CN108054737B - A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method - Google Patents

A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method Download PDF

Info

Publication number
CN108054737B
CN108054737B CN201711291921.8A CN201711291921A CN108054737B CN 108054737 B CN108054737 B CN 108054737B CN 201711291921 A CN201711291921 A CN 201711291921A CN 108054737 B CN108054737 B CN 108054737B
Authority
CN
China
Prior art keywords
string
route
asymmetric operation
mends
definite value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711291921.8A
Other languages
Chinese (zh)
Other versions
CN108054737A (en
Inventor
全生明
祁太元
李生
张洪平
弓建荣
李海峰
董凌
张节潭
张永祥
方保民
张桂红
温广
李红志
刘庆彪
宋锐
孔祥鹏
王轩
赵世昌
谢华
思晓兰
陆金凤
刘立敏
赵青春
王宁霞
梁建龙
罗敏
陈卉
孟可风
薛俊茹
李春来
丛贵斌
杨�嘉
汪凤月
刘可
王少飞
车克杉
杨文丽
赵金朝
保积秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Engineering Co Ltd
State Grid Qinghai Electric Power Co Ltd
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Original Assignee
NR Engineering Co Ltd
State Grid Qinghai Electric Power Co Ltd
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Engineering Co Ltd, State Grid Qinghai Electric Power Co Ltd, Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd filed Critical NR Engineering Co Ltd
Priority to CN201711291921.8A priority Critical patent/CN108054737B/en
Publication of CN108054737A publication Critical patent/CN108054737A/en
Application granted granted Critical
Publication of CN108054737B publication Critical patent/CN108054737B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured

Abstract

The invention discloses a kind of strings to mend asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method; include the following steps: the real-time acquisition system run signal of step 1, line protective devices, judges that the string whether system enters under this route non-failure conditions mends asymmetric operation state;Step 2, when differentiating that this route enters under non-failure conditions string and mends asymmetric operation state, line protective devices are automatically adjusted to adapt to the operating status zero sequence most latter end protection act definite value.It is preferred that line protective devices acquire this route protection action signal, the another set of route protection action signal of duplicate system retrofit, string in real time and mend protection signal and string benefit by-pass switch position signal in step 1.Without carrying out manual intervention, prevent string from causing route protection incorrect operation that route is caused accidentally to cut off when mending in asymmetric operation state, lifting system integrated automation performance and safety action performance.

Description

A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method
Technical field
The present invention relates to a kind of strings to mend asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method.
Background technique
With the super, fast development of extra-high voltage grid and the interconnection of regional power grid, long range large capacity EHV transmission Route using increasingly extensive, in order to improve the conveying capacity of route, improve transmission of electricity quality, series capacitor compensation (string is mended) equipment It is got a lot of applications in transmission line of electricity.When string is mended in asymmetric operation state, will occur in transmission line of electricity certain The zero-sequence current of ratio, which may cause route protection standby zero-sequenceprotection movement, to cause whole route quilt Accidentally cut off.Due to generally convey that load is higher and importance is also very high containing series compensated transmission line, malfunctioning can for system power supply It is influenced by property very big.
Control is mended containing the line protective devices and string applied in series compensated transmission line at present to protect without information exchange, Corresponding measure is taken in route protection abnormal operation behavior when not mending asymmetric operation for string.Therefore, it is highly desirable to study Route protection adaptability solution when string mends asymmetric operation.
Summary of the invention
In view of the above-mentioned problems, the present invention provides a kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value adjust automatically Method makes full use of system related information, solves the problems, such as the abnormal operation in the case of route protection malfunctions herein.
Name Resolution:
1, string mends asymmetric operation state: referring to that string benefit by-pass switch is not at three-phase whole closure or three-phase is all disconnected The state symmetrical operation state opened.
2, zero sequence most latter end protection act definite value: multisection type zero-sequenceprotection is usually configured in route protection, this definite value is refered in particular to According to the last section of zero-sequenceprotection for escaping load unbalanced formation zero-sequence current adjusting.
To realize above-mentioned technical purpose and the technique effect, the invention is realized by the following technical scheme:
A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method, includes the following steps:
The real-time acquisition system run signal of step 1, line protective devices, judges whether system enters this route fault-free feelings String under condition mends asymmetric operation state;
Step 2, when differentiating that this route enters under non-failure conditions string and mends asymmetric operation state, line protective devices from It is dynamic that zero sequence most latter end protection act definite value is adjusted to adapt to the operating status.
It is preferred that in step 1, line protective devices acquire in real time this route protection action signal, duplicate system retrofit it is another Cover route protection action signal, string mends protection signal and string mends by-pass switch position signal.
It is preferred that when this route protection is not operating, the another set of route protection of duplicate system retrofit is not operating, string is mended protection and do not moved Make and string is when to mend a certain phase of by-pass switch be coincidence, differentiates that this route enters under non-failure conditions string and mends asymmetric operation state.
It is preferred that in step 2, if I0setFor zero sequence adjusted most latter end protection act definite value, then:
I0set=kI0_un
In formula, k is safety factor, I0_unThe maximum zero sequence current being likely to occur in the case of asymmetric operation is mended for string.
It is preferred that k value range is 1.05~1.2, for example, k value is 1.1.
The beneficial effects of the present invention are:
The present invention mends current operating conditions by integrated system relevant information identification string and adjust automatically protects definite value, is not necessarily to Manual intervention is carried out, prevents string from causing route protection incorrect operation that route is caused accidentally to cut when mending in asymmetric operation state It removes, lifting system integrated automation performance and safety action performance.
Detailed description of the invention
Fig. 1 is the logic chart that the present invention differentiates this route fault-free and string mends asymmetric operation state.
Specific embodiment
Technical solution of the present invention is described in further detail with specific embodiment with reference to the accompanying drawing, so that ability The technical staff in domain can better understand the present invention and can be practiced, but illustrated embodiment is not as to limit of the invention It is fixed.
A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method, includes the following steps:
The real-time acquisition system run signal of step 1, line protective devices, judges whether system enters this route fault-free feelings String under condition mends asymmetric operation state;
Step 2, when differentiating that this route enters under non-failure conditions string and mends asymmetric operation state, line protective devices from It is dynamic that zero sequence most latter end protection act definite value is adjusted to adapt to the operating status.
As shown in Figure 1, it is preferable that in step 1, line protective devices acquire this route protection action signal, dual in real time The another set of route protection action signal of configuration, string mend protection signal and string mends by-pass switch position signal.In summary Whether signal line protection identifying system, which enters the string under this line non-failure conditions, is mended asymmetric operation state.With electric system Intelligent development, the interconnection technology between relevant device is increasingly mature, and real-time, the reliability of signal transmitting can obtain To being effectively ensured.Therefore, it makes full use of string to mend the coherent signal of control protection, identifies that current string mends asymmetric operation state, from And adaptively improves route protection action performance and be possibly realized.
It is preferred that when this route protection is not operating, the another set of route protection of duplicate system retrofit is not operating, string is mended protection and do not moved Make and string mends (this four conditions are all satisfied) when a certain phase of by-pass switch is coincidence, differentiates that this route enters under non-failure conditions String mends asymmetric operation state, needs to adjust route standby zero-sequenceprotection definite value at this time, otherwise without adjustment.
It is preferred that in step 2, if I0setFor zero sequence adjusted most latter end protection act definite value, then:
I0set=kI0_un
In formula, k is safety factor, I0_unThe maximum zero sequence current being likely to occur in the case of asymmetric operation is mended for string.K's Value range is 1.05~1.2, for example, k value is 1.1.
The present invention mends current operating conditions by integrated system relevant information identification string and adjust automatically protects definite value, is not necessarily to Manual intervention is carried out, prevents string from causing route protection incorrect operation that route is caused accidentally to cut when mending in asymmetric operation state It removes, lifting system integrated automation performance and safety action performance.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure made by bright specification and accompanying drawing content perhaps equivalent process transformation or be directly or indirectly used in other correlation Technical field, be included within the scope of the present invention.

Claims (5)

1. a kind of string mends asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method, which is characterized in that including as follows Step:
The real-time acquisition system run signal of step 1, line protective devices, judges whether system enters under this route non-failure conditions String mend asymmetric operation state;The string benefit asymmetric operation state is not at three-phase including string benefit by-pass switch and all closes It closes or all off state symmetrical operation state of three-phase;
Step 2, when differentiating that this route enters under non-failure conditions string and mends asymmetric operation state, line protective devices are automatically right Zero sequence most latter end protection act definite value is adjusted to adapt to the operating status, if I0setFor the protection of zero sequence adjusted most latter end Act definite value, then:
I0set=kI0_un
In formula, k is safety factor, I0_unThe maximum zero sequence current being likely to occur in the case of asymmetric operation is mended for string.
2. a kind of string according to claim 1 mends asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method, It is characterized in that, in step 1, line protective devices acquire in real time this route protection action signal, duplicate system retrofit it is another set of Route protection action signal, string mend protection signal and string mends by-pass switch position signal.
3. a kind of string according to claim 2 mends asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method, It is characterized in that, when this route protection is not operating, duplicate system retrofit another set of route protection is not operating, string benefit protection is not operating And string mends by-pass switch a certain phase when being coincidence, differentiates that this route enters under non-failure conditions string and mends asymmetric operation state.
4. a kind of string according to claim 1 mends asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method, It is characterized in that, k value range is 1.05~1.2.
5. a kind of string according to claim 4 mends asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method, It is characterized in that, k value is 1.1.
CN201711291921.8A 2017-12-08 2017-12-08 A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method Active CN108054737B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711291921.8A CN108054737B (en) 2017-12-08 2017-12-08 A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711291921.8A CN108054737B (en) 2017-12-08 2017-12-08 A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method

Publications (2)

Publication Number Publication Date
CN108054737A CN108054737A (en) 2018-05-18
CN108054737B true CN108054737B (en) 2019-06-21

Family

ID=62123597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711291921.8A Active CN108054737B (en) 2017-12-08 2017-12-08 A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method

Country Status (1)

Country Link
CN (1) CN108054737B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2656527B2 (en) * 1988-01-30 1997-09-24 株式会社日立製作所 Spot network relay
US7472026B2 (en) * 2006-12-22 2008-12-30 General Electric Company Multi-ended fault location system
CN101662141B (en) * 2009-08-31 2011-12-14 国电南京自动化股份有限公司 Series capacitor compensation circuit distance protection method by combining phase-comparison relay
CN102545173B (en) * 2012-01-10 2014-08-27 广东省电力调度中心 Zero-sequence backup protection setting method for ultra-high voltage transmission line
CN102611083B (en) * 2012-03-07 2014-06-25 广东电网公司东莞供电局 Method for implementing adaptive zero sequence current network protection
CN103779845B (en) * 2014-02-14 2017-03-08 华北电网有限公司 A kind of method improving serial supplementary line current differential protection performance
CN104269848B (en) * 2014-10-17 2016-07-06 国家电网公司 A kind of string mends the control method for coordinating controlling protection with relay protection
CN105098986A (en) * 2015-08-21 2015-11-25 上海毅昊自动化有限公司 Relay protection device constant value online monitoring system and method thereof

Also Published As

Publication number Publication date
CN108054737A (en) 2018-05-18

Similar Documents

Publication Publication Date Title
US11128127B2 (en) FLISR without communication
CN105044543B (en) Reactor Fault method of discrimination after a kind of PT broken string
Pazoki et al. Effect of UPFC on protection of transmission lines with infeed current
CN206149022U (en) Net feeder automation terminal is joined in marriage to distributing type
CN106329509A (en) Small current fault line selection protection system of power grid isolated neutral system
CN108181500B (en) Method for determining non-pressure fixed value of switching-on of power transmission and transformation equipment
CN108054737B (en) A kind of string benefit asymmetric operation route standby zero-sequenceprotection definite value automatic adjusting method
CN108963974B (en) A kind of method and device preventing external area error excision differential protection malfunction
CN103022985B (en) Closing coil protective device
CN104237741A (en) Intelligent station domain information based double-circuit line fault phase selection method
CN108336717A (en) One kind opens that machine process is region-wide to open machine guard method suitable for phase modifier transformer group
CN204179639U (en) Intelligent leakage circuit breaker
CN110148924A (en) A kind of Current Transformer Secondary side group is in the open-circuit protecting device of electronic switch
CN203368041U (en) Device in on-line detection self-excitation type MCR for performing excitation control on state of thyristor
CN205489439U (en) Novel based on PLC digital intelligent formula flame -proof type phase sensitivity short -circuit protection system
CN203261125U (en) Self-powered digital relay
CN104714194A (en) Intelligent power supply panel module test platform and operating method thereof
CN105510731A (en) Parallel resonance detection alarming method and system for medium-voltage side power grid of power transformer
CN203761017U (en) Short circuit current protection device of motor protector
CN109254206A (en) Highly resistance electric parameter on-Line Monitor Device and method
CN203588920U (en) AC-DC general skip detection circuit for vacuum circuit breaker
CN209730798U (en) A kind of Current Transformer Secondary side group is in the open-circuit protecting device of electronic switch
CN207010245U (en) A kind of reactive-load compensation automatic tracking control apparatus
CN203607859U (en) Dynamic reactive compensation controller
CN206685964U (en) High voltage power supply parallel circuit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant