end face, is connected with to be rotatably installed in link block on the end face of adjusting bolt and turns Block.
When adjusting bolt is rotated compared with the second supporting block, adjusting bolt can be driven integrally to move up and down, so as to drive Three supporting blocks move up and down, and the rotation that rotation connection of the switch block in link block is used to implement adjusting bolt and the 3rd supporting block connects It connects, it can the further more careful setting to present apparatus height to the adjusting of the 3rd supporting block by operating bolt.
As an improvement, the 3rd locking nut is threaded in the adjusting bolt.
After the height that the 3rd supporting block is adjusted by adjusting bolt, the 3rd locking nut is fixed on the 3rd supporting block On lower face, so as to fulfill the 3rd supporting block compared with the fixation of the second supporting block, prevent that in use, adjusting bolt goes out It now loosens, influences the stability of the fixed position of the 3rd supporting block.
As an improvement, further including the second fixing bolt, first support bar, second support bar are cut with scissors respectively by fixing bolt and pedestal Connect installation.
Second fixing bolt inserts first support bar with being to rotate to match somebody with somebody on pedestal and respectively with first support bar, pedestal simultaneously It closes, second support bar being hinged again by identical the second fixing bolt inserting connection and being mutually rotatably assorted next real with pedestal Now, the dismounting of such first support bar easy to connect, second support bar and pedestal, convenient for carrying.
As an improvement, the retaining ring being rotatably assorted therewith is installed on second fixing bolt, first support bar, the second support The fixture block with retaining ring snap fit is separately installed on bar.
The retaining ring for being rotatably installed in the second fixing bolt facilitates with portable drawing so that the second fixing bolt takes off from its installation site From, so as to more convenient dismounting in first support bar and pedestal, second support bar and pedestal, first support bar, second Strut so as to ensure the fixed levelness of first support bar, second support bar, prevents in use, retaining ring is installed on fixture block One supporting rod, second support bar touch ground and cause to wear because of dead weight.
It utilizes in conclusion present invention mounting stability in cable duct is strong, easy to operate, easy to disassemble, repeatable, is high Degree adjustment is accurate.
Description of the drawings
The present invention is described in further details below in conjunction with the accompanying drawings.
Fig. 1 is overall structure diagram of the present invention;
Fig. 2 is top view of the present invention;
Fig. 3 is connected partial schematic diagram for first support bar of the present invention with pedestal;
Fig. 4 is the second support plate installing component broken away view of the invention;
Fig. 5 is that the 3rd support plate of the invention is connected sectional view with adjusting bolt.
Specific embodiment
A kind of cable channel cover plate support base as depicted, including pedestal 1, is connected with fixed block 2, fixed block 2 on pedestal 1 It is interior to be equipped with sliding slot 3, the first supporting block 4 is slidably fitted in sliding slot 3,2 side wall of fixed block is equipped with first through hole 5, the first supporting block 4 Side wall is equipped with to be inserted with 5 corresponding second through hole 6 of first through hole, first through hole 5,6 interior be equipped with of the second through hole with the two simultaneously First fixing bolt 7 of connection, the first fixing bolt 7 are equipped with the first locking nut 8 being threadedly coupled therewith, and pedestal is as entire dress The support put and directly contacted with ground in groove, the first supporting block is to be slidably matched with fixed block, and the first supporting block can be in cunning It is slided up and down in slot, by adjusting position of the fixed block in sliding slot, so as to fulfill the adjustment of whole device height, on fixed block Equipped with first through hole, the first supporting block is equipped with the second through hole, after first through hole is alignd with the second through hole, passes through the first fixing bolt It is inserted into first through hole and the second through hole, so as to fulfill the fixation between the first supporting block and fixed block, the first locking nut First fixing bolt is locked on fixed block, places the first fixing bolt from first through hole with departing from the second through hole.
In the present invention, first support bar 9, second support bar 10 are further included, one end of first support bar 9 is hingedly mounted on bottom On seat 1, the other end of first support bar 9 is hingedly equipped with slip pipe 11, and one end of second support bar 10 is hingedly mounted on pedestal 1 On, the other end of second support bar 10 is hingedly equipped with screw rod 12, and screw rod 12 is socketed in slip pipe 11 and is to slide with slip pipe 11 Coordinate, the second locking nut 13 being threadedly coupled therewith is installed on screw rod 12, one end of first support bar is hingedly mounted on bottom Seat one side, the other end is clamped on the one side inner wall of groove, likewise, to be hingedly mounted on pedestal same for one end of second support bar Side, the other end are clamped on the opposite side inner wall of groove, the cunning between first support bar and second support bar by being slidably installed Bar is connected with screw rod, is threaded in the second locking nut on screw rod and is slided for the contraction between Limit screw and slip pipe It is dynamic, in use, first support bar is adjacent on the sidewalls of the trench respectively with second support bar, sliding sleeve at this moment and screw rod phase therewith Locked to sliding into a position, then by the second locking nut, realize first support bar and second support bar and the two it Between pedestal fixed compared with the position between two inner wall of groove, so as to fulfill the fixation of whole device in the trench, pedestal Opposite side is again provided with the first support bar and second support bar equally connected, further increases pedestal installation position in the trench The stability put.
In the present invention, second through hole 6 be side walls that are multiple and being vertically arranged in the first supporting block 4, second Through hole is two row arranged side by side, i.e., per a line all there are two the second through hole on second support bar side, each second through hole corresponds to One first through hole, any first through hole communicated are inserted by the first fixing bolt with the second through hole and connected, and ensure that second The stability that fagging is connected with fixed block, multiple second through holes ensure that multiple installation positions of second supporting block on fixed block It puts, by selecting the second different through holes, and then realizes the adjustment of the height of whole device.
In the present invention, the second supporting block 14 is connected on 4 upper surface of the first supporting block, the second supporting block 14 is equipped with Pilot hole 15, guide rod 16 is slidably fitted in pilot hole 15, and 16 end face of guide rod is connected with the 3rd supporting block 17, the 3rd support Block is moved up and down by guide rod and being slidably matched for pilot hole so as to fulfill along vertical direction, when in use, the 3rd The upper surface of bracer is directly contacted with steel plate, for carrying the pressure from steel plate, by adjusting the 3rd supporting block compared with the The distance of two supporting blocks is so as to further adjust the height of whole device.
In the present invention, second supporting block 14 is equipped with threaded hole 18, is equipped with what is be threadedly coupled therewith in threaded hole 18 Adjusting bolt 19 is connected with link block 20 on 17 end face of the 3rd supporting block, rotational installation is connected on the end face of adjusting bolt 19 Switch block 21 in link block 20 when adjusting bolt is rotated compared with the second supporting block, can drive adjusting bolt to move down on the whole Dynamic, so as to which the 3rd supporting block be driven to move up and down, rotation connection of the switch block in link block is used to implement adjusting bolt and the 3rd The rotation connection of supporting block, can be further more careful to present apparatus height to the adjusting of the 3rd supporting block by operating bolt The setting of degree.
In the present invention, the 3rd locking nut 22 is threaded in the adjusting bolt 19, is adjusted by adjusting bolt After the height of 3rd supporting block, the 3rd locking nut is fixed on the lower face of the 3rd supporting block, so as to fulfill the 3rd support Block prevents that in use, adjusting bolt loosens, influences consolidating for the 3rd supporting block compared with the fixation of the second supporting block Position the stability put.
In the present invention, further include the second fixing bolt 23, first support bar 9, second support bar 10 respectively by fixing bolt with Pedestal 1 is hingedly installed, and the second fixing bolt inserts first support bar with being to turn on pedestal and respectively with first support bar, pedestal simultaneously Dynamic cooperation, second support bar connect and are mutually rotatably assorted with the hinged of pedestal again by identical the second fixing bolt inserting It realizes, the dismounting of such first support bar easy to connect, second support bar and pedestal, convenient for carrying.
In the present invention, the retaining ring 24 being rotatably assorted therewith, first support bar 9, are installed on second fixing bolt 23 The fixture block 25 with 24 snap fit of retaining ring is separately installed on two supporting rods 10, the retaining ring for being rotatably installed in the second fixing bolt is convenient With portable drawing so that the second fixing bolt departs from from its installation site, so as to more convenient in first support bar and pedestal, second The dismounting of supporting rod and pedestal, in first support bar, second support bar in use, retaining ring is installed on fixture block, so as to ensure The fixed levelness of one supporting rod, second support bar prevents first support bar, second support bar from touching ground because of dead weight And it causes to wear.

Claims (8)

1. a kind of cable channel cover plate support base, it is characterized in that:Including pedestal(1), pedestal(1)On be connected with fixed block(2), it is fixed Block(2)It is interior to be equipped with sliding slot(3), sliding slot(3)Inside it is slidably fitted with the first supporting block(4), fixed block(2)Side wall is equipped with first through hole (5), the first supporting block(4)Side wall is equipped with and first through hole(5)Corresponding second through hole(6), first through hole(5), it is second logical Hole(6)It is interior to be equipped with the first fixing bolt with the two inserting connection simultaneously(7), the first fixing bolt(7)It is equipped with and is threadedly coupled therewith The first locking nut(8).
2. a kind of cable channel cover plate support base as described in claim 1, it is characterized in that:Further include first support bar(9), second Supporting rod(10), first support bar(9)One end be hingedly mounted on pedestal(1)On, first support bar(9)The other end hingedly pacify Equipped with slip pipe(11), second support bar(10)One end be hingedly mounted on pedestal(1)On, second support bar(10)The other end hinge It connects and screw rod is installed(12), screw rod(12)It is socketed in slip pipe(11)Interior and and slip pipe(11)It is to be slidably matched, screw rod(12)Upper peace Equipped with the second locking nut being threadedly coupled therewith(13).
3. a kind of cable channel cover plate support base as claimed in claim 2, it is characterized in that:Second through hole(6)To be multiple and Vertically it is arranged in the first supporting block(4)Side wall.
4. a kind of cable channel cover plate support base as claimed in claim 3, it is characterized in that:First supporting block(4)Upper surface On be connected with the second supporting block(14), the second supporting block(14)It is equipped with pilot hole(15), pilot hole(15)Inside it is slidably fitted with Guide rod(16), guide rod(16)End face is connected with the 3rd supporting block(17).
5. a kind of cable channel cover plate support base as claimed in claim 4, it is characterized in that:Second supporting block(14)It is equipped with Threaded hole(18), threaded hole(18)It is interior equipped with the adjusting bolt being threadedly coupled therewith(19), the 3rd supporting block(17)It is solid on end face It is connected to link block(20), adjusting bolt(19)End face on be connected with and be rotatably installed in link block(20)Interior switch block(21).
6. a kind of cable channel cover plate support base as claimed in claim 5, it is characterized in that:The adjusting bolt(19)Upper screw thread connects It is connected to the 3rd locking nut(22).
7. a kind of cable channel cover plate support base as claimed in claim 6, it is characterized in that:Further include the second fixing bolt(23), the One supporting rod(9), second support bar(10)Pass through fixing bolt and pedestal respectively(1)Hinged installation.
8. a kind of cable channel cover plate support base as claimed in claim 7, it is characterized in that:Second fixing bolt(23)Upper installation There is the retaining ring being rotatably assorted therewith(24), first support bar(9), second support bar(10)On be separately installed with and retaining ring(24)Card Assemble the fixture block closed(25).
CN201611004087.5A 2016-11-15 2016-11-15 Cable channel cover plate support base Pending CN108075429A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611004087.5A CN108075429A (en) 2016-11-15 2016-11-15 Cable channel cover plate support base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611004087.5A CN108075429A (en) 2016-11-15 2016-11-15 Cable channel cover plate support base

Publications (1)

Publication Number Publication Date
CN108075429A true CN108075429A (en) 2018-05-25

Family

ID=62162827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611004087.5A Pending CN108075429A (en) 2016-11-15 2016-11-15 Cable channel cover plate support base

Country Status (1)

Country Link
CN (1) CN108075429A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110391632A (en) * 2019-06-30 2019-10-29 国网山东省电力公司烟台供电公司 A kind of telescoping cable operculum colpi plate bracing frame
CN116148052A (en) * 2023-03-22 2023-05-23 江苏华科建设工程质量检测有限公司 Building steel structure strength detection equipment and detection method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2257663Y (en) * 1996-05-07 1997-07-16 邢文海 Height adjustable health writing desk
CN202297015U (en) * 2011-08-19 2012-07-04 许进 Multifunctional portable mini forklift
CN203491651U (en) * 2013-10-23 2014-03-19 国网山东省电力公司潍坊供电公司 Telescoping cover plate support frame
CN204384597U (en) * 2015-01-06 2015-06-10 国家电网公司 Telescopic pay off rack
CN204492633U (en) * 2015-03-25 2015-07-22 广东梅雁吉祥水电股份有限公司 A kind of high stability double ladder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2257663Y (en) * 1996-05-07 1997-07-16 邢文海 Height adjustable health writing desk
CN202297015U (en) * 2011-08-19 2012-07-04 许进 Multifunctional portable mini forklift
CN203491651U (en) * 2013-10-23 2014-03-19 国网山东省电力公司潍坊供电公司 Telescoping cover plate support frame
CN204384597U (en) * 2015-01-06 2015-06-10 国家电网公司 Telescopic pay off rack
CN204492633U (en) * 2015-03-25 2015-07-22 广东梅雁吉祥水电股份有限公司 A kind of high stability double ladder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110391632A (en) * 2019-06-30 2019-10-29 国网山东省电力公司烟台供电公司 A kind of telescoping cable operculum colpi plate bracing frame
CN116148052A (en) * 2023-03-22 2023-05-23 江苏华科建设工程质量检测有限公司 Building steel structure strength detection equipment and detection method

Similar Documents

Publication Publication Date Title
CN104483672B (en) INSAR corner reflector
US8826555B2 (en) Self-supporting story pole
CN108151784B (en) Supporting device of engineering measurement equipment
CN109115591A (en) A kind of heavy construction curtain wall physical property detection system
CN102220789B (en) Suspension type floating plate vibration isolation system
CN108075429A (en) Cable channel cover plate support base
JP2021177632A (en) Antenna device and wireless base station
CN208417745U (en) A kind of pipe gallery line holder
CN112854695B (en) Intelligent brick paving equipment
CN202148613U (en) Suspended floating plate vibration isolation system
CN202402891U (en) Supporting and levelling device and test-bed employing supporting and levelling device
CN109779214A (en) A kind of automatic adjustment ceramic tile system
CN102829287A (en) Supporting and levelling device and test stand using same
CN104499618A (en) Out-hung wall panel bottom regulating assembly
CN206656034U (en) A kind of pipeline fixing bracket
CN207988413U (en) Ground leveling component
CN209497235U (en) A kind of cable ditch support that field uses
CN207339163U (en) Cable stringer is used in a kind of electromechanical installation
US20180171647A1 (en) Tool and Methods for Installation of Interior Panels
KR100824799B1 (en) An assembly device for local pannel the utilization of unit pannel
CN110337207A (en) Cabinet base, cabinet base component and cabinet base device
CN207069412U (en) One kind changes switch cabinet current transformer specific purpose tool
CN214364824U (en) Strutting arrangement for building engineering
CN203755170U (en) Assistant installation tool of steel tower combination section of cable-stayed bridge
CN203823954U (en) Air conditioner outdoor equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190403

Address after: 261021 No. 425 Dongfeng West Street, Weicheng District, Weifang City, Shandong Province

Applicant after: State Grid Shandong Electric Power Company Weifang Power Supply Company

Applicant after: State Grid Corporation of China

Address before: 261041 No. 8221 Dongfeng East Street, Weifang City, Shandong Province

Applicant before: Liu Weihua

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180525