CN108044957A - Bonding angle is prefabricated and integral pouring and forming process - Google Patents

Bonding angle is prefabricated and integral pouring and forming process Download PDF

Info

Publication number
CN108044957A
CN108044957A CN201711079738.1A CN201711079738A CN108044957A CN 108044957 A CN108044957 A CN 108044957A CN 201711079738 A CN201711079738 A CN 201711079738A CN 108044957 A CN108044957 A CN 108044957A
Authority
CN
China
Prior art keywords
bonding angle
prefabricated
bonding
cloth
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711079738.1A
Other languages
Chinese (zh)
Other versions
CN108044957B (en
Inventor
文景波
张万娟
王国伟
田军
董勃
刘锦帆
权飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinoma Technology (jiuquan) Wind Turbine Blade Co Ltd
Original Assignee
Sinoma Technology (jiuquan) Wind Turbine Blade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinoma Technology (jiuquan) Wind Turbine Blade Co Ltd filed Critical Sinoma Technology (jiuquan) Wind Turbine Blade Co Ltd
Priority to CN201711079738.1A priority Critical patent/CN108044957B/en
Publication of CN108044957A publication Critical patent/CN108044957A/en
Application granted granted Critical
Publication of CN108044957B publication Critical patent/CN108044957B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/68Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts by incorporating or moulding on preformed parts, e.g. inserts or layers, e.g. foam blocks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B11/00Making preforms
    • B29B11/06Making preforms by moulding the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/30Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core
    • B29C70/34Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core and shaping or impregnating by compression, i.e. combined with compressing after the lay-up operation
    • B29C70/342Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core and shaping or impregnating by compression, i.e. combined with compressing after the lay-up operation using isostatic pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/40Shaping or impregnating by compression not applied
    • B29C70/42Shaping or impregnating by compression not applied for producing articles of definite length, i.e. discrete articles
    • B29C70/44Shaping or impregnating by compression not applied for producing articles of definite length, i.e. discrete articles using isostatic pressure, e.g. pressure difference-moulding, vacuum bag-moulding, autoclave-moulding or expanding rubber-moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/68Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts by incorporating or moulding on preformed parts, e.g. inserts or layers, e.g. foam blocks
    • B29C70/681Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/68Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts by incorporating or moulding on preformed parts, e.g. inserts or layers, e.g. foam blocks
    • B29C70/681Component parts, details or accessories; Auxiliary operations
    • B29C70/683Pretreatment of the preformed part, e.g. insert
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/08Blades for rotors, stators, fans, turbines or the like, e.g. screw propellers
    • B29L2031/082Blades, e.g. for helicopters
    • B29L2031/085Wind turbine blades

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The present invention provides bonding angle is prefabricated and integral pouring and forming process, including bonding angle Mold Making, bonding angle is prefabricated, covering forming and one perfusion.During blade forming, using bonding angle of the present invention is prefabricated and the integral perfusion technique of covering forming after, can be to identifying defects of timely and effectively to be repaired due to making bonding angle prefabricated component in advance, thus easy to control, easy to identify the defects of bonding angle;And bonding angle layer of cloth is impregnated with without turning over glue again in filling process, infusion time is effectively shortened, and the dosage of perfusion resin is reduced, production cost is reduced while production efficiency is improved, improves product qualification rate;The present invention has been identified due to bonding angular defect in prefabrication phase, when back segment circulates without defect repair phenomenon is found again, the repair again of main formative stage is avoided, reduces the blade circulation time, production efficiency is improved, there is considerable promotion prospect and potential practical value.

Description

Bonding angle is prefabricated and integral pouring and forming process
Technical field
The present invention relates to wind electricity blade production technical fields, and in particular to bonding angle is prefabricated and integral pouring and forming process.
Background technology
In existing wind electricity blade molding technology thereof, the molding mode to front and rear edges bonding angle is:In covering forming process In, trailing edge bonding angle layer of cloth is laid with together with covering layer of cloth, relies on bonding angle tool locating layer of cloth, control glue-line, bonding angle cloth Layer form together with covering layer of cloth.This moulding process has the disadvantage that:(1)During laying, because trailing edge is compared with leading edge Radian is bigger than normal, and trailing edge bonding angle frock radian is bigger than normal, and layer of cloth is not easy sturdy with frock, and the bad adjustment of layer of cloth wastes a large amount of man-hours; (2)Because trailing edge bonding angular breadth is wide compared with glue, forming process needs accommodating tool in addition, and vacuum diaphragm bad adjustment during bag vacuum easily goes out Existing vacuum diaphragm is hanging, and vacuum diaphragm is once hanging, and easily being taken out in filling process quick-fried causes gas leakage;(3)In filling process, because of trailing edge There is uniaxially layer of cloth, gluing is slow, also needs perfusion trailing edge bonding angle, causes perfusion resin demand bigger than normal;And trailing edge walks glue and is not easy to see It examines;(4)If trailing edge bonding angle forming frock uses formpiston, easily at frock edge, uniaxially layer of cloth region forms step, repairs into This height;(5)After shaping, easily there is the defects of fold, step in bonding angle, and maintenance time is long, and the blade production cycle lengthens;And due to Trailing edge cavity limits, and the defect is not easy to identify, therefore there are larger quality risks;(6)After covering cures, the work of bonding angle Dress, auxiliary material cleaning difficulty are big, the waste plenty of time.
The content of the invention
The present invention in order to more than solving the technical issues of, provide that bonding angle is prefabricated and integral pouring and forming process.
To solve the above problems, bonding angle of the present invention is prefabricated and integral pouring and forming process, comprise the steps of:
A. bonding angle Mold Making:Bonding corner structure is kept, in band after bonding angle simulation layer of cloth is divided into two according to molding seam The windward side of covering die and leeward are laid with respectively and form;Scraping thickness on leeward bonding angle simulation layer of cloth is 2.0-4.0mm, wide 30-50mm triangle glue-type after, windward side is molded and is bonded, is demoulded after cured up to formpiston master mold; Using angle grinder, peak steel knife that deburred on the inside of the formpiston master mold is clean, coated with releasing agent is laid with perforated membrane, cuts glass Cloth form is demoulded after being heating and curing up to bonding angle prefabricated mould;
B. bonding angle is prefabricated:Bonding angle is pre-formed in advance as a component using the bonding angle prefabricated mould;Shaping When, it is laid with using the forming surface of outer surface as the bonding angle inner cavity of the bonding angle prefabricated mould, is carried out after laying Perfusion;It after the completion of perfusion, wraps three layers of vacuum and is covered using insulation quilt, place air-heater in blade root and blade tip position, institute is set The temperature of air-heater is stated as 75-85 DEG C, 5.6-6.8h of continuous heating, after heating terminates and confirms and be fully cured, sampling and measuring Tg values when Tg >=60 DEG C can remove auxiliary material, the surface temperature of layer of cloth at vertical rib are measured using temperature-measuring gun, when surface temperature≤40 DEG C when can demould, directly gained bonding angle prefabricated component is positioned over after the demoulding and is loaded onto for use with type storing name;
C. covering forming:During blade covering forming, the stage of bonding angle need to be made in former technique, imitates girder air guide system System arranges the perfusion gas directing system of the bonding angle prefabricated component, and yarn is filled between the bonding angle prefabricated component and blade mold To control gap, the positioning to prefabricated bonding angle is positioned using bonding angle prefabricated component positioning clip before bag vacuum, prevented prefabricated Bonding angle glides, and controls prefabricated bonding angle bondline thickness;
D. one perfusion:For prefabricated bonding angle is coordinated integrally to be perfused with covering, the continuous felt of covering original laying is widened, is routed to The turning peak of the vertical rib of distance, and continuous felt is laid under the bonding angle prefabricated component, interior rib side is put down with rib in blade mold Together, cavity side exceeds 20-50mm of pre-manufactured product, and flow-guiding screen is glued apart from the bonding angle prefabricated component 80mm, and described in cavity It connects and is laid with evacuation medium between rib inside and outside the peak and mold of angle prefabricated component, to increase its air guide;Increase extract system to prevent Only compacting perfusion is impermeable;In filling process, glue, which is routed up after mold founds rib, can stop injecting glue.
Further, in the bonding angle precasting process, the generation of fold should be controlled, specific control method is:A. to institute It states bonding angle prefabricated mould to practice Buddhism or Taoism, it is ensured that the R of vertical rib position mold is relatively larger than or equal to 8.0mm;B. prohibit during laying Layer of cloth only is fixed using glue spraying, to prevent layer of cloth from gliding, release cloth compartment can be used to tie down fixed layer of cloth, removed before bag vacuum ;C. 2 layers of 808gm are laid in the bonding angle preform surfaces-2Biaxially layer of cloth, and buckle is made, in bonding angle After the completion of prefabricated profiled auxiliary material is laid with, the buckle is placed at vertical rib.
Further, the production method of the buckle is:Rib position, which is stood, in the bonding angle preform surfaces is laid with 2 layers of breadth For the 808gm of 150mm-2Biaxially layer of cloth, and ensure layer of cloth it is axial, it is tangential have staggered floor, vacuum infusion molding is up to institute Buckle is stated, the buckle must use perforated membrane to wrap up when in use.
Further, the retinue storage frock includes pedestal, column and deposits device, and the column is fixedly connected on described Base center, both sides be uniformly connected with it is several it is described deposit device, the device that deposits includes pallet and is fixedly connected on institute State the railing of pallet both sides.
Further, the bonding angle prefabricated component positioning clip includes upright bar, locating rod and locating piece, and the upright bar top is solid Surely channel steel is connected with, the channel steel is internally provided with gear;Described locating rod one end is socketed with the channel steel, and passes through tooth socket and institute Gear engagement is stated, the other end is fixedly connected with the locating piece.
Further, the gear centre is additionally provided with rotational handle.
Further, the use of the bonding angle prefabricated component need to defer to the principle of first in first out, i.e., according to pre-formed and deposit The sequencing for putting the time uses.
The present invention has the following advantages compared with prior art:
(1)During blade forming, using bonding angle of the present invention is prefabricated and the integral perfusion technique of covering forming after, by It is thus easy to control, easy to identify the defects of bonding angle in making bonding angle prefabricated component in advance, it can be to identifying defects of to carry out in time Effective repair;And bonding angle layer of cloth is impregnated with without turning over glue again in filling process, infusion time is effectively shortened, and is reduced The dosage of perfusion resin, reduces production cost while production efficiency is improved, improves product qualification rate, optimize production Moral character energy has considerable promotion prospect and potential practical value.
(2)The present invention is since bonding angular defect has been identified in prefabrication phase, when back segment circulates without discovery defect dimension again Phenomenon is repaiied, avoids the repair again of main formative stage, reduces the blade circulation time, improves production efficiency.
(3)Bonding angle prefabricated component of the present invention, using integral perfusion technique, does not use bonding angle positioning tool on covering, Frock impression defect is effectively prevented, and vacuum diaphragm easily adjusts, and significantly reduces gas leakage risk, eliminates hidden danger of quality, effectively Improve leaf quality.
(4)Bonding angle of the present invention is form in advance, with adhesion zone during covering one form without being perfused again Infiltration effectively reduces perfusion resin demand;
(5)The present invention, without clearing up bonding angle frock, can save burn close time after covering cures.
(6)Buckle is placed in vertical rib position before bag vacuum of the present invention, in vacuum, vertical rib region layer of cloth passes through button Plate uniform stressed founds rib region layer of cloth when vacuumizing when eliminating no buckle and big cloth layer moment is taken out tightly in vertical rib corner location The problem of forming fold.
Description of the drawings
Fig. 1 is the structure diagram that frock is stored in present invention retinue;
Fig. 2 is the structure diagram of bonding angle prefabricated component positioning clip of the present invention;
In figure:1st, pedestal, 2, pallet, 3, column, 4, railing, 5, strut, 6, channel steel, 7, tooth socket, 8, gear, 9, rotational handle, 10th, locating rod, 11, locating piece.
Specific embodiment
The present invention and its effect will be described further by embodiment below.
Embodiment:By taking length is the production of the megawatt wind-power blade of 54.38m as an example
(1)Bonding angle Mold Making:Bonding corner structure is kept, in band after bonding angle simulation layer of cloth is divided into two according to molding seam The windward side of covering die and leeward are laid with respectively and form;Scraping thickness on leeward bonding angle simulation layer of cloth is 2.0-4.0mm, wide 30-50mm triangle glue-type after, windward side is molded and is bonded, is demoulded after cured up to formpiston master mold; Using angle grinder, peak steel knife that deburred on the inside of formpiston master mold is clean, coated with releasing agent is laid with perforated membrane, cuts glass-fiber-fabric and fills Injection forming is demoulded after being heating and curing up to bonding angle prefabricated mould;
(2)Bonding angle is prefabricated:Bonding angle is pre-formed in advance as a component using bonding angle prefabricated mould;During shaping, It is laid with using the forming surface of the outer surface of bonding angle prefabricated mould as bonding angle inner cavity, is irrigated after laying;It fills It after the completion of note, wraps three layers of vacuum and is covered using insulation quilt, place air-heater in blade root and blade tip position, the temperature of air-heater is set It spends for 75-85 DEG C, 5.6-6.8h of continuous heating, after heating terminates and confirms and be fully cured, sampling and measuring Tg values, when Tg >=60 DEG C auxiliary material can be removed, the surface temperature of layer of cloth at vertical rib is measured using temperature-measuring gun, can be demoulded when surface temperature≤40 DEG C, Directly gained bonding angle prefabricated component is positioned over after the demoulding and is loaded onto for use with type storing name;In bonding angle precasting process, it should control The generation of fold processed, specific control method are:A. practice Buddhism or Taoism to bonding angle prefabricated mould, it is ensured that the R of vertical rib position mold compared with More than or equal to 8.0mm;B. forbid fixing layer of cloth using glue spraying during laying, to prevent layer of cloth from gliding, release cloth can be used Compartment ties down fixed layer of cloth, is removed before bag vacuum;C. pair of 2 layers of 808gm-2 is laid in bonding angle preform surfaces Axial layer of cloth, and buckle is made, after the completion of the prefabricated profiled auxiliary material of bonding angle is laid with, buckle is placed at vertical rib;Buckle Production method is:Rib position, which is stood, in bonding angle preform surfaces is laid with the 808gm that 2 layers of breadth are 150mm-2Biaxially cloth Layer, and ensure layer of cloth it is axial, it is tangential have staggered floor, vacuum infusion molding must use perforated membrane when in use up to buckle, buckle Package;Retinue storage frock includes pedestal 1, column 2 and deposits device, and column 2 is fixedly connected on 1 center of pedestal, and both sides are equal It is even be connected with it is several deposit device, depositing device includes pallet 3 and is fixedly connected on the railings 4 of 3 both sides of pallet;It is deposited using with type When putting frock storage bonding angle prefabricated component, the different parts of bonding angle prefabricated component, which are used, to be had without depositing being deposited with type for device Frock support storage is put, generally places a set of storage frock every 1.0m;
(3)Covering forming:During blade covering forming, the stage of bonding angle need to be made in former technique, imitates girder air guide System arranges the perfusion gas directing system of bonding angle prefabricated component, and yarn is filled between bonding angle prefabricated component and blade mold to control Gap, the positioning to prefabricated bonding angle are positioned using bonding angle prefabricated component positioning clip before bag vacuum, prevent prefabricated bonding angle It glides, controls prefabricated bonding angle bondline thickness;Bonding angle prefabricated component positioning clip includes upright bar 5, locating rod 10 and locating piece 11, 5 top of upright bar is fixedly connected with channel steel 6, and channel steel 6 is internally provided with gear 8;10 one end of locating rod is socketed with channel steel 6, and passes through tooth Slot 7 is engaged with gear 8, and the other end is fixedly connected with locating piece 11, and 8 center of gear is additionally provided with rotational handle 9;It is pre- using bonding angle During product positioning clip, upright bar is fixed, and locating piece 11 is stretched into bonding angle prefabricated component intracavitary and fixation, passes through rotational handle 9 rotate gears 8 are driven, and drive locating rod 10 flexible with this, until bonding angle prefabricated component is made to be fixed to suitable position;It is covering In skin forming process, the final of rib is stood with mold according to prefabricated bonding angle and is bonded situation, respectively bonding angle prefabricated component placement before, It is filled with yarn at twice afterwards, it is as shown in the table to be specifically filled with position:
1 stock yarn line is filled with respectively according to the position that is filled in upper table, and per share yarn includes 25 beam individual event yarns;
(4)One perfusion:Bonding angle prefabricated component is used according to the using priciple of first in first out, i.e. the use palpus of bonding angle prefabricated component It is used according to pre-formed and the resting period sequencing;It is for prefabricated bonding angle is coordinated integrally to be perfused with covering, covering is former The continuous felt of laying is widened, and is routed to the turning peak of the vertical rib of distance, and continuous felt is laid under bonding angle prefabricated component, interior rib Side is concordant with rib in blade mold, and cavity side exceeds 20-50mm of pre-manufactured product, and flow-guiding screen is apart from bonding angle prefabricated component in cavity 80mm, and evacuation medium is laid between rib inside and outside the peak and mold of bonding angle prefabricated component, to increase its air guide;Increase Extract system prevents that compacting perfusion is impermeable;In filling process, glue, which is routed up after mold founds rib, can stop injecting glue.
In the megawatt wind-power blade production process of 54.38m, using more than bonding angle is prefabricated and integral form work Skill has following and aspect promotion:Bonding angle precasting process, can identify wrinkle defect before laying, do not influence blade and normally give birth to Produce the cycle;After bonding angle is prefabricated, the laying time can shorten 20min;After prefabricated, perfusion gluing is normal, the bonding without early period Angle bag gas blushing problems, perfusion resin demand decline 30kg;Bonding angle is heating and curing without using electric blanket, under formpiston frock Whiten controllable;After prefabricated, mold the auxiliary material cleaning at teams and groups' bonding angle and shorten 30min, bonding angle glue-line is uniform, no early period Peak glue-line super thick problem, and bonding angle without repairing again;After prefabricated, without placing formpiston frock, after no early period Handle the apparent protrusion problem in frock edge to take place frequently.Therefore, it is pre- using bonding angle of the present invention during blade forming After system and covering forming one perfusion technique, due to making bonding angle prefabricated component in advance, thus it is easy to control, easy the defects of bonding angle Identification, can be to identifying defects of timely and effectively to be repaired;And bonding angle is impregnated with without turning over glue again in filling process Layer of cloth effectively shortens infusion time, and reduces the dosage of perfusion resin, and production is reduced while production efficiency is improved Cost improves product qualification rate, optimizes properties of product;The present invention due to bonding angular defect identified in prefabrication phase, Without defect repair phenomenon is found again when back segment circulates, the repair again of main formative stage is avoided, reduces the blade circulation time, Improve production efficiency;Bonding angle prefabricated component of the present invention, using integral perfusion technique, does not use bonding angle positioning on covering Frock effectively prevents frock impression defect, and vacuum diaphragm easily adjusts, and significantly reduces gas leakage risk, eliminates hidden danger of quality, Leaf quality is effectively improved, there is considerable promotion prospect and potential practical value.
It should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted.Although with reference to reality Example is applied the present invention is described in detail, it will be apparent to an ordinarily skilled person in the art that technical scheme into Row modification or equivalent substitution without departure from the spirit and scope of technical solution of the present invention, should all cover the power in the present invention Among sharp claimed range.

Claims (7)

1. bonding angle is prefabricated and integral pouring and forming process, it is characterised in that:It comprises the steps of:
A. bonding angle Mold Making:Bonding corner structure is kept, in band after bonding angle simulation layer of cloth is divided into two according to molding seam The windward side of covering die and leeward are laid with respectively and form;Scraping thickness on leeward bonding angle simulation layer of cloth is 2.0-4.0mm, wide 30-50mm triangle glue-type after, windward side is molded and is bonded, is demoulded after cured up to formpiston master mold; Using angle grinder, peak steel knife that deburred on the inside of the formpiston master mold is clean, coated with releasing agent is laid with perforated membrane, cuts glass Cloth form is demoulded after being heating and curing up to bonding angle prefabricated mould;
B. bonding angle is prefabricated:Bonding angle is pre-formed in advance as a component using the bonding angle prefabricated mould;Shaping When, it is laid with using the forming surface of outer surface as the bonding angle inner cavity of the bonding angle prefabricated mould, is carried out after laying Perfusion;It after the completion of perfusion, wraps three layers of vacuum and is covered using insulation quilt, place air-heater in blade root and blade tip position, institute is set The temperature of air-heater is stated as 75-85 DEG C, 5.6-6.8h of continuous heating, after heating terminates and confirms and be fully cured, sampling and measuring Tg values when Tg >=60 DEG C can remove auxiliary material, the surface temperature of layer of cloth at vertical rib are measured using temperature-measuring gun, when surface temperature≤40 DEG C when can demould, directly gained bonding angle prefabricated component is positioned over after the demoulding and is loaded onto for use with type storing name;
C. covering forming:During blade covering forming, the stage of bonding angle need to be made in former technique, imitates girder air guide system System arranges the perfusion gas directing system of the bonding angle prefabricated component, and yarn is filled between the bonding angle prefabricated component and blade mold To control gap, the positioning to prefabricated bonding angle is positioned using bonding angle prefabricated component positioning clip before bag vacuum, prevented prefabricated Bonding angle glides, and controls prefabricated bonding angle bondline thickness;
D. one perfusion:For prefabricated bonding angle is coordinated integrally to be perfused with covering, the continuous felt of covering original laying is widened, is routed to The turning peak of the vertical rib of distance, and continuous felt is laid under the bonding angle prefabricated component, interior rib side is put down with rib in blade mold Together, cavity side exceeds 20-50mm of pre-manufactured product, and flow-guiding screen is glued apart from the bonding angle prefabricated component 80mm, and described in cavity It connects and is laid with evacuation medium between rib inside and outside the peak and mold of angle prefabricated component, to increase its air guide;Increase extract system to prevent Only compacting perfusion is impermeable;In filling process, glue, which is routed up after mold founds rib, can stop injecting glue.
2. bonding angle according to claim 1 is prefabricated and integral pouring and forming process, it is characterised in that:In the bonding In the precasting process of angle, the generation of fold should be controlled, specific control method is:A. practice Buddhism or Taoism to the bonding angle prefabricated mould, Ensure that the R angles of vertical rib position mold are greater than or equal to 8.0mm;B. forbid fixing layer of cloth using glue spraying during laying, to prevent Layer of cloth glides, and release cloth compartment can be used to tie down fixed layer of cloth, is removed before bag vacuum;C. in the bonding angle prefabricated component Surface is laid with 2 layer of 808 gm-2Biaxially layer of cloth, and make buckle, after the completion of the prefabricated profiled auxiliary material of bonding angle is laid with, The buckle is placed at vertical rib.
3. bonding angle according to claim 2 is prefabricated and integral pouring and forming process, it is characterised in that:The buckle Production method is:Rib position, which is stood, in the bonding angle preform surfaces is laid with the 808gm that 2 layers of breadth are 150 mm-2Twin shaft To layer of cloth, and ensure layer of cloth it is axial, it is tangential have staggered floor, vacuum infusion molding is up to the buckle, and the buckle is when in use It must be wrapped up using perforated membrane.
4. bonding angle according to claim 1 is prefabricated and integral pouring and forming process, it is characterised in that:The retinue storage Frock includes pedestal(1), column(2)With deposit device, the column(2)It is fixedly connected on the pedestal(1)Center, both sides Uniformly be connected with it is several it is described deposit device, the device that deposits includes pallet(3)Be fixedly connected on the pallet(3)Both sides Railing(4).
5. bonding angle according to claim 1 is prefabricated and integral pouring and forming process, it is characterised in that:The bonding angle is pre- Product positioning clip includes upright bar(5), locating rod(10)And locating piece(11), the upright bar(5)Top is fixedly connected with channel steel (6), the channel steel(6)It is internally provided with gear(8);The locating rod(10)One end and the channel steel(6)Socket, and pass through tooth socket (7)With the gear(8)Engagement, the other end are fixedly connected with the locating piece(11).
6. bonding angle according to claim 5 is prefabricated and integral pouring and forming process, it is characterised in that:The gear(8) Center is additionally provided with rotational handle(9).
7. bonding angle according to claim 1 is prefabricated and integral pouring and forming process, it is characterised in that:The bonding angle is pre- The use of product need to defer to the principle of first in first out, i.e., used according to pre-formed and the resting period sequencing.
CN201711079738.1A 2017-11-06 2017-11-06 Prefabricated and integrated pouring forming process for bonding angle Active CN108044957B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711079738.1A CN108044957B (en) 2017-11-06 2017-11-06 Prefabricated and integrated pouring forming process for bonding angle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711079738.1A CN108044957B (en) 2017-11-06 2017-11-06 Prefabricated and integrated pouring forming process for bonding angle

Publications (2)

Publication Number Publication Date
CN108044957A true CN108044957A (en) 2018-05-18
CN108044957B CN108044957B (en) 2020-06-09

Family

ID=62119915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711079738.1A Active CN108044957B (en) 2017-11-06 2017-11-06 Prefabricated and integrated pouring forming process for bonding angle

Country Status (1)

Country Link
CN (1) CN108044957B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109203512A (en) * 2018-10-24 2019-01-15 郑州郑飞木业有限责任公司 Box body moulding process is stored in one kind
CN110774617A (en) * 2019-12-03 2020-02-11 东方电气(天津)风电叶片工程有限公司 Integrated forming device for composite material wind power blade web bonding angle
CN110789134A (en) * 2019-11-02 2020-02-14 中材科技(酒泉)风电叶片有限公司 Second bonding angle fixing method for wind power blade
CN111186145A (en) * 2019-12-28 2020-05-22 中材科技(萍乡)风电叶片有限公司 Wind power blade die assembly method
CN113211822A (en) * 2021-05-07 2021-08-06 上海电气风电集团股份有限公司 Pouring method of wind power generation blade shell
CN114193791A (en) * 2021-12-10 2022-03-18 甘肃重通成飞新材料有限公司 Shell filling process for forming connecting angle in advance

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101905538A (en) * 2010-01-14 2010-12-08 连云港中复连众复合材料集团有限公司 Process for integrally manufacturing megawatt wind turbine blade
CN201771696U (en) * 2010-07-12 2011-03-23 内蒙古航天亿久科技发展有限责任公司 Integral blade of large scaled wind generating set
CN103395213A (en) * 2013-07-30 2013-11-20 无锡乘风新能源设备有限公司 Manufacturing process of megawatt blade tail edge splicing angle

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101905538A (en) * 2010-01-14 2010-12-08 连云港中复连众复合材料集团有限公司 Process for integrally manufacturing megawatt wind turbine blade
CN201771696U (en) * 2010-07-12 2011-03-23 内蒙古航天亿久科技发展有限责任公司 Integral blade of large scaled wind generating set
CN103395213A (en) * 2013-07-30 2013-11-20 无锡乘风新能源设备有限公司 Manufacturing process of megawatt blade tail edge splicing angle

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109203512A (en) * 2018-10-24 2019-01-15 郑州郑飞木业有限责任公司 Box body moulding process is stored in one kind
CN110789134A (en) * 2019-11-02 2020-02-14 中材科技(酒泉)风电叶片有限公司 Second bonding angle fixing method for wind power blade
CN110774617A (en) * 2019-12-03 2020-02-11 东方电气(天津)风电叶片工程有限公司 Integrated forming device for composite material wind power blade web bonding angle
CN111186145A (en) * 2019-12-28 2020-05-22 中材科技(萍乡)风电叶片有限公司 Wind power blade die assembly method
CN113211822A (en) * 2021-05-07 2021-08-06 上海电气风电集团股份有限公司 Pouring method of wind power generation blade shell
CN114193791A (en) * 2021-12-10 2022-03-18 甘肃重通成飞新材料有限公司 Shell filling process for forming connecting angle in advance
CN114193791B (en) * 2021-12-10 2024-03-29 甘肃重通成飞新材料有限公司 Shell pouring technology for advanced forming of connecting angle

Also Published As

Publication number Publication date
CN108044957B (en) 2020-06-09

Similar Documents

Publication Publication Date Title
CN108044957A (en) Bonding angle is prefabricated and integral pouring and forming process
CN106863842A (en) For the system and method for the manufacture of auxiliary wind turbine blade shell
JP2012519098A5 (en)
CN108638541B (en) Blade shell and web integrated forming method and blade forming method
CN104249464B (en) Method and manufacturing line for manufacturing wind turbine blades
CN102481733B (en) A Method Of Strengthening A Wind Turbine Blade And The Strengthened Blade
CN103042701B (en) Integrated formation device and method for wind power blade
WO2011156947A1 (en) Method for manufacturing blade root of megavatt level wind generator
CN102416700A (en) Production technology of vane used for vertical shaft wind driven generator
CN105346105B (en) The making mould and preparation method of a kind of wind electricity blade
CN102230448A (en) Wind power generator blade of bamboo fibre reinforced composite material and manufacture method thereof
CN110978567B (en) Structure function integrated composite material wing and integral forming method thereof
CN109624369A (en) A kind of preparation method of coldblade
CN106457614A (en) A wind turbine blade manufacturing system and method
CN107415282A (en) I-shaped web for blade, die and manufacturing method
CN109571991B (en) Method for preparing wind power blade main beam by adopting different materials
CN207195099U (en) A kind of wind turbine blade root structure
CA2975658C (en) Method and apparatus for producing a preform
CN109822946A (en) A kind of wind electricity blade web perfusion optimization technique
CN102774017A (en) Upward flow guiding method of wind generator blade spar cap
CN108189424A (en) Blade assembly mold and the method using its manufacture blade assembly
CN113942252B (en) Method for integrally pouring and forming adhesive flange mold and blade skin
CN108327315A (en) The production method of reinforcement mold outside blade front and rear edge with heating function
CN102280230B (en) Glass reinforced plastic insulating sleeve for wind driven generator and molding method of glass reinforced plastic insulating sleeve
CN105269837B (en) Girder prefabricated part and manufacturing method thereof, and blade and manufacturing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant