CN108053196A - A kind of recruitment methods of construction site - Google Patents
A kind of recruitment methods of construction site Download PDFInfo
- Publication number
- CN108053196A CN108053196A CN201810096573.7A CN201810096573A CN108053196A CN 108053196 A CN108053196 A CN 108053196A CN 201810096573 A CN201810096573 A CN 201810096573A CN 108053196 A CN108053196 A CN 108053196A
- Authority
- CN
- China
- Prior art keywords
- target
- recruitment
- interview
- applicant
- page
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
- G06Q10/1053—Employment or hiring
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The present invention relates to a kind of recruitment methods of construction site, including herein below:101st, enterprise's issue target recruitment information is recruited:Based on the target classification selected by recruitment enterprise and the recruitment information filled in, the target recruitment information page is generated;Based on the preset other keyword of target class, target recruitment information content is retrieved, the issue target recruitment information page is carried out when retrieving related keyword, otherwise prompting modification recruitment information;102nd, applicant's reading target recruitment information page, confirmation are interviewed, and send interview request;103rd, recruit enterprise and receive interview request, video interview request is sent to applicant, and be made whether the decision of admission after interview.Construction site can carry out online interview recruitment by video interview, meanwhile, the construction with reference to construction site arranges and the time of going to work of construction worker is interviewed and contracted so that the operation is stable of construction worker, while ensure the construction progress of construction site.
Description
Technical field
The present invention relates to building trade technical field, more particularly to a kind of recruitment methods of construction site.
Background technology
In traditional building trade, due to the not equity of information, construction worker be difficult understand in time, get it is local
Advertise for workers information, construction worker look for it is living either the introduction of relationship or directly trusted to chance and strokes of luck mainly by friends, so
The unstability of recruitment relation is caused, construction site construction party is also in this way, generally being opened by employee referrals and at the construction field (site)
Patch recruitment notice, especially some provisional work, it is not easy to advertise for workers, so not only influence construction worker to work
Stability, meanwhile, also influence the progress constructed in construction site.
The content of the invention
It is an object of the invention to provide a kind of recruitment methods of construction site, can well solve construction site construction
The problem of Fang Zhaogong is not easy.
To achieve these goals, the present invention provides following technical schemes:
The recruitment methods of a kind of construction site provided by the invention, including herein below:
101st, enterprise's issue target recruitment information is recruited;
Wherein, target recruitment information carries out confirmation issue by the following method:Based on the target classification selected by recruitment enterprise
And the recruitment information filled in, generate the target recruitment information page;Based on the preset other keyword of target class, target is recruited
The information content is retrieved, and the issue target recruitment information page is carried out when retrieving related keyword, otherwise prompting modification recruitment
Information;
102nd, applicant's reading target recruitment information page, confirmation are interviewed, and send interview request;
103rd, recruit enterprise and receive interview request, video interview request is sent to applicant, and is made after interview
The decision whether enrolled.
Further, in a step 102, applicant is when confirmation is interviewed, by target recruitment page insertion applicant
The resume page end generation target interview page and be sent to recruitment enterprise.
Further, in step 103, recruit enterprise and receive target interview page, before target interview page of reading
Applicant's resume at end sends applicant video interview by the video communication of the end of target interview page and asks
Yet further, record has the time that applicant can go to work in applicant's resume.
Compared with prior art, the present invention has the following advantages:
A kind of recruitment methods of construction site of the present invention, construction site can be carried out online interview by video interview and recruited
It engages, meanwhile, the construction with reference to construction site arranges and the time of going to work of construction worker is interviewed and contracted so that construction worker
The operation is stable, while ensure the construction progress of construction site.
Below by embodiment, technical scheme is described in further detail.
Specific embodiment
The embodiment of the present invention is illustrated below, it should be understood that embodiment described herein be merely to illustrate and
It explains the present invention, is not intended to limit the present invention.
Embodiment 1
The recruitment methods of a kind of construction site provided in this embodiment, including herein below:
Step 101, recruitment enterprise issue target recruitment information.
Wherein, for specification recruitment information, junk information is reduced, good network environment is built, target recruitment information is led to
It crosses following methods and carries out confirmation issue:Based on the target classification selected by recruitment enterprise and the recruitment information filled in, target is generated
The recruitment information page;Based on the preset other a keyword of target class, target recruitment information content is retrieved successively, when
RetrievalThe issue target recruitment information page is carried out during a keyword, otherwise prompting modification recruitment information.
Step 102, applicant's reading target recruitment information page, confirmation are interviewed, and send interview request.
Wherein, applicant is when confirmation is interviewed, by the end of the resume page of target recruitment page insertion applicant
Generation target interview page is simultaneously sent to recruitment enterprise.
Step 103, recruitment enterprise receive interview request, and video interview request is sent to applicant, and after interview
It is made whether the decision of admission.
Wherein, recruit enterprise and receive target interview page, applicant's resume of the front end for target interview page of reading passes through
The video communication of the end of target interview page sends applicant video interview request.
Construction site (recruitment enterprise) can carry out online interview recruitment by video interview, meanwhile, construction worker's (application
Person) record has the time that can be gone to work in resume, and it is interviewed and is contracted with reference to the construction arrangement of construction site so that construction work
The operation is stable of people, while ensure the construction progress of construction site.
It should be appreciated that the above embodiment of the present invention and example, are in order at description and interpretation purpose, not thereby limit this hair
Bright scope.The scope of the present invention is defined by claim rather than by above-described embodiment and example definition.
Claims (4)
1. a kind of recruitment methods of construction site, which is characterized in that including herein below:
101st, enterprise's issue target recruitment information is recruited;
Wherein, target recruitment information carries out confirmation issue by the following method:Based on recruitment enterprise selected by target classification and
The recruitment information filled in generates the target recruitment information page;Based on the preset other keyword of target class, to target recruitment information
Content is retrieved, and the issue target recruitment information page is carried out when retrieving related keyword, otherwise prompting modification recruitment information;
102nd, applicant's reading target recruitment information page, confirmation are interviewed, and send interview request;
103rd, recruit enterprise and receive interview request, video interview request is sent to applicant, and be made whether after interview
The decision of admission.
2. a kind of recruitment methods of construction site according to claim 1, which is characterized in that in the step 102, applicant
It is when confirmation is interviewed, the end generation target interview page of the resume page of target recruitment page insertion applicant is concurrent
It send to recruitment enterprise.
3. a kind of recruitment methods of construction site according to claim 2, which is characterized in that in the step 103, recruitment enterprise
Industry receives target interview page, and applicant's resume of the front end for target interview page of reading passes through the end of target interview page
Video communication applicant is sent video interview request.
4. a kind of recruitment methods of construction site according to claim 3, which is characterized in that recorded in applicant's resume
There is the time that applicant can go to work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810096573.7A CN108053196A (en) | 2018-01-31 | 2018-01-31 | A kind of recruitment methods of construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810096573.7A CN108053196A (en) | 2018-01-31 | 2018-01-31 | A kind of recruitment methods of construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108053196A true CN108053196A (en) | 2018-05-18 |
Family
ID=62125210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810096573.7A Pending CN108053196A (en) | 2018-01-31 | 2018-01-31 | A kind of recruitment methods of construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108053196A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104750754A (en) * | 2013-12-31 | 2015-07-01 | 北龙中网(北京)科技有限责任公司 | Website industry classification method and server |
US20160034679A1 (en) * | 2014-07-31 | 2016-02-04 | Samsung Electronics Co., Ltd. | Wearable device and method of operating the same |
CN106446089A (en) * | 2016-09-12 | 2017-02-22 | 北京大学 | Method for extracting and storing multidimensional field key knowledge |
-
2018
- 2018-01-31 CN CN201810096573.7A patent/CN108053196A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104750754A (en) * | 2013-12-31 | 2015-07-01 | 北龙中网(北京)科技有限责任公司 | Website industry classification method and server |
US20160034679A1 (en) * | 2014-07-31 | 2016-02-04 | Samsung Electronics Co., Ltd. | Wearable device and method of operating the same |
CN106446089A (en) * | 2016-09-12 | 2017-02-22 | 北京大学 | Method for extracting and storing multidimensional field key knowledge |
Non-Patent Citations (1)
Title |
---|
闵敏: "企业招聘系统的设计与实现", 《中国优秀硕士学位论文全文数据库信息科技辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zenz et al. | Securitizing Xinjiang: police recruitment, informal policing and ethnic minority co-optation | |
CA3051393A1 (en) | Method for providing recording and verification service for data received and transmitted by messenger service, and server using method | |
US20120066773A1 (en) | Information safeguard tool | |
CN106372798A (en) | User customization contract generation method based on risks and system | |
CN107861967A (en) | A kind of methods, devices and systems of intelligent Matching good friend | |
EP1557737A3 (en) | Method, system and program procuct for electronically executing contracts within a secure computer infrastructure | |
CN106251114B (en) | Method and device for realizing approval in application | |
Abazid et al. | An overview of risk management in the construction projects | |
Xu et al. | Towards heuristic web services composition using immune algorithm | |
Yoshikawa et al. | Generalized social exchange and its relevance to new era workplace relationships | |
CN108053196A (en) | A kind of recruitment methods of construction site | |
Chatterjee et al. | Robust content-driven reputation | |
Tually et al. | The role of private rental support programs in housing outcomes for vulnerable Australians | |
Słupska et al. | Knowledge management and internal relational capital versus development of relations with environment | |
CN111061844A (en) | Enterprise contract auditing system and method based on semantic network | |
CN110362626A (en) | One kind being based on the convenience-for-people inquiry system of block chain network and application method | |
Sanderson | Records management and the capture of tacit knowledge | |
Van der Aalst et al. | Emailanalyzer: an e-mail mining plug-in for the prom framework | |
Negara et al. | Identifying client project manager competency in Indonesian construction project | |
CN107491530A (en) | A kind of social relationships mining analysis method based on the automatic label information of file | |
He et al. | Perturbation-Based Two-Stage Multi-Domain Active Learning | |
Zahralddin-Aravena et al. | COVID-19: A catalyst of modernization across jurisdictions | |
Gidhagen et al. | Resuming ended business relationships: the impact of relationship remains | |
Manzoor et al. | Construction sustainability in indian perspective-a review | |
Zhou | Modelling productivity performance risks in modular integrated construction in Hong Kong |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180518 |
|
RJ01 | Rejection of invention patent application after publication |