Toolbox for aerial work crane
Technical Field
The invention relates to an auxiliary tool box for construction, in particular to a tool box for an aerial work lifting frame.
Background
The high-place work is a work performed by a person at a high place with reference to a certain position. The national standard GB/T3608-2008 high place operation grading stipulation: "work at a high place where there is a possibility of falling at a height of 2m or more (including 2m) from the falling height reference surface is called high place work. "according to this definition, the range of work at high altitudes is fairly broad in the construction industry. When the operation is performed in a building, the operation is performed on a frame with the length of more than 2m, namely the high-altitude operation.
When the high-altitude operation is carried out, certain tools need to be carried for operation, the tool box used on the traditional ground cannot be effectively adapted to the special environment of the high-altitude operation, the carrying is difficult, the tools are used more complexly, and the using effect is poor, so that the tool box for the high-altitude operation lifting frame, which can deal with the high-altitude operation environment, is convenient to carry and is convenient for the tools to be used, needs to be researched and developed urgently.
Disclosure of Invention
(1) Technical problem to be solved
The invention aims to overcome the defects of difficult carrying, complex tool taking and poor using effect of the traditional tool box, and the technical problem to be solved is to provide the tool box for the aerial work lifting frame, which is convenient to carry and use and can deal with the aerial work environment.
(2) Technical scheme
In order to solve the technical problem, the invention provides the tool box for the aerial work lifting frame, which comprises a tool box, wheels, a lifting mechanism and an opening and closing mechanism, wherein the wheels are arranged at the bottom of the tool box, the lifting mechanism is arranged in the tool box, and the opening and closing mechanism is arranged on a moving part of the lifting mechanism.
Preferably, elevating system is including slide rail, slider, first spring, connecting rod and cylinder, and the inside left and right sides lateral wall symmetry of toolbox is equipped with the slide rail, and the gliding style is equipped with the slider on the slide rail, is connected with first spring between the bottom of slider and toolbox, is connected with the connecting rod between the slider on the left and right sides, and the middle part of connecting rod is equipped with the cylinder.
Preferably, the opening and closing mechanism includes the rotation axis, places a section of thick bamboo, rubber pad, magnet and second spring, and the middle part of cylinder is equipped with the rotation axis, is equipped with two on the rotation axis and places a section of thick bamboo, and the inner wall of placing a section of thick bamboo is equipped with the rubber pad, and the interior diapire of placing a section of thick bamboo is equipped with magnet, and the left and right sides is placed and is connected with the second spring between the section.
Preferably, still including hand mechanism, hand mechanism is equipped with first branch including first branch, first reel, hand pole, first stay wire and second reel, the left side middle part of toolbox, and the left end of first branch is equipped with first reel, is equipped with hand pole on the first reel, and the left side top of toolbox is equipped with the second reel, winds on first reel and the second reel and has first stay wire, and the trailing end connection of first stay wire is on the slider.
Preferably, the tool box further comprises a clamping mechanism, the clamping mechanism comprises a sliding rod, a spring seat, a third spring and a pull ring, positioning holes are symmetrically formed in the left side and the right side of the lower position of the top of the tool box, the sliding rod matched with the positioning holes is arranged in the positioning holes, the spring seat is arranged at one end, away from the tool box, of the sliding rod, the third spring is connected between the spring seat and the tool box, the sliding rod penetrates through the third spring, the pull ring is arranged at one end, away from the tool box, of the spring seat, and a positioning groove matched with the sliding rod.
Preferably, still including fixed establishment, fixed establishment is equipped with the fixed plate including fixed plate, inserted bar and split pin on the right side of toolbox, and it has the fixed orifices to open on the fixed plate, and open on the right side of fixed plate has the through-hole, is equipped with the inserted bar in the through-hole, and the front side of inserted bar is equipped with the jack, is equipped with the split pin in the jack.
Preferably, the device also comprises a brush, and the top of the placing cylinder is provided with the brush.
The working principle is as follows: the tool box is characterized in that an operator stores the tool through the opening and closing mechanism, carries the tool box to an operation position, guides the opening and closing mechanism out of the tool box through the action of the lifting mechanism when the tool needs to be taken out, can take the tool out of the opening and closing mechanism, and can replace the tool into the opening and closing mechanism after the tool is used up to control the opening and closing mechanism and the lifting mechanism to reset.
Because elevating system is including slide rail, slider, first spring, connecting rod and cylinder, the inside left and right sides lateral wall symmetry of toolbox is equipped with the slide rail, and the gliding formula is equipped with the slider on the slide rail, is connected with first spring between the bottom of slider and toolbox, is connected with the connecting rod between the slider on left and right sides, and the middle part of connecting rod is equipped with the cylinder. Pulling connecting rod, connecting rod drive cylinder rebound, and the cylinder rebound can drive the closing mechanism after a locating position and rise to operating position, and first spring is tensile this moment, and after finishing taking the instrument, unclamp the connecting rod, the connecting rod drives the closing mechanism under the effect of first spring and resets, so can reach the effect of taking the instrument.
Because closing mechanism is including the rotation axis, place a section of thick bamboo, rubber pad, magnet and second spring, the middle part of cylinder is equipped with the rotation axis, is equipped with two on the rotation axis and places a section of thick bamboo, and the inner wall of placing a section of thick bamboo is equipped with the rubber pad, and the interior diapire of placing a section of thick bamboo is equipped with magnet, and the left and right sides is placed and is connected with the second spring between the section of thick. Place the instrument that will need to use in placing a section of thick bamboo, place the rubber pad in a section of thick bamboo and can carry out certain protection to the instrument, magnet fixes a position the instrument simultaneously, prevent to rock in placing a section of thick bamboo, after elevating system removed the cylinder to a certain position, drive under the effect of second spring and place a section of thick bamboo bullet and open, it can expand to operating condition to place a section of thick bamboo, when need not use tools, put back the instrument to placing a section of thick bamboo, stir simultaneously and place a section of thick bamboo and make it rotate to same position, it can of resetting through elevating system.
Because still including hand mechanism, hand mechanism is equipped with first branch including first branch, first reel, hand pole, first stay and second reel in the middle part of the left side of toolbox, and the left end of first branch is equipped with first reel, is equipped with hand pole on the first reel, and the left side top of toolbox is equipped with the second reel, winds on first reel and the second reel and has first stay, and the trailing end connection of first stay is on the slider. An operator shakes the hand-operated rod, the hand-operated rod collects the first pull wire through the first winding wheel, meanwhile, the sliding block is pulled to move upwards under the guide of the second winding wheel, the sliding block moves to drive the opening and closing mechanism to move to a construction position, when the opening and closing mechanism needs to be reset, the hand-operated rod is controlled to rotate in the opposite direction, the first winding wheel is enabled to place the first pull wire, the opening and closing mechanism can be reset, manual pushing of the connecting rod for a long time can be avoided, and the using effect of the wire winding device is improved.
Because still including chucking mechanism, chucking mechanism is including the slide bar, the spring holder, third spring and pull ring, the top of toolbox is to the downside position bilateral symmetry division have the locating hole, be equipped with complex slide bar with it in the locating hole, the one end that the toolbox was kept away from to the slide bar is equipped with the spring holder, be connected with the third spring between spring holder and the toolbox, the slide bar passes the third spring, the one end that the toolbox was kept away from to the spring holder is equipped with the pull ring, the one end that the connecting rod was kept away from to the slider is opened there is the constant. After the hand-operated mechanism drives the opening and closing mechanism to ascend to the height of the tool for taking, the slide bar is inserted into the positioning groove, the slide block can be fixed, the long-time control over the hand-operated mechanism is avoided, and when the lifting mechanism needs to reset, the pull ring is pulled to drive the slide bar to be not inserted into the positioning groove.
Because still including fixed establishment, fixed establishment is equipped with the fixed plate including fixed plate, inserted bar and split pin on the right side of toolbox, and it has the fixed orifices to open on the fixed plate, and open on the right side of fixed plate has the through-hole, is equipped with the inserted bar in the through-hole, and the front side of inserted bar is equipped with the jack, is equipped with the split pin in the jack. The fixing hole is sleeved at a fixed position after the fixing device is carried to a working height, the inserting rod is inserted into the through hole, and the cotter pin is inserted into the inserting hole, so that the fixing device can be fixed.
Because the hair brush is also included, the top of the placing cylinder is provided with the hair brush. The hairbrush can clean the placed tools to a certain extent, and the using effect of the cleaning brush is improved.
(3) Advantageous effects
The invention simplifies the tool box by the mutual matching of the lifting mechanism and the opening and closing mechanism, and achieves the effects of coping with the high-altitude operation environment, convenient carrying and convenient tool taking by utilizing the optimization of the hand-operated mechanism and the clamping mechanism.
Drawings
Fig. 1 is a first front view structure diagram of the present invention.
Fig. 2 is a second front view structure diagram of the present invention.
Fig. 3 is a third schematic view of the present invention.
Fig. 4 is a schematic top view of the fixing mechanism of the present invention.
The labels in the figures are: 1-tool box, 2-wheel, 3-lifting mechanism, 31-sliding rail, 32-sliding block, 33-first spring, 34-connecting rod, 35-roller, 4-opening and closing mechanism, 41-rotating shaft, 42-placing barrel, 43-rubber pad, 44-magnet, 45-second spring, 5-hand-operated mechanism, 51-first supporting rod, 52-first reel, 53-hand-operated rod, 54-first pull wire, 55-second reel, 6-clamping mechanism, 61-positioning hole, 62-sliding rod, 63-spring seat, 64-third spring, 65-pull ring, 66-positioning groove, 7-fixing mechanism, 71-fixing plate, 72-fixing hole, 73-through hole, 74-inserting rod, 75-jack, 76-split pin, 8-brush.
Detailed Description
The invention is further described below with reference to the figures and examples.
Example 1
A tool box for an aerial work lifting frame is shown in figures 1-4 and comprises a tool box 1, wheels 2, a lifting mechanism 3 and an opening and closing mechanism 4, wherein the wheels 2 are arranged at the bottom of the tool box 1, the lifting mechanism 3 is arranged in the tool box 1, and the opening and closing mechanism 4 is arranged on a moving part of the lifting mechanism 3.
Example 2
A tool box for an aerial work lifting frame is shown in figures 1-4 and comprises a tool box 1, wheels 2, a lifting mechanism 3 and an opening and closing mechanism 4, wherein the wheels 2 are arranged at the bottom of the tool box 1, the lifting mechanism 3 is arranged in the tool box 1, and the opening and closing mechanism 4 is arranged on a moving part of the lifting mechanism 3.
The lifting mechanism 3 comprises a sliding rail 31, a sliding block 32, a first spring 33, a connecting rod 34 and a roller 35, the sliding rail 31 is symmetrically arranged on the inner left side wall and the inner right side wall of the tool box 1, the sliding block 32 is slidably arranged on the sliding rail 31, the first spring 33 is connected between the sliding block 32 and the bottom of the tool box 1, the connecting rod 34 is connected between the sliding blocks 32 on the left side and the right side, and the roller 35 is arranged in the middle of the connecting rod 34.
Example 3
A tool box for an aerial work lifting frame is shown in figures 1-4 and comprises a tool box 1, wheels 2, a lifting mechanism 3 and an opening and closing mechanism 4, wherein the wheels 2 are arranged at the bottom of the tool box 1, the lifting mechanism 3 is arranged in the tool box 1, and the opening and closing mechanism 4 is arranged on a moving part of the lifting mechanism 3.
The lifting mechanism 3 comprises a sliding rail 31, a sliding block 32, a first spring 33, a connecting rod 34 and a roller 35, the sliding rail 31 is symmetrically arranged on the inner left side wall and the inner right side wall of the tool box 1, the sliding block 32 is slidably arranged on the sliding rail 31, the first spring 33 is connected between the sliding block 32 and the bottom of the tool box 1, the connecting rod 34 is connected between the sliding blocks 32 on the left side and the right side, and the roller 35 is arranged in the middle of the connecting rod 34.
The opening and closing mechanism 4 includes a rotating shaft 41, two placing cylinders 42, a rubber pad 43, a magnet 44 and a second spring 45, the rotating shaft 41 is arranged in the middle of the roller 35, the two placing cylinders 42 are arranged on the rotating shaft 41, the rubber pad 43 is arranged on the inner wall of the placing cylinder 42, the magnet 44 is arranged on the inner bottom wall of the placing cylinder 42, and the second spring 45 is connected between the placing cylinders 42 on the left side and the right side.
Example 4
A tool box for an aerial work lifting frame is shown in figures 1-4 and comprises a tool box 1, wheels 2, a lifting mechanism 3 and an opening and closing mechanism 4, wherein the wheels 2 are arranged at the bottom of the tool box 1, the lifting mechanism 3 is arranged in the tool box 1, and the opening and closing mechanism 4 is arranged on a moving part of the lifting mechanism 3.
The lifting mechanism 3 comprises a sliding rail 31, a sliding block 32, a first spring 33, a connecting rod 34 and a roller 35, the sliding rail 31 is symmetrically arranged on the inner left side wall and the inner right side wall of the tool box 1, the sliding block 32 is slidably arranged on the sliding rail 31, the first spring 33 is connected between the sliding block 32 and the bottom of the tool box 1, the connecting rod 34 is connected between the sliding blocks 32 on the left side and the right side, and the roller 35 is arranged in the middle of the connecting rod 34.
The opening and closing mechanism 4 includes a rotating shaft 41, two placing cylinders 42, a rubber pad 43, a magnet 44 and a second spring 45, the rotating shaft 41 is arranged in the middle of the roller 35, the two placing cylinders 42 are arranged on the rotating shaft 41, the rubber pad 43 is arranged on the inner wall of the placing cylinder 42, the magnet 44 is arranged on the inner bottom wall of the placing cylinder 42, and the second spring 45 is connected between the placing cylinders 42 on the left side and the right side.
Still including hand mechanism 5, hand mechanism 5 is including first branch 51, first reel 52, hand lever 53, first stay wire 54 and second reel 55, the left side middle part of toolbox 1 is equipped with first branch 51, the left end of first branch 51 is equipped with first reel 52, be equipped with hand lever 53 on the first reel 52, the left side top of toolbox 1 is equipped with second reel 55, around having first stay wire 54 on first reel 52 and the second reel 55, the trailing end connection of first stay wire 54 is on slider 32.
The tool box is characterized by further comprising a clamping mechanism 6, the clamping mechanism 6 comprises a sliding rod 62, a spring seat 63, a third spring 64 and a pull ring 65, positioning holes 61 are symmetrically formed in the left side and the right side of the lower position of the top of the tool box 1, a sliding rod 62 matched with the positioning holes 61 is arranged in the positioning holes 61, the spring seat 63 is arranged at one end, away from the tool box 1, of the sliding rod 62, the third spring 64 is connected between the spring seat 63 and the tool box 1, the sliding rod 62 penetrates through the third spring 64, the pull ring 65 is arranged at one end, away from the tool box 1, of the spring seat 63, and a positioning groove 66 matched with the.
The tool box comprises a tool box body 1 and is characterized by further comprising a fixing mechanism 7, wherein the fixing mechanism 7 comprises a fixing plate 71, an inserting rod 74 and a split pin 76, the fixing plate 71 is arranged on the right side of the tool box body 1, a fixing hole 72 is formed in the fixing plate 71, a through hole 73 is formed in the right side of the fixing plate 71, the inserting rod 74 is arranged in the through hole 73, a jack 75 is arranged on the front side of the inserting rod 74, and the split pin 76 is arranged in the jack 75.
Also comprises a brush 8, and the top of the placing cylinder 42 is provided with the brush 8.
The working principle is as follows: the operator stores the tool through the opening and closing mechanism 4, carries the tool to the operation position, when the tool needs to be taken out, the opening and closing mechanism 4 is led out of the tool box 1 through the action of the lifting mechanism 3, the operator can take the tool out of the opening and closing mechanism 4 at the moment, after the tool is used, the tool is put back into the opening and closing mechanism 4 again, and the opening and closing mechanism 4 and the lifting mechanism 3 are controlled to reset.
Because elevating system 3 is including slide rail 31, slider 32, first spring 33, connecting rod 34 and cylinder 35, the interior left and right sides lateral wall symmetry of toolbox 1 is equipped with slide rail 31, and the gliding style is equipped with slider 32 on slide rail 31, is connected with first spring 33 between the bottom of slider 32 and toolbox 1, is connected with connecting rod 34 between the slider 32 on left and right sides, and the middle part of connecting rod 34 is equipped with cylinder 35. Pulling connecting rod 34, connecting rod 34 drive cylinder 35 rebound, and cylinder 35 rebound can drive closing mechanism 4 and rise to operating position after a locating position, and first spring 33 is tensile this moment, and after taking the completion to the instrument, unclamp connecting rod 34, connecting rod 34 drives closing mechanism 4 under the effect of first spring 33 and resets, so can reach the effect of taking the instrument.
Because the opening and closing mechanism 4 includes the rotating shaft 41, the placing cylinders 42, the rubber pads 43, the magnets 44 and the second springs 45, the rotating shaft 41 is provided in the middle of the drum 35, two placing cylinders 42 are provided on the rotating shaft 41, the rubber pads 43 are provided on the inner walls of the placing cylinders 42, the magnets 44 are provided on the inner bottom walls of the placing cylinders 42, and the second springs 45 are connected between the placing cylinders 42 on the left and right sides. Place the instrument that will need to use in placing a section of thick bamboo 42, place the rubber pad 43 in a section of thick bamboo 42 and can carry out certain protection to the instrument, magnet 44 fixes a position the instrument simultaneously, prevent to rock in placing a section of thick bamboo 42, remove a certain position back with cylinder 35 at elevating system 3, drive under the effect of second spring 45 and place a section of thick bamboo 42 and bounce off, it can expand to operating condition to place a section of thick bamboo 42, when need not use the instrument, place a section of thick bamboo 42 with the instrument and place in returning to placing a section of thick bamboo 42, stir simultaneously and place a section of thick bamboo 42 and make it rotate to same position, it can reset through elevating system 3.
Because still including hand mechanism 5, hand mechanism 5 is including first branch 51, first reel 52, hand lever 53, first stay 54 and second reel 55, the left side middle part of toolbox 1 is equipped with first branch 51, the left end of first branch 51 is equipped with first reel 52, be equipped with hand lever 53 on the first reel 52, the left side top of toolbox 1 is equipped with second reel 55, around having first stay 54 on first reel 52 and the second reel 55, the trailing end of first stay 54 is connected on slider 32. An operator shakes the hand lever 53, the hand lever 53 retracts the first pull wire 54 through the first reel 52, meanwhile, the sliding block 32 is pulled to move upwards under the guiding of the second reel 55, the sliding block 32 can move to drive the opening and closing mechanism 4 to move to a construction position, when the opening and closing mechanism 4 needs to be reset, the hand lever 53 is controlled to rotate in the opposite direction, the first pull wire 54 is placed on the first reel 52, the opening and closing mechanism can be reset, manual long-time pushing of the connecting rod 34 can be omitted, and the using effect of the invention is improved.
Because the tool box further comprises the clamping mechanism 6, the clamping mechanism 6 comprises a sliding rod 62, a spring seat 63, a third spring 64 and a pull ring 65, positioning holes 61 are symmetrically formed in the left side and the right side of the lower position of the top of the tool box 1, the sliding rod 62 matched with the positioning holes 61 is arranged in the positioning holes 61, the spring seat 63 is arranged at one end, away from the tool box 1, of the sliding rod 62, the third spring 64 is connected between the spring seat 63 and the tool box 1, the sliding rod 62 penetrates through the third spring 64, the pull ring 65 is arranged at one end, away from the tool box 1, of the spring seat 63, and the positioning groove 66 matched with the sliding rod 62. After the hand-operated mechanism 5 drives the opening and closing mechanism 4 to ascend to the height for taking tools, the sliding rod 62 is inserted into the positioning groove 66 at the moment, so that the sliding block 32 can be fixed, the long-time control over the hand-operated mechanism 5 is avoided, and when the lifting mechanism 3 needs to reset, the pull ring 65 is pulled to drive the sliding rod 62 to be not inserted into the positioning groove 66 any more.
Because the tool box further comprises a fixing mechanism 7, the fixing mechanism 7 comprises a fixing plate 71, an inserting rod 74 and a split pin 76, the fixing plate 71 is arranged on the right side of the tool box 1, a fixing hole 72 is formed in the fixing plate 71, a through hole 73 is formed in the right side of the fixing plate 71, the inserting rod 74 is arranged in the through hole 73, a jack 75 is arranged on the front side of the inserting rod 74, and the split pin 76 is arranged in the jack 75. After the portable multifunctional handheld work apparatus is carried to a work height, the fixing hole 72 is sleeved at a fixed position, the inserting rod 74 is inserted into the through hole 73, the cotter 76 is inserted into the inserting hole 75, and therefore the portable multifunctional handheld work apparatus can be fixed, when the portable multifunctional portable.
Because the hair brush 8 is also included, the top of the placing cylinder 42 is provided with the hair brush 8. The brush 8 can clean the placed tools to a certain extent, and the using effect of the cleaning brush is improved.
The above examples are merely representative of preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, various changes, modifications and substitutions can be made without departing from the spirit of the present invention, and these are all within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.