CN108075429A - Cable channel cover plate support base - Google Patents
Cable channel cover plate support base Download PDFInfo
- Publication number
- CN108075429A CN108075429A CN201611004087.5A CN201611004087A CN108075429A CN 108075429 A CN108075429 A CN 108075429A CN 201611004087 A CN201611004087 A CN 201611004087A CN 108075429 A CN108075429 A CN 108075429A
- Authority
- CN
- China
- Prior art keywords
- hole
- block
- cover plate
- support
- cable channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/02—Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
- H02G9/025—Coverings therefor, e.g. tile
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
Description
技术领域technical field
本发明涉及机械领域,尤其涉及一种电缆沟盖板支撑座。The invention relates to the field of machinery, in particular to a support seat for a cable trench cover plate.
背景技术Background technique
户内变电站二层布置电气设备时,一般需要设计地面电缆沟,通常的做法是结构层不变增加面层的厚度。但随着智能化变电站的兴建,沟内的电缆数量大增,通用电缆沟的尺寸很难满足智能变电站的要求,增加电缆沟宽度,但是电缆沟宽度增加后,常用的5mm厚的花纹钢板易变形,无法正常使用,普通钢筋混凝土盖板厚度大,会减小电缆沟的有效深度;复合电缆沟盖板造价高,均不满足要求,工作人员考虑在电缆沟内设置一种支撑盖板方式从而继续使用5mm厚的花纹钢板。When arranging electrical equipment on the second floor of an indoor substation, it is generally necessary to design ground cable trenches. The usual practice is to increase the thickness of the surface layer without changing the structure layer. However, with the construction of intelligent substations, the number of cables in the trench has increased greatly, and the size of general cable trenches is difficult to meet the requirements of intelligent substations. The width of cable trenches has been increased. Deformation makes it impossible to use normally. The thickness of ordinary reinforced concrete cover plate is large, which will reduce the effective depth of cable trench; the cost of composite cable trench cover plate is high, and none of them meet the requirements. The staff considers setting a supporting cover plate in the cable trench Thus continue to use 5mm thick checkered steel plate.
现有的方式为在电缆沟内预设一定高度的水泥块作为支撑,这样的方式高度固定,没法进行高度调节,另一方面水泥预制的支撑建造以及拆除需耗费大量的财力,拆除后的水泥预制支撑不能再次使用,另有其他的可移动的支撑设备在盖板不均匀的压力下会在电缆沟内出现位置偏差,不能满足支撑要求。The existing method is to preset a certain height of cement blocks in the cable trench as a support. This method has a fixed height and cannot be adjusted in height. The cement prefabricated support cannot be used again, and other movable support equipment will have position deviation in the cable trench under the uneven pressure of the cover plate, which cannot meet the support requirements.
发明内容Contents of the invention
本发明针对上述不足提供了一种电缆沟盖板支撑座,本装置在电缆沟内安装稳定性强、操作简单、便于拆卸、可重复利用、高度调整精确。The present invention provides a support seat for a cable trench cover plate aiming at the above disadvantages. The device has strong installation stability in the cable trench, simple operation, easy disassembly, reusability, and accurate height adjustment.
为解决上述问题,一种电缆沟盖板支撑座,包括底座,底座上固接有固定块,固定块内设有滑槽,滑槽内滑动安装有第一支撑块,固定块侧壁设有第一通孔,第一支撑块侧壁设有与第一通孔相对应的第二通孔,第一通孔、第二通孔内设有同时与二者插装连接的第一固定栓,第一固定栓上设有与之螺纹连接的第一锁紧螺母。In order to solve the above problems, a cable trench cover support seat includes a base, a fixed block is fixedly connected to the base, a chute is provided in the fixed block, a first support block is slidably installed in the chute, and the side wall of the fixed block is provided with The first through hole, the side wall of the first support block is provided with a second through hole corresponding to the first through hole, the first through hole and the second through hole are provided with a first fixing bolt that is plugged and connected to both at the same time , the first fixing bolt is provided with a first locking nut screwed therewith.
底座作为整个装置的支撑而直接与沟槽内地面接触,第一支撑块与固定块是滑动配合,第一支撑块可在滑槽内上下滑动,通过调整固定块在滑槽内的位置,从而实现整个装置高度的调整,固定块上设有第一通孔,第一支撑块上设有第二通孔,第一通孔与第二通孔对齐后,通过第一固定栓插装在第一通孔与第二通孔内,从而实现第一支撑块与固定块之间的固定,第一锁紧螺母将第一固定栓锁紧在固定块上,放置第一固定栓从第一通孔与第二通孔内脱离。The base is directly in contact with the ground in the groove as the support of the whole device. The first support block and the fixed block are in sliding fit. The first support block can slide up and down in the chute. By adjusting the position of the fixed block in the chute, the To adjust the height of the entire device, the fixed block is provided with a first through hole, and the first support block is provided with a second through hole. After the first through hole is aligned with the second through hole, the first through hole is inserted into the second through hole. One through hole and the second through hole, so as to realize the fixation between the first support block and the fixed block, the first lock nut locks the first fixed bolt on the fixed block, and places the first fixed bolt from the first through The hole is separated from the second through hole.
作为改进,还包括第一支撑杆、第二支撑杆,第一支撑杆的一端铰接安装在底座上,第一支撑杆的另一端铰接安装有滑管,第二支撑杆的一端铰接安装在底座上,第二支撑杆的另一端铰接安装有螺杆,螺杆套接在滑管内且与滑管是滑动配合,螺杆上安装有与之螺纹连接的第二锁紧螺母。As an improvement, it also includes a first support rod and a second support rod, one end of the first support rod is hingedly installed on the base, the other end of the first support rod is hingedly installed with a slide tube, and one end of the second support rod is hingedly installed on the base On the other hand, the other end of the second support rod is hingedly equipped with a screw rod, which is sleeved in the sliding tube and is in sliding fit with the sliding tube, and a second locking nut threadedly connected with the screw rod is installed on the screw rod.
第一支撑杆的一端铰接安装在底座一侧,另一端卡紧在沟槽的一侧内壁上,同样的,第二支撑杆的一端铰接安装在底座同一侧,另一端卡紧在沟槽的另一侧内壁上,第一支撑杆与第二支撑杆之间通过滑动安装的滑杆与螺杆相连接,螺纹连接在螺杆上的第二锁紧螺母用于限位螺杆与滑管之间的收缩滑动,使用时,第一支撑杆与第二支撑杆分别贴紧在沟槽的侧壁上,这时的滑套与螺杆随之相对滑动到一个位置,再通过第二锁紧螺母锁紧,实现第一支撑杆与第二支撑杆以及二者之间的底座相对于沟槽两内壁之间的位置固定,从而实现整个装置在沟槽内的固定,底座的另一侧同样设有同样连接的第一支撑杆与第二支撑杆,进一步增加了底座在沟槽内安装位置的稳定性。One end of the first support rod is hingedly installed on one side of the base, and the other end is clamped on the inner wall of one side of the groove. Similarly, one end of the second support rod is hingedly installed on the same side of the base, and the other end is clamped on the side of the groove. On the inner wall on the other side, the first support rod and the second support rod are connected to the screw rod through a slide rod installed in a sliding manner, and the second lock nut threaded on the screw rod is used to limit the distance between the screw rod and the slide tube. Shrinking and sliding, when in use, the first support rod and the second support rod are respectively attached to the side wall of the groove, at this time, the sliding sleeve and the screw rod slide to a position relative to each other, and then locked by the second lock nut , to realize the position fixation of the first support rod and the second support rod and the base between them relative to the two inner walls of the groove, so as to realize the fixing of the whole device in the groove, and the other side of the base is also provided with the same The connected first support rod and the second support rod further increase the stability of the installation position of the base in the groove.
作为改进,所述第二通孔为多个且沿竖直方向排列在第一支撑块的侧壁。As an improvement, there are multiple second through holes arranged vertically on the side wall of the first support block.
第二通孔为并列的两列,即在第二支撑杆侧面上每一行都有两个第二通孔,每个第二通孔对应一个第一通孔,任一相通的第一通孔与第二通孔通过第一固定栓插装连接,保证了第二支撑板与固定块连接的稳定性,多个第二通孔保证了第二支撑块在固定块上的多个安装位置,通过选用不同的第二通孔,进而实现整个装置的高度的调整。The second through holes are two rows side by side, that is, there are two second through holes in each row on the side of the second support rod, and each second through hole corresponds to a first through hole, and any connected first through hole Inserting and connecting with the second through hole through the first fixing bolt ensures the stability of the connection between the second support plate and the fixed block. Multiple second through holes ensure multiple installation positions of the second support block on the fixed block. By selecting different second through holes, the adjustment of the height of the whole device can be realized.
作为改进,所述第一支撑块上端面上固接有第二支撑块,第二支撑块上设有导向孔,导向孔内滑动安装有导向杆,导向杆端面固接有第三支撑块。As an improvement, a second support block is affixed to the upper end surface of the first support block, a guide hole is provided on the second support block, a guide rod is slidably installed in the guide hole, and a third support block is affixed to the end surface of the guide rod.
第三支撑块通过导向杆与导向孔的滑动配合从而实现沿着竖直方向而上下移动,在使用时,第三支撑块的上端面直接与钢板接触,用于承载来自钢板的压力,通过调整第三支撑块相对于第二支撑块的距离从而进一步调整整个装置的高度。The third support block moves up and down along the vertical direction through the sliding fit between the guide rod and the guide hole. When in use, the upper end surface of the third support block directly contacts the steel plate to bear the pressure from the steel plate. The distance between the third support block and the second support block can further adjust the height of the whole device.
作为改进,所述第二支撑块上设有螺纹孔,螺纹孔内设有与之螺纹连接的调节螺栓,第三支撑块端面上固接有连接块,调节螺栓的端面上固接有转动安装在连接块内的转块。As an improvement, the second support block is provided with a threaded hole, the threaded hole is provided with an adjusting bolt threadedly connected thereto, the end surface of the third support block is affixed with a connection block, and the end surface of the adjustment bolt is affixed with a rotating mounting A turn block within a connection block.
调节螺栓相对于第二支撑块转动时,会驱动调节螺栓整体上下移动,从而带动第三支撑块上下移动,转块在连接块内的转动连接用于实现调节螺栓与第三支撑块的转动连接,通过操作螺栓对第三支撑块的调节可以进一步更加细致的对本装置高度的设置。When the adjusting bolt rotates relative to the second supporting block, it will drive the adjusting bolt to move up and down as a whole, thereby driving the third supporting block to move up and down, and the rotating connection of the rotating block in the connecting block is used to realize the rotating connection between the adjusting bolt and the third supporting block , the height of the device can be further and more carefully set by operating the bolt to adjust the third support block.
作为改进,所述调节螺栓上螺纹连接有第三锁紧螺母。As an improvement, a third locking nut is threadedly connected to the adjusting bolt.
通过调节螺栓调整好第三支撑块的高度后,将第三锁紧螺母固定在第三支撑块的下端面上,从而实现第三支撑块相对于第二支撑块的固定,防止在使用过程中,调节螺栓出现松动,影响第三支撑块的固定位置的稳定性。After adjusting the height of the third support block by adjusting the bolt, fix the third lock nut on the lower end surface of the third support block, so as to realize the fixing of the third support block relative to the second support block and prevent the , the adjusting bolt becomes loose, affecting the stability of the fixed position of the third support block.
作为改进,还包括第二固定栓,第一支撑杆、第二支撑杆分别通过固定栓与底座铰接安装。As an improvement, it also includes a second fixing bolt, and the first support rod and the second support rod are respectively hingedly installed on the base through the fixing bolt.
第二固定栓同时插装第一支撑杆与底座上且分别与第一支撑杆、底座是转动配合,第二支撑杆与底座的铰接同样通过相同的第二固定栓插装连接且相互转动配合来实现,这样的连接方便第一支撑杆、第二支撑杆与底座的拆装,便于搬运。The second fixing bolt is plugged into the first support rod and the base at the same time and is rotatively matched with the first support rod and the base respectively, and the hinge connection between the second support rod and the base is also inserted and connected by the same second fixing bolt and mutually rotatably matched To realize, such connection facilitates the disassembly and assembly of the first support rod, the second support rod and the base, and is convenient for transportation.
作为改进,所述第二固定栓上安装有与之转动配合的扣环,第一支撑杆、第二支撑杆上分别安装有与扣环卡装配合的卡块。As an improvement, the second fixing bolt is provided with a clasp which rotates with it, and the first support bar and the second support bar are respectively provided with blocks which snap fit with the clasp.
转动安装在第二固定栓的扣环方便用手提拉从而使第二固定栓从其安装位置脱离,从而更加方便于第一支撑杆与底座、第二支撑杆与底座的拆卸,在第一支撑杆、第二支撑杆使用时,扣环卡装在卡块上,从而保证第一支撑杆、第二支撑杆固定的水平度,防止第一支撑杆、第二支撑杆因为自重而碰触到地面而造成磨损。Rotating the clasp installed on the second fixing bolt is convenient to pull by hand so that the second fixing bolt can be separated from its installation position, thereby making it easier to disassemble the first support rod and the base, the second support rod and the base, and the first support When the rod and the second support rod are in use, the buckle is snapped on the block, thereby ensuring the fixed levelness of the first support rod and the second support rod, and preventing the first support rod and the second support rod from touching due to their own weight. wear on the ground.
综上所述,本发明在电缆沟内安装稳定性强、操作简单、便于拆卸、可重复利用、高度调整精确。In summary, the present invention has strong installation stability in the cable trench, simple operation, easy disassembly, reusability, and accurate height adjustment.
附图说明Description of drawings
下面结合附图对本发明做进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.
图1为本发明整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the present invention;
图2为本发明俯视图;Fig. 2 is a top view of the present invention;
图3为本发明第一支撑杆与底座连接局部示意图;Fig. 3 is a partial schematic diagram of the connection between the first support rod and the base of the present invention;
图4为本发明第二支撑板安装部件拆分图;Fig. 4 is a disassembled view of the second support plate installation part of the present invention;
图5为本发明第三支撑板与调节螺栓连接剖面图。Fig. 5 is a sectional view of the connection between the third support plate and the adjusting bolt of the present invention.
具体实施方式Detailed ways
如图所示的一种电缆沟盖板支撑座,包括底座1,底座1上固接有固定块2,固定块2内设有滑槽3,滑槽3内滑动安装有第一支撑块4,固定块2侧壁设有第一通孔5,第一支撑块4侧壁设有与第一通孔5相对应的第二通孔6,第一通孔5、第二通孔6内设有同时与二者插装连接的第一固定栓7,第一固定栓7上设有与之螺纹连接的第一锁紧螺母8,底座作为整个装置的支撑而直接与沟槽内地面接触,第一支撑块与固定块是滑动配合,第一支撑块可在滑槽内上下滑动,通过调整固定块在滑槽内的位置,从而实现整个装置高度的调整,固定块上设有第一通孔,第一支撑块上设有第二通孔,第一通孔与第二通孔对齐后,通过第一固定栓插装在第一通孔与第二通孔内,从而实现第一支撑块与固定块之间的固定,第一锁紧螺母将第一固定栓锁紧在固定块上,放置第一固定栓从第一通孔与第二通孔内脱离。A cable trench cover support seat as shown in the figure includes a base 1, a fixed block 2 is fixedly connected to the base 1, a chute 3 is provided in the fixed block 2, and a first support block 4 is slidably installed in the chute 3 , the side wall of the fixed block 2 is provided with a first through hole 5, the side wall of the first support block 4 is provided with a second through hole 6 corresponding to the first through hole 5, the first through hole 5, the second through hole 6 There is a first fixing bolt 7 that is plugged and connected with the two at the same time. The first fixing bolt 7 is provided with a first lock nut 8 that is threaded with it. The base is used as the support of the whole device and directly contacts the ground in the groove. , the first support block and the fixed block are sliding fit, the first support block can slide up and down in the chute, by adjusting the position of the fixed block in the chute, so as to realize the adjustment of the height of the whole device, the fixed block is provided with a first Through holes, the first support block is provided with a second through hole, after the first through hole is aligned with the second through hole, the first fixing bolt is inserted into the first through hole and the second through hole, thereby realizing the first For the fixing between the support block and the fixed block, the first lock nut locks the first fixed bolt on the fixed block, so that the first fixed bolt is disengaged from the first through hole and the second through hole.
本发明中,还包括第一支撑杆9、第二支撑杆10,第一支撑杆9的一端铰接安装在底座1上,第一支撑杆9的另一端铰接安装有滑管11,第二支撑杆10的一端铰接安装在底座1上,第二支撑杆10的另一端铰接安装有螺杆12,螺杆12套接在滑管11内且与滑管11是滑动配合,螺杆12上安装有与之螺纹连接的第二锁紧螺母13,第一支撑杆的一端铰接安装在底座一侧,另一端卡紧在沟槽的一侧内壁上,同样的,第二支撑杆的一端铰接安装在底座同一侧,另一端卡紧在沟槽的另一侧内壁上,第一支撑杆与第二支撑杆之间通过滑动安装的滑杆与螺杆相连接,螺纹连接在螺杆上的第二锁紧螺母用于限位螺杆与滑管之间的收缩滑动,使用时,第一支撑杆与第二支撑杆分别贴紧在沟槽的侧壁上,这时的滑套与螺杆随之相对滑动到一个位置,再通过第二锁紧螺母锁紧,实现第一支撑杆与第二支撑杆以及二者之间的底座相对于沟槽两内壁之间的位置固定,从而实现整个装置在沟槽内的固定,底座的另一侧同样设有同样连接的第一支撑杆与第二支撑杆,进一步增加了底座在沟槽内安装位置的稳定性。In the present invention, it also includes a first support rod 9 and a second support rod 10, one end of the first support rod 9 is hingedly mounted on the base 1, the other end of the first support rod 9 is hingedly equipped with a slide pipe 11, and the second support rod 9 is hingedly mounted on the base 1. One end of the rod 10 is hingedly mounted on the base 1, and the other end of the second support rod 10 is hingedly mounted with a screw rod 12. The second locking nut 13 of threaded connection, one end of the first support rod is hingedly installed on one side of the base, and the other end is clamped on the inner wall of one side of the groove. Similarly, one end of the second support rod is hingedly installed on the same side of the base. side, the other end is clamped on the inner wall of the other side of the groove, the first support rod and the second support rod are connected to the screw rod through a sliding rod installed slidingly, and the second lock nut threaded on the screw rod is used Due to the contraction and sliding between the limiting screw and the sliding tube, when in use, the first support rod and the second support rod are respectively attached to the side walls of the groove, and the sliding sleeve and the screw rod then slide to a position relative to each other. , and then locked by the second lock nut, the position of the first support rod and the second support rod and the base between them are fixed relative to the two inner walls of the groove, so as to realize the fixing of the whole device in the groove The other side of the base is also provided with the same connected first support rod and second support rod, which further increases the stability of the installation position of the base in the groove.
本发明中,所述第二通孔6为多个且沿竖直方向排列在第一支撑块4的侧壁,第二通孔为并列的两列,即在第二支撑杆侧面上每一行都有两个第二通孔,每个第二通孔对应一个第一通孔,任一相通的第一通孔与第二通孔通过第一固定栓插装连接,保证了第二支撑板与固定块连接的稳定性,多个第二通孔保证了第二支撑块在固定块上的多个安装位置,通过选用不同的第二通孔,进而实现整个装置的高度的调整。In the present invention, the second through holes 6 are multiple and arranged on the side wall of the first support block 4 along the vertical direction, and the second through holes are in two parallel rows, that is, each row on the side of the second support rod There are two second through holes, each second through hole corresponds to a first through hole, and any connected first through hole is connected to the second through hole through the first fixing bolt to ensure that the second support plate The stability of the connection with the fixed block and the plurality of second through holes ensure multiple installation positions of the second support block on the fixed block. By selecting different second through holes, the height adjustment of the entire device can be realized.
本发明中,所述第一支撑块4上端面上固接有第二支撑块14,第二支撑块14上设有导向孔15,导向孔15内滑动安装有导向杆16,导向杆16端面固接有第三支撑块17,第三支撑块通过导向杆与导向孔的滑动配合从而实现沿着竖直方向而上下移动,在使用时,第三支撑块的上端面直接与钢板接触,用于承载来自钢板的压力,通过调整第三支撑块相对于第二支撑块的距离从而进一步调整整个装置的高度。In the present invention, a second support block 14 is fixedly connected to the upper end surface of the first support block 4, and a guide hole 15 is provided on the second support block 14, and a guide rod 16 is slidably installed in the guide hole 15, and the end surface of the guide rod 16 is A third support block 17 is fixedly connected, and the third support block moves up and down along the vertical direction through the sliding fit of the guide rod and the guide hole. When in use, the upper end surface of the third support block is directly in contact with the steel plate. In order to bear the pressure from the steel plate, the height of the whole device can be further adjusted by adjusting the distance between the third support block and the second support block.
本发明中,所述第二支撑块14上设有螺纹孔18,螺纹孔18内设有与之螺纹连接的调节螺栓19,第三支撑块17端面上固接有连接块20,调节螺栓19的端面上固接有转动安装在连接块20内的转块21,调节螺栓相对于第二支撑块转动时,会驱动调节螺栓整体上下移动,从而带动第三支撑块上下移动,转块在连接块内的转动连接用于实现调节螺栓与第三支撑块的转动连接,通过操作螺栓对第三支撑块的调节可以进一步更加细致的对本装置高度的设置。In the present invention, the second supporting block 14 is provided with a threaded hole 18, and the threaded hole 18 is provided with an adjusting bolt 19 threaded therewith, and the end surface of the third supporting block 17 is fixedly connected with a connecting block 20, and the adjusting bolt 19 The end face of the connecting block 20 is fixedly connected with a turning block 21 which is rotatably installed in the connecting block 20. When the adjusting bolt rotates relative to the second supporting block, it will drive the adjusting bolt to move up and down as a whole, thereby driving the third supporting block to move up and down. The rotation connection in the block is used to realize the rotation connection between the adjustment bolt and the third support block, and the adjustment of the third support block by the operation bolt can further set the height of the device more carefully.
本发明中,所述调节螺栓19上螺纹连接有第三锁紧螺母22,通过调节螺栓调整好第三支撑块的高度后,将第三锁紧螺母固定在第三支撑块的下端面上,从而实现第三支撑块相对于第二支撑块的固定,防止在使用过程中,调节螺栓出现松动,影响第三支撑块的固定位置的稳定性。In the present invention, the third locking nut 22 is threadedly connected to the adjusting bolt 19. After adjusting the height of the third supporting block through the adjusting bolt, the third locking nut is fixed on the lower end surface of the third supporting block. Therefore, the fixing of the third support block relative to the second support block is realized, and the adjustment bolts are prevented from loosening during use, which affects the stability of the fixed position of the third support block.
本发明中,还包括第二固定栓23,第一支撑杆9、第二支撑杆10分别通过固定栓与底座1铰接安装,第二固定栓同时插装第一支撑杆与底座上且分别与第一支撑杆、底座是转动配合,第二支撑杆与底座的铰接同样通过相同的第二固定栓插装连接且相互转动配合来实现,这样的连接方便第一支撑杆、第二支撑杆与底座的拆装,便于搬运。In the present invention, it also includes a second fixing bolt 23, the first supporting rod 9 and the second supporting rod 10 are respectively hingedly installed with the base 1 through the fixing bolt, and the second fixing bolt is inserted into the first supporting rod and the base at the same time and is connected with the base respectively. The first support rod and the base are rotationally fitted, and the second support rod and the base are hinged through the same second fixed bolt plug-in connection and mutual rotational cooperation to achieve such a connection to facilitate the first support rod, the second support rod and The disassembly and assembly of the base is convenient for transportation.
本发明中,所述第二固定栓23上安装有与之转动配合的扣环24,第一支撑杆9、第二支撑杆10上分别安装有与扣环24卡装配合的卡块25,转动安装在第二固定栓的扣环方便用手提拉从而使第二固定栓从其安装位置脱离,从而更加方便于第一支撑杆与底座、第二支撑杆与底座的拆卸,在第一支撑杆、第二支撑杆使用时,扣环卡装在卡块上,从而保证第一支撑杆、第二支撑杆固定的水平度,防止第一支撑杆、第二支撑杆因为自重而碰触到地面而造成磨损。In the present invention, the second fixing bolt 23 is provided with a clasp 24 which rotates and fits therewith, and the first support bar 9 and the second support bar 10 are respectively provided with clamping blocks 25 which snap fit with the clasp 24 . Rotating the clasp installed on the second fixing bolt is convenient to pull by hand so that the second fixing bolt can be separated from its installation position, thereby making it easier to disassemble the first support rod and the base, the second support rod and the base, and the first support When the rod and the second support rod are in use, the buckle is snapped on the block, thereby ensuring the fixed levelness of the first support rod and the second support rod, and preventing the first support rod and the second support rod from touching due to their own weight. wear on the ground.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611004087.5A CN108075429A (en) | 2016-11-15 | 2016-11-15 | Cable channel cover plate support base |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611004087.5A CN108075429A (en) | 2016-11-15 | 2016-11-15 | Cable channel cover plate support base |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108075429A true CN108075429A (en) | 2018-05-25 |
Family
ID=62162827
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611004087.5A Pending CN108075429A (en) | 2016-11-15 | 2016-11-15 | Cable channel cover plate support base |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108075429A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110391632A (en) * | 2019-06-30 | 2019-10-29 | 国网山东省电力公司烟台供电公司 | A kind of telescoping cable operculum colpi plate bracing frame |
| CN116148052A (en) * | 2023-03-22 | 2023-05-23 | 江苏华科建设工程质量检测有限公司 | A kind of testing equipment and testing method for the strength of building steel structure |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2257663Y (en) * | 1996-05-07 | 1997-07-16 | 邢文海 | Height adjustable health writing desk |
| CN202297015U (en) * | 2011-08-19 | 2012-07-04 | 许进 | Multifunctional portable mini forklift |
| CN203491651U (en) * | 2013-10-23 | 2014-03-19 | 国网山东省电力公司潍坊供电公司 | Telescoping cover plate support frame |
| CN204384597U (en) * | 2015-01-06 | 2015-06-10 | 国家电网公司 | Telescopic pay off rack |
| CN204492633U (en) * | 2015-03-25 | 2015-07-22 | 广东梅雁吉祥水电股份有限公司 | A kind of high stability double ladder |
-
2016
- 2016-11-15 CN CN201611004087.5A patent/CN108075429A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2257663Y (en) * | 1996-05-07 | 1997-07-16 | 邢文海 | Height adjustable health writing desk |
| CN202297015U (en) * | 2011-08-19 | 2012-07-04 | 许进 | Multifunctional portable mini forklift |
| CN203491651U (en) * | 2013-10-23 | 2014-03-19 | 国网山东省电力公司潍坊供电公司 | Telescoping cover plate support frame |
| CN204384597U (en) * | 2015-01-06 | 2015-06-10 | 国家电网公司 | Telescopic pay off rack |
| CN204492633U (en) * | 2015-03-25 | 2015-07-22 | 广东梅雁吉祥水电股份有限公司 | A kind of high stability double ladder |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110391632A (en) * | 2019-06-30 | 2019-10-29 | 国网山东省电力公司烟台供电公司 | A kind of telescoping cable operculum colpi plate bracing frame |
| CN116148052A (en) * | 2023-03-22 | 2023-05-23 | 江苏华科建设工程质量检测有限公司 | A kind of testing equipment and testing method for the strength of building steel structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101993607B1 (en) | Cable tray protection equipment of apartment building | |
| CN110932198B (en) | Movable cable support | |
| KR101571462B1 (en) | Mechanism for power transmission and distribution cable support mounting plate | |
| US8826555B2 (en) | Self-supporting story pole | |
| CN108075429A (en) | Cable channel cover plate support base | |
| CN210266207U (en) | Combined support for subway | |
| AU2017100111A4 (en) | Surveillance equipment tower | |
| KR20160121880A (en) | Manhole A manhole with adjustable height and inclination of the frame | |
| CN108842917B (en) | Combined shelter system and installation method | |
| CN207069412U (en) | One kind changes switch cabinet current transformer specific purpose tool | |
| KR101375604B1 (en) | A self-assembly guard rail of utility-pipe conduit | |
| CN107217993B (en) | Pylon | |
| CN203846858U (en) | Sucking disc fixed type fence ground stake | |
| CN106710907A (en) | Load switch | |
| CN214364824U (en) | Strutting arrangement for building engineering | |
| KR101532977B1 (en) | Lightning prevention apparatus | |
| KR101903457B1 (en) | Fixing apparatus of underground distribution line | |
| KR101483986B1 (en) | Fixing apparatus of electric power cable with very high voltage in underground manhole | |
| KR101376764B1 (en) | Temporary resources for constructing tank of LNG carrier | |
| CN209497235U (en) | A kind of cable ditch support that field uses | |
| CN107882425A (en) | A kind of portable fence for construction | |
| CN111740370B (en) | Composite material cable support for electric pipe well | |
| KR20180000415U (en) | the structure of manhole | |
| KR101694192B1 (en) | An apparatus for arranging horizontaling of h-beam | |
| EP1684393B1 (en) | Installation for supplying media and energy and method for mounting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20190403 Address after: 261021 No. 425 Dongfeng West Street, Weicheng District, Weifang City, Shandong Province Applicant after: State Grid Shandong Electric Power Company Weifang Power Supply Company Applicant after: State Grid Corporation of China Address before: 261041 No. 8221 Dongfeng East Street, Weifang City, Shandong Province Applicant before: Liu Weihua |
|
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180525 |