CN108019735A - A kind of double reheat power generation sets steam blowing out by pressure reduction system and method - Google Patents

A kind of double reheat power generation sets steam blowing out by pressure reduction system and method Download PDF

Info

Publication number
CN108019735A
CN108019735A CN201711406704.9A CN201711406704A CN108019735A CN 108019735 A CN108019735 A CN 108019735A CN 201711406704 A CN201711406704 A CN 201711406704A CN 108019735 A CN108019735 A CN 108019735A
Authority
CN
China
Prior art keywords
blowpipe
steam
power generation
superheater
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711406704.9A
Other languages
Chinese (zh)
Other versions
CN108019735B (en
Inventor
部俊锋
顾峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongshi Yitong Group Co Ltd
Original Assignee
Shandong Zhongshi Yitong Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongshi Yitong Group Co Ltd filed Critical Shandong Zhongshi Yitong Group Co Ltd
Priority to CN201711406704.9A priority Critical patent/CN108019735B/en
Publication of CN108019735A publication Critical patent/CN108019735A/en
Application granted granted Critical
Publication of CN108019735B publication Critical patent/CN108019735B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/48Devices for removing water, salt, or sludge from boilers; Arrangements of cleaning apparatus in boilers; Combinations thereof with boilers
    • F22B37/486Devices for removing water, salt, or sludge from boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J3/00Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
    • F23J3/02Cleaning furnace tubes; Cleaning flues or chimneys
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G9/00Cleaning by flushing or washing, e.g. with chemical solvents

Abstract

The invention discloses a kind of double reheat power generation sets steam blowing out by pressure reduction system and method, superheater, high pressure turbine by and single reheat device are considered as one, it is equal to the superheater of single reheat unit, secondary reheater is equal to the reheater part of single reheat unit;Blowpipe, which faces, to be blown door and is arranged on single reheat device outlet port, carries out blowpipe in two stages, first stage string blows superheater, single reheat device system and pipeline;Second stage string blows superheater, single reheat device, secondary reheater system and pipeline.Beneficial effect of the present invention:Double reheat power generation sets single reheat device water capacity is 3 times of superheater or so, the amount of stored heat of boiler when the program substantially increases blowpipe, even exceed with amount of stored heat during capacity drum boiler blowpipe, steam parameter during blowpipe can be greatly reduced, avoid facing and blow the puckery generation of badge.

Description

A kind of double reheat power generation sets steam blowing out by pressure reduction system and method
Technical field
The invention belongs to double reheat power generation sets steam-line blowing technical field, more particularly to a kind of decompression of double reheat power generation sets to steam Vapour blow pipe system and method.
Background technology
Double reheat power generation sets are low with generating efficiency high (improving 2% or so), coal consumption for power generation compared with single reheat unit The advantages of (reducing 10g/kwh or so), represent the clean efficient developing direction of coal unit.With more in recent years large capacities The operation of double reheat power generation sets, indicate China coal electric construction set comprehensively into ultra supercritical double reheat power generation sets head the list of signers when Generation.
The Construction Practice of double reheat power generation sets shows that it is different from the structure of the steam superheating section of single reheat unit, really The real workload and difficulty that bigger is brought to engineering construction, this can just be embodied during the steam-line blowing conscientiously.
Due to《Thermal power generation construction project unit steam-line blowing directive/guide》It is secondary not towards the specification of double reheat power generation sets The blowpipe principle that reheating embrittlement is both referred to single reheat unit in directive/guide carries out blowpipe, voltage stabilizing method, voltage drop method both of which Respectively there is application.The features such as condition that is needed to have due to voltage stabilizing method blowpipe is more, blowpipe operating mode is unmanageable, use it is less, Most of project, which all employs, implements relatively simple decompression blowpipe method.
The double reheat power generation sets of existing voltage drop method steam-line blowing, it faces the setting position for blowing door and single reheat unit phase Together, superheater outlet is all provided in, has summed up two kinds of embodiments.
A kind of scheme is " three-stage process ":I.e. the first stage singly blows superheater until qualification of practicing shooting, second stage string blow over heat Device and single reheat device are until qualification of practicing shooting, phase III string blow superheater, single reheat device and secondary reheater, until practicing shooting It is qualified.This scheme eliminates the making and installation of granulating device, but the start and stop of boiler and target practice number are more, and the blowpipe duration is longer.
Another scheme is " two-stage method ":I.e. the first stage singly blows superheater until qualification of practicing shooting, second stage string are blown over Hot device and whole reheaters (installing granulating device additional between double reheating device), until it is qualified to practice shooting.Double reheating device is considered as by this scheme One, it is similar with " two-stage method " decompression blowpipe scheme of single reheat unit, but need to make and install bigbore granulating device.
From blowpipe put into practice, either " two-stage method " still " three-stage process ", using the steam parameter calculated (in theory Amplified in value) blowpipe when, all there is the situation that superheater pipe-blowing coefficient does not reach 1.4 far, therefore, it has to significantly carry High parameter;And the raising of parameter can give to face and blow door and bring great challenge, usually occur because face blow badge it is puckery interrupt blowpipe Situation, so as to cause the extension of blowpipe duration.
The content of the invention
The present invention is to solve the above-mentioned problems, it is proposed that a kind of double reheat power generation sets steam blowing out by pressure reduction system and method, Superheater, high pressure turbine by and single reheat device are considered as one, are equal to the superheater of single reheat unit, by it is secondary again Hot device is equal to the reheater part of single reheat unit;Blowpipe, which faces, to be blown door and is arranged on single reheat device outlet port, is divided to two Stage carries out blowpipe, and first stage string blows superheater, single reheat device system and pipeline;Second stage string blows superheater, once Reheater, secondary reheater system and pipeline.
To achieve these goals, the present invention adopts the following technical scheme that:
The invention discloses a kind of double reheat power generation sets steam blowing out by pressure reduction system, include the blow pipe system in two stages:
The blow pipe system of first stage includes:Sequentially connected superheater system, single reheat device system, target plate and noise reduction Device, sets to face and blows door in the exit of the single reheat device system;High pressure turbine by pipeline is kept to be in breakthrough status all the time; The inlet of the single reheat device system is removably installed by granulating device.
Steam flow during first stage blowpipe is:Separator come vapour → superheater system → main steam line and High pressure turbine by pipeline → granulating device → single reheat device system →, which faces, blows door → target plate → muffler → row's air.
The blow pipe system of second stage includes:Sequentially connected superheater system, single reheat device system, secondary reheater System, target plate and muffler, set to face and blow door in the exit of the single reheat device system;Keep high pressure turbine by pipeline all the time In breakthrough status.
Steam flow during second stage blowpipe is:Separator come vapour → superheater system → main steam line and High pressure turbine by pipeline → single reheat device system →, which faces, blows door → secondary reheater system → target plate → muffler → row's air.
The invention discloses a kind of double reheat power generation sets steam blowing out by pressure reduction method, comprise the following steps:
(1) boiler cold-state water rinses;
(2) the hot flushing of ignition of the boiler;
(3) first stage examination blowpipe:Slowly boost by boiler startup curve, when steam pressure rises to setting pressure, point It Da Kai not face to blow and carry out examination blowpipe;According to the pipe-blowing coefficient of superheater system during examination blowpipe, formal blowpipe steam parameter is determined;
(4) first stage formal blowpipe:When steam pressure rises to formal blowpipe steam pressure, opening, which is faced, is blowing a progress just Formula blowpipe;
(5) after the formal blowpipe setting frequency, blowing out;
(6) repeat step (3)-(5), until it is qualified to practice shooting, first stage blowpipe terminates;
(7) blow pipe system by system reconfiguration for second stage;
(8) second stage examination blowpipe:Slowly boost by boiler startup curve, when steam pressure rises to setting pressure, point It Da Kai not face to blow and carry out examination blowpipe;According to the pipe-blowing coefficient of secondary reheater system during examination blowpipe, formal blowpipe steam is determined Parameter;
(9) the formal blowpipe of second stage:When steam pressure rises to formal blowpipe steam pressure, opening, which is faced, is blowing a progress just Formula blowpipe;
(10) after the formal blowpipe setting frequency, blowing out;
(11) repeat step (8)-(10), until it is qualified to practice shooting, second stage blowpipe terminates.
Further, first stage blowpipe flow is:Separator comes vapour → superheater system → main steam line and height Pressure bypass duct → granulating device → single reheat device system →, which faces, blows door → target plate → muffler → row's air.
Further, second stage blowpipe flow is:Separator comes vapour → superheater system → main steam line and height Pressure bypass duct → single reheat device system →, which faces, blows door → secondary reheater system → target plate → muffler → row's air.
Beneficial effect of the present invention:
1st, double reheat power generation sets single reheat device water capacity is 3 times of superheater or so, and the program, which substantially increases, blows The amount of stored heat of boiler during pipe, or even exceeded with amount of stored heat during capacity drum boiler blowpipe, steaming during blowpipe can be greatly reduced Vapour parameter, avoids facing and blows the puckery generation of badge.
2nd, high pressure turbine by pipeline and major steam line purge at the same time, eliminate high pressure turbine by purging temporary system, save Material and installation fee;The resistance after superheater is reduced at the same time, helps to improve superheater pipe-blowing coefficient.
3rd, when second stage string blows superheater, single reheat device and secondary reheater, Boiler Steam parameter should be controlled two Below secondary reheater running parameter, avoid under existing blowpipe mode, the situation of Boiler Steam whole process high parameter, had both reduced and faced The infringement of door is blown, can also greatly save resource and duration.
4th, due to facing the outlet port blown door and be arranged on single reheat device, single reheat device exists steam all the time during blowpipe Vapour, avoids the dry combustion method of single reheat device, protects reheater.
5th, granulating device is removably mounted at the entry position of single reheat device system, therefore only needs small-bore collection Grain device, saves material and process.
6th, single reheat device safety door verifying work can also be arranged in tube blowing stage, and providing safer band for the whole series startup bears Lotus condition.
Brief description of the drawings
Fig. 1 is depressured blowpipe first stage system for double reheat power generation sets and arranges schematic diagram;
Fig. 2 is depressured blowpipe second stage system for double reheat power generation sets and arranges schematic diagram.
Embodiment
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings.
In terms of the boiler structure of double reheat power generation sets, due to adding level-one reheater, the heating surface of superheater reduces More than half, therefore the amount of stored heat of superheater is also greatly reduced.Such consequence is that the steam that boiler heat storage produces is overcoming Face after blowing a consumption opened, it cannot be guaranteed that pipe-blowing coefficient is more than 1.4 requirement.To ensure that pipe-blowing coefficient is qualified, only Greatly improve steam parameter.
In terms of the design parameter of double reheat power generation sets single reheat device, the steam of boiler when its operating pressure is all higher than blowpipe Pressure, this is different from the situation of the steam pressure of boiler when single reheat unit reheater operating pressure is less than blowpipe.
Two point analysis based on more than, the present invention propose the new system and method for double reheat power generation sets voltage drop method blowpipe.
It is mainly characterized by the design of blowpipe temporary system:Done 1. changing and will face to blow door and be arranged on the routine of superheater outlet Method, will face and blows door and be arranged on the outlet of single reheat device, 2. remove high pressure turbine by valve core, high pressure turbine by pipeline is in during blowpipe Breakthrough status, regards it as a part for main steam line, 3. granulating device is installed additional in single reheat device inlet, to collect reheater Impurity in preceding jet chimney, and selected a good opportunity according to impurity collecting amount and remove granulating device.
Blowpipe temporary system includes the main blowpipe flow of two-way:
System such as Fig. 1 all the way, for purging superheater, high pressure turbine by, single reheat device and its jet chimney.Steam flow It is:Separator carrys out vapour → superheater system → main steam line (pipeline containing high pressure turbine by) → granulating device → single reheat device system → face and blow door → target plate device → muffler → row's air.
Two tunnel system such as Fig. 2, for purging secondary reheater and its jet chimney.Steam flow is:Separator come vapour → Superheater system → main steam line (pipeline containing high pressure turbine by) → single reheat device system → faces and blows door → secondary reheater system System → target plate device → muffler → row's air.
Other are identical with Normal practice without the blowpipe of the branch system of target practice.
The method of blowpipe:Steam-line blowing is carried out using two benches voltage drop method, first blows system all the way, after qualification of practicing shooting, blowpipe System reconfiguration is two tunnel systems, then purges two tunnel systems until qualification of practicing shooting.
The key step of blowpipe:
1.1 boiler cold-state water rinse:First opened water rinses, during device entrance water quality Fe 500 μ g/L of < to be separated, stove Water Sproading To condenser, input precision processing system carries out closed-up water flushing, until separator water quality reaches 100 μ g/L of Fe <, cold conditions is rinsed Terminate.
The hot flushing of 1.2 ignitions of the boiler:Ignition of the boiler heating furnace water, control water-cooling wall outlet temperature are not more than 190 DEG C, lead to The mode arranged and be combined with precision processing filtering is crossed outside activation system, progressively purification furnace water water quality, as 50 μ g/ of separator water quality Fe < L is hot to rinse qualification.
1.3 first stage tried blowpipe:Slowly boost by boiler startup curve, when steam pressure rises to 2MPa, opening is faced Blow progress examination blowpipe for the first time.Check expansion, suspension and support stressing conditions and the temporary facility of jet chimney, can meet further After the requirement for rising parameter, boiler continues to boost, and respectively in 4MPa, 6MPa, carries out examination blowpipe.According to superheater during examination blowpipe Pipe-blowing coefficient, determines formal blowpipe steam parameter (generally 7-8MPa, 400 DEG C or so).
1.4 first stage formal blowpipe
1.4.1 boiler boost, when steam pressure rises to formal blowpipe steam pressure, opening face blow door to system all the way into The formal blowpipe of row.Keep being no more than the blowpipe frequency of 4 times per hour, after formal blowpipe 30 times or so, blowing out.Blowing out cooling time 12 it is small when more than, during blowing out to participate in blow pipe system carry out comprehensively check and defect elimination, granulating device is cleared up.
1.4.2 boiler is lighted a fire again, the blowpipe step of 1.3 and 1.4.1 of repetition, after formal blowpipe 30 times or so, is stopped again Furnace cooling but 12 it is small when more than.Arrange once to practice shooting before blowing out, the cleannes for system of blowing are checked, in favor of the peace of next blowpipe Row.Granulating device is cleared up during blowing out, if relatively cleaner, granulating device can be removed between this shutdown period, to reduce system Resistance;Also removed again after first stage blowpipe qualification being remained.
1.4.3 boiler is lighted a fire again, repeats the blowpipe step of 1.3 and 1.4.1, until it is qualified to practice shooting, first stage blowpipe Terminate.
Blow pipe system reconfiguration is two tunnel system connection modes by 1.5.
1.6 second stage try blowpipe:Slowly boost by boiler startup curve, when steam pressure rises to 1MPa, opening is faced Blow progress examination blowpipe for the first time.Check expansion, suspension and support stressing conditions and the temporary facility of jet chimney, after all going well, Boiler continues to boost, and respectively in 1.5MPa, 2MPa, carries out examination blowpipe.According to examination blowpipe when secondary reheater pipe-blowing coefficient, Determine formal blowpipe steam parameter (generally 3MPa, 400 DEG C or so).
The formal blowpipe of 1.7 second stage
1.7.1 boiler boost, when steam pressure rises to formal blowpipe steam pressure, opening face blow bis- tunnel systems of Men Dui into The formal blowpipe of row.Control boiler combustion, keep being no more than per hour the blowpipe frequency of 4 times, after formal blowpipe 15 times or so, stop Stove.This stage, the method that also voltage stabilizing decompression can be used to combine carried out blowpipe according to unit moisturizing and combustion case.When blowing out cools down Between 12 it is small when more than, during blowing out to participate in blow pipe system carry out comprehensively check and defect elimination.
1.7.2 boiler is lighted a fire again, the blowpipe step of 1.6 and 1.7.1 of repetition, after formal blowpipe 15 times or so, is stopped again Furnace cooling but 12 it is small when more than.Arrange once to practice shooting before blowing out, the cleannes for system of blowing are checked, in favor of the peace of next blowpipe Row.
1.7.3 boiler is lighted a fire again, repeats the blowpipe step of 1.6 and 1.7.1, until it is qualified to practice shooting, second stage blowpipe Terminate.
Although above-mentioned be described the embodiment of the present invention with reference to attached drawing, model not is protected to the present invention The limitation enclosed, those skilled in the art should understand that, on the basis of technical scheme, those skilled in the art are not Need to make the creative labor the various modifications that can be made or deformation still within protection scope of the present invention.

Claims (8)

1. a kind of double reheat power generation sets steam blowing out by pressure reduction system, including sequentially connected superheater system, single reheat device system System, target plate and muffler, it is characterised in that set to face in the exit of the single reheat device system and blow door;Keep by high pressure Road pipeline is in breakthrough status all the time.
A kind of 2. double reheat power generation sets steam blowing out by pressure reduction system as claimed in claim 1, it is characterised in that it is described once The inlet of reheater system is removably installed by granulating device.
3. a kind of double reheat power generation sets steam blowing out by pressure reduction system as claimed in claim 2, it is characterised in that during blowpipe Steam flow be:Separator comes vapour → superheater system → main steam line and high pressure turbine by pipeline → granulating device → once Reheater system → face and blow door → target plate → muffler → row's air.
4. a kind of double reheat power generation sets steam blowing out by pressure reduction system as claimed in claim 1, it is characterised in that carry out second-order During section blowpipe, face increase secondary reheater system between door and target plate of blowing described.
5. a kind of double reheat power generation sets steam blowing out by pressure reduction system as claimed in claim 4, it is characterised in that during blowpipe Steam flow be:Separator comes vapour → superheater system → main steam line and high pressure turbine by pipeline → single reheat device system Unite → face and blow door → secondary reheater system → target plate → muffler → row's air.
A kind of 6. double reheat power generation sets steam blowing out by pressure reduction method, it is characterised in that comprise the following steps:
(1) boiler cold-state water rinses;
(2) the hot flushing of ignition of the boiler;
(3) first stage examination blowpipe:Slowly boost by boiler startup curve, when steam pressure rises to setting pressure, beat respectively Open to face to blow and carry out examination blowpipe;According to the pipe-blowing coefficient of superheater system during examination blowpipe, formal blowpipe steam parameter is determined;
(4) first stage formal blowpipe:When steam pressure rises to formal blowpipe steam pressure, opening, which faces to blow, is formally blown Pipe;
(5) after the formal blowpipe setting frequency, blowing out;
(6) repeat step (3)-(5), until it is qualified to practice shooting, first stage blowpipe terminates;
(7) system by system reconfiguration for second stage blowpipe;
(8) second stage examination blowpipe:Slowly boost by boiler startup curve, when steam pressure rises to setting pressure, beat respectively Open to face to blow and carry out examination blowpipe;According to the pipe-blowing coefficient of secondary reheater system during examination blowpipe, formal blowpipe steam parameter is determined;
(9) the formal blowpipe of second stage:When steam pressure rises to formal blowpipe steam pressure, opening, which faces to blow, is formally blown Pipe;
(10) after the formal blowpipe setting frequency, blowing out;
(11) repeat step (8)-(10), until it is qualified to practice shooting, second stage blowpipe terminates.
7. a kind of double reheat power generation sets steam blowing out by pressure reduction method as claimed in claim 6, it is characterised in that the first stage blows Pipe flow is:Separator comes vapour → superheater system → main steam line and high pressure turbine by pipeline → granulating device → single reheat Device system → face and blow door → target plate → muffler → row's air.
8. a kind of double reheat power generation sets steam blowing out by pressure reduction method as claimed in claim 6, it is characterised in that second stage is blown Pipe flow is:Separator come vapour → superheater system → main steam line and high pressure turbine by pipeline → single reheat device system → Face and blow door → secondary reheater system → target plate → muffler → row's air.
CN201711406704.9A 2017-12-22 2017-12-22 Pressure-reducing steam blowpipe system and method for secondary reheating unit Active CN108019735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711406704.9A CN108019735B (en) 2017-12-22 2017-12-22 Pressure-reducing steam blowpipe system and method for secondary reheating unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711406704.9A CN108019735B (en) 2017-12-22 2017-12-22 Pressure-reducing steam blowpipe system and method for secondary reheating unit

Publications (2)

Publication Number Publication Date
CN108019735A true CN108019735A (en) 2018-05-11
CN108019735B CN108019735B (en) 2023-08-18

Family

ID=62074427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711406704.9A Active CN108019735B (en) 2017-12-22 2017-12-22 Pressure-reducing steam blowpipe system and method for secondary reheating unit

Country Status (1)

Country Link
CN (1) CN108019735B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112146079A (en) * 2020-09-22 2020-12-29 山东中实易通集团有限公司 Supercritical unit pressure reduction blowing pipe system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200417591Y1 (en) * 2006-03-13 2006-06-02 한국전력공사 Air blowing system for performing chemical cleaning process of steam touched boilers in thermal power plant
CN204006045U (en) * 2014-07-23 2014-12-10 山东中实易通集团有限公司 Thermal power plant's double reheat boiler one-phase step-down in parallel blow tube construction
CN105157047A (en) * 2015-09-07 2015-12-16 广东电网有限责任公司电力科学研究院 Method and system for debugging boiler of 1045MW ultra-supercritical coal-fired unit through pipe purging
CN105972623A (en) * 2016-06-29 2016-09-28 西安热工研究院有限公司 1000WM-level secondary reheating power station and boiler series-connection method three-stage blowpipe structure
CN205717266U (en) * 2016-06-29 2016-11-23 西安热工研究院有限公司 A kind of double reheat station boiler series process three stage blow tube construction of 1000WM grade

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200417591Y1 (en) * 2006-03-13 2006-06-02 한국전력공사 Air blowing system for performing chemical cleaning process of steam touched boilers in thermal power plant
CN204006045U (en) * 2014-07-23 2014-12-10 山东中实易通集团有限公司 Thermal power plant's double reheat boiler one-phase step-down in parallel blow tube construction
CN105157047A (en) * 2015-09-07 2015-12-16 广东电网有限责任公司电力科学研究院 Method and system for debugging boiler of 1045MW ultra-supercritical coal-fired unit through pipe purging
CN105972623A (en) * 2016-06-29 2016-09-28 西安热工研究院有限公司 1000WM-level secondary reheating power station and boiler series-connection method three-stage blowpipe structure
CN205717266U (en) * 2016-06-29 2016-11-23 西安热工研究院有限公司 A kind of double reheat station boiler series process three stage blow tube construction of 1000WM grade

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112146079A (en) * 2020-09-22 2020-12-29 山东中实易通集团有限公司 Supercritical unit pressure reduction blowing pipe system and method
CN112146079B (en) * 2020-09-22 2022-12-09 山东中实易通集团有限公司 Supercritical unit pressure reduction blowpipe system and method

Also Published As

Publication number Publication date
CN108019735B (en) 2023-08-18

Similar Documents

Publication Publication Date Title
CN105157007B (en) Steam pipe washing method for 1000MW ultra-supercritial double reheat boiler
CN107120149B (en) The method and system of newly-built supercritical unit is debugged using external activated vapor
US9435228B2 (en) Air cooling system and method for a heat recovery steam generator inlet
CN101846311A (en) The system and method for preheating heat recovery steam generator and the jet chimney that is associated
CN105157047A (en) Method and system for debugging boiler of 1045MW ultra-supercritical coal-fired unit through pipe purging
CN102901081A (en) Double-flue double-reheat DC (Direct Current) boiler with overall horizontal arrangement on heating surface in boiler
CN101713334A (en) Peak load management by combined cycle power augmentation using peaking cycle exhaust heat recovery
CN107597747A (en) A kind of low discharge long range Liang Luyiji sweeping steam pipelines mechanism and blowing method
CN108019735A (en) A kind of double reheat power generation sets steam blowing out by pressure reduction system and method
CN112325267B (en) Pressure-stabilizing steam blowing pipe system and method for double reheat boiler
CN113503532A (en) Boiler blow pipe method for preventing overtemperature of platen superheater
CN207865358U (en) A kind of double reheat power generation sets steam blowing out by pressure reduction system
CN104132552B (en) A kind of method utilizing converter waste heat steam utilization system to carry out UTILIZATION OF VESIDUAL HEAT IN
CN204986958U (en) Double reheat unit washing pipe system
CN210069816U (en) Power plant boiler high temperature steam pipeline cinder sweeps structure
CN106524200A (en) Steam extraction regenerative heating type stable-pressure pipe blowing system of generator set
CN217604068U (en) Adjacent machine heating thermal state flushing system of boiler
CN208146590U (en) The blowpipe temporary system of three discard heat boilers
CN205717266U (en) A kind of double reheat station boiler series process three stage blow tube construction of 1000WM grade
CN112146079B (en) Supercritical unit pressure reduction blowpipe system and method
CN104832899B (en) A kind of Water pipe heating pipe afterheat boiler system being built on sintering machine flue
CN108072026A (en) A kind of Novel supercritical direct current three-pressure reheat waste heat boiler
CN204142064U (en) A kind of flue gas heat-exchange unit
CN105972623A (en) 1000WM-level secondary reheating power station and boiler series-connection method three-stage blowpipe structure
JPH10331607A (en) Exhaust heat recovery boiler blowing device and a boiler blowing-out method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant