CN108038273A CN201711193202.2A CN201711193202A CN108038273A CN 108038273 A CN108038273 A CN 108038273A CN 201711193202 A CN201711193202 A CN 201711193202A CN 108038273 A CN108038273 A CN 108038273A
Authority
CN
China
Prior art keywords
dam
section
site
flow
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711193202.2A
Other languages
English (en)
Other versions
CN108038273B (zh
Inventor
李涛
胡晖
张建丰
李思祎
习娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Technology
Original Assignee
Xian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Technology filed Critical Xian University of Technology
Priority to CN201711193202.2A priority Critical patent/CN108038273B/zh
Publication of CN108038273A publication Critical patent/CN108038273A/zh
Application granted granted Critical
Publication of CN108038273B publication Critical patent/CN108038273B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Abstract

本发明公开了一种瞬间溃坝坝址流量过程线的快速预测方法,具体按照以下步骤实施:步骤1,首先计算出坝址最大流量Qp,然后计算出矩形库区的平顶历时ts或梯形库区的峰现时间tp,步骤2,计算初始流量Q0,步骤3,利用步骤1和步骤2计算出的结果,得到库区坝址流量过程线。解决了在资料缺乏情况下准确快速预测溃坝坝址流量过程的问题。

Description

一种瞬间溃坝坝址流量过程线的快速预测方法
技术领域
本发明属于溃坝洪峰流量监控技术领域,涉及一种瞬间溃坝坝址流量过程线的快速预测方法。
背景技术
溃坝问题的核心部分是溃坝坝址的流量和水位变化过程、以及下游洪水的演进,坝址流量过程可作为下游洪水演进的上边界条件,决定下游洪水的演进时间、洪量大小等等。在实际中,如果能快速正确预测溃坝坝址的流量过程,对于进一步预测溃坝洪水、最大限度地减少洪灾损失等具有重要意义。现有溃坝坝址流量过程的预测方法一般采用非恒定流计算,资料要求全、技术要求高,很多根据模型试验总结的简化的经验公式缺乏理论推导,得到的结果误差较大。其他预测方法还有数值模拟方法,需要详细的地形资料和强大的计算机处理能力,较复杂且费时。因此,特别是在缺乏资料的情况下,如何准确快速的预测坝址流量成为一个亟待解决的问题。
发明内容
本发明的目的是提供一种瞬间溃坝坝址流量过程线的快速预测方法,解决了资料缺乏情况下准确快速预测溃坝坝址流量过程的问题。
本发明所采用的技术方案是,一种瞬间溃坝坝址流量过程线的快速预测方法,具体按照以下步骤实施:
步骤1,首先计算出坝址最大流量Qp,然后计算出矩形库区的平顶历时ts或梯形库区的峰现时间tp
步骤2,计算初始流量Q0
步骤3,利用步骤1和步骤2计算出的结果,得到库区坝址流量过程线。
本发明的特点还在于,
所述的步骤1具体为:
步骤1.1,计算坝址处最大溃坝出流量,
步骤1.2,计算矩形库区的平顶历时或梯形库区的峰现时间。
所述的步骤1.1具体为,
坝址处最大溃坝出流量,具体的计算公式为:
其中,m与断面形状有关,是河道断面形状指数,如矩形断面时,m=1、断面为双曲线型时,m=1.5;断面为三角形时,m=2;
对于矩形河道则m=1,分别代入库区的尺寸参数,A0指坝址处的过水断面面积,Am指库区上游端过水断面面积,A0/Am是库区断面比;k是一个系数,是库区断面比A0/Am的函数,取值见表1;系数坝址未溃决之前初始水深H0对应之坝址处过水断面面积δ是河道断面系数,如为矩形断面,δ就等于断面宽度,则
所述的步骤1.2具体为,
对于矩形库区,计算平顶历时ts,具体计算公式为:
对于梯形库区,计算峰现时间tp,具体计算公式为:
所述的步骤2具体为,按照公式(5)计算初始流量Q0
所述的步骤3具体为,利用步骤1和步骤2中计算出的Qp和tp,根据不同的时间t选择分段函数计算出相应的坝址流量,得到库区坝址流量过程线,
其中,库区的初始水量
m——河道断面形状指数;n——指数,平底河道n=m;
δ——河道断面系数;
L0——库区水面长度,m;
H0——坝址处蓄水深,m;
B0——坝址断面过流宽度,m;
Q0——溃坝瞬间形成的初始流量,仅针对梯形库区,m3/s;
Qp——峰值流量,m3/s;
q——坝址流量,m3/s;
ts——流量过程线平顶历时,s;
tp——峰值流量出现时间,s;
te——库区泄空时间,s;
t——时间,s;
λ——系数;
W0——库区的初始水量,m3
A0——坝址处的过水断面面积,m2
Am——库区上游端过水断面面积,m2
k——系数,是库区断面比A0/Am的函数;
A——过水断面面积,m2
本发明的有益效果是,提供了一种针对平底河道、两种库区形状的瞬间全溃坝址流量过程线的新预测方法,具体包括提出坝址最大流量的计算公式及坝址出流过程线的简单快速预测方法。只要知道坝址蓄水深、断面宽度等尺寸参数,通过简单计算,便可以快速地获得梯形或矩形库区坝址处瞬间全溃的最大流量及其流量过程线,比以前的预测公式更精准,并且该计算结果为进一步研究如何预测下游的洪水演进提供了边界条件。经验证表明该方法简便、合理、可靠、应用性较好。
附图说明
图1是本发明中涉及的矩形库区俯视图和正视图;
图2是本发明方法中涉及的梯形库区俯视图和正视图;
图3是利用本发明方法预测后得到的矩形库区坝址流量过程线;
图4利用本发明方法预测后得到的梯形库区坝址流量过程线。
图中,1.坝址,2.库区,3.坝址断面过流宽度B0,4.坝址处蓄水深H0,5.库区水面长度L0,6.梯形库区上游边界宽度Bm,7.X轴,8.下游。
具体实施方式
下面结合附图和具体实施方式对本发明进行详细说明。
本发明的瞬间溃坝坝址流量过程线的快速预测方法,具体按照以下步骤实施:
步骤1,首先计算出坝址最大流量Qp,然后计算出矩形库区的平顶历时ts或梯形库区的峰现时间tp
步骤1.1,计算坝址处最大溃坝出流量,
影响坝址最大流量的因素只有库区过水断面宽度和坝前蓄水深,坝址处最大溃坝出流量:
具体的计算公式为:
其中,m与断面形状有关,是河道断面形状指数,如矩形断面时,m=1、断面为双曲线型时,m=1.5;断面为三角形时,m=2;
对于矩形河道则m=1,分别代入库区的尺寸参数,A0指坝址处的过水断面面积,Am指库区上游端过水断面面积,A0/Am是库区断面比;k是一个系数,是库区断面比A0/Am的函数,取值见表1;系数坝址未溃决之前初始水深H0对应之坝址处过水断面面积δ是河道断面系数,如为矩形断面,δ就等于断面宽度,则
表1系数k的取值表
步骤1.2,对于矩形库区,计算平顶历时ts,具体计算公式为:
对于梯形库区,计算峰现时间tp,具体计算公式为:
步骤2,按照公式(4)计算初始流量Q0
步骤3,利用步骤1和步骤2计算出的结果,得到库区坝址流量过程线,具体步骤为:
通过公式(1)和(2)计算出Qp和tp后,根据不同的时间t选择分段函数计算出相应的坝址流量,便能得到库区坝址流量过程线。
其中,库区的初始水量
m——河道断面形状指数;n——指数,平底河道n=m;
δ——河道断面系数;
L0——库区水面长度,m;
H0——坝址处蓄水深,m;
B0——坝址断面过流宽度,m;
Q0——溃坝瞬间形成的初始流量,仅针对梯形库区,m3/s;
Qp——峰值流量,m3/s;
q——坝址流量,m3/s;
ts——流量过程线平顶历时,s;
tp——峰值流量出现时间,s;
te——库区泄空时间,s;
t——时间,s;
λ——系数;
W0——库区的初始水量,m3
A0——坝址处的过水断面面积,m2
Am——库区上游端过水断面面积,m2
k——系数,是库区断面比A0/Am的函数;
A——过水断面面积,m2
设置如下库区尺寸:H0=30m,L0=100m,B0=50m,代入公式(5)进行计算,得到的流量过程线的型式如图3所示;设置如下库区尺寸:H0=30m,L0=100m,B0=50m,Bm=66.7m,代入公式(6)进行计算,得到的流量过程线的型式如图4所示。
其中,图3为矩形库区坝址流量过程线,图4为梯形库区坝址流量过程线。
当库区形状如图1所示为矩形时,为水面宽度相等的平底库区,简称矩形库区,库区正视和俯视都是矩形,
在矩形库区情况下,坝前蓄水库区断面宽度相等,也就是说库区没有收缩或扩张,因溃坝发生时迅速且剧烈,故假设在坝址瞬间全部溃决的时刻,坝址流量达到最大值Qp,之后会保持这个流量大小一段时间,表现为溃坝流量过程线有一段平顶,这是由于平底库区内的起始水深相同,在洪水波未反射回坝址之前,坝址处水深、流速和流量不变,出现平顶线型,直到t时刻,
s洪水波反射回坝址,所以流量开始逐渐减小,过程线在t>ts之后呈下凹曲线型直到库区水全部泄完。
当断面宽度不相等时,即库区形状为如图2所示的梯形的情况下,过水断面逐渐变小的库区,因水面宽度不等、水面高度相等,使这种库区正视是矩形,俯视是梯形,因此下文简称梯形库区。在溃坝瞬间形成较大的流量,且称为初始流量Q0,因库区上游端断面较坝址断面宽,坝址溃决以后,上游向坝址充水量逐渐增加,使坝址处的水位逐渐升高,所以坝址流量会逐渐增大直到在tp时刻达到最大值Qp,此时是波流经上游边界反射回坝址的时刻,当时间大于tp以后,坝址处水位逐渐降低,出流过程呈下凹曲线退水直到库区蓄水全部泄完。对于这种断面收缩的库区,不同于平底库区的是坝址流量过程线的第一个阶段是线性增加的斜线,第二阶段和平底库区相同,是一条下凹的曲线。

Claims (6)

1.一种瞬间溃坝坝址流量过程线的快速预测方法,其特征在于,具体按照以下步骤实施:
步骤1,首先计算出坝址最大流量Qp,然后计算出矩形库区的平顶历时ts或梯形库区的峰现时间tp
步骤2,计算初始流量Q0
步骤3,利用步骤1和步骤2计算出的结果,得到库区坝址流量过程线。
2.根据权利要求1所述的瞬间溃坝坝址流量过程线的快速预测方法,其特征在于,所述的步骤1具体为:
步骤1.1,计算坝址处最大溃坝出流量,
步骤1.2,计算矩形库区的平顶历时或梯形库区的峰现时间。
3.根据权利要求2所述的瞬间溃坝坝址流量过程线的快速预测方法,其特征在于,所述的步骤1.1具体为,
坝址处最大溃坝出流量,具体的计算公式为:
<mrow> <msub> <mi>Q</mi> <mi>p</mi> </msub> <mo>=</mo> <msup> <mi>k&amp;lambda;</mi> <mrow> <msub> <mi>A</mi> <mn>0</mn> </msub> <mo>/</mo> <msub> <mi>A</mi> <mi>m</mi> </msub> </mrow> </msup> <msub> <mi>B</mi> <mn>0</mn> </msub> <msqrt> <mi>g</mi> </msqrt> <msubsup> <mi>H</mi> <mn>0</mn> <mfrac> <mn>3</mn> <mn>2</mn> </mfrac> </msubsup> <mo>=</mo> <mi>k</mi> <mo>(</mo> <msup> <mi>m</mi> <mrow> <mi>m</mi> <mo>-</mo> <mn>1</mn> </mrow> </msup> <msup> <mrow> <mo>(</mo> <mfrac> <mrow> <mn>2</mn> <msqrt> <mi>m</mi> </msqrt> </mrow> <mrow> <mn>1</mn> <mo>+</mo> <mn>2</mn> <mi>m</mi> </mrow> </mfrac> <mo>)</mo> </mrow> <mrow> <msub> <mi>A</mi> <mn>0</mn> </msub> <mo>/</mo> <msub> <mi>A</mi> <mi>m</mi> </msub> </mrow> </msup> <msub> <mi>B</mi> <mn>0</mn> </msub> <msqrt> <mi>g</mi> </msqrt> <msubsup> <mi>H</mi> <mn>0</mn> <mfrac> <mn>3</mn> <mn>2</mn> </mfrac> </msubsup> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
其中,m与断面形状有关,是河道断面形状指数,如矩形断面时,m=1、断面为双曲线型时,m=1.5;断面为三角形时,m=2;
对于矩形河道则m=1,分别代入库区的尺寸参数,A0指坝址处的过水断面面积,Am指库区上游端过水断面面积,A0/Am是库区断面比;k是一个系数,是库区断面比A0/Am的函数,取值见表1;系数坝址未溃决之前初始水深H0对应之坝址处过水断面面积δ是河道断面系数,如为矩形断面,δ就等于断面宽度,则
4.根据权利要求2所述的瞬间溃坝坝址流量过程线的快速预测方法,其特征在于,所述的步骤1.2具体为,
对于矩形库区,计算平顶历时ts,具体计算公式为:
<mrow> <msub> <mi>t</mi> <mi>s</mi> </msub> <mo>=</mo> <mfrac> <mrow> <msub> <mi>L</mi> <mn>0</mn> </msub> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <msup> <mrow> <mo>(</mo> <mfrac> <mrow> <mn>2</mn> <mi>m</mi> </mrow> <mrow> <mn>2</mn> <mi>m</mi> <mo>+</mo> <mn>1</mn> </mrow> </mfrac> <mo>)</mo> </mrow> <mrow> <mn>2</mn> <mi>m</mi> </mrow> </msup> <mo>)</mo> </mrow> </mrow> <mrow> <msup> <mrow> <mo>(</mo> <mfrac> <mn>2</mn> <mrow> <mn>2</mn> <mi>m</mi> <mo>+</mo> <mn>1</mn> </mrow> </mfrac> <mo>)</mo> </mrow> <mrow> <mn>2</mn> <mi>m</mi> <mo>+</mo> <mn>1</mn> </mrow> </msup> <msqrt> <mrow> <msub> <mi>gH</mi> <mn>0</mn> </msub> </mrow> </msqrt> <msup> <mi>m</mi> <mrow> <mn>2</mn> <mi>m</mi> <mo>+</mo> <mn>0.5</mn> </mrow> </msup> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
对于梯形库区,计算峰现时间tp,具体计算公式为:
<mrow> <msub> <mi>t</mi> <mi>p</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>L</mi> <mn>0</mn> </msub> <msqrt> <mrow> <msub> <mi>gH</mi> <mn>0</mn> </msub> </mrow> </msqrt> </mfrac> <mo>+</mo> <mfrac> <msub> <mi>L</mi> <mn>0</mn> </msub> <mrow> <mfrac> <msub> <mi>Q</mi> <mi>p</mi> </msub> <mrow> <msub> <mi>B</mi> <mn>0</mn> </msub> <msub> <mi>H</mi> <mn>0</mn> </msub> </mrow> </mfrac> <mo>+</mo> <msqrt> <mrow> <msub> <mi>gH</mi> <mn>0</mn> </msub> </mrow> </msqrt> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> <mo>.</mo> </mrow>
5.根据权利要求1所述的瞬间溃坝坝址流量过程线的快速预测方法,其特征在于,所述的步骤2具体为,按照公式(4)计算初始流量Q0
<mrow> <msub> <mi>Q</mi> <mn>0</mn> </msub> <mo>=</mo> <msub> <mi>&amp;lambda;B</mi> <mn>0</mn> </msub> <msqrt> <mi>g</mi> </msqrt> <msubsup> <mi>H</mi> <mn>0</mn> <mfrac> <mn>3</mn> <mn>2</mn> </mfrac> </msubsup> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>4</mn> <mo>)</mo> </mrow> <mo>.</mo> </mrow>
6.根据权利要求1所述的瞬间溃坝坝址流量过程线的快速预测方法,其特征在于,所述的步骤3具体为,利用步骤1和步骤2中计算出的Qp和tp,根据不同的时间t选择分段函数计算出相应的坝址流量,得到库区坝址流量过程线,
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>q</mi> <mo>=</mo> <msub> <mi>Q</mi> <mi>p</mi> </msub> </mrow> </mtd> <mtd> <mrow> <mn>0</mn> <mo>&amp;le;</mo> <mi>t</mi> <mo>&lt;</mo> <msub> <mi>t</mi> <mi>s</mi> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>q</mi> <mo>=</mo> <msup> <mrow> <mo>(</mo> <mfrac> <mrow> <mo>(</mo> <mi>n</mi> <mo>-</mo> <mn>1.5</mn> <mo>)</mo> <msup> <mrow> <mo>(</mo> <mi>&amp;lambda;</mi> <msqrt> <mi>g</mi> </msqrt> <msub> <mi>B</mi> <mn>0</mn> </msub> <mo>)</mo> </mrow> <mfrac> <mi>n</mi> <mn>1.5</mn> </mfrac> </msup> <msubsup> <mi>H</mi> <mn>0</mn> <mi>n</mi> </msubsup> </mrow> <mrow> <msub> <mi>nW</mi> <mn>0</mn> </msub> </mrow> </mfrac> <mo>(</mo> <mrow> <msub> <mi>t</mi> <mi>s</mi> </msub> <mo>-</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>+</mo> <msubsup> <mi>Q</mi> <mi>p</mi> <mfrac> <mrow> <mi>n</mi> <mo>-</mo> <mn>1.5</mn> </mrow> <mn>1.5</mn> </mfrac> </msubsup> <mo>)</mo> </mrow> <mfrac> <mn>1.5</mn> <mrow> <mi>n</mi> <mo>-</mo> <mn>1.5</mn> </mrow> </mfrac> </msup> </mrow> </mtd> <mtd> <mrow> <msub> <mi>t</mi> <mi>s</mi> </msub> <mo>&amp;le;</mo> <mi>t</mi> <mo>&amp;le;</mo> <msub> <mi>t</mi> <mi>e</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>q</mi> <mo>=</mo> <msub> <mi>Q</mi> <mn>0</mn> </msub> </mrow> </mtd> <mtd> <mrow> <mi>t</mi> <mo>=</mo> <mn>0</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>q</mi> <mo>=</mo> <msub> <mi>Q</mi> <mi>p</mi> </msub> </mrow> </mtd> <mtd> <mrow> <mi>t</mi> <mo>=</mo> <msub> <mi>t</mi> <mi>p</mi> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>q</mi> <mo>=</mo> <msup> <mrow> <mo>(</mo> <mfrac> <mrow> <mo>(</mo> <mi>n</mi> <mo>-</mo> <mn>1.5</mn> <mo>)</mo> <msup> <mrow> <mo>(</mo> <mi>&amp;lambda;</mi> <msqrt> <mi>g</mi> </msqrt> <msub> <mi>B</mi> <mn>0</mn> </msub> <mo>)</mo> </mrow> <mfrac> <mi>n</mi> <mn>1.5</mn> </mfrac> </msup> <msubsup> <mi>H</mi> <mn>0</mn> <mi>n</mi> </msubsup> </mrow> <mrow> <msub> <mi>nW</mi> <mn>0</mn> </msub> </mrow> </mfrac> <mo>(</mo> <mrow> <msub> <mi>t</mi> <mi>p</mi> </msub> <mo>-</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>+</mo> <msubsup> <mi>Q</mi> <mi>p</mi> <mfrac> <mrow> <mi>n</mi> <mo>-</mo> <mn>1.5</mn> </mrow> <mn>1.5</mn> </mfrac> </msubsup> <mo>)</mo> </mrow> <mfrac> <mn>1.5</mn> <mrow> <mi>n</mi> <mo>-</mo> <mn>1.5</mn> </mrow> </mfrac> </msup> </mrow> </mtd> <mtd> <mrow> <msub> <mi>t</mi> <mi>p</mi> </msub> <mo>&amp;le;</mo> <mi>t</mi> <mo>&amp;le;</mo> <msub> <mi>t</mi> <mi>e</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow>
其中,库区的初始水量W0
m——河道断面形状指数;n——指数,平底河道n=m;
δ——河道断面系数;
L0——库区水面长度,m;
H0——坝址处蓄水深,m;
B0——坝址断面过流宽度,m;
Q0——溃坝瞬间形成的初始流量,仅针对梯形库区,m3/s;
Qp——峰值流量,m3/s;
q——坝址流量,m3/s;
ts——流量过程线平顶历时,s;
tp——峰值流量出现时间,s;
te——库区泄空时间,s;
t——时间,s;
λ——系数;
W0——库区的初始水量,m3
A0——坝址处的过水断面面积,m2
Am——库区上游端过水断面面积,m2
k——系数,是库区断面比A0/Am的函数;
A——过水断面面积,m2
CN201711193202.2A 2017-11-24 2017-11-24 一种瞬间溃坝坝址流量过程线的快速预测方法 Active CN108038273B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711193202.2A CN108038273B (zh) 2017-11-24 2017-11-24 一种瞬间溃坝坝址流量过程线的快速预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711193202.2A CN108038273B (zh) 2017-11-24 2017-11-24 一种瞬间溃坝坝址流量过程线的快速预测方法

Publications (2)

Publication Number Publication Date
CN108038273A true CN108038273A (zh) 2018-05-15
CN108038273B CN108038273B (zh) 2021-12-21

Family

ID=62093436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711193202.2A Active CN108038273B (zh) 2017-11-24 2017-11-24 一种瞬间溃坝坝址流量过程线的快速预测方法

Country Status (1)

Country Link
CN (1) CN108038273B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685312A (zh) * 2018-11-19 2019-04-26 西安理工大学 一种流域次降雨事件下淤地坝系失效风险评价方法
CN112749475A (zh) * 2020-11-10 2021-05-04 中国电力建设股份有限公司 一种确定梯级水库群连续溃坝风险分析方法
CN112967476A (zh) * 2021-04-09 2021-06-15 黑龙江文图测绘地理信息有限责任公司 一种基于双曲分流模型的洪水预报系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105740607A (zh) * 2016-01-25 2016-07-06 河海大学 一种溃坝洪水致生命损失的计算方法
CN106548012A (zh) * 2016-10-17 2017-03-29 河海大学 一种通过流量过程线估算流域平均自由水蓄水容量的方法
CN106599476A (zh) * 2016-12-15 2017-04-26 长江水利委员会长江科学院 岩体二维细观时效破裂幂函数型模型
CN106647831A (zh) * 2016-10-20 2017-05-10 西安理工大学 一种控制地下水位平衡的试验装置及其控制方法
CN107016185A (zh) * 2017-03-31 2017-08-04 中国地质科学院探矿工艺研究所 一种冰碛湖溃决洪水峰值流量预测的计算方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105740607A (zh) * 2016-01-25 2016-07-06 河海大学 一种溃坝洪水致生命损失的计算方法
CN106548012A (zh) * 2016-10-17 2017-03-29 河海大学 一种通过流量过程线估算流域平均自由水蓄水容量的方法
CN106647831A (zh) * 2016-10-20 2017-05-10 西安理工大学 一种控制地下水位平衡的试验装置及其控制方法
CN106599476A (zh) * 2016-12-15 2017-04-26 长江水利委员会长江科学院 岩体二维细观时效破裂幂函数型模型
CN107016185A (zh) * 2017-03-31 2017-08-04 中国地质科学院探矿工艺研究所 一种冰碛湖溃决洪水峰值流量预测的计算方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
JIA-QIAN LUO 等: "Life Loss Evaluation of Dam Failure Based on VOF Method", 《 2009 3RD INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING》 *
李涛: "极端干旱区成龄葡萄深层坑渗灌试验研究与应用", 《中国优秀硕士学位论文全文数据库(农业科技辑)》 *
谢任之: "《溃坝水力学》", 30 May 1993 *
魏勇 等: "溃坝水流计算方法研究", 《金属矿山》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685312A (zh) * 2018-11-19 2019-04-26 西安理工大学 一种流域次降雨事件下淤地坝系失效风险评价方法
CN109685312B (zh) * 2018-11-19 2023-09-29 西安理工大学 一种流域次降雨事件下淤地坝系失效风险评价方法
CN112749475A (zh) * 2020-11-10 2021-05-04 中国电力建设股份有限公司 一种确定梯级水库群连续溃坝风险分析方法
CN112749475B (zh) * 2020-11-10 2024-03-26 中国电力建设股份有限公司 一种确定梯级水库群连续溃坝风险分析方法
CN112967476A (zh) * 2021-04-09 2021-06-15 黑龙江文图测绘地理信息有限责任公司 一种基于双曲分流模型的洪水预报系统

Also Published As

Publication number Publication date
CN108038273B (zh) 2021-12-21

Similar Documents

Publication Publication Date Title
CN108038273B (zh) 一种瞬间溃坝坝址流量过程线的快速预测方法
Shahheydari et al. Discharge coefficient and energy dissipation over stepped spillway under skimming flow regime
Toso et al. Extreme pressures in hydraulic-jump stilling basins
Bijankhan et al. Dimensional analysis and stage-discharge relationship for weirs: a review
CN110263453B (zh) 一种自适应的堰塞湖逐渐溃耦合预测模型的建模方法
CN105353620A (zh) 一种基于地表水深信息的地面灌溉控制方法
Madadi et al. Improving the pressurized flushing efficiency in reservoirs: an experimental study
CN111581828B (zh) 一种感潮河段闸下水位流量关系的计算方法
CN108256780A (zh) 一种基于迭代库区回水计算的梯级水库防洪调度计算方法
CN106910248B (zh) 一种尾矿坝洪水漫顶溃坝事故的情景构建方法
CN105716998B (zh) 一种混凝土裂缝化学灌浆浆液扩散半径的计算方法
CN107167188B (zh) 一种应用于矩形明渠流量计量的方法
CN104120690A (zh) 拦河闸下游一级消力池尾坎高度计算方法
CN107090809B (zh) 一种低水头水闸下游消力池建造方法
CN103866846B (zh) 初期雨水分离方法
Machiels et al. Large scale experimental study of piano key weirs
CN110984088A (zh) 一种竖直消力井消能率的实验计算方法
Zanje et al. CFD modeling of storm sewer geysers in partially filled dropshafts
CN108843478B (zh) 一种水轮机转轮叶片卡门涡共振修型的方法
Munta et al. Study of the inception length of flow over stepped spillway models
CN108385603B (zh) 掺气水流窄缝消能工水力模型试验装置及方法
Zhang et al. Numerical simulation of the hydraulic performances and flow pattern of swallow-tailed flip bucket
Abdul-Mehdi et al. A laboratory study attempt of flow and energy dissipation in stepped spillways
CN206512668U (zh) 一种水工模型试验稳定水流的过渡装置
Ulfiana et al. Model test variations of baffled block installation pattern in energy dissipator USBR type III for reduce flow energy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant