CN108051195A - A kind of straining beam verifying attachment for glass production line - Google Patents

A kind of straining beam verifying attachment for glass production line Download PDF

Info

Publication number
CN108051195A
CN108051195A CN201711446218.XA CN201711446218A CN108051195A CN 108051195 A CN108051195 A CN 108051195A CN 201711446218 A CN201711446218 A CN 201711446218A CN 108051195 A CN108051195 A CN 108051195A
Authority
CN
China
Prior art keywords
template
supporting
horizontal
straining beam
fixing support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711446218.XA
Other languages
Chinese (zh)
Inventor
徐阚阚
孙琦
王云奎
耿志新
杨宇
韩丽君
董超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengbu Triumph Engineering and Technology Co Ltd
Original Assignee
Bengbu Triumph Engineering and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengbu Triumph Engineering and Technology Co Ltd filed Critical Bengbu Triumph Engineering and Technology Co Ltd
Priority to CN201711446218.XA priority Critical patent/CN108051195A/en
Publication of CN108051195A publication Critical patent/CN108051195A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Abstract

The invention discloses a kind of straining beam verifying attachments for glass production line, include be relatively fixed supporting rack and adjustable supporter;Fixing support rack includes first base connected in sequence, the first mounting bracket and first level installing plate from bottom to up and the first template with the L-shaped connection of first level installing plate;Adjustable supporter includes second base, is installed in second base top end surface two guide rail supporting frames, the horizontal guide rail being connected between two guide rail supporting frames, the sliding block being set on horizontal guide rail, the second horizontal mounting plate being fixed on slider top end face and the second template with the L-shaped connection of the second horizontal mounting plate.The present invention supports the one end of straining beam by fixing support rack, using the other end of adjustable supporter support straining beam, it detects easy to operate, template on fixing support rack and adjustable supporter can replace the template of different size according to the size and shape of straining beam end plate, suitable for the detection of plurality of specifications straining beam.

Description

A kind of straining beam verifying attachment for glass production line
Technical field
The present invention relates to glass production fields, are specifically a kind of straining beam verifying attachment for glass production line.
Background technology
With the development of national economy, the breakthrough of float glass, rolled glass, electronical display glass, photovoltaic glass technology, Drive glass equipment manufacture industry high speed development.Due to the continuous developing in various functions glass market, user is to production equipment The requirement of energy, precision is continuously improved, and the cycle of glass manufacturing apparatus manufacture and rigging up and debugging accurate synchronization is caused to propose to want Summation challenge.Straining beam is the main building block of glass manufacturing apparatus, and the size and installation accuracy of straining beam determine glass production Precision after equipment assembling.
At present, straining beam is measured when detecting using tape measure, and detection efficiency is extremely low, measurement accuracy it is difficult to ensure that, to rear The installation of phase glass manufacturing apparatus causes great hidden danger of quality, on the one hand in period of assembly, dimensional discrepancy, the morpheme public affairs of straining beam Difference is required to adjust, and the on the other hand operating to the glass manufacturing apparatus after assembling causes uncontrollable unstability.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of straining beam verifying attachment for glass production line, to straining beam Flatness, the size of the depth of parallelism and end plate mounting hole and position are used for quickly detecting, and detection efficiency is fast, precision is high.
The technical scheme is that:
A kind of straining beam verifying attachment for glass production line includes fixing support rack and adjustable supporter;Described Fixing support rack includes first base, is fixed in first base top end surface the first mounting bracket is fixed on the first installation First level installing plate and the first template on top of the trellis end face, first template are vertically arranged, the first template Bottom is close to first level installing plate and is fixedly connected with first level installing plate, first level installing plate and the first template assemblies The vertical inner face of L-shaped structure and the first template is towards adjustable supporter;The adjustable supporter include second base, Two guide rail supporting frames being installed in second base top end surface, the horizontal guide rail being connected between two guide rail supporting frames, The sliding block that is set on horizontal guide rail, the second horizontal mounting plate being fixed on slider top end face and the second template, it is described The second template be vertically arranged, the bottom of the second template is close to the second horizontal mounting plate and fixes with the second horizontal mounting plate connect It connects, the second horizontal mounting plate and the vertical inner face of the L-shaped structure of the second template assemblies and the second template are towards fixing support rack; The first level installing plate and the thickness of the second horizontal mounting plate are consistent with setting height(from bottom), first template and second Through hole corresponding with straining beam two end plates upper installing hole is offered in template.
First mounting bracket is included there are two the first supporting beam and the first upper sealing plate, and two the first supporting beams are perpendicular Two parallel portions of the U-type groove steel construction directly set, i.e. U-type groove steel be horizontality, the U-lag mouth phase of two the first supporting beams Right, the lower horizontal part of two the first supporting beams is fixedly connected with first base top end surface, the upper water of two the first supporting beams Flat portion is fixedly connected with the lower face of upper sealing plate, and the first level installing plate is fixed on the upper surface of the first upper sealing plate On.
The second mounting bracket is fixed in the top end surface of the second base, there are two second mounting bracket includes Second supporting beam and the second upper sealing plate, the two of the U-type groove steel construction, i.e. U-type groove steel that two the second supporting beams are vertically arranged Parallel portion is horizontality, and the U-lag mouth of two the second supporting beams is opposite, and the lower horizontal parts of two the second supporting beams is with second Base top end face is fixedly connected, and the lower face of the upper horizontal parts of two the second supporting beams with the second upper sealing plate is fixedly connected, The guide hole of up/down perforation string configuration is offered on second upper sealing plate, described two guide rail supporting frames and level are led Rail is located between two the second supporting beams, and the top of the sliding block is stretched out from guide hole.
Fixed there are two side seal board on second horizontal mounting plate, side seal board includes the top of U-shaped structure and erects The lower part of straight panel structure, the U-lag mouth on two side seal board top are inserted into respectively from the opposite two sides of the second horizontal mounting plate It is fixedly connected on second horizontal mounting plate and with the second horizontal mounting plate, the lower part of two side seal boards is located at two second respectively The outside of beam is supportted, gap is left in the lower part of each side seal board between corresponding second supporting beam.
In two second supporting beams, graduated scale is provided on the vertical lateral wall of one of them the second supporting beam, The bottom of the corresponding side seal board of the second supporting beam with being equipped with graduated scale is connected with graduation indication piece, the graduation indication piece Lower part extend to the side of graduated scale.
The fixing support rack is two, and the structure of two fixing support racks is identical, and two fixing support racks first The vertical inner face of template is towards adjustable supporter, and one of fixing support rack is adjacent to adjustable supporter and positioned at another Between fixing support rack and adjustable supporter.
Advantages of the present invention:
The present invention supports the one end of straining beam by fixing support rack, and the other end of straining beam is supported using adjustable supporter, Then illustrate its depth of parallelism qualification when straining beam two end plates are bonded gapless with the template of fixing support rack, adjustable supporter respectively, Otherwise there is gap, can check degree of error with clearance gauge;Template on adjustable supporter of the present invention can be moved, convenient for different lengths Straining beam be used for quickly detecting;Through hole corresponding with the mounting hole of straining beam end plate is both provided in the template of the present invention, works as through hole When Chong Die with mounting hole, illustrate the size qualification of mounting hole;The present invention is provided with graduated scale and corresponding graduation indication piece, The scale being directed toward by graduation indication piece intuitively shows the length of straining beam, reduces the difficulty of straining beam length detection and improves inspection The accuracy of survey.
The configuration of the present invention is simple, detection are easy to operate, and the template on fixing support rack and adjustable supporter can be according to drawing The size and shape of beam end plate replace the template of different size, suitable for the detection of plurality of specifications straining beam.
Description of the drawings
Fig. 1 is the half sectional view of main view of the present invention.
Fig. 2 is the right view of fixing support rack of the present invention.
Fig. 3 is the sectional view of the A-A of adjustable supporter in Fig. 1.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment belongs to the scope of protection of the invention.
See Fig. 1-Fig. 3, a kind of straining beam verifying attachment for glass production line, including there are two 1,2 Hes of fixing support rack Adjustable supporter 3, the structure of two fixing support racks 1,2 is identical, and two fixing support racks 1,2 are towards adjustable supporter 3, One of fixing support rack 2 is adjacent to adjustable supporter 3 and between another fixing support rack 1 and adjustable supporter 3;
Fixing support rack include first base 4, the first mounting bracket being fixed in 4 top end surface of first base and 7 and first template 8 of first level installing plate, the first mounting bracket the first supporting beam 5 and first upper sealing plate 6 including there are two, two Two parallel portions of the U-type groove steel construction that the first supporting beam 5 is vertically arranged, i.e. U-type groove steel be horizontality, two first The U-lag mouth of support beam 5 is opposite, and the lower horizontal part of two the first supporting beams 5 is fixedly connected with 4 top end surface of first base, and two Lower face of the upper horizontal part of a first supporting beam 5 with upper sealing plate 6 is fixedly connected, and first level installing plate 7 is fixed on first On the upper surface of upper sealing plate 6, the first template 8 is vertically arranged, the bottom of the first template 8 be close to first level installing plate 7 and with First level installing plate 7 is fixedly connected, and 7 and first template 8 of first level installing plate is assembled into L-shaped structure and the first template 8 Vertical inner face is towards adjustable supporter;
Adjustable supporter includes second base 9, the second mounting bracket being installed in 9 top end surface of second base and two Guide rail supporting frame 12, the horizontal guide rail 13 being connected between two guide rail supporting frames 12, the sliding block being set on horizontal guide rail 13 14th, the second horizontal mounting plate 15 being fixed in 14 top end surface of sliding block and the second template 16 and two side seal boards 17, second Mounting bracket is included there are two the second supporting beam 10 and the second upper sealing plate 11, and two the second supporting beams 10 are vertically arranged U-shaped Two parallel portions of channel steel structure, i.e. U-type groove steel are horizontality, and the U-lag mouth of two the second supporting beams 10 is opposite, two second The lower horizontal part of supporting beam 10 is fixedly connected with 9 top end surface of second base, and the upper horizontal part of two the second supporting beams 10 is equal It is fixedly connected with the lower face of the second upper sealing plate 11, the guide hole of up/down perforation string configuration is offered on the second upper sealing plate 11 18, two guide rail supporting frames 12 and horizontal guide rail 13 are located between two the second supporting beams 10, and the top of sliding block 14 is from guide hole 18 Middle stretching, the second template 16 are vertically arranged, the bottom of the second template 16 be close to the second horizontal mounting plate 15 and with it is second horizontal Installing plate 15 is fixedly connected, and the second horizontal mounting plate 15 and the second template 16 are assembled into the vertical of L-shaped structure and the second template 16 Inner face is fixed on towards fixing support rack, two side seal boards 17 on the second horizontal mounting plate 15, and two side seal boards 17 include U The top of shape structure and the lower part of vertical harden structure, the U-lag mouth on two 17 top of side seal board is respectively from the second horizontal mounting plate 15 opposite two sides are inserted on the second horizontal mounting plate 15 and are fixedly connected with the second horizontal mounting plate 15, two side seal boards 17 lower part is located at the outside of two the second supporting beams 10 respectively, the lower part of each side seal board 17 with corresponding second supporting beam Gap is left between 10;Graduated scale 19 is provided on the vertical lateral wall of one of them the second supporting beam 10, with being equipped with scale The bottom of the 10 corresponding side seal board 17 of the second supporting beam of ruler 19 is connected with graduation indication piece 20, and the lower part of graduation indication piece 20 is prolonged Extend the side of graduated scale 19;
First level installing plate 7 is consistent with setting height(from bottom) with the thickness of the second horizontal mounting plate 15, so as to ensure straining beam frame If levelness, offer through hole 21 corresponding with straining beam two end plates upper installing hole in the first template 8 and the second template 16, just In the position of opening and size of detection straining beam end plate mounting hole.
Fixing support rack 1,2 supports the one end of straining beam, and the other end of straining beam, fixed branch are supported using adjustable supporter 3 The straining beam of 3 conjunction measuring 4097-5697mm length of support 1 and adjustable supporter, and when detecting 4097-5697mm straining beams, Gu The first template 8 determined on supporting rack 2 does not fill, and is put into convenient for tested straining beam;3 conjunction measuring of fixing support rack 2 and adjustable supporter The straining beam of 1997-3597mm length.
Then illustrate that its is parallel when straining beam two end plates are bonded gapless with the template of fixing support rack, adjustable supporter respectively Degree is qualified, otherwise has gap, can check degree of error with clearance gauge;When the through hole 21 and straining beam in the first template 8 and the second template 16 During the mounting hole overlapping of end plate, illustrate the size qualification of mounting hole;The scale that graduated scale 19 is directed toward by graduation indication piece 20 is straight The length that ground shows straining beam is seen, reduce the difficulty of straining beam length detection and improves the accuracy of detection.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of straining beam verifying attachment for glass production line, it is characterised in that:Include fixing support rack and adjustable supports Frame;The fixing support rack includes first base, is fixed in first base top end surface the first mounting bracket is fixed on First level installing plate and the first template in first mounting bracket top end surface, first template are vertically arranged, the It is close to first level installing plate and is fixedly connected with first level installing plate, first level installing plate and first in the bottom of one template The vertical inner face of the L-shaped structure of template assemblies and the first template is towards adjustable supporter;The adjustable supporter includes Second base, two guide rail supporting frames being installed in second base top end surface are connected between two guide rail supporting frames Horizontal guide rail, the sliding block being set on horizontal guide rail, the second horizontal mounting plate and second being fixed on slider top end face Template, second template are vertically arranged, and the bottom of the second template is close to the second horizontal mounting plate and is pacified with the second level Loading board is fixedly connected, the second horizontal mounting plate and the vertical inner face direction of the L-shaped structure of the second template assemblies and the second template Fixing support rack;The first level installing plate and the thickness of the second horizontal mounting plate are consistent with setting height(from bottom), and described Through hole corresponding with straining beam two end plates upper installing hole is offered in one template and the second template.
2. a kind of straining beam verifying attachment for glass production line according to claim 1, it is characterised in that:Described One mounting bracket is included there are two the first supporting beam and the first upper sealing plate, the U-type groove steel that two the first supporting beams are vertically arranged Two parallel portions of structure, i.e. U-type groove steel are horizontality, and the U-lag mouth of two the first supporting beams is opposite, two the first supporting beams Lower horizontal part be fixedly connected with first base top end surface, the upper horizontal parts of two the first supporting beams under upper sealing plate End face is fixedly connected, and the first level installing plate is fixed on the upper surface of the first upper sealing plate.
3. a kind of straining beam verifying attachment for glass production line according to claim 1, it is characterised in that:Described The second mounting bracket is fixed in the top end surface of two pedestals, second mounting bracket is including there are two the second supporting beam and second Upper sealing plate, two parallel portions of the U-type groove steel construction that two the second supporting beams are vertically arranged, i.e. U-type groove steel are horizontality, The U-lag mouth of two the second supporting beams is opposite, and the lower horizontal part of two the second supporting beams is fixed with second base top end surface Connection, the lower face of the upper horizontal parts of two the second supporting beams with the second upper sealing plate are fixedly connected, second upper sealing plate On offer the guide hole of up/down perforation string configuration, described two guide rail supporting frames and horizontal guide rail are located at two second Between supportting beam, the top of the sliding block is stretched out from guide hole.
4. a kind of straining beam verifying attachment for glass production line according to claim 3, it is characterised in that:Described Fixed there are two side seal board on two horizontal mounting plates, side seal board includes the top of U-shaped structure and the lower part of vertical harden structure, and two The U-lag mouth on a side seal board top be inserted into respectively from the opposite two sides of the second horizontal mounting plate on the second horizontal mounting plate and It is fixedly connected with the second horizontal mounting plate, the lower part of two side seal boards is located at the outside of two the second supporting beams, each side respectively Gap is left between corresponding second supporting beam in the lower part of sealing plate.
5. a kind of straining beam verifying attachment for glass production line according to claim 4, it is characterised in that:Described two In a second supporting beam, graduated scale is provided on the vertical lateral wall of one of them the second supporting beam, with being equipped with graduated scale The bottom of the corresponding side seal board of second supporting beam is connected with graduation indication piece, and the lower part of the graduation indication piece extends to scale The side of ruler.
6. a kind of straining beam verifying attachment for glass production line according to claim 1, it is characterised in that:Described consolidates Supporting rack is determined for two, and the structure of two fixing support racks is identical, and the vertical inner face of two the first templates of fixing support rack Towards adjustable supporter, one of fixing support rack is adjacent to adjustable supporter and positioned at another fixing support rack and adjustable Between supporting rack.
CN201711446218.XA 2017-12-27 2017-12-27 A kind of straining beam verifying attachment for glass production line Pending CN108051195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711446218.XA CN108051195A (en) 2017-12-27 2017-12-27 A kind of straining beam verifying attachment for glass production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711446218.XA CN108051195A (en) 2017-12-27 2017-12-27 A kind of straining beam verifying attachment for glass production line

Publications (1)

Publication Number Publication Date
CN108051195A true CN108051195A (en) 2018-05-18

Family

ID=62128209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711446218.XA Pending CN108051195A (en) 2017-12-27 2017-12-27 A kind of straining beam verifying attachment for glass production line

Country Status (1)

Country Link
CN (1) CN108051195A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203705149U (en) * 2013-10-29 2014-07-09 天津市天锻液压有限公司 Hydraulic experiment machine for stretching and rotation of tap
US20150202351A1 (en) * 2011-04-20 2015-07-23 Trustees Of Tufts College Dynamic silk coatings for implantable devices
CN205045659U (en) * 2015-09-22 2016-02-24 希姆斯电梯(中国)有限公司 Elevator host computer frame
CN107121290A (en) * 2017-05-23 2017-09-01 沈阳巨人创新精工机械有限公司 Engine test installs equipment and engine test installation system
CN207689117U (en) * 2017-12-27 2018-08-03 蚌埠凯盛工程技术有限公司 A kind of straining beam verifying attachment for glass production line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150202351A1 (en) * 2011-04-20 2015-07-23 Trustees Of Tufts College Dynamic silk coatings for implantable devices
CN203705149U (en) * 2013-10-29 2014-07-09 天津市天锻液压有限公司 Hydraulic experiment machine for stretching and rotation of tap
CN205045659U (en) * 2015-09-22 2016-02-24 希姆斯电梯(中国)有限公司 Elevator host computer frame
CN107121290A (en) * 2017-05-23 2017-09-01 沈阳巨人创新精工机械有限公司 Engine test installs equipment and engine test installation system
CN207689117U (en) * 2017-12-27 2018-08-03 蚌埠凯盛工程技术有限公司 A kind of straining beam verifying attachment for glass production line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
葛洪军;苏广洪;: "广州珠江新城西塔顶升模板系统支撑架设计与应用", 施工技术, no. 12 *

Similar Documents

Publication Publication Date Title
CN201993210U (en) Downwards pulled meter bracket for testing bridge flexibility
CN202002786U (en) Instrument for testing deflection of bridge
CN103499312B (en) A kind of plane parallelism measurement device
CN207689117U (en) A kind of straining beam verifying attachment for glass production line
CN108253865A (en) A kind of rectangular channel deviation measuring apparatus and measuring method
CN207991407U (en) A kind of rectangular channel deviation measuring apparatus
CN108051195A (en) A kind of straining beam verifying attachment for glass production line
CN203518959U (en) Plane parallelism measuring device
CN205332952U (en) Special detection device of casing
CN201215474Y (en) Detection device for verticality of guide rail
CN110044230B (en) Novel spare part assembly error detects device
CN207407829U (en) A kind of standard clearance device
CN209043298U (en) A kind of Project Supervising detection device
CN202485609U (en) Device for measuring fringe spacing of glass base plate
CN105403130A (en) Tool for measuring verticality of side plate of elevator framework
CN111571243A (en) Double-guide-rail debugging device and method
CN201653404U (en) Telescopic multifunctional vertical guiding rule
CN215676780U (en) Linear guide rail detection device
CN220316985U (en) Full-automatic deformation guide rail high-precision mounting frame for lifting platform
CN205940334U (en) Adjustable nodal pattern hole quality detection device
CN206223163U (en) Cage guide laser detecting apparatus
CN218092140U (en) Curtain wall vertical keel mounting and positioning device
CN220489910U (en) Multifunctional steel structure measuring ruler
CN208998742U (en) A kind of automatic range tooling between ATM cash-out movement lockable mechanism and guide rail
CN220670423U (en) Special inspection frock of three-phase reactor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination